017716 – CONTRACT CLOSEOUT.pdf

PDF 123 KB Posted

Attached to
Electrical Substation Replacement Project – Equipment Procurement Phase
Solicitation number
US.255952
Issued by
Lehigh County, Pennsylvania

About this file

This is a Contract Closeout specification document for the Lehigh County Authority's Electrical Substation Replacement Project – Equipment Procurement Phase, located at 7676 Industrial Boulevard, Allentown, Pennsylvania, with an effective date of September 15, 2026. The document establishes mandatory closeout procedures and deliverables required for project completion, including three inspection phases (Detailed Inspection upon substantial completion, Final Inspection with written exception lists, and Joint Inspection for Physical Completion to establish the physical completion date). The contractor must maintain two sets of project record documents on-site throughout construction, including contract drawings, project manuals, addenda, change orders, and reviewed shop drawings. Upon project completion, the contractor must create electronic versions of all record documents scanned in TIFF format and delivered on labeled USB flash drives organized by trade. Online sealed bids for this procurement were to be received by Lehigh County Authority via PennBid until 11:00 a.m. on Wednesday, October 28, 2026, with bids remaining open for 60 days following the opening date. Site visits were available on a self-guided basis by scheduling with Charles Volk, P.E., Chief Capital Works Officer.

The contractor must submit two sets of Operation and Maintenance Instructions in bound binders 15 days prior to final inspection, including equipment lists, operating and maintenance procedures, design criteria, and contact information for all subcontractors and suppliers. In-person and video training must be provided to facility personnel on equipment operation and maintenance. Warranty certifications and copies of all warranties must be delivered in a bound binder prior to final payment, with updated submittals required within 10 days for any work delayed beyond Substantial Completion. Spare parts, maintenance materials, and extra materials must be labeled "NOT FOR WARRANTY REPAIRS" and delivered to the site with a signed receipt. The contractor must furnish names, business addresses, and telephone numbers of authorized service organizations. All applications for progress payments require current record documents; final payment approval is contingent upon delivery of project record documents, Operation and Maintenance data, warranty certifications, and spare parts to the Authority's Representative. Bid security of 10 percent of the bid total is required in the form of a certified check, bank check, or bid bond.

View the file

Other files

File Type Posted
26 11 16.11 - Secondary Unit Substations - Secondary Less Than 1000V.pdf PDF
26 12 13.01 - Liquid-Filled Medium Voltge Unit Substation Transformers.pdf PDF
9-Agreement of Surety Form Contract.pdf PDF
23-EJCDC - Payment Bond (C-620-2002).pdf PDF
1-LCA-ELECTRICAL SUBSTATION PROCUREMENT DWGS.pdf PDF
15-Affidavit of Non-Collusion.pdf PDF
21-EJCDC - Performance Bond (C-600-2002).pdf PDF
012977.02 - MEASUREMENT AND PAYMENT.pdf PDF
13-List of Proposed Subcontractors.pdf PDF
26 27 13.11 - Microprocessor-Based Metering Equipment.pdf PDF
017900.01 - VIDEO TRAINING PROGRAMS.pdf PDF
26 23 00.16 - Arc Resistant Metal Enclosed Drawout Switchgear LV.pdf PDF
27-PA Prevailing Wage Act Duties00810.pdf PDF
26 05 73.13 - Short Circuit Studies.pdf PDF
1-TITLE page.pdf PDF
26 13 26.11 - Metal Clad MV Arc Resistent Switchgear.pdf PDF
24-EJCDC - General Conditions (with Supplementary shown).pdf PDF
2-TOC.pdf PDF
011000.03 -SUMMARY OF THE WORK.pdf PDF
26 05 53 - Identification For Electrical Systems.pdf PDF
26 05 73.19 - Arc Flash Hazard Analysis.pdf PDF
26 43 13A - LV Surge Protective Devices For Electrical Distribution Systems.pdf PDF
19-EJCDC - Agreement Stipulated Price (C-520-2002).pdf PDF
5-EJCDC - Bid Form for Construction Contracts 00300 (003).pdf PDF
4-7-EJCDC - Bid Bond, Penal Sum Form (C-430-2002) Revised 10-30-2026.pdf PDF
11-Experience Questionnaire.pdf PDF
013300.0 - SUBMITTALS.pdf PDF
3-Addendum 1 LCA.pdf PDF
4-EJCDC - Instructions to Bidders (C-200-2002).pdf PDF
7-EJCDC - Bid Bond, Penal Sum Form (C-430-2002).pdf PDF
3-00010_Invitation to Bid.pdf PDF
26 05 73.16 - Coordination Studies.pdf PDF
17-CertAsToCorpPrincipal.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Substation #2, #4 Procurement

7676 Industrial Blvd.

Allentown, PA 18106 September 15, 2026

017716-1

SECTION 017716

CONTRACT CLOSEOUT

PART 1 - GENERAL

1.1 CONTRACT CLOSEOUT INSPECTIONS

A. The following 3 inspections will be made in addition to the normal inspections to ensure that all

Contract requirements are met and that the Work is complete and acceptable. The purpose of each of these inspections is to furnish the Contractor a written list of Contract exceptions, omissions, and incompletions so that the Work can be progressed to timely completion in accordance with the Contract Documents.

1. Detailed Inspection: The “Detailed Inspection” will be made when the Work is substantially complete. A copy of the detailed inspection list will be furnished to the

Contractor. When this inspection progresses over any length of time, copies of the list will be furnished as the inspection progresses so that the Contractor may proceed with the required Work without delay.

2. Final Inspection: The Contractor will be advised by letter of the date and time of final inspection. A copy of the final inspection list containing all incomplete or unsatisfactory items and the time allowed to complete the Work will be furnished to the Contractor.

3. Joint Inspection for Physical Completion: The joint inspection for physical completion may be made to verify completion of the exception items listed on the final inspection list so that the physical completion date may be established.

1.2 PROJECT RECORD DOCUMENTS

A. Maintain on site, 2 sets of the following record documents; record actual revisions to the Work.

1. Contract Drawings.

2. Project Manual.

3. Addenda.

4. Change Orders and other modifications to the Contract.

5. Reviewed shop drawings, product data, and samples.

B. Store record documents separate from documents used for construction.

C. Record information concurrent with construction progress.

D. Record Documents and Shop Drawings: Legibly mark each item to record actual construction including.

1. Measured depths of foundations in relation to finish (first) (main) floor datum.

2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.

017716-2

3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.

4. Field changes of dimension and detail.

5. Details not on original Contract Drawings.

E. Upon completion of the work, create electronic versions of the project record documents. Black and white documents are to be scanned into TIFF format using CCIT Group 4 compression.

Documents with color, which include black line documents with color notations, are to be scanned into TIFF format using a minimum of 8 colors and “packbits” compression test.

1. The scanned images are to be put on a USB flash drive using NTFS/NTFS5 format. Name the electronic files with the same name as the drawing. Create a folder on the USB flash drive for each trade and one for Shop Drawings.

2. Label the USB flash drive with the project number, name, and title as it appears on the project manual cover. If there is more than one USB flash drive include notation to that effect on the label; i.e., 1 of 3, 2 of 3, 3 of 3. The project record documents, and USB flash drive(s) are to be turned over to the Authority’s Representative.

F. Applications for progress payments will not be approved if the record documents are not kept current. Application for final payment will not be approved until the project record documents are delivered to the Authority’s Representative.

1.3 OPERATION AND MAINTENANCE DATA

A. Prepare 2 sets comprised of 8-1/2 x 11 inch text pages bound in capacity expansion binders with durable plastic covers identified with printed title “OPERATION AND MAINTENANCE

INSTRUCTIONS”, title of project, and subject matter of binder when multiple binders are required. Prepare a printed Table of Contents for each volume, with each product or system description identified. Internally subdivide the binder contents with permanent page dividers, logically organized as described below, with tab titles clearly printed under reinforced laminated plastic tabs:

Part 1: Authorityy, listing names, addresses, and telephone numbers of Architect/Engi-neer, Contractor, subcontractors, and major equipment suppliers.

Part 2: Operation and maintenance instructions, arranged by system and subdivided by specification section. For each category, identify names, addresses, and telephone num-bers of subcontractors and suppliers. Identify the following:

1. Significant design criteria.

2. List of equipment.

3. Parts list for each component.

4. Operating instructions.

5. Maintenance instructions for equipment and systems.

6. Maintenance instructions for finishes, including recommended cleaning methods and materials and special precautions identifying detrimental agents.

Part 3: Project documents and certificates, including the following:

017716-3

1. Shop drawings and product data.

2. Air and water balance reports.

3. Certificates.

4. Photocopies of warranties.

B. Submit one copy of completed volumes in final form 15 days prior to final inspection. This copy will be returned after final inspection, with the Authority’s comments. Revise content of documents as required prior to final submittal.

C. Submit 2 volumes prior to final Application for Payment.

D. In person and Video training shall be provided to the facility personnel for the proper operation and maintenance of the equipment.

1.4 WARRANTIES

A. Furnish warranty certification and copies of warranties. Warranties submitted without warranty certification will not be accepted.

1. Warranty Certification: Written certification from the warrantor that invoices for installation, service, supplies, and warranty fees have been paid in full to persons or firms due payment, and that the warranty is in effect and non-retractable due to any of the specified conditions.

B. Prepare printed Table of Contents and assemble warranty certifications and warranty copies in a binder with a durable plastic cover.

C. Deliver the binder to the Authority’s Representative prior to final Application for Payment.

D. For items of Work delayed beyond date of Substantial Completion, provide updated submittal within 10 days after acceptance, indicating date of acceptance as start of warranty period.

E. Applications for final payment will not be approved until the warranty certification and warranty documents are delivered to the Authority’s Representative.

1.5 SPARE PARTS AND MAINTENANCE MATERIALS

A. Label and deliver spare parts, maintenance items, and extra materials to the Site. Place in locations as directed.

1. Include “NOT FOR WARRANTY REPAIRS” on the labels.

2. Obtain receipt prior to final payment.

B. Do not use the spare parts and maintenance materials required by the Contract Documents to remedy defects during the one-year period described in Paragraph 9.8 of the General Conditions except when approved otherwise by authorized Facility Representative. In such cases, replace items used.

017716-4

C. Furnish the names, business addresses, and telephone numbers of fully equipped authorized service organizations to the Authority’s Representative.

D. Applications for final payment will not be approved until these items are delivered to the

Authority’s Representative.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 017716

PART 1 - GENERAL
1.1 CONTRACT CLOSEOUT INSPECTIONS
A. The following 3 inspections will be made in addition to the normal inspections to ensure that all Contract requirements are met and that the Work is complete and acceptable. The purpose of each of these inspections is to furnish the Contractor a w...
1. Detailed Inspection: The “Detailed Inspection” will be made when the Work is substantially complete. A copy of the detailed inspection list will be furnished to the Contractor. When this inspection progresses over any length of time, copies of t...
2. Final Inspection: The Contractor will be advised by letter of the date and time of final inspection. A copy of the final inspection list containing all incomplete or unsatisfactory items and the time allowed to complete the Work will be furnished...
3. Joint Inspection for Physical Completion: The joint inspection for physical completion may be made to verify completion of the exception items listed on the final inspection list so that the physical completion date may be established.
1.2 PROJECT RECORD DOCUMENTS
A. Maintain on site, 2 sets of the following record documents; record actual revisions to the Work.
1. Contract Drawings.
2. Project Manual.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed shop drawings, product data, and samples.
B. Store record documents separate from documents used for construction.
C. Record information concurrent with construction progress.
D. Record Documents and Shop Drawings: Legibly mark each item to record actual construction including.
1. Measured depths of foundations in relation to finish (first) (main) floor datum.
2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.
3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.
4. Field changes of dimension and detail.
5. Details not on original Contract Drawings.
E. Upon completion of the work, create electronic versions of the project record documents. Black and white documents are to be scanned into TIFF format using CCIT Group 4 compression. Documents with color, which include black line documents with co...
1. The scanned images are to be put on a USB flash drive using NTFS/NTFS5 format. Name the electronic files with the same name as the drawing. Create a folder on the USB flash drive for each trade and one for Shop Drawings.
2. Label the USB flash drive with the project number, name, and title as it appears on the project manual cover. If there is more than one USB flash drive include notation to that effect on the label; i.e., 1 of 3, 2 of 3, 3 of 3. The project recor...

F. Applications for progress payments will not be approved if the record documents are not kept current. Application for final payment will not be approved until the project record documents are delivered to the Authority’s Representative.

1.3 OPERATION AND MAINTENANCE DATA
A. Prepare 2 sets comprised of 8-1/2 x 11 inch text pages bound in capacity expansion binders with durable plastic covers identified with printed title “OPERATION AND MAINTENANCE INSTRUCTIONS”, title of project, and subject matter of binder when multi...
B. Submit one copy of completed volumes in final form 15 days prior to final inspection. This copy will be returned after final inspection, with the Authority’s comments. Revise content of documents as required prior to final submittal.
C. Submit 2 volumes prior to final Application for Payment.
D. In person and Video training shall be provided to the facility personnel for the proper operation and maintenance of the equipment.
1.4 WARRANTIES
A. Furnish warranty certification and copies of warranties. Warranties submitted without warranty certification will not be accepted.
1. Warranty Certification: Written certification from the warrantor that invoices for installation, service, supplies, and warranty fees have been paid in full to persons or firms due payment, and that the warranty is in effect and non-retractable du...
B. Prepare printed Table of Contents and assemble warranty certifications and warranty copies in a binder with a durable plastic cover.
C. Deliver the binder to the Authority’s Representative prior to final Application for Payment.
D. For items of Work delayed beyond date of Substantial Completion, provide updated submittal within 10 days after acceptance, indicating date of acceptance as start of warranty period.
E. Applications for final payment will not be approved until the warranty certification and warranty documents are delivered to the Authority’s Representative.
1.5 SPARE PARTS AND MAINTENANCE MATERIALS
A. Label and deliver spare parts, maintenance items, and extra materials to the Site. Place in locations as directed.
1. Include “NOT FOR WARRANTY REPAIRS” on the labels.
2. Obtain receipt prior to final payment.
B. Do not use the spare parts and maintenance materials required by the Contract Documents to remedy defects during the one-year period described in Paragraph 9.8 of the General Conditions except when approved otherwise by authorized Facility Represen...
C. Furnish the names, business addresses, and telephone numbers of fully equipped authorized service organizations to the Authority’s Representative.
D. Applications for final payment will not be approved until these items are delivered to the Authority’s Representative.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)