012977.02 - MEASUREMENT AND PAYMENT.pdf
PDF 118 KB Posted
- Solicitation number
- US.255952
- Issued by
- Lehigh County, Pennsylvania
About this file
Measurement and Payment File Summary
This Measurement and Payment document relates to the Electrical Substation Replacement Project – Equipment Procurement Phase being procured by the Lehigh County Authority in Pennsylvania. The file establishes the procedures and requirements for measuring work performed and processing payment claims throughout the contract execution. Online sealed bids will be received via the PennBid electronic bidding service until 11:00 a.m. on Wednesday, October 28, 2026, with bids remaining open for 60 days following the opening. Self-guided site visits can be scheduled via email with Charles Volk, P.E., Chief Capital Works Officer, and all bidding documents are available at no cost through PennBid (www.PennBid.net).
Each bid must be accompanied by bid security equal to 10 percent of the total bid amount in the form of a certified check, bank check, or bid bond. The Lehigh County Authority reserves the right to reject any and all bids and to waive any omissions, errors, mistakes, defects, or irregularities in submitted bids. The measurement and payment provisions contained within this document establish the specific methodologies, documentation requirements, and approval processes that will govern contractor invoicing and owner reimbursement throughout the performance period of this equipment procurement project.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Substation #2, #4 Procurement
7676 Industrial Blvd.
Allentown, PA 18106 September 15, 2026
012977.02 - 1
SECTION 012977.02
MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 UNIT PRICE WORK-STANDARD
A. Payment for Work listed in the Unit Price Schedule will be made at the contract unit price indicated multiplied by the units of completed Work.
B. The Unit Price of an item of Unit Price Work may be subject to re-evaluation, negotiation and possible adjustment under the following conditions:
1. If the total cost of a particular item of Unit Price Work differs by more than 20% from the estimated quantity of such item indicated in the Contract Documents and if the
Contractor justifies and adequately documents to the Authority's satisfaction, additional expenses have been incurred as a result thereof.
1.2 NON UNIT PRICE WORK - NEGOTIATED BASIS
A. If the Work includes Work which is not covered by the Unit Price Schedule, payment for such work may be based on a negotiated dollar amount agreed upon by the Contractor, the
Authority’s Representative, and the Bureau of Cost Control. The negotiated dollar amount shall be calculated in a manner similar to that provided below:
1. By estimating the fair and reasonable cost of: (i) labor, including all wages, required wage supplements and insurance required by law (worker’s compensation, social security, disability, unemployment, etc.) paid to or on behalf of foreman, workers and other employees below the rank of the Contractor’s designated representative directly employed at the Work site; (ii) materials; (iii) equipment, excluding hand tools (which are defined as equipment having a purchase price of less than five hundred dollars), which, in the judgment of the State, would have been or will be employed exclusively and directly on the Work, as the case may be; and, where the same is performed directly by the Contractor; by adding to the total of such estimated costs a sum equal to 15 percent thereof, but, where the Work is performed by a subcontractor, by adding a sum equal to 15 percent of said costs for the benefit of such subcontractor, and by adding, for the benefit of the Contractor (no further allowance will be made where extra Work is performed by the sub-subcontractor), an additional sum equal to 10 percent of the first
$10,000 of the above estimated costs, including the subcontractor’s percentage override, plus 5 percent of the next $90,000 of the total of said items, plus 3 percent of any sum in excess of $100,000 of the total of said items.
2. All profit, overhead and expense of whatsoever kind and nature, other than those set forth above in items (i) through (iii), are covered by the aforesaid percentage overrides and no additional payment therefore will be made by the State.
012977.02 - 2
B. The Contractor shall, after being requested, promptly submit to the State a detailed breakdown of the Contractor’s proposal. The State shall promptly review and respond to the submitted proposal.
C. Upon reaching agreement on a negotiated dollar amount for the non-unit price Work, the State shall confirm the agreement in writing, and the Contractor shall proceed with the Work.
1.3 NON UNIT PRICE WORK - LABOR AND MATERIAL BASIS
A. If the Work includes Work which is not covered by this Unit Price Schedule, payment for such
Work may be based on the actual cost of labor and materials; cost to be determined as the Work progresses. The labor and material (L&M) dollar amount shall be calculated in a manner similar to that provided below:
1. By determining the actual cost of the Work in the same manner as in the above
Subparagraph 1.02. A. 1., except that actual costs of the Contractor be utilized in lieu of estimated costs. The State shall have the option to utilize this method provided it notifies the Contractor of its intent to do so prior to the time the Contractor is properly authorized to commence performance of such non-unit price Work.
2. Whenever this Contract requires the determination of the actual cost of equipment, it shall be determined as follows:
a. Equipment used or to be used in the performance of Work shall be specifically described by the manufacturer, model number and date of manufacture and be of suitable size and capacity required for the work to be performed.
b. For the purposes of computing the Contractor’s cost for self-owned equipment, the rate used for periods of under five days shall be the monthly rate set forth for the item of equipment in the “Rental Rate Blue Book” published by K-III Authority
Corporation (800) 669-3282 divided by 22 days to establish a daily rate and divided again by eight hours to establish an hourly rate. The rate used for periods of 5 days or more shall be 45 percent of the published monthly rate. In the event the “Rental Rate Blue Book” does not list the item of equipment used, the applicable rate shall be determined in the same manner as set forth above except that the monthly rate used shall be that set forth in “The AED Green Book” published by K-III Authority Corporation (800) 669-3282. In the event that a rate is not established in the “Rental Rate Blue Book” or “The AED Green Book” for a particular piece of equipment, the Contracting Officer shall establish a rate for ownership costs and operating costs for that piece of equipment, that is consistent with its cost and expected life. Self-owned equipment is defined to include equipment rented from controlled or affiliated companies.
c. Rented equipment will be paid for at the actual rental cost.
d. For the purposes of the performance of work, when, in the opinion of the
Contractor, and as approved in writing by the Authority’s Representative, suitable equipment is not available on the Site, the moving of said equipment to and from the Site will be paid for at actual cost.
e. Notwithstanding any other provision, if the State should determine that the nature or size of the equipment used by the Contractor in connection with the performance of Work is larger or more elaborate, as the case may be, than the size
012977.02 - 3 or nature of the minimum equipment determined by the State to be suitable for the performance of Work, the cost of equipment used in calculating the costs of Work will not be based upon the equipment used by the Contractor but instead will be based on the smallest or least elaborate equipment determined by the State to have been suitable for the performance of the Work. In no event shall the amount paid to the Contractor for the use of self-owned construction equipment exceed the lower of the actual cost of such equipment or the depreciated value of such equipment as carried on the Contractor or subcontractors books.
f. The Contractor shall be reimbursed for its operating costs for self-owned equipment based on actual cost data. Operating costs shall include fuel, lubricants, other operating expendables and preventive and field maintenance. Operating costs do not include the operator’s wages. In the event, after documented and demonstrated due diligence, actual operating costs are not ascertainable, then the
Contractor will be compensated utilizing not more than 50 percent of the operating costs set forth in the “Rental Rate Blue Book” and the Contractor shall be reimbursed the product of the number of hours of actual use multiplied by the operating cost per hour.
g. The rate for idle equipment and stand-by equipment, shall be based upon the rate of depreciation specified in the Contractor’s books and records, or 50 percent of the rate set forth in the “Rental Rate Blue Book,” with the appropriate adjustments noted in Subparagraph 1.03 A. 2 (b), above, whichever is less. In the event the equipment is fully depreciated, the rate shall be the actual ownership costs based upon audit of the Contractor’s books and records.
h. The maximum amount of reimbursement for the ownership costs of self-owned equipment is limited to the original purchase price of the equipment as listed in the
“Green Guide for Construction Equipment” published by K-III Authorityy
Corporation (800) 669-3282. In the specific event when the ownership reimbursement is limited by the original purchase price, the Contractor shall, nevertheless, be reimbursed for the operating cost per hour for each hour of actual use.
B. If the Contractor employs subcontractors in the performance of the Work, the actual cost to the subcontractor of labor and materials as defined in Subparagraph 1.03 A. 2 (b) above.
C. Overhead and Profit:
1. If the Work is performed by the Contractor, an amount of 15% may be added to the cost of labor and materials for overhead and profit.
2. If the Work is performed by a subcontractor, an amount of 15% of said costs may be added for the benefit of such subcontractor, and for the benefit of the Contractor an additional sum equal to 10% of the first $10,000 (including the subcontractor’s percentage override), plus 5% of the next $90,000, plus 3% of any said costs in excess of
$100,000 may be added.
3. If any Work is performed by a sub-subcontractor, no further allowance will be made.
1.4 PAYMENT METHOD
A. It is the intent of the State to compensate the contractor in accordance with Article 1.1 above.
012977.02 - 4
B. There may be occasions when NON-UNIT PRICE WORK is necessary. For those occasions, the first choice will be to compensate the contractor in accordance with Article 1.2 above.
C. If all reasonable attempts to comply with Paragraph 1.4 B. above have failed to result in a negotiated dollar amount for the non-unit price Work, the Contractor shall be directed to proceed with the Work, and will be compensated in accordance with Article 1.3 above.
D. The Contractor shall bill any item of work listed as “Lump Sum” to 100%, no partial percentages will be allowed.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012977.01
| PART 1 - GENERAL |
| 1.1 UNIT PRICE WORK-STANDARD |
| A. Payment for Work listed in the Unit Price Schedule will be made at the contract unit price indicated multiplied by the units of completed Work. |
| B. The Unit Price of an item of Unit Price Work may be subject to re-evaluation, negotiation and possible adjustment under the following conditions: |
| 1. If the total cost of a particular item of Unit Price Work differs by more than 20% from the estimated quantity of such item indicated in the Contract Documents and if the Contractor justifies and adequately documents to the Authority's satisfaction... |
| 1.2 NON UNIT PRICE WORK - NEGOTIATED BASIS |
| A. If the Work includes Work which is not covered by the Unit Price Schedule, payment for such work may be based on a negotiated dollar amount agreed upon by the Contractor, the Authority’s Representative, and the Bureau of Cost Control. The negotiat... |
| 1. By estimating the fair and reasonable cost of: (i) labor, including all wages, required wage supplements and insurance required by law (worker’s compensation, social security, disability, unemployment, etc.) paid to or on behalf of foreman, worker... |
| 2. All profit, overhead and expense of whatsoever kind and nature, other than those set forth above in items (i) through (iii), are covered by the aforesaid percentage overrides and no additional payment therefore will be made by the State. |
| B. The Contractor shall, after being requested, promptly submit to the State a detailed breakdown of the Contractor’s proposal. The State shall promptly review and respond to the submitted proposal. |
| C. Upon reaching agreement on a negotiated dollar amount for the non-unit price Work, the State shall confirm the agreement in writing, and the Contractor shall proceed with the Work. |
| 1.3 NON UNIT PRICE WORK - LABOR AND MATERIAL BASIS |
| A. If the Work includes Work which is not covered by this Unit Price Schedule, payment for such Work may be based on the actual cost of labor and materials; cost to be determined as the Work progresses. The labor and material (L&M) dollar amount shal... |
| 1. By determining the actual cost of the Work in the same manner as in the above Subparagraph 1.02. A. 1., except that actual costs of the Contractor be utilized in lieu of estimated costs. The State shall have the option to utilize this method provid... |
| 2. Whenever this Contract requires the determination of the actual cost of equipment, it shall be determined as follows: |
| a. Equipment used or to be used in the performance of Work shall be specifically described by the manufacturer, model number and date of manufacture and be of suitable size and capacity required for the work to be performed. |
| b. For the purposes of computing the Contractor’s cost for self-owned equipment, the rate used for periods of under five days shall be the monthly rate set forth for the item of equipment in the “Rental Rate Blue Book” published by K-III Authority Cor... |
| c. Rented equipment will be paid for at the actual rental cost. |
| d. For the purposes of the performance of work, when, in the opinion of the Contractor, and as approved in writing by the Authority’s Representative, suitable equipment is not available on the Site, the moving of said equipment to and from the Site wi... |
| e. Notwithstanding any other provision, if the State should determine that the nature or size of the equipment used by the Contractor in connection with the performance of Work is larger or more elaborate, as the case may be, than the size or nature o... |
| f. The Contractor shall be reimbursed for its operating costs for self-owned equipment based on actual cost data. Operating costs shall include fuel, lubricants, other operating expendables and preventive and field maintenance. Operating costs do not ... |
| g. The rate for idle equipment and stand-by equipment, shall be based upon the rate of depreciation specified in the Contractor’s books and records, or 50 percent of the rate set forth in the “Rental Rate Blue Book,” with the appropriate adjustments n... |
| h. The maximum amount of reimbursement for the ownership costs of self-owned equipment is limited to the original purchase price of the equipment as listed in the “Green Guide for Construction Equipment” published by K-III Authorityy Corporation (800)... |
| B. If the Contractor employs subcontractors in the performance of the Work, the actual cost to the subcontractor of labor and materials as defined in Subparagraph 1.03 A. 2 (b) above. |
| C. Overhead and Profit: |
| 1. If the Work is performed by the Contractor, an amount of 15% may be added to the cost of labor and materials for overhead and profit. |
| 2. If the Work is performed by a subcontractor, an amount of 15% of said costs may be added for the benefit of such subcontractor, and for the benefit of the Contractor an additional sum equal to 10% of the first $10,000 (including the subcontractor’s... |
| 3. If any Work is performed by a sub-subcontractor, no further allowance will be made. |
| 1.4 PAYMENT METHOD |
| A. It is the intent of the State to compensate the contractor in accordance with Article 1.1 above. |
| B. There may be occasions when NON-UNIT PRICE WORK is necessary. For those occasions, the first choice will be to compensate the contractor in accordance with Article 1.2 above. |
| C. If all reasonable attempts to comply with Paragraph 1.4 B. above have failed to result in a negotiated dollar amount for the non-unit price Work, the Contractor shall be directed to proceed with the Work, and will be compensated in accordance with ... |
| D. The Contractor shall bill any item of work listed as “Lump Sum” to 100%, no partial percentages will be allowed. |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION (Not Used) |