Electrical Substation Replacement Project – Equipment Procurement Phase
Solicitation number
US.255952
Issued by
Lehigh County, Pennsylvania

About this file

This is a Payment Bond form (EJCDC C-615) for the Electrical Substation #2 and #4 Procurement project administered by Lehigh County Authority in Allentown, Pennsylvania. The bond covers Contract One, General Construction, and is scheduled for September 2026. The payment bond is executed jointly by the Contractor as Principal and the Surety, binding both parties to pay for all labor, materials, and equipment furnished by claimants for use in the contract performance. Sealed bids for this project are due by 11:00 a.m. on Wednesday, October 28, 2026, through the PennBid electronic bidding service, with a 60-day bid hold period following the opening. Self-guided site visits may be scheduled via email with Charles Volk, P.E., Chief Capital Works Officer. Each bid must be accompanied by bid security equal to 10 percent of the bid total in the form of a certified check, bank check, or bid bond.

The payment bond establishes the surety's obligations to respond to claimant notices within 60 days, identify undisputed amounts, and arrange payment accordingly. Claimants with direct contracts must notify the surety of claims, while those without direct contracts must provide written notice to the contractor within 90 days of last performing labor or furnishing materials. The surety's total obligation is limited to the bond amount, with any payments made in good faith credited against the total. The bond incorporates Pennsylvania statutory requirements and defines claimants broadly to include suppliers of materials, labor, equipment rentals, utilities, architectural and engineering services, and all items for which mechanic's liens may be asserted under Pennsylvania law. Lehigh County Authority reserves the right to reject any and all bids and to waive any irregularities in bid submissions.

View the file

Other files

File Type Posted
26 11 16.11 - Secondary Unit Substations - Secondary Less Than 1000V.pdf PDF
26 12 13.01 - Liquid-Filled Medium Voltge Unit Substation Transformers.pdf PDF
9-Agreement of Surety Form Contract.pdf PDF
1-LCA-ELECTRICAL SUBSTATION PROCUREMENT DWGS.pdf PDF
017716 – CONTRACT CLOSEOUT.pdf PDF
15-Affidavit of Non-Collusion.pdf PDF
21-EJCDC - Performance Bond (C-600-2002).pdf PDF
012977.02 - MEASUREMENT AND PAYMENT.pdf PDF
13-List of Proposed Subcontractors.pdf PDF
26 27 13.11 - Microprocessor-Based Metering Equipment.pdf PDF
017900.01 - VIDEO TRAINING PROGRAMS.pdf PDF
26 23 00.16 - Arc Resistant Metal Enclosed Drawout Switchgear LV.pdf PDF
27-PA Prevailing Wage Act Duties00810.pdf PDF
26 05 73.13 - Short Circuit Studies.pdf PDF
1-TITLE page.pdf PDF
26 13 26.11 - Metal Clad MV Arc Resistent Switchgear.pdf PDF
24-EJCDC - General Conditions (with Supplementary shown).pdf PDF
2-TOC.pdf PDF
011000.03 -SUMMARY OF THE WORK.pdf PDF
26 05 53 - Identification For Electrical Systems.pdf PDF
26 05 73.19 - Arc Flash Hazard Analysis.pdf PDF
26 43 13A - LV Surge Protective Devices For Electrical Distribution Systems.pdf PDF
19-EJCDC - Agreement Stipulated Price (C-520-2002).pdf PDF
5-EJCDC - Bid Form for Construction Contracts 00300 (003).pdf PDF
4-7-EJCDC - Bid Bond, Penal Sum Form (C-430-2002) Revised 10-30-2026.pdf PDF
11-Experience Questionnaire.pdf PDF
013300.0 - SUBMITTALS.pdf PDF
3-Addendum 1 LCA.pdf PDF
4-EJCDC - Instructions to Bidders (C-200-2002).pdf PDF
7-EJCDC - Bid Bond, Penal Sum Form (C-430-2002).pdf PDF
3-00010_Invitation to Bid.pdf PDF
26 05 73.16 - Coordination Studies.pdf PDF
17-CertAsToCorpPrincipal.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electrical Substation #2 And #4 Procurement– Contract One – General Construction September 2026

PAYMENT BOND

EJCDC C-615 Payment Bond Form for Construction Contracts

00620 –1

Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable.

Supplemental Provisions, which are revisions by Lehigh County Authority to the original EJCDC form, are indicated.

CONTRACTOR (Name and Address): SURETY (Name and Address of Principal Place of Business):

OWNER (Name and Address): Lehigh County Authority

1053 Spruce Street

Allentown, PA 18106

CONTRACT

Date:

Amount:

Description (Name and Location):

Project Identification: Electrical Substation# 2 and 4 Procurement

Contract Number Identification: No. 1 General Construction

BOND

Bond Number:

Date (Not earlier than Contract Date):

Amount:

Modifications to this Bond Form:

Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this

Payment Bond to be duly executed on its behalf by its authorized officer, agent, or representative.

CONTRACTOR AS PRINCIPAL SURETY

Company:

Signature: (Seal) (Seal)

Name and Title: Surety’s Name and Corporate Seal

By:

Signature and Title

(Attach Power of Attorney)

(Space is provided below for signatures of additional parties, if required.)

Attest:

CONTRACTOR AS PRINCIPAL SURETY

Company:

Signature: (Seal) (Seal)

Name and Title: Surety’s Name and Corporate Seal

By:

(Attach Power of Attorney)

Attest:

Signature and Title:

1. Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to Owner to pay for labor, materials, and

Electrical Substation #2 And #4 Procurement– Contract One – General Construction September 2026 equipment furnished by Claimants for use in the performance of the Contract, which is incorporated herein by reference.

2. With respect to Owner, this obligation shall be null and void if Contractor:

2.1. Promptly makes payment, directly or indirectly, for all sums due Claimants, and

2.2. Defends, indemnifies, and holds harmless Owner from all claims, demands, liens, or suits alleging non-payment by Contractor by any person or entity who furnished labor, materials, or equipment for use in the performance of the Contract, provided Owner has promptly notified Contractor and Surety (at the addresses described in Paragraph 12) of any claims, demands, liens, or suits and tendered defense of such claims, demands, liens, or suits to Contractor and

Surety, and provided there is no Owner Default.

3. With respect to Claimants, this obligation shall be null and void if Contractor promptly makes payment, directly or indirectly, for all sums due.

4. Surety shall have no obligation to Claimants under this Bond until:

4.1. Claimants who are employed by or have a direct contract with Contractor have given notice to Surety (at the addresses described in Paragraph 12) and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim.

4.2. Claimants who do not have a direct contract with Contractor:

1. Have furnished written notice to Contractor and sent a copy, or notice thereof, to Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials or equipment were furnished or supplied, or for whom the labor was done or performed; and

2. Have either received a rejection in whole or in part from Contractor, or not received within 30 days of furnishing the above notice any communication from

Contractor by which Contractor had indicated the claim will be paid directly or indirectly; and

3. Not having been paid within the above 30 days, have sent a written notice to Surety and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to Contractor.

Notice for purposes of Paragraph 4.2.1 shall be served by registered or certified mail, postage prepaid, in an envelope addressed to such Contractor where Contractor’s office is regularly maintained for the transaction of business or served in any manner in which legal process may be served as provided by law for the service of a summons, except that such service need not be made by a public officer.

5. If a notice by a Claimant required by Paragraph 4 is provided by Owner to Contractor or to Surety, other than the notice as required in Paragraph 4.2.1 which must be provided by Claimant, that is sufficient compliance.

6. When a Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at Surety's expense take the following actions:

6.1. Send an answer to that Claimant, with a copy to Owner, within 60 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed.

6.2. Pay or arrange for payment of any undisputed amounts.

6.3 Surety's failure to discharge its obligations under this Section 6 shall not be deemed to constitute a waiver of defenses Surety or Contractor may have or acquire as to a claim. However, if Surety fails to discharge its obligations under this Section 6, Surety shall indemnify Claimant for the reasonable attorney's fees Claimant incurs to recover any sums found to be due and owing to Claimant.

7. Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by Surety.

8. Amounts owed by Owner to Contractor under the Contract shall be used for the performance of the Contract and to satisfy claims, if any, under any performance bond.

By Contractor furnishing and Owner accepting this Bond, they agree that all funds earned by Contractor in the performance of the Contract are dedicated to satisfy obligations of Contractor and Surety under this Bond, subject to Owner's priority to use the funds for the completion of the Work.

9. Surety shall not be liable to Owner, Claimants, or others for obligations of Contractor that are unrelated to the Contract. Owner shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond.

10. Surety hereby waives notice of any change, including changes of time, to the Contract or to related Subcontracts, purchase orders and other obligations.

11. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in which the Work or part of the

Work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by Paragraph 4.1 or Paragraph 4.2.3, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable.

12. Notice to Surety, Owner, or Contractor shall be mailed or delivered to the addresses shown on the signature page. Actual receipt of notice by Surety, Owner, or

Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page.

13. When this Bond has been furnished to comply with a statutory requirement in the location where the Contract was to be performed, any provision in this Bond conflicting with said statutory requirement shall be deemed deleted herefrom and provisions conforming to such statutory requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory Bond and not as a common law bond.

14. Document copies.

14.1. Upon request of any person or entity appearing to be a potential beneficiary of this Bond, Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made.

14.2. Owner shall furnish a certified copy of this payment bond and the Contract for which such bond was given to any person who makes an application for such copy and who submits an affidavit stating that:

1. He has furnished material or performed labor, for the completion of the Work provided for in the Contract, and that he has not been fully paid for such labor or material; or

2. He is a defendant in an action brought on this payment bond; or

3. He is the Surety on this payment bond on which an action has been brought.

Every such applicant shall pay for each certified copy a fee fixed by Owner to cover the actual cost of the preparation of such copy.

14.3. A certified copy of this payment bond and the Contract for which such bond was given shall constitute prima facie evidence of the contents, execution and delivery of the original of such bond and Contract.

Electrical Substation #2 And #4 Procurement– Contract One – General Construction September 2026

15. DEFINITIONS

15.1. Claimant: An individual or entity having a direct contract with Contractor, or with a first-tier subcontractor of Contractor, to furnish labor, materials, or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service, or rental equipment used in the Contract, architectural and engineering services required for performance of the Work of Contractor and Contractor's Subcontractors, and all other items for which a mechanic's lien may be asserted in the

Commonwealth of Pennsylvania.

15.2. Contract: The agreement between Owner and Contractor identified on the signature page, including all Contract Documents and changes thereto.

15.3. Owner Default: Failure of Owner, which has neither been remedied nor waived, to pay Contractor as required by the Contract or to perform and complete or comply with the other terms thereof.