Electrical Substation Replacement Project – Equipment Procurement Phase
Solicitation number
US.255952
Issued by
Lehigh County, Pennsylvania

About this file

This file is a technical specification section (26 05 73.19) for an arc-flash hazard analysis to be performed on substations #2 and #4 at 7676 Industrial Boulevard, Allentown, Pennsylvania, as part of the Lehigh County Authority's Electrical Substation Replacement Project—Equipment Procurement Phase. The specification requires a computer-based arc-flash study to determine hazard distances and incident energy exposure for personnel working on or near electrical equipment. The project involves performing short-circuit and protective device coordination studies prior to initiating the arc-flash analysis, calculating maximum and minimum fault-current contributions, and determining arc-flash protection boundaries and incident energy at medium- and low-voltage equipment locations. Submittals must include arc-flash study input data and a comprehensive report signed, dated, and sealed by a licensed Power Systems Analysis Specialist. The specification mandates application of 3.5-by-5-inch self-adhesive warning labels to specific equipment types, including motor-control centers, switchgear, transformers, and panelboards, with labels displaying arc-flash boundary information, incident energy, required personal protective equipment ratings, and hazard risk categories. Sealed bids for this procurement are due by 11:00 a.m. on Wednesday, October 28, 2026, with bid security required at 10 percent of the total bid amount, and bids remaining open for 60 days following the opening date.

The specification requires engagement of qualified vendors meeting specific industry standards and certifications. The Power Systems Analysis Software Developer must use commercially developed software compliant with IEEE 1584 and NFPA 70E standards, with acceptable manufacturers including EasyPower LLC, Eaton CYME, and SKM Systems Analysis Inc. The Power Systems Analysis Specialist must be a licensed professional engineer in Pennsylvania with direct supervision of all study elements. The Field Adjusting Agency must employ a NETA ETT-Certified Technician Level III or NICET Electrical Power Testing Level III certified professional and be a member company of NETA. The specification includes detailed electrical survey data requirements, including transformer ratings, reactor impedance, circuit breaker specifications, generator short-circuit contribution data, relay settings, conductor specifications, and motor horsepower designations. No explicit pricing terms, set-asides, incumbent information, or funding sources are identified in this specification section. Lehigh County Authority reserves the right to reject any and all bids and to waive defects or irregularities; site visits may be scheduled by contacting Charles Volk, P.E., Chief Capital Works Officer, at charlesvolk@lehighcountyauthority.org.

View the file

Other files

File Type Posted
26 11 16.11 - Secondary Unit Substations - Secondary Less Than 1000V.pdf PDF
26 12 13.01 - Liquid-Filled Medium Voltge Unit Substation Transformers.pdf PDF
9-Agreement of Surety Form Contract.pdf PDF
23-EJCDC - Payment Bond (C-620-2002).pdf PDF
1-LCA-ELECTRICAL SUBSTATION PROCUREMENT DWGS.pdf PDF
017716 – CONTRACT CLOSEOUT.pdf PDF
15-Affidavit of Non-Collusion.pdf PDF
21-EJCDC - Performance Bond (C-600-2002).pdf PDF
012977.02 - MEASUREMENT AND PAYMENT.pdf PDF
13-List of Proposed Subcontractors.pdf PDF
26 27 13.11 - Microprocessor-Based Metering Equipment.pdf PDF
017900.01 - VIDEO TRAINING PROGRAMS.pdf PDF
26 23 00.16 - Arc Resistant Metal Enclosed Drawout Switchgear LV.pdf PDF
27-PA Prevailing Wage Act Duties00810.pdf PDF
26 05 73.13 - Short Circuit Studies.pdf PDF
1-TITLE page.pdf PDF
26 13 26.11 - Metal Clad MV Arc Resistent Switchgear.pdf PDF
24-EJCDC - General Conditions (with Supplementary shown).pdf PDF
2-TOC.pdf PDF
011000.03 -SUMMARY OF THE WORK.pdf PDF
26 05 53 - Identification For Electrical Systems.pdf PDF
26 43 13A - LV Surge Protective Devices For Electrical Distribution Systems.pdf PDF
19-EJCDC - Agreement Stipulated Price (C-520-2002).pdf PDF
5-EJCDC - Bid Form for Construction Contracts 00300 (003).pdf PDF
4-7-EJCDC - Bid Bond, Penal Sum Form (C-430-2002) Revised 10-30-2026.pdf PDF
11-Experience Questionnaire.pdf PDF
013300.0 - SUBMITTALS.pdf PDF
3-Addendum 1 LCA.pdf PDF
4-EJCDC - Instructions to Bidders (C-200-2002).pdf PDF
7-EJCDC - Bid Bond, Penal Sum Form (C-430-2002).pdf PDF
3-00010_Invitation to Bid.pdf PDF
26 05 73.16 - Coordination Studies.pdf PDF
17-CertAsToCorpPrincipal.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Substation #2, #4 Procurement 7676 Industrial Blvd.

Allentown, PA 18106 September 15, 2026

26 05 73.19-1

SECTION 26 05 73.19

ARC-FLASH HAZARD ANALYSIS

PART 1 GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Section includes a computer-based, arc-flash study to determine the arc-flash hazard distance and the incident energy to which personnel could be exposed during work on or near electrical equipment.

1.03 DEFINITIONS

A. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

B. Field Adjusting Agency: An independent electrical testing agency with full-time employees and the capability to adjust devices and conduct testing indicated and that is a member company of NETA.

C. One-Line Diagram: A diagram that shows, by means of single lines and graphic symbols, the course of an electric circuit or system of circuits and the component devices or parts used therein.

D. Power System Analysis Software Developer: An entity that commercially develops, maintains, and distributes computer software used for power system studies.

E. Power Systems Analysis Specialist: Professional engineer in charge of performing the study and documenting recommendations, licensed in the state where Project is located.

F. Protective Device: A device that senses when an abnormal current flow exists and then removes the affected portion from the system.

G. SCCR: Short-circuit current rating.

H. Service: The conductors and equipment for delivering electric energy from the serving utility to the wiring system of the premises served.

Allentown, PA 18106 September 15, 2026

26 05 73.19-2

I. Single-Line Diagram: See "One-Line Diagram."

1.04 SUBMITTALS

A. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions.

B. Manufacturer’s installation instructions shall be provided along with product data.

C. Submittals shall be provided in the order in which they are specified and tabbed (for combined submittals).

D. Product Data: For computer software program to be used for studies.

E. Study Submittals: Submit the following submittals after the approval of system protective devices submittals. Submittals may be in digital form:

1. Arc-flash study input data, including completed computer program input data sheets.

2. Arc-flash study report; signed, dated, and sealed by Power Systems Analysis Specialist.

3. Submit study report for action prior to receiving final approval of distribution equipment submittals. If formal completion of studies will cause delay in equipment manufacturing, obtain approval from Architect for preliminary submittal of sufficient study data to ensure that selection of devices and associated characteristics is satisfactory.

F. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions.

G. Qualification Data:

1. For Power Systems Analysis Software Developer.

2. For Power System Analysis Specialist.

3. For Field Adjusting Agency.

H. Product Certificates: For arc-flash hazard analysis software, certifying compliance with IEEE 1584 and NFPA 70E.

1.05 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data:

1. Provide maintenance procedures in equipment manuals according to requirements in NFPA 70E.

Allentown, PA 18106 September 15, 2026

26 05 73.19-3

1.06 QUALITY ASSURANCE

A. Study shall be performed using commercially developed and distributed software designed specifically for power system analysis.

B. Software algorithms shall comply with requirements of standards and guides specified in this Section.

C. Manual calculations are unacceptable.

D. Power System Analysis Software Qualifications: An entity that owns and markets computer software used for studies, having performed successful studies of similar magnitude on electrical distribution systems using similar devices.

1. Computer program shall be designed to perform arc-flash analysis or have a function, component, or add-on module designed to perform arc-flash analysis.

2. Computer program shall be developed under the charge of a licensed professional engineer who holds IEEE Computer Society's Certified Software Development Professional certification.

E. Power Systems Analysis Specialist Qualifications: Professional engineer in charge of performing the arc-flash study, analyzing the arc flash, and documenting recommendations, licensed in the state where Project is located. All elements of the study shall be performed under the direct supervision and control of this professional engineer.

F. Arc-Flash Study Certification: Arc-Flash Study Report shall be signed and sealed by Power Systems Analysis Specialist.

G. Field Adjusting Agency Qualifications:

1. Employer of a NETA ETT-Certified Technician Level III or NICET Electrical Power Testing Level III certification responsible for all field adjusting of the Work.

2. A member company of NETA.

3. Acceptable to authorities having jurisdiction.

PART 2 PRODUCTS

2.01 COMPUTER SOFTWARE DEVELOPERS

A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

1. EasyPower, LLC (formerly ESA Inc.).

2. Eaton CYME.

3. SKM Systems Analysis, Inc.

4. Or equal.

Allentown, PA 18106 September 15, 2026

26 05 73.19-4

B. Comply with IEEE 1584 and NFPA 70E.

C. Analytical features of device coordination study computer software program shall have the capability to calculate "mandatory," "very desirable," and "desirable" features as listed in IEEE 399.

2.02 ARC-FLASH STUDY REPORT CONTENT

A. Executive summary of study findings.

B. Study descriptions, purpose, basis, and scope. Include case descriptions, definition of terms, and guide for interpretation of results.

C. One-line diagram, showing the following:

1. Protective device designations and ampere ratings.

2. Conductor types, sizes, and lengths.

3. Transformer kilovolt ampere (kVA) and voltage ratings, including derating factors and environmental conditions.

4. Motor and generator designations and kVA ratings.

5. Switchgear, switchboard, motor-control center, panelboard designations, and ratings.

D. Study Input Data: As described in "Power System Data" Article.

E. Short-Circuit Study Output Data: As specified in "Short-Circuit Study Output Reports" Paragraph in "Short-Circuit Study Report Contents" Article in Section 260573.13 "Short- Circuit Studies."

F. Protective Device Coordination Study Report Contents: As specified in "Coordination Study Report Contents" Article in Section 260573.16 "Coordination Studies."

G. Arc-Flash Study Output Reports:

1. Interrupting Duty Report: Three-phase and unbalanced fault calculations, showing the following for each equipment location included in the report:

a. Voltage.

b. Calculated symmetrical fault-current magnitude and angle.

c. Fault-point X/R ratio.

d. No AC Decrement (NACD) ratio.

e. Equivalent impedance.

f. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a symmetrical basis.

g. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a total basis.

H. Incident Energy and Flash Protection Boundary Calculations:

Allentown, PA 18106 September 15, 2026

26 05 73.19-5

1. Arcing fault magnitude.

2. Protective device clearing time.

3. Duration of arc.

4. Arc-flash boundary.

5. Restricted approach boundary.

6. Limited approach boundary.

7. Working distance.

8. Incident energy.

9. Hazard risk category.

10. Recommendations for arc-flash energy reduction.

I. Fault study input data, case descriptions, and fault-current calculations including a definition of terms and guide for interpretation of computer printout.

2.03 ARC-FLASH WARNING LABELS

A. Produce a 3.5-by-5-inch self-adhesive equipment label for each work location included in the analysis.

B. Label shall have an orange header with the wording, "WARNING, ARC-FLASH HAZARD," and shall include the following information taken directly from the arc-flash hazard analysis:

1. Location designation.

2. Nominal voltage.

3. Protection boundaries.

a. Arc-flash boundary.

b. Restricted approach boundary.

c. Limited approach boundary.

4. Arc flash PPE category.

5. Required minimum arc rating of PPE in Cal/cm squared.

6. Available incident energy.

7. Working distance.

8. Engineering report number, revision number, and issue date.

C. Labels shall be machine printed, with no field-applied markings.

PART 3 EXECUTION

3.01 EXAMINATION

A. Examine Project overcurrent protective device submittals. Proceed with arc-flash study only after relevant equipment submittals have been assembled. Overcurrent protective devices that have not been submitted and approved prior to arc-flash study may not be used in study.

Allentown, PA 18106 September 15, 2026

26 05 73.19-6

3.02 ARC-FLASH HAZARD ANALYSIS

A. Comply with NFPA 70E and its Annex D for hazard analysis study.

B. Preparatory Studies: Perform the Short-Circuit and Protective Device Coordination studies prior to starting the Arc-Flash Hazard Analysis or obtain results from another source.

C. Calculate maximum and minimum contributions of fault-current size.

1. Maximum calculation shall assume a maximum contribution from the utility and shall assume motors to be operating under full-load conditions.

2. Calculate arc-flash energy at 85 percent of maximum short-circuit current according to IEEE 1584 recommendations.

3. Calculate arc-flash energy at 38 percent of maximum short-circuit current according to NFPA 70E recommendations.

4. Calculate arc-flash energy with the utility contribution at a minimum and assume no motor contribution.

D. Calculate the arc-flash protection boundary and incident energy at locations in electrical distribution system where personnel could perform work on energized parts.

E. Include medium- and low-voltage equipment locations, except equipment rated 240 V ac or less fed from transformers less than 125 kVA.

F. Calculate the limited, restricted, and prohibited approach boundaries for each location.

G. Incident energy calculations shall consider the accumulation of energy over time when performing arc-flash calculations on buses with multiple sources. Iterative calculations shall take into account the changing current contributions, as the sources are interrupted or decremented with time. Fault contribution from motors and generators shall be decremented as follows:

1. Fault contribution from induction motors shall not be considered beyond three to five cycles.

2. Fault contribution from synchronous motors and generators shall be decayed to match the actual decrement of each as closely as possible (for example, contributions from permanent magnet generators will typically decay from 10 per unit to three per unit after 10 cycles).

H. Arc-flash energy shall generally be reported for the maximum of line or load side of a circuit breaker. However, arc-flash computation shall be performed and reported for both line and load side of a circuit breaker as follows:

1. When the circuit breaker is in a separate enclosure.

2. When the line terminals of the circuit breaker are separate from the work location.

I. Base arc-flash calculations on actual overcurrent protective device clearing time. Cap maximum clearing time at two seconds based on IEEE 1584, Section B.1.2.

Allentown, PA 18106 September 15, 2026

26 05 73.19-7

3.03 POWER SYSTEM DATA

A. Obtain all data necessary for conduct of the arc-flash hazard analysis.

1. Verify completeness of data supplied on one-line diagram on Drawings and under "Preparatory Studies" Paragraph in "Arc-Flash Hazard Analysis" Article. Call discrepancies to Architect's attention.

2. For new equipment, use characteristics from approved submittals under provisions of action submittals and information submittals for this Project.

3. For existing equipment, whether or not relocated, obtain required electrical distribution system data by field investigation and surveys conducted by qualified technicians and engineer’s Director’s Representative.

B. Electrical Survey Data: Gather and tabulate the following input data to support study.

Comply with recommendations in IEEE 1584 and NFPA 70E as to the amount of detail that is required to be acquired in the field. Field data gathering shall be under the direct supervision and control of the engineer Director’s Representative in charge of performing the study and shall be by the engineer’s Director’s Representative or its representative who holds NETA ETT-Certified Technician Level III or NICET Electrical Power Testing Level III certification. Data include, but are not limited to, the following:

1. Product Data for overcurrent protective devices specified in other Sections and involved in overcurrent protective device coordination studies. Use equipment designation tags that are consistent with electrical distribution system diagrams, overcurrent protective device submittals, input and output data, and recommended device settings.

2. Obtain electrical power utility impedance or available short circuit current at the service.

3. Power sources and ties.

4. Short-circuit current at each system bus (three phase and line to ground).

5. Full-load current of all loads.

6. Voltage level at each bus.

7. For transformers, include kVA, primary and secondary voltages, connection type, impedance, X/R ratio, taps measured in percent, and phase shift.

8. For reactors, provide manufacturer and model designation, voltage rating and impedance.

9. For circuit breakers and fuses, provide manufacturer and model designation. List type of breaker, type of trip and available range of settings, SCCR, current rating, and breaker settings.

10. Generator short-circuit current contribution data, including short-circuit reactance, rated kVA, rated voltage, and X/R ratio.

11. For relays, provide manufacturer and model designation, current transformer ratios, potential transformer ratios, and relay settings.

12. Busway manufacturer and model designation, current rating, impedance, lengths, size, and conductor material.

13. Motor horsepower and NEMA MG 1 code letter designation.

14. Low-voltage conductor sizes, lengths, number, conductor material and conduit material (magnetic or nonmagnetic).

Allentown, PA 18106 September 15, 2026

26 05 73.19-8

15. Medium-voltage conductor sizes, lengths, conductor material, conductor construction and metallic shield performance parameters, and conduit material (magnetic or nonmagnetic).

3.04 LABELING

A. Apply one arc-flash label on the front cover of each section of the equipment and on side or rear covers with accessible live parts and hinged doors or removable plates for each equipment included in the study. Base arc-flash label data on highest values calculated at each location.

B. Each piece of equipment listed below shall have an arc-flash label applied to it:

1. Motor-control center.

2. Low-voltage switchboard.

3. Switchgear.

4. Medium-voltage switch.

5. Medium voltage transformers

6. Low voltage transformers. Exclude transformers with high voltage side 240 V or less and less than 125 kVA.

7. Panelboard and safety switch over 250 V.

8. Applicable panelboard and safety switch under 250 V.

9. Control panel.

C. Note on record Drawings the location of equipment where the personnel could be exposed to arc-flash hazard during their work.

1. Indicate arc-flash energy.

2. Indicate protection level required.

3.05 APPLICATION OF WARNING LABELS

A. Install arc-flash warning labels under the direct supervision and control of Power System Analysis Specialist.

3.06 DEMONSTRATION

A. Engage Power Systems Analysis Specialist to train Director’s Representative's maintenance personnel in potential arc-flash hazards associated with working on energized equipment and the significance of arc-flash warning labels.

END OF SECTION 260573.19

PART 1 GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section includes a computer-based, arc-flash study to determine the arc-flash hazard distance and the incident energy to which personnel could be exposed during work on or near electrical equipment.
1.03 DEFINITIONS
A. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
B. Field Adjusting Agency: An independent electrical testing agency with full-time employees and the capability to adjust devices and conduct testing indicated and that is a member company of NETA.
C. One-Line Diagram: A diagram that shows, by means of single lines and graphic symbols, the course of an electric circuit or system of circuits and the component devices or parts used therein.
D. Power System Analysis Software Developer: An entity that commercially develops, maintains, and distributes computer software used for power system studies.
E. Power Systems Analysis Specialist: Professional engineer in charge of performing the study and documenting recommendations, licensed in the state where Project is located.
F. Protective Device: A device that senses when an abnormal current flow exists and then removes the affected portion from the system.
G. SCCR: Short-circuit current rating.
H. Service: The conductors and equipment for delivering electric energy from the serving utility to the wiring system of the premises served.
I. Single-Line Diagram: See "One-Line Diagram."
1.04 SUBMITTALS
A. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions.
B. Manufacturer’s installation instructions shall be provided along with product data.
C. Submittals shall be provided in the order in which they are specified and tabbed (for combined submittals).
D. Product Data: For computer software program to be used for studies.
E. Study Submittals: Submit the following submittals after the approval of system protective devices submittals. Submittals may be in digital form:
1. Arc-flash study input data, including completed computer program input data sheets.
2. Arc-flash study report; signed, dated, and sealed by Power Systems Analysis Specialist.
3. Submit study report for action prior to receiving final approval of distribution equipment submittals. If formal completion of studies will cause delay in equipment manufacturing, obtain approval from Architect for preliminary submittal of sufficie...
F. Submittals for this section are subject to the re-evaluation fee identified in Article 4 of the General Conditions.
G. Qualification Data:
1. For Power Systems Analysis Software Developer.
2. For Power System Analysis Specialist.
3. For Field Adjusting Agency.

H. Product Certificates: For arc-flash hazard analysis software, certifying compliance with IEEE 1584 and NFPA 70E.

1.05 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data:
1. Provide maintenance procedures in equipment manuals according to requirements in NFPA 70E.
1.06 QUALITY ASSURANCE
A. Study shall be performed using commercially developed and distributed software designed specifically for power system analysis.
B. Software algorithms shall comply with requirements of standards and guides specified in this Section.
C. Manual calculations are unacceptable.
D. Power System Analysis Software Qualifications: An entity that owns and markets computer software used for studies, having performed successful studies of similar magnitude on electrical distribution systems using similar devices.
1. Computer program shall be designed to perform arc-flash analysis or have a function, component, or add-on module designed to perform arc-flash analysis.
2. Computer program shall be developed under the charge of a licensed professional engineer who holds IEEE Computer Society's Certified Software Development Professional certification.
E. Power Systems Analysis Specialist Qualifications: Professional engineer in charge of performing the arc-flash study, analyzing the arc flash, and documenting recommendations, licensed in the state where Project is located. All elements of the study...
F. Arc-Flash Study Certification: Arc-Flash Study Report shall be signed and sealed by Power Systems Analysis Specialist.
G. Field Adjusting Agency Qualifications:
1. Employer of a NETA ETT-Certified Technician Level III or NICET Electrical Power Testing Level III certification responsible for all field adjusting of the Work.
2. A member company of NETA.
3. Acceptable to authorities having jurisdiction.
PART 2 PRODUCTS
2.01 COMPUTER SOFTWARE DEVELOPERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
1. EasyPower, LLC (formerly ESA Inc.).
2. Eaton CYME.
3. SKM Systems Analysis, Inc.
4. Or equal.
B. Comply with IEEE 1584 and NFPA 70E.
C. Analytical features of device coordination study computer software program shall have the capability to calculate "mandatory," "very desirable," and "desirable" features as listed in IEEE 399.
2.02 ARC-FLASH STUDY REPORT CONTENT
A. Executive summary of study findings.
B. Study descriptions, purpose, basis, and scope. Include case descriptions, definition of terms, and guide for interpretation of results.
C. One-line diagram, showing the following:
1. Protective device designations and ampere ratings.
2. Conductor types, sizes, and lengths.
3. Transformer kilovolt ampere (kVA) and voltage ratings, including derating factors and environmental conditions.
4. Motor and generator designations and kVA ratings.
5. Switchgear, switchboard, motor-control center, panelboard designations, and ratings.
D. Study Input Data: As described in "Power System Data" Article.
E. Short-Circuit Study Output Data: As specified in "Short-Circuit Study Output Reports" Paragraph in "Short-Circuit Study Report Contents" Article in Section 260573.13 "Short-Circuit Studies."
F. Protective Device Coordination Study Report Contents: As specified in "Coordination Study Report Contents" Article in Section 260573.16 "Coordination Studies."
G. Arc-Flash Study Output Reports:
1. Interrupting Duty Report: Three-phase and unbalanced fault calculations, showing the following for each equipment location included in the report:
a. Voltage.
b. Calculated symmetrical fault-current magnitude and angle.
c. Fault-point X/R ratio.
d. No AC Decrement (NACD) ratio.
e. Equivalent impedance.
f. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a symmetrical basis.
g. Multiplying factors for 2-, 3-, 5-, and 8-cycle circuit breakers rated on a total basis.
H. Incident Energy and Flash Protection Boundary Calculations:
1. Arcing fault magnitude.
2. Protective device clearing time.
3. Duration of arc.
4. Arc-flash boundary.
5. Restricted approach boundary.
6. Limited approach boundary.
7. Working distance.
8. Incident energy.
9. Hazard risk category.
10. Recommendations for arc-flash energy reduction.

I. Fault study input data, case descriptions, and fault-current calculations including a definition of terms and guide for interpretation of computer printout.

2.03 ARC-FLASH WARNING LABELS
A. Produce a 3.5-by-5-inch self-adhesive equipment label for each work location included in the analysis.
B. Label shall have an orange header with the wording, "WARNING, ARC-FLASH HAZARD," and shall include the following information taken directly from the arc-flash hazard analysis:
1. Location designation.
2. Nominal voltage.
3. Protection boundaries.
a. Arc-flash boundary.
b. Restricted approach boundary.
c. Limited approach boundary.
4. Arc flash PPE category.
5. Required minimum arc rating of PPE in Cal/cm squared.
6. Available incident energy.
7. Working distance.
8. Engineering report number, revision number, and issue date.

C. Labels shall be machine printed, with no field-applied markings.

PART 3 EXECUTION
3.01 EXAMINATION
A. Examine Project overcurrent protective device submittals. Proceed with arc-flash study only after relevant equipment submittals have been assembled. Overcurrent protective devices that have not been submitted and approved prior to arc-flash study m...
3.02 ARC-FLASH HAZARD ANALYSIS
A. Comply with NFPA 70E and its Annex D for hazard analysis study.
B. Preparatory Studies: Perform the Short-Circuit and Protective Device Coordination studies prior to starting the Arc-Flash Hazard Analysis or obtain results from another source.
C. Calculate maximum and minimum contributions of fault-current size.
1. Maximum calculation shall assume a maximum contribution from the utility and shall assume motors to be operating under full-load conditions.
2. Calculate arc-flash energy at 85 percent of maximum short-circuit current according to IEEE 1584 recommendations.
3. Calculate arc-flash energy at 38 percent of maximum short-circuit current according to NFPA 70E recommendations.
4. Calculate arc-flash energy with the utility contribution at a minimum and assume no motor contribution.
D. Calculate the arc-flash protection boundary and incident energy at locations in electrical distribution system where personnel could perform work on energized parts.
E. Include medium- and low-voltage equipment locations, except equipment rated 240 V ac or less fed from transformers less than 125 kVA.
F. Calculate the limited, restricted, and prohibited approach boundaries for each location.
G. Incident energy calculations shall consider the accumulation of energy over time when performing arc-flash calculations on buses with multiple sources. Iterative calculations shall take into account the changing current contributions, as the source...
1. Fault contribution from induction motors shall not be considered beyond three to five cycles.
2. Fault contribution from synchronous motors and generators shall be decayed to match the actual decrement of each as closely as possible (for example, contributions from permanent magnet generators will typically decay from 10 per unit to three per ...
H. Arc-flash energy shall generally be reported for the maximum of line or load side of a circuit breaker. However, arc-flash computation shall be performed and reported for both line and load side of a circuit breaker as follows:
1. When the circuit breaker is in a separate enclosure.
2. When the line terminals of the circuit breaker are separate from the work location.

I. Base arc-flash calculations on actual overcurrent protective device clearing time. Cap maximum clearing time at two seconds based on IEEE 1584, Section B.1.2.

3.03 POWER SYSTEM DATA
A. Obtain all data necessary for conduct of the arc-flash hazard analysis.
1. Verify completeness of data supplied on one-line diagram on Drawings and under "Preparatory Studies" Paragraph in "Arc-Flash Hazard Analysis" Article. Call discrepancies to Architect's attention.
2. For new equipment, use characteristics from approved submittals under provisions of action submittals and information submittals for this Project.
3. For existing equipment, whether or not relocated, obtain required electrical distribution system data by field investigation and surveys conducted by qualified technicians and engineer’s Director’s Representative.
B. Electrical Survey Data: Gather and tabulate the following input data to support study. Comply with recommendations in IEEE 1584 and NFPA 70E as to the amount of detail that is required to be acquired in the field. Field data gathering shall be unde...
1. Product Data for overcurrent protective devices specified in other Sections and involved in overcurrent protective device coordination studies. Use equipment designation tags that are consistent with electrical distribution system diagrams, overcur...
2. Obtain electrical power utility impedance or available short circuit current at the service.
3. Power sources and ties.
4. Short-circuit current at each system bus (three phase and line to ground).
5. Full-load current of all loads.
6. Voltage level at each bus.
7. For transformers, include kVA, primary and secondary voltages, connection type, impedance, X/R ratio, taps measured in percent, and phase shift.
8. For reactors, provide manufacturer and model designation, voltage rating and impedance.
9. For circuit breakers and fuses, provide manufacturer and model designation. List type of breaker, type of trip and available range of settings, SCCR, current rating, and breaker settings.
10. Generator short-circuit current contribution data, including short-circuit reactance, rated kVA, rated voltage, and X/R ratio.
11. For relays, provide manufacturer and model designation, current transformer ratios, potential transformer ratios, and relay settings.
12. Busway manufacturer and model designation, current rating, impedance, lengths, size, and conductor material.
13. Motor horsepower and NEMA MG 1 code letter designation.
14. Low-voltage conductor sizes, lengths, number, conductor material and conduit material (magnetic or nonmagnetic).
15. Medium-voltage conductor sizes, lengths, conductor material, conductor construction and metallic shield performance parameters, and conduit material (magnetic or nonmagnetic).
3.04 LABELING
A. Apply one arc-flash label on the front cover of each section of the equipment and on side or rear covers with accessible live parts and hinged doors or removable plates for each equipment included in the study. Base arc-flash label data on highest ...
B. Each piece of equipment listed below shall have an arc-flash label applied to it:
1. Motor-control center.
2. Low-voltage switchboard.
3. Switchgear.
4. Medium-voltage switch.
5. Medium voltage transformers
6. Low voltage transformers. Exclude transformers with high voltage side 240 V or less and less than 125 kVA.
7. Panelboard and safety switch over 250 V.
8. Applicable panelboard and safety switch under 250 V.
9. Control panel.
C. Note on record Drawings the location of equipment where the personnel could be exposed to arc-flash hazard during their work.
1. Indicate arc-flash energy.
2. Indicate protection level required.
3.05 APPLICATION OF WARNING LABELS
A. Install arc-flash warning labels under the direct supervision and control of Power System Analysis Specialist.
3.06 DEMONSTRATION
A. Engage Power Systems Analysis Specialist to train Director’s Representative's maintenance personnel in potential arc-flash hazards associated with working on energized equipment and the significance of arc-flash warning labels.