2.01 Solicitation - N6264926R0013.pdf
PDF 2 MB Posted
- Attached to
- YON-285 Outfit
- Solicitation number
- N6264926R0013
About this file
This is a Request for Proposal (RFP) for ship repair and alteration services for the YON-285 vessel at SRF Sasebo (Ship Repair Facility - Japan Regional Maintenance Center).
The solicitation N6264926R0013, issued by NAVSUP Fleet Logistics Center Yokosuka on April 22, 2026, seeks proposals for outfit and growth work on the YON-285 ship. The requirement includes two contract line items: CLIN 0001 for YON-285 outfit work (6B1 11 package) covering eleven Industrial Control Numbers (ICNs) specified in Section J, and CLIN 0002 for growth work to accommodate anticipated modifications. Both items are priced as firm fixed-price contracts in Japanese Yen. The delivery period runs from September 28, 2026, through April 30, 2027, with work performed at SRF AND JRMC YOKOSUKA in Yokosuka, Japan. Proposals are due by June 22, 2026 at 10:00 AM Japan Standard Time and must be submitted electronically via email. Award eligibility is restricted to firms possessing a current Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) with the U.S. Navy in the Japan Region; firms without existing agreements may apply for certification if adequate time exists before award. A pre-proposal conference is scheduled for May 13, 2026. Evaluation will be based on technical factors (labor hours, management/staffing plan, and milestone schedule) rated acceptable/unacceptable, past performance information, and price, with past performance weighted more heavily than price for trade-off decisions among acceptable proposals.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Section A - Solicitation/Contract Form
YON - 285 Outfit
A 1.0 – FORM OF SOLICITATION AND RESULTANT CONTRACT (JOB ORDER)
Master Agreement for Repair and Alteration of Vessels (MARV) is a written instrument of understanding, negotiated between a contracting activity and a contractor that — (A) Contains contract clauses, terms, and conditions applying to future contracts for repairs, alterations, and/or additions to vessels; and (B) Contemplates separate future contracts that will incorporate by reference or attachment the required and applicable clauses agreed upon in the master agreement.
Award of a contract resulting from this solicitation will be restricted to firms, which possesses a current MARAV with the U.S. Navy (NAVSUP FLCY) in the form of either a Master Ship Repair Agreement (MSRA) or an Agreement for Boat Repair (ABR) in Japan Region.
Award for this requirement will be made in the form of a Firm-Fixed-Price job order under the applicable agreement and all of the terms and conditions of the offer's existing MARAV will apply. The awardee’s “Agreement” number is shown in the resultant contract (block 1 at 1st page in DD Form 1155 or block 2 at 1st page in SF 26).
Note: Firms who do not possess an MSRA/ABR are ineligible for award unless adequate time exists to permit the Navy to perform an assessment of their MSRA/ABR application and to execute the applicable MSRA/ABR without impacting the vessel's availability dates. Non MARAV holders may request an application for an MSRA or an ABR by requesting an application package from: flcy_msra_abr_group@us.navy.mil.
(End of FORM OF SOLICITATION AND RESULTANT CONTRACT)
N6264926R0013
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Customer: SRF Sasebo Ship (Hull): YON-285 Title: YON-285 Outfit ICN: See attachment
JPY Amount:
Item Supplies/Service Quantity Unit Unit Price Amount
YON-285
6B1 11 pkg ICN/Control #: See spec list The contractor shall accomplish the work requirements of all eleven ICN's as outlined in the specifications provided in Section J Attachment (1).
Japanese yen amount: JPY
Pricing Arrangement: Firm Fixed Price
1 Job
YON-285 Growth Work 6B1 11 pkg ICN/Control #: See spec list The contractor shall accomplish Growth Work necessary to accommodate anticipated Growth Work for the YON-285 as outlined in Section H-6.0.
Japanese yen amount: JPY
Pricing Arrangement: Firm Fixed Price
1 Job
Section C - Description/Specifications/Statement of Work
C 1.0 - AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is: Authorized Contracting Officer in Sasebo Contracts Division (Code 240), NAVSUP Fleet Logistics Center Yokosuka (FLCY).
(d) Report any conditions, discrepancies, and/or finding to the Contracting POC via the Government Technical POC. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.
(e) Government POCs Technical POC: Project Manager stated in "Overall Contract Inspection/Acceptance Locations"
Contracting POC: Jason Rankin Jason.m.rankin6.civ@us.navy.mil
Alternate Contracting POC: Fumika Yamasaki fumika.yamasaki2.ln@us.navy.mil
Contracting Officer POC: Hiromi Kurita hiromi.kurita.ln@us.navy.mil
[Solicitation] See block 5 at 1st page of SF 18 or block 7 at the 1st page of the SF 33 [Contract] See block 6 at 1st page of DD 1155 or block 5 at 1st page of SF 26.
(End of AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER)
C 2.0 - NON-NAVY OWNED CRANES
C 2.0 applies when non-navy owned crane is used to accomplish the requirement. If non-navy owned crane is not used, disregard C 2.0.
Sections 11.1 through 11.4 in the latest NAVSUPFLCYINST 4200.9, Contracting Officer's Crane Oversight Plan, is invoked for the incidental use of non- Navy owned cranes at Navy shore installations.
(End of NON-NAVY OWNED CRANES)
Requirements YON - 285 Outfit
There will be a pre-proposal conference held on or around 13-MAY-2026.
Section D - Packaging and Marking
Section E - Inspection and Acceptance
E 1.0 - INSPECTION/ACCEPTANCE:
In addition to the FAR clause 52.213-4 (d), inspection of the work accomplished hereunder shall be performed periodically by an authorized representative during the performance of the work and at the final inspection upon completion of the work. The representative will be identified in writing at time of contract award.
(End of INSPECTION/ACCEPTANCE)
E 2.0 - QUALITY ASSURANCE:
The Contractor shall provide and maintain a quality management system acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that system to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. For U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Yokosuka/Detachment Sasebo, Japan requirements and Commander, Logistics Group Western Pacific (COMLOGWESTPAC) SRU Singapore requirements, the Contractor's quality management system shall be in accordance with that set forth in NAVSEA Standard Item 009-
04. In addition to its rights under DFARS clause 252.217-7005 Inspection and Manner of Doing Work of the Master Agreement for Repair and Alteration of Vessels, the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality management system and, as such, the Contractor shall not be entitled to progress payments for said work and material.
(End of QUALITY ASSURANCE)
FAR Clauses Incorporated by Full Text
52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
NAVSEA Standard Item[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.]
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Acceptance and Inspection will be conducted in accordance with contract terms and conditions.
DoDAAC: N62758 CountryCode: USA
SRF AND JRMC YOKOSUKA
PSC 473 BOX 8, FPO AP 96349
FPO, AP 96349
UNITED STATES
Tanya Escritoryamada, SRF - JRMC DET Sasebo Email: tanya.l.escritoryamada.civ@us.navy.mil Telephone: 252-6772
Inspection and Acceptance Location
Both Destination Instructions: Acceptance and Inspection will be conducted in accordance with contract terms and conditions.
DoDAAC: N62758 CountryCode: USA
SRF AND JRMC YOKOSUKA
PSC 473 BOX 8, FPO AP 96349
FPO, AP 96349
UNITED STATES
Tanya Escritoryamada, SRF - JRMC DET Sasebo Email: tanya.l.escritoryamada.civ@us.navy.mil Telephone: 252-6772
Section F - Deliveries or Performance
F 1.0 - PERIOD OF THE CONTRACT
The "Anticipated Award Date" on the job specification should be at a minimum the Contract Award Milestone date for scheduled ship repair availabilities or the desired contract award date. For revision specs for contract modifications, this date should be the date work needs to be awarded so it does not affect schedule.
"Effective Date" (block 3 at the 1st page of the contract) represents the date that will give the awardee time to order materials, submit process control procedure and any other preparation work needed prior to the actual physical work starting.
The "POP Start Date" is usually the first day of the scheduled ship repair availability or the date when actual/physical work may start.
The "Production Completion Date" is the key event date when production work excluding testing must be completed.
The "POP End Date" is the date when work must be completed for all requirements in the work specification. The awardee is expected to have all GFM returned, work area cleaned, required reports/paper work submitted or any other post work requirements that there may be. The POP End date is stated in the DELIVERY INFORMATION section below.
Coordinate work schedule with the Government Technical Point of Contact (POC) to accomplish all requirements and other related works within the effective period. If the contractor realizes any potential or actual delay in performance, report to the Government Contracting POC via the Government Technical POC.
(End of PERIOD OF THE CONTRACT)
Line Item Delivery Schedule Quantity Address and POC
Delivery Period From 28 Sep 2026 to 30 Apr 2027
Period of Performance From 28 Sep 2026 To 30 Apr 2027
1 Job Ship To DoDAAC: N62758
SRF AND JRMC YOKOSUKA
1 CHOME HON CHO BLDG A61
YOKOSUKA JAPAN AP USA
Delivery Period From 28 Sep 2026 to 30 Apr 2027
Period of Performance From 28 Sep 2026 To 30 Apr 2027
1 Job Ship To DoDAAC: N62758
SRF AND JRMC YOKOSUKA
1 CHOME HON CHO BLDG A61
YOKOSUKA JAPAN AP USA
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.242-15 Stop-Work Order. Aug 1989 52.242-17 Government Delay of Work. Apr 1984 52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
G 1.0 - CURRENCY AND EXCHANGE RATE
For the Government's administrative purpose, the contract amount will be expressed in U.S. dollars (USD). However, payment will be made in Japanese currency (JPY). Applies FY26 Budget Exchange Rate, JPY 150.4415 per USD 1.00.
Total Contract Amount (CLIN0001 + CLIN0002) JPY:
(End of CURRENCY AND EXCHANGE RATE)
G 2.0 - ELECTRONIC FUND TRANSFER (EFT)
The Contractor must agree to receive payment by EFT. Transaction fee (currently JPY735) will be deducted by the Financial Institution (Bank of America) making payment. Additional fee may be imposed by the bank designated to receive payment.
(End of EFT)
G 3.0 - CONSUMPTION TAX
(a) The Governments of the United States and Japan have agreed that this contract is exempt from the Japanese Consumption Tax. In accordance with paragraph (c) of the clause FAR 52.229-6, "TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)," the offerors or quoters shall not include the Consumption Tax (including underlying taxes) in their proposal or quotations. By submission of your proposal or quotation, you are certifying that your proposal or quotation does not contain any such tax. The following U.S. Government (USG) proof of purchase forms shall be used to claim the exemption at tax offices:
USG Standard Form 1034 USG Standard Form 1113 USG Standard Form 44 Department of Defense Form 1155 Navy Comptroller Form 2277
(b) The Contractor shall retain the appropriate USG proof of purchase forms set forth above for a period of seven (7) years. In addition, the Contractor shall maintain adequate records containing all pertinent information with regard to the claiming of Consumption Tax exemptions related to this contract. These records shall be subject to review by the Contracting Officer, or his or her designated representative, at any time up to seven (7) years from the date of final payment under this contract.
(c) Any questions concerning the applicability of the Consumption Tax should be directed to the appropriate local tax office.
(End of CONSUMPTION TAX)
G 4.0 - CUSTOMS AND TAX EXEMPTION
(a) The Contractor shall, notwithstanding any other clause in this contract to the contrary, be required to submit a request in writing to the Contracting Officer for issuance of a Tax Exemption Certificate for any import duties and all taxes paid or to be paid from which the U.S. Government is entitled to an exemption. These taxes and duties are enumerated in Article XII of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between the Governments of the United States of America and Japan, regarding facilities areas and the status of United States Armed Forces in Japan. The Contractor's request shall include the following information:
(1) Name of contractor;
(2) Contract number and job order number (if applicable);
(3) Nomenclature of taxable material to be delivered and intended use;
(4) Quantity of taxable material used or to be delivered; and
(5) Period of taxable material use.
(b) In the case of gasoline and other petroleum products, the Contractor shall be responsible for making every reasonable effort to determine the accuracy of his figures on consumption. In this regard, the Contractor shall, upon request of the Contracting Officer, present all available data used by the Contractor as the basis for determining such figures. The Contractor shall be required to maintain adequate records containing all pertinent information with regard to the above requirements. Further, these records shall be subject to review by the Contracting Officer at any time up to three years from the date of final payment under this contract.
(End of CUSTOMS AND TAX EXEMPTION)
G 5.0 - EXPEDITING CONTRACT CLOSEOUT
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
(End of EXPEDITING CONTRACT CLOSEOUT)
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.204-7006 Billing Instructions-Cost Vouchers May 2023 252.217-7007 Payments. Dec 1991 252.217-7008 Bonds. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7008 Assignment of Claims (Overseas). Jun 1997
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice as 2 in 1
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0721
Issue By DoDAAC N62649
Admin DoDAAC N62649
Inspect By DoDAAC N62758
Ship To Code N62758
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N62758
Accept at Other DoDAAC N/A
LPO DoDAAC N62758
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Ayako.Nagamori3.ln@us.navy.mil
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
H 1.0 - OCCUPATIONAL AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT (29 CFR 1915)
The Contractor shall fully comply with 29 Code of Federal Regulations Part 1915, Occupational and Health Standards for Shipyard Employment (29 CFR 1915), as it is effective at the date of contract award, while performing any contract that is awarded from this solicitation. The provisions of 29 CFR 1915 shall apply to the same extent as if the ship repairing, shipbuilding, and shipbreaking employments and related employments to be performed under the contract are wholly accomplished on the navigable waters of the United States. The Contractor shall comply with applicable provisions of the laws and regulations where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed in addition to complying with the corresponding provisions of 29 CFR 1915 in instances in which those laws and regulations require compliance with more stringent safety standards. The Contractor shall promptly notify the contracting officer if it becomes aware of any law or regulation that is applicable where the ship repairing, shipbuilding, and shipbreaking employment and related employments are performed that precludes compliance with any provision of 29 CFR 1915.
(End of OCCUPATIONAL AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT)
H 2.0 - EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software.
Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
(End of EXTENSION OF COMMERCIAL WARRANTY)
H 3.0 - CONTROL OF UNCLASSIFIED INFORMATION (SRF-JRMC Requirements Only)
The Contractor shall not provide Controlled Unclassified Information (CUI) U.S. Navy technical information (engineering drawings, technical manuals, system or equipment photographs or any other U.S. Navy engineering data in any form (orally, paper copy, film or digital file/image) to anyone except SRF-JRMC employees, other Department of Defense (DoD) employees or U.S. DoD Contractors requiring the data for accomplishment of an SRF-JRMC business processes unless the data is marked Distribution Statement "A" (Approved for public release: distribution is unlimited) or has been approved for unrestricted public release by the Commanding Officer of SRF-JRMC or Commander U.S. Naval Forces Japan (COMNAVFORJAPAN) Public Affairs Officer (PAO). The Contractor shall notify SRF-JRMC Code 700 (Code 950 in Sasebo) and request written permission to release CUI outside of SRF-JRMC, DoD Activities or U.S. DoD Contractors that are not involved in the SRF-JRMC business process if the Contractor believes that the release is required to support a SRF-JRMC business or Public Affairs requirement.
(End of CONTROL OF UNCLASSIFIED INFORMATION)
H 4.0 - LAY DOWN SPACE
The Contractor may request the lay down space adjacent to the ship yard in * (location and name of the base) Upon the receipt of approval by the Government, the Contractor may obtain the applicable lay down space. The Contractor shall be responsible for all the cost, but not limited to, for maintaining the facility, utility, safety, and security. (*) See Job Specification.
(End of LAY DOWN SPACE)
H 5.0 - APPLICABLE TO CONTRACTS PERFORMED IN JAPAN
HISTORIC AND CULTURAL RESOURCES
If ship repair work is being performed in and around potentially significant historic buildings and structures (cultural properties) such as Dry Docks 1 through 6 and Cave 682 in Yokosuka Base, the contractor shall avoid changing the original materials and finishes used in the properties.
If work is being performed to repair or change a historical building/structure, the contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work.
If work is being performed on a cultural or historical asset, such as a historical building/structure or archeological site, special precautions may be necessary. The contractor shall submit design drawings, floor plans, and other relevant operational details to the CFAY Cultural Resource Manager through the Contracting Officer for review and approval prior to the commencement of work. The contractor shall contact the CFAY Cultural Resources Manager through the Contracting Officer to determine if the work involves any archaeological, historical or cultural assets.
The contractor must conduct an archaeological monitoring by a qualified archaeologist for the planned excavations. During the monitoring, use of flat bladed bucket is required for backhoe operations. If any cultural/historical artifacts/assets include brick structures, manufactures plates indicating years before 1945 on the machines and equipment are discovered during work, the contractor shall notify the Public Works Department (PWD) Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager (DSN 243-5136/COMM 046-816-5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area until further direction from the PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer.
If the items need to be temporarily removed, carefully protect them from disturbance, including weather conditions, unforeseen traffic, and pilfering.
The PWD Environmental Cultural Resources Manager Environmental Branch Cultural Resources Manager through the Contracting Officer will provide further direction/guidance on how to protect the items. The Government retains ownership and control over historical and archaeological resources.
The contractor shall carefully protect in-place and report immediately to the Contracting Officer historical and archaeological items or human skeletal remains discovered in the course of work. Upon discovery, the contractor shall notify Cultural, Historical, and/or Natural Resources (CHNR) Manager (DSN 243-5136/COMM 046-816- 5136) through the Contracting Officer, secure the discovery area, and continue to work around the secured area. The Government retains ownership and control over historical and archaeological resources."
(End of APPLICABLE TO CONTRACTS PERFORMED IN JAPAN)
H 6.0 - Growth CLIN
(a) This contract will utilize a Growth CLIN (CLIN 0002) which is pre-funded to accommodate the anticipated growth work that may arise during the performance of the specified Industrial Control Numbers (ICNs) under CLIN 0001. The contractor shall provide approx. 4,645 man-hours and $119,471.07 in materials in the performance of the Growth CLIN in support of historically based growth under this contract. Upon negotiation of each growth work task, the agreed labor and material amount shall become a completion requirement. The total authorized growth work may not exceed the total dollar value of the Growth CLIN, however, the mix of labor hours and material provided above may be adjusted so long as the total does not exceed the dollar value of the Growth CLIN.
(b) GROWTH WORK - Growth is defined as any additional work that is identified and authorized after contract award that is within the scope of work of the ICNs defined in CLIN 0001 and as attached under Section J. Any additional work determined by the Contracting Officer as not within the scope of any of the ICNs shall be considered NEW WORK and will not be covered by this Growth CLIN.
(1) After any inspection reports detailed in any of the Industrial Control Numbers (ICNs) are submitted to Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC), the contractor will propose solutions, recommendations, material availability, and time impacts to the Period of Performance. This will be in the form of a Condition Found Report (CFR), which will be submitted to SRF-JRMC within twenty-four (24) hours after the conditions have been found and identified. This form (SRF- JRMC Form 4730-141) shall be submitted electronically and physically for recordkeeping purposes. The contractor shall not begin work reported under a CFR until an agreement is reached between the contractor, SRF-JRMC and the Administrative Contracting Officer (ACO).
(2) The contractor shall submit any repair items outside of the scope of the ICNs via CFR (SRF-JRMC Form 4730-141) to SRF-JRMC to include schedule impacts.
(3) For any Government Furnished Material (GFM) or Contractor Furnished Material (CFM) that is part of any ICN and which is later identified to not arrive on time for the requirement's completion, the contractor shall submit a CFR (Form 4730-141) to SRF-JRMC to include schedule impacts.
(4) SRF-JRMC shall review the CFR and will determine further action. When determined by SRF-JRMC that the work detailed on the CFR is required and would require additional man-hours or materials, the CFR is returned to the contractor through the Contracting Office, as growth work together with a Deficiency Log (DL) detailing the corrective actions and additional work requirements. A Growth Management Request (GMR) Level of Effort (LOE) to completion will be utilized for each growth work request and approval.
(5) Upon receipt of a growth work requirement, the contractor shall submit a proposal with the estimated price within 5 working days, or as specified by the Contracting Office. Naval Supply Systems Command (NAVSUP) Fleet Logistics Center Yokosuka (FLCY) Site Sasebo and SRF-JRMC will review and approve each proposal. Once an agreement has been reached between the contractor, SRF-JRMC and the ACO, a signed GMR by the ACO will be issued to enable the contractor to commence work. The price negotiated by the parties shall be a firm fixed price for the growth work requirement.
(6) The ACO will develop a growth work tracking log for the Growth CLIN to identify, record, and reconcile all the approved GMR-LOE to completion. The tracking log shall include but not limited to LOE number, ICN, Deficiency Log (DL) number, job description, and approved total price, labor hours, materials/other cost.
(c) Effort performed in fulfilling the obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee's usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations or other time and effort which does not have a specific and direct contribution to the tasks described in Sections B and C.
(d) (1) The Contractor shall schedule the performance of all items of the work package. The contractor agrees that these man-hours, if tasked, shall be performed concurrently with the other contracted for work items, during the contract period of performance, without impacting, accelerating, or causing delay or disruption to the work required by the other contracted for work items, to any other Government contract, or to any other work in progress for the Government.
(2) The growth, if required, shall be tasked during the contract period of performance, as may be modified, on the schedule in coordination with the Contracting Officer.
(e) (1) The Contractor's fully burdened labor rate that will be proposed in the original contract and included below will be used for negotiating growth work to be performed under this contract. The contractor agrees that the number of man-hours included in its price proposal for contract modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting Fire Watch
Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work N6264926R0025 Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Pipefitting Rigging General Labor Staging/Scaffolding
Labor Rate: (To be filled in upon Contract Award)
(2) The fully burdened ship repair labor rate proposed by the contractor listed in paragraph (e)(1) above shall include all costs associated with support functions (whether charged directly or indirectly by the offeror's accounting systems) provided in support of the direct production man-hour functions listed in paragraph (e)(1) above. Support functions shall be considered to be included in the offeror's fully burdened ship repair labor rate for direct production man-hours. Labor hours for the below support functions shall not be separately proposed in any circumstance, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:
Testing Quality Assurance Execution Planning Cleaning Supervision Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Material handling & warehousing Safety/Environmental
(3) The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
(4) Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully burdened ship repair labor rate and not separately priced.
(5) The contract fixed fully burdened ship repair labor rate shall be used for negotiating growth work during the entire availability regardless of how many labor hours and material dollars are procured and negotiated.
(6) The growth reservation man-hours and material dollar requirements listed above are part of this contract under the original solicitation and award.
The man-hour reservation shall include both prime contractor and subcontractor efforts. Only actual production man-hours expended will be considered towards the contractor's obligation to provide the defined reservation man-hour effort. While supervision, quality assurance, and other nonproduction labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractor's obligation to provide reserved man- hours. The man-hour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual ICN. Proposed material price shall be based on actual costs to the Contractor of acquiring the materials provided. Proposed material price may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the actual cost of materials expended toward the reservation. The reservation in the contract is Firm Fixed Price Level of Effort to completion. This reservation is Level of Effort to Completion. Once the scope of work for a task has been listed and a mutually agreeable number of man-hours or materials has been agreed to, neither party will be entitled to an adjustment based on actual man-hours or material dollars required. The Contractor shall not commence work without approval from the ACO or receipt of the approved GMR.
(f) The balance of hours and material remaining on the Growth CLIN after negotiations have concluded and when it is evident that no additional growth work will be tasked is subject to a decrease change order. As a result, any unused funds on the Growth CLIN will be recouped by the ACO through a contract modification action as a decrease in price within 30 days after the end of the contract period of performance.
Section I - Contract Clauses
I 1.0 - JAPANESE CONCILIATION PROCEDURES
(a) Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the US-Japan Joint Committee for conciliation in accordance with paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of Mutual Cooperation and Security between Japan and the United States of America. Request by the Contractor for conciliation shall be made in accordance with the procedures provided herein.
(b) In the event the Contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact within the time limits described therein before filing request for conciliation with the Joint Committee and then request for appellate authority under the clause of this contract entitled Disputes to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.
(c) The request for conciliation will be submitted by the Contractor through the nearest local Japanese Defense Facilities Administration Bureau to the Contract Conciliation Panel of the Joint Committee. Upon the filing of the request with the Joint Committee, the Contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.
(d) In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the Contractor to notify the appellate authority designated in the clause of this contract, entitled Disputes, of the settlement of the dispute and to withdraw his appeal.
(e) In the event the Contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding the pending request for conciliation, that action by the appropriate authority under the clause of this contract entitled Disputes be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the Contractor of his action taken hereunder.
(f) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled Disputes has been rendered. Pending the hearing of conciliation panel the Contractor shall proceed diligently with the performance of the contract and in accordance with the Contracting Officer's decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file a civil suit.
(End of JAPANESE CONCILIATION PROCEDURES)
I 2.0 - SUPTXT204-9400(4-22) CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE
INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED HEALTH INFORMATION
The security text does not apply in cases where the contractor/vendor does not have access to Navy Marine Corps Intranet (NMCI) computers, is not issued a Common Access Card (CAC) and is involved in training or other short term duties of less than 30 days duration that allow for the use of a visitor request. In these cases, the government employee must submit a Visitor Access Request (VAR) to the main gate or applicable processing entity for your facility and assume responsibility to escort those without CAC Credentials.
This local text does not apply to non-United States (U.S.) Nationals (foreign nationals) who are contactor employees performing work overseas. This text is applicable to the U.S. Nationals living in the U.S. or overseas who are performing work on a Navy contract.
The investigation of a non-U.S. national at a foreign location must be consistent with a National Agency Check with Written Inquiries (NACI), to the extent possible and include a fingerprint check against the Federal Bureau of Investigation (FBI) criminal history database, an FBI investigations file (name check) search and a name check against the terrorist screening database. Also, the above cited reference notes that Foreign Nationals may not be granted CAC credentials until completion of their investigation and not in the interim.
Per Department of Defense Memorandum (DoDM) 5200.2, Department of Defense (DoD) components must initiate and ensure completion of a background investigation before applying the credentialing standards to a non-U.S. national at a foreign location. The background investigation must be favorably adjudicated before a CAC can be issued to a non-U.S. national at a foreign location. The type of background investigation may vary based on standing reciprocity treaties concerning identity assurance and information exchanges that exist between the U.S. and its allies or agency agreements with the host country.
CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, IT SYSTEMS OR
PROTECTED HEALTH INFORMATION
Executive Order 13467, Reforming Processes Related to Suitability for Government Employee, Fitness for Contractor Employees and Eligibility for Access to Classified National Security Information, Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The 5 CFR 32 Part 157 in concert with DoD Manual 1000.13, Vol 1, implements the Federal Standards.
APPLICABILITY
This text applies to all DoD sponsored individuals who require CAC eligibility (or login and P/W if acceptable per contract) for: Physical access to DoD facilities or non-DoD facilities on behalf of DoD; Logical access to information systems (whether on site or remotely); or remote access to DoD networks that use only the CAC logon for user authentication, or access to sensitive and protected information. This applies to the Office of the Secretary of Defense (OSD), the Military Departments, the Office of the Chairman of the Joint Chiefs of Staff and the Joint Staff, the Combatant
Commands, the Office of the Inspector General of the DoD, the Defense Agencies, the DoD Field Activities and all other organizational entities within the DoD (hereinafter referred to collectively as the "DoD Components").
Each contractor employee providing services at a Navy command under this contract is required to obtain a DoD CAC. Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Definition. As used in this clause - Military installation means a base, camp, post, station, yard, center, or other activity under the jurisdiction of the Secretary of a military department, or, in the case of an activity in a foreign country, under the operational control of the Secretary of a military department or the Secretary of Defense (see 10 U.S.C. 2801(c)(4)).
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command's Security Manager (CSM) upon arrival to the command and shall out-process prior to their departure at the completion of the individual's performance under the contract.
Training. Contractor employees who require routine physical access to a Federally controlled facility or military installation shall complete "Level I Antiterrorism Awareness Training" prior to gaining access to a facility and annually thereafter in accordance with DoDI O-2000.16 Vol. 1. In accordance with Department of Defense Instruction O-2000.16 Volume 1, DoD Antiterrorism (AT) Program Implementation: DoD AT Standards, Level I Antiterrorism Awareness Training shall be completed by:
1. Completion of "Level I Antiterrorism Awareness Training" available at https://jkodirect.jten.mil/pdf/atl1/launch.html; or
2. Under the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .