This document provides a contract price schedule template for solicitation number PARK - PMIS: BOST 227374 & BOST 254798 to restore hardscapes and a Dorchester Heights Monument. The National Park Service Denver Service Center is seeking pricing for base line items and all option line items to complete hardsape repairs including micropiles, granite stair treads, and monument restoration work including interior masonry repairs, exterior stone restoration, bronze door cleaning, and structural, electrical and stair repairs. Unit pricing is also requested for stone crack repairs, pinning, Dutchman installation and stone removal and resetting. Offerors are required to provide pricing for all base and option line items. The total proposed price should include the base price plus all option prices.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule Template National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:
PARK - PMIS: BOST 227374 & BOST 254798
(Project Management Information System)
Developed Area: THOMAS PARK
Project Title:
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1* BOST 227374 HARDSCAPE PROJECT
Base Bid Scope of Work * 1 Lump Sum $0.00 $0.00
2* BOST 227374 HARDSCAPE PROJECT
Micropiles * 1 11,136 LF $0.00 $0.00
BOST 254798 MONUMENT RESTORATION
PROJECT
Base Bid Scope of Work
1 Lump Sum $0.00 $0.00
TOTAL BASE PRICE (Contract Line Item Number 1 through 3) --------------------------------------------------------------------------------- $0.00
4 BOST 254798 MONUMENT RESTORATION
OPTION B: Interior Masonry Repairs & Repointing 1 Lump Sum $0.00 $0.00
BOST 254798 MONUMENT RESTORATION
OPTION C: Exterior Masonry Restoration Below Level 2 Balconies
1 Lump Sum $0.00 $0.00
6* BOST 227374 HARDSCAPE PROJECT
OPTION A: Granite Stair Treads * 1 Lump Sum $0.00 $0.00
BOST 254798 MONUMENT RESTORATION
OPTION D: Bronze Entry Door Cleaning & Restoration, & Lock Repairs
1 Lump Sum $0.00 $0.00
BOST 254798 MONUMENT RESTORATION
OPTION E: Exterior Railing and Decorative Gate Restoration
1 Lump Sum $0.00 $0.00
BOST 254798 MONUMENT RESTORATION
OPTION F: Cleaning and Refinishing of Square Steel Stair
1 Lump Sum $0.00 $0.00
10 BOST 254798 MONUMENT RESTORATION
OPTION G: Modification of Square Steel Stair Railing 1 Lump Sum $0.00 $0.00
BOST 254798 MONUMENT RESTORATION
OPTION H: Cleaning and Refinishing of Spiral Steel Stair
1 Lump Sum $0.00 $0.00
12 BOST 254798 MONUMENT RESTORATION
OPTION J: Plinth Paving 1 Lump Sum $0.00 $0.00
BOST 254798 MONUMENT RESTORATION
OPTION K: Level 01 Structural Framing & Floor Replacement
1 Lump Sum $0.00 $0.00
BOST 254798 MONUMENT RESTORATION
OPTION L: Electrical Service Wire Replacement 1 Lump Sum $0.00 $0.00
Section 0122000 Unit Prices:
Unit Price No. 1: Provide Route and Fill Crack Repair in Marble 1 LF $0.00 $0.00
Unit Price No. 2: Face Pin Marble Unit Along Crack Length and Patch Crack 1 LF $0.00 $0.00
Unit Price No. 3: Blind Pin Marble Unit Along Crack Length and Patch Crack 1 LF $0.00 $0.00
Unit Price No. 4: Install Marble Dutchman
1 SF $0.00 $0.00
DORCHESTER HEIGHTS HARDSCAPE PROJECT &
DORCHESTER HEIGHTS MONUMENT RESTORATION
Unit Price No. 5: Remove Exterior Face Stone and Reset 1 SF $0.00 $0.00
Unit Price No. 6: Replace Stone Unit
1 SF $0.00 $0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 4 through 20) ----------------------------------------------------------- $0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 20) -------------------------- $0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.
Price Schedule Template