This specification covers lead abatement requirements for the restoration of the Dorchester Heights Monument. Locations of lead include copper roofing material, black paint on the main entrance door and frame, and low concentrations on structural steel and fencing. The specification requires lead contractors to be certified and have performed lead abatement work for three years. They must submit lead abatement work plans, waste disposal plans, and evidence of proper training, medical clearance, and respirator fit tests for workers. High exposure risk activities like torch cutting painted surfaces are prohibited. Strict lead control areas, decontamination procedures, and waste handling standards must be followed. Hazardous lead waste must be transported and disposed of according to EPA regulations.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOST – 227374 & BOST - 25798 02 83 13 - 1
MONUMENT LEAD IN CONSTRUCTION
SECTION 02 83 13 – MONUMENT LEAD IN CONSTRUCTION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes requirements for worker and environmental protection when disturbing lead.
B. Locations of Lead:
1. On copper roofing material.
2. In black paint on main entrance door and door frame.
3. Detected at low concentrations
a. Gray I-beam on the first observatory level
b. Blank paint on fence
Paragraph 1.3 in this Section identifies key lead regulations. All applicable regulations apply whether they are called out in the reference section or not.
1.2 RELATED DOCUMENTS
A. Section 01 74 19, “Construction Waste Management and Disposal”.
B. Section 02 42 96, “Monument Historic Removal and Dismantling”.
C. Section 02 81 13, “Monument Miscellaneous Hazardous Materials”.
D. Section 02 82 13, “Monument Asbestos Abatement”.
E. Section 02 87 13, “Monument Bird Excrement Removal”.
1.3 REFERENCES
A. Hazardous Materials Inspection Reports
1. Hazardous Building Materials Survey Report: Prepared by TRC Environmental Corporation, Woburn, MA; June 7, 2021.
2. Hazardous Building Materials Survey Report: Prepared by Maxximus Environmental, Inc., Rockville, MD; December 2, 2021.
B. US Occupational Safety and Health Administration (OSHA) Regulations
1. 29 CFR 1926.62 “Lead in Construction”
C. US Environmental Protection Agency (EPA) Regulations
1. 40 CFR 260 et seq “Hazardous Waste Management System”
D. Code of Massachusetts Regulations (CMR)
BOST – 227374 & BOST - 25798 02 83 13 - 2
1. 105 CMR 460.000 “Lead Poisoning Prevention and Control”
2. 310 CMR 30.000 “Hazardous Waste”
1.4 DEFINITIONS
A. Words defined in applicable regulations have the same meaning in this specification.
B. Lead Contractor means the contractor responsible for disturbing lead-based paint.
C. General Contractor means the prime contractor responsible for all aspects of construction.
D. Owner means the National Park Service.
1.5 SUBMITTALS
A. General Contractor’s health and safety program shall include a section about lead paint. This shall include identification of the locations of lead, communication of lead risk to all subcontractors, identification of which subcontractors are anticipated to disturb lead (may include roofing subcontractor, painting subcontractor, demolition subcontractor or specialized lead paint removal contractor), and how workers will be protected during disturbance.
B. Lead contractors to submit a lead safe work plan that includes:
1. Description of process that will disturb lead.
2. Engineering controls used to protect workers and the environment.
3. Worker and supervisor certifications including training required by OSHA, medical approval, and respirator fit tests.
4. Personal protective equipment.
5. Worker exposure monitoring.
6. Personnel decontamination means and methods.
7. Means and methods to be used while disturbing lead.
8. Lead waste management plan including
a. Testing,
b. Label
c. Transportation
d. Disposal
1.6 QUALITY ASSURANCE
A. Permits and Notifications: Submit any required state or local permits or notifications.
B. Contractor Requirements: Contractor must have been performing lead in construction work for three years. Contractor liability insurance coverage must be approved by Owner, must be
BOST – 227374 & BOST - 25798 02 83 13 - 3
occurrence form and must include pollution coverage. Workers compensation insurance must be at least equal to the state minimum requirements.
C. Competent Person Requirements: Minimum 5 years’ experience with lead in construction.
Trained as required by 29 CFR 1926.62. Medical approval to perform lead work within the past 12 months. A respirator fit test for the type of respirator that will be used within the past 12 months.
D. Worker Requirements: Trained as required by 29 CFR 1926.62. Medical approval to perform lead work within the past 12 months. A respirator fit test for the type of respirator that will be used within the past 12 months.
E. Waste Transporter: Hazardous waste must be transported by a US DOT hazardous waste transporter.
F. Landfill Approval: The waste must be disposed in a facility approved by state and/or EPA for disposal of lead hazardous waste.
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION
3.1 HIGH EXPOSURE RISK ACTIVITIES
A. Torch cutting and welding may not be done on a painted surface. Paint must first be removed.
B. Abrasive blasting is permitted on lead containing paint but if other techniques are practical, they are preferred. Prior to abrasive blasting on either lead-based paint or other paint, paint chip samples shall be collected and submitted for analysis for priority pollutant metals. Workers must be protected from exposure to other heavy metals. OSHA has separate standards for exposure to arsenic, cadmium, and chromium if any of these metals are detected.
3.2 LEAD CONTROL AREA
A. All work disturbing lead will be done in a lead regulated area. Only approved workers may enter the lead control area. The are must be marked by DANGER tape or sealed with plastic sheeting, as appropriate. OSHA required signs shall be posted at the entrance to the regulated area in English and in Spanish.
3.3 DECONTAMINATION
A. Lead dust and debris must be controlled such that it cannot leave the regulated area unless packaged for disposal
B. Hands and face must be washed each time a worker leaves a regulated area.
C. Workers exposed above the OSHA Permissible Exposure Limit must shower at the end of the shift.
BOST – 227374 & BOST - 25798 02 83 13 - 4
3.4 WASTE MANAGEMENT
A. Roofing material shall be recycled, if practical. Otherwise, it shall be disposed as hazardous waste.
B. Paint chips shall be sampled and analyzed by the Toxicity Characteristic Leaching Protocol (TCLP) for lead. If TCLP result is greater than 5 mg/L, waste is hazardous.
C. Wash water from hand wash station and shower shall be sampled and analyzed by TCLP for lead.
If TCLP result is greater than 5 mg/L, waste is hazardous.
D. Hazardous waste shall be transported in compliance with US DOT regulations.
E. Hazardous waste shall be disposed in compliance with US EPA regulations.
F. Non-hazardous waste containing lead shall be recycled or disposed in a landfill that is permitted to accept non-hazardous waste containing lead.
END OF SECTION 02 83 13
| Part 1 - GENERAL |
| 1.1 SUMMARY |
| A. This Section includes requirements for worker and environmental protection when disturbing lead. |
| B. Locations of Lead: |
| 1. On copper roofing material. |
| 2. In black paint on main entrance door and door frame. |
| 3. Detected at low concentrations |
| a. Gray I-beam on the first observatory level |
| b. Blank paint on fence |
Paragraph 1.3 in this Section identifies key lead regulations. All applicable regulations apply whether they are called out in the reference section or not.
| 1.2 RELATED DOCUMENTS |
| A. Section 01 74 19, “Construction Waste Management and Disposal”. |
| B. Section 02 42 96, “Monument Historic Removal and Dismantling”. |
| C. Section 02 81 13, “Monument Miscellaneous Hazardous Materials”. |
| D. Section 02 82 13, “Monument Asbestos Abatement”. |
| E. Section 02 87 13, “Monument Bird Excrement Removal”. |
| 1.3 REFERENCES |
| A. Hazardous Materials Inspection Reports |
| 1. Hazardous Building Materials Survey Report: Prepared by TRC Environmental Corporation, Woburn, MA; June 7, 2021. |
| 2. Hazardous Building Materials Survey Report: Prepared by Maxximus Environmental, Inc., Rockville, MD; December 2, 2021. |
| B. US Occupational Safety and Health Administration (OSHA) Regulations |
| 1. 29 CFR 1926.62 “Lead in Construction” |
| C. US Environmental Protection Agency (EPA) Regulations |
| 1. 40 CFR 260 et seq “Hazardous Waste Management System” |
| D. Code of Massachusetts Regulations (CMR) |
| 1. 105 CMR 460.000 “Lead Poisoning Prevention and Control” |
| 2. 310 CMR 30.000 “Hazardous Waste” |
| 1.4 DEFINITIONS |
| A. Words defined in applicable regulations have the same meaning in this specification. |
| B. Lead Contractor means the contractor responsible for disturbing lead-based paint. |
| C. General Contractor means the prime contractor responsible for all aspects of construction. |
| D. Owner means the National Park Service. |
| 1.5 SUBMITTALS |
| A. General Contractor’s health and safety program shall include a section about lead paint. This shall include identification of the locations of lead, communication of lead risk to all subcontractors, identification of which subcontractors are antici... |
| B. Lead contractors to submit a lead safe work plan that includes: |
| 1. Description of process that will disturb lead. |
| 2. Engineering controls used to protect workers and the environment. |
| 3. Worker and supervisor certifications including training required by OSHA, medical approval, and respirator fit tests. |
| 4. Personal protective equipment. |
| 5. Worker exposure monitoring. |
| 6. Personnel decontamination means and methods. |
| 7. Means and methods to be used while disturbing lead. |
| 8. Lead waste management plan including |
| a. Testing, |
| b. Label |
| c. Transportation |
| d. Disposal |
| 1.6 QUALITY ASSURANCE |
| A. Permits and Notifications: Submit any required state or local permits or notifications. |
| B. Contractor Requirements: Contractor must have been performing lead in construction work for three years. Contractor liability insurance coverage must be approved by Owner, must be occurrence form and must include pollution coverage. Workers compe... |
| C. Competent Person Requirements: Minimum 5 years’ experience with lead in construction. Trained as required by 29 CFR 1926.62. Medical approval to perform lead work within the past 12 months. A respirator fit test for the type of respirator that wil... |
| D. Worker Requirements: Trained as required by 29 CFR 1926.62. Medical approval to perform lead work within the past 12 months. A respirator fit test for the type of respirator that will be used within the past 12 months. |
| E. Waste Transporter: Hazardous waste must be transported by a US DOT hazardous waste transporter. |
| F. Landfill Approval: The waste must be disposed in a facility approved by state and/or EPA for disposal of lead hazardous waste. |
| PART 2 - pRODUCTS [NOT USED] |
| PART 3 - eXECUTION |
| 3.1 HIGH EXPOSURE RISK ACTIVITIES |
| A. Torch cutting and welding may not be done on a painted surface. Paint must first be removed. |
| B. Abrasive blasting is permitted on lead containing paint but if other techniques are practical, they are preferred. Prior to abrasive blasting on either lead-based paint or other paint, paint chip samples shall be collected and submitted for analys... |
| 3.2 LEAD CONTROL AREA |
| A. All work disturbing lead will be done in a lead regulated area. Only approved workers may enter the lead control area. The are must be marked by DANGER tape or sealed with plastic sheeting, as appropriate. OSHA required signs shall be posted at ... |
| 3.3 DECONTAMINATION |
| A. Lead dust and debris must be controlled such that it cannot leave the regulated area unless packaged for disposal |
| B. Hands and face must be washed each time a worker leaves a regulated area. |
| C. Workers exposed above the OSHA Permissible Exposure Limit must shower at the end of the shift. |
| 3.4 WASTE MANAGEMENT |
| A. Roofing material shall be recycled, if practical. Otherwise, it shall be disposed as hazardous waste. |
| B. Paint chips shall be sampled and analyzed by the Toxicity Characteristic Leaching Protocol (TCLP) for lead. If TCLP result is greater than 5 mg/L, waste is hazardous. |
| C. Wash water from hand wash station and shower shall be sampled and analyzed by TCLP for lead. If TCLP result is greater than 5 mg/L, waste is hazardous. |
| D. Hazardous waste shall be transported in compliance with US DOT regulations. |
| E. Hazardous waste shall be disposed in compliance with US EPA regulations. |
| F. Non-hazardous waste containing lead shall be recycled or disposed in a landfill that is permitted to accept non-hazardous waste containing lead. |