Addendum_F_02_83_13_-_MONUMENT_LEAD_IN_CONSTRUCTION_2022-1028_0002.pdf

PDF 180 KB Posted

Attached to
BOST 254798 - Restore Dorchester Heights Monument
Solicitation number
140P2023R0023
Issued by

About this file

This specification covers lead abatement requirements for the restoration of the Dorchester Heights Monument. Locations of lead include copper roofing material, black paint on the main entrance door and frame, and low concentrations on structural steel and fencing. The specification requires lead contractors to be certified and have performed lead abatement work for three years. They must submit lead abatement work plans, waste disposal plans, and evidence of proper training, medical clearance, and respirator fit tests for workers. High exposure risk activities like torch cutting painted surfaces are prohibited. Strict lead control areas, decontamination procedures, and waste handling standards must be followed. Hazardous lead waste must be transported and disposed of according to EPA regulations.

View the file

Other files

File Type Posted
Sol_140P2023R0023_Amd_0004.pdf PDF
B08_Amend_4_-_Updated_Wage_Determination_0004.pdf PDF
2023-0213_NPS_BOST_254798_DD_CD_-_Addendum_G_Summary_Memo_0003.pdf PDF
Outstanding_Questions_as_of_20220715_0003.pdf PDF
140P2023R0023_02132023_-_Master_Question_Set_0003.pdf PDF
08_11_13_Monument_Hollow_Metal_Doors_and_Frames_0003.pdf PDF
CSS_-_Question___Answer_Set_6_0003.pdf PDF
09_90_00_Monument_Specialty_Finishes_-_Gilding_0003.pdf PDF
B08_BOST_254798_Contract_Price_Schedule_-_Template_0003.pdf PDF
2023-0213_NPS_BOST_254798_DD_CD_-_Addendum_G_Drawings_0003.pdf PDF
2022-0614_140P2022R0049_-_Contractor_Question_Set_4_0003.pdf PDF
140P2022R0049_-_Q_A_Set_3_Response_0003.pdf PDF
181117-BOST_457_25038_A__Partial_Sheets_1-29_0003.pdf PDF
140P2022R0049_Question_Set_1_20220606_JM_0003.pdf PDF
2022-0708_140P2022R0049_-_Contractor_Question_Set_5_0003.pdf PDF
2021-1210_Masonry_Restoration_Quantities_0003.xlsx XLSX spreadsheet
Sol_140P2023R0023_REV1_0003.pdf PDF
Sol_140P2023R0023_Amd_0003.pdf PDF
B09_PreBid_SignIn_Master_0002.pdf PDF
Addendum_A_07_61_00_-_MONUMENT_SHEET_METAL_ROOFING_-2022-0610_0002.pdf PDF
Addendum_D_07_18_00_-_MONUMENT_TRAFFIC_COATINGS_-__2022-0712_0002.pdf PDF
Addendum_D_00_00_00_-_SPEC_TOC_-__2022-0712_0002.pdf PDF
Addendum_B_Summary_Memo_2022-0622_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
Addendum_D_Summary_Memo_2022-0712_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
Addendum_C_Drawings_2022-0701_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
140P2023R0023_-_Master_Question_Set_1-24-2023_0002.pdf PDF
Sol_140P2023R0023_Amd_0002.pdf PDF
Addendum_E_Drawings_2022-0727_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
AD65A9_1_0002.PDF PDF
Addendum_A_00_00_00_-_SPEC_TOC_-__2022-0610_0002.pdf PDF
Addendum_C_00_00_00_-_SPEC_TOC_-_2022-0701_0002.pdf PDF
Addendum_A_04_20_00_-_MONUMENT_UNIT_MASONRY_-__2022-0610_0002.pdf PDF
Addendum_A_Drawings_2022-0610_NPS_BOST_254798_DD___CD_0002.pdf PDF
Addendum_A_Summary_Memo_2022-0610_NPS_BOST_254798_DD___CD_0002.pdf PDF
B11_Pre-Proposal_Presentation_0002.pptx PPTX presentation
Addendum_E_Summary_Memo_2022-0727_NPS_BOST_254798_DD_CD_0002.pdf PDF
Addendum_C_Summary_Memo_2022-0701_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
AD15EE_1_0002.PDF PDF
Addendum_B_Drawings_2022-0622_NPS_BOST_254798_DD_CD_0002.pdf PDF
DOHE_Red_line_Drawings_2015_0002.pdf PDF
Sol_140P2023R0023_Amd_0001.pdf PDF
Attachment_4_A06_Final_Specs_Rev_02_2022-0310.pdf PDF
Attachment_2__Certification_of_Vaccination_Form.pdf PDF
Attachment_9_Previous_Solicit_QA_Set.pdf PDF
Attachment_3_Vaccination_Certification_Notification_.pdf PDF
Attachment_8_2022-1028_NPS_BOST_254798_DD_CD_-_Addendum_F_Summary_Memo.pdf PDF
B08_140P2023R0023.pdf PDF
Attachment_1_B03_Wage_Determination_11182022.pdf PDF
Attachment_5_A06_Combined_Final_CD_Drawings_-_SIGNED_SEALED.pdf PDF
Attachment_6_Solit_PSP_Vol_I_REQD.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOST – 227374 & BOST - 25798 02 83 13 - 1

MONUMENT LEAD IN CONSTRUCTION

SECTION 02 83 13 – MONUMENT LEAD IN CONSTRUCTION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes requirements for worker and environmental protection when disturbing lead.

B. Locations of Lead:

1. On copper roofing material.

2. In black paint on main entrance door and door frame.

3. Detected at low concentrations

a. Gray I-beam on the first observatory level

b. Blank paint on fence

Paragraph 1.3 in this Section identifies key lead regulations. All applicable regulations apply whether they are called out in the reference section or not.

1.2 RELATED DOCUMENTS

A. Section 01 74 19, “Construction Waste Management and Disposal”.

B. Section 02 42 96, “Monument Historic Removal and Dismantling”.

C. Section 02 81 13, “Monument Miscellaneous Hazardous Materials”.

D. Section 02 82 13, “Monument Asbestos Abatement”.

E. Section 02 87 13, “Monument Bird Excrement Removal”.

1.3 REFERENCES

A. Hazardous Materials Inspection Reports

1. Hazardous Building Materials Survey Report: Prepared by TRC Environmental Corporation, Woburn, MA; June 7, 2021.

2. Hazardous Building Materials Survey Report: Prepared by Maxximus Environmental, Inc., Rockville, MD; December 2, 2021.

B. US Occupational Safety and Health Administration (OSHA) Regulations

1. 29 CFR 1926.62 “Lead in Construction”

C. US Environmental Protection Agency (EPA) Regulations

1. 40 CFR 260 et seq “Hazardous Waste Management System”

D. Code of Massachusetts Regulations (CMR)

BOST – 227374 & BOST - 25798 02 83 13 - 2

1. 105 CMR 460.000 “Lead Poisoning Prevention and Control”

2. 310 CMR 30.000 “Hazardous Waste”

1.4 DEFINITIONS

A. Words defined in applicable regulations have the same meaning in this specification.

B. Lead Contractor means the contractor responsible for disturbing lead-based paint.

C. General Contractor means the prime contractor responsible for all aspects of construction.

D. Owner means the National Park Service.

1.5 SUBMITTALS

A. General Contractor’s health and safety program shall include a section about lead paint. This shall include identification of the locations of lead, communication of lead risk to all subcontractors, identification of which subcontractors are anticipated to disturb lead (may include roofing subcontractor, painting subcontractor, demolition subcontractor or specialized lead paint removal contractor), and how workers will be protected during disturbance.

B. Lead contractors to submit a lead safe work plan that includes:

1. Description of process that will disturb lead.

2. Engineering controls used to protect workers and the environment.

3. Worker and supervisor certifications including training required by OSHA, medical approval, and respirator fit tests.

4. Personal protective equipment.

5. Worker exposure monitoring.

6. Personnel decontamination means and methods.

7. Means and methods to be used while disturbing lead.

8. Lead waste management plan including

a. Testing,

b. Label

c. Transportation

d. Disposal

1.6 QUALITY ASSURANCE

A. Permits and Notifications: Submit any required state or local permits or notifications.

B. Contractor Requirements: Contractor must have been performing lead in construction work for three years. Contractor liability insurance coverage must be approved by Owner, must be

BOST – 227374 & BOST - 25798 02 83 13 - 3

occurrence form and must include pollution coverage. Workers compensation insurance must be at least equal to the state minimum requirements.

C. Competent Person Requirements: Minimum 5 years’ experience with lead in construction.

Trained as required by 29 CFR 1926.62. Medical approval to perform lead work within the past 12 months. A respirator fit test for the type of respirator that will be used within the past 12 months.

D. Worker Requirements: Trained as required by 29 CFR 1926.62. Medical approval to perform lead work within the past 12 months. A respirator fit test for the type of respirator that will be used within the past 12 months.

E. Waste Transporter: Hazardous waste must be transported by a US DOT hazardous waste transporter.

F. Landfill Approval: The waste must be disposed in a facility approved by state and/or EPA for disposal of lead hazardous waste.

PART 2 - PRODUCTS [NOT USED]

PART 3 - EXECUTION

3.1 HIGH EXPOSURE RISK ACTIVITIES

A. Torch cutting and welding may not be done on a painted surface. Paint must first be removed.

B. Abrasive blasting is permitted on lead containing paint but if other techniques are practical, they are preferred. Prior to abrasive blasting on either lead-based paint or other paint, paint chip samples shall be collected and submitted for analysis for priority pollutant metals. Workers must be protected from exposure to other heavy metals. OSHA has separate standards for exposure to arsenic, cadmium, and chromium if any of these metals are detected.

3.2 LEAD CONTROL AREA

A. All work disturbing lead will be done in a lead regulated area. Only approved workers may enter the lead control area. The are must be marked by DANGER tape or sealed with plastic sheeting, as appropriate. OSHA required signs shall be posted at the entrance to the regulated area in English and in Spanish.

3.3 DECONTAMINATION

A. Lead dust and debris must be controlled such that it cannot leave the regulated area unless packaged for disposal

B. Hands and face must be washed each time a worker leaves a regulated area.

C. Workers exposed above the OSHA Permissible Exposure Limit must shower at the end of the shift.

BOST – 227374 & BOST - 25798 02 83 13 - 4

3.4 WASTE MANAGEMENT

A. Roofing material shall be recycled, if practical. Otherwise, it shall be disposed as hazardous waste.

B. Paint chips shall be sampled and analyzed by the Toxicity Characteristic Leaching Protocol (TCLP) for lead. If TCLP result is greater than 5 mg/L, waste is hazardous.

C. Wash water from hand wash station and shower shall be sampled and analyzed by TCLP for lead.

If TCLP result is greater than 5 mg/L, waste is hazardous.

D. Hazardous waste shall be transported in compliance with US DOT regulations.

E. Hazardous waste shall be disposed in compliance with US EPA regulations.

F. Non-hazardous waste containing lead shall be recycled or disposed in a landfill that is permitted to accept non-hazardous waste containing lead.

END OF SECTION 02 83 13

Part 1 - GENERAL
1.1 SUMMARY
A. This Section includes requirements for worker and environmental protection when disturbing lead.
B. Locations of Lead:
1. On copper roofing material.
2. In black paint on main entrance door and door frame.
3. Detected at low concentrations
a. Gray I-beam on the first observatory level
b. Blank paint on fence

Paragraph 1.3 in this Section identifies key lead regulations. All applicable regulations apply whether they are called out in the reference section or not.

1.2 RELATED DOCUMENTS
A. Section 01 74 19, “Construction Waste Management and Disposal”.
B. Section 02 42 96, “Monument Historic Removal and Dismantling”.
C. Section 02 81 13, “Monument Miscellaneous Hazardous Materials”.
D. Section 02 82 13, “Monument Asbestos Abatement”.
E. Section 02 87 13, “Monument Bird Excrement Removal”.
1.3 REFERENCES
A. Hazardous Materials Inspection Reports
1. Hazardous Building Materials Survey Report: Prepared by TRC Environmental Corporation, Woburn, MA; June 7, 2021.
2. Hazardous Building Materials Survey Report: Prepared by Maxximus Environmental, Inc., Rockville, MD; December 2, 2021.
B. US Occupational Safety and Health Administration (OSHA) Regulations
1. 29 CFR 1926.62 “Lead in Construction”
C. US Environmental Protection Agency (EPA) Regulations
1. 40 CFR 260 et seq “Hazardous Waste Management System”
D. Code of Massachusetts Regulations (CMR)
1. 105 CMR 460.000 “Lead Poisoning Prevention and Control”
2. 310 CMR 30.000 “Hazardous Waste”
1.4 DEFINITIONS
A. Words defined in applicable regulations have the same meaning in this specification.
B. Lead Contractor means the contractor responsible for disturbing lead-based paint.
C. General Contractor means the prime contractor responsible for all aspects of construction.
D. Owner means the National Park Service.
1.5 SUBMITTALS
A. General Contractor’s health and safety program shall include a section about lead paint. This shall include identification of the locations of lead, communication of lead risk to all subcontractors, identification of which subcontractors are antici...
B. Lead contractors to submit a lead safe work plan that includes:
1. Description of process that will disturb lead.
2. Engineering controls used to protect workers and the environment.
3. Worker and supervisor certifications including training required by OSHA, medical approval, and respirator fit tests.
4. Personal protective equipment.
5. Worker exposure monitoring.
6. Personnel decontamination means and methods.
7. Means and methods to be used while disturbing lead.
8. Lead waste management plan including
a. Testing,
b. Label
c. Transportation
d. Disposal
1.6 QUALITY ASSURANCE
A. Permits and Notifications: Submit any required state or local permits or notifications.
B. Contractor Requirements: Contractor must have been performing lead in construction work for three years. Contractor liability insurance coverage must be approved by Owner, must be occurrence form and must include pollution coverage. Workers compe...
C. Competent Person Requirements: Minimum 5 years’ experience with lead in construction. Trained as required by 29 CFR 1926.62. Medical approval to perform lead work within the past 12 months. A respirator fit test for the type of respirator that wil...
D. Worker Requirements: Trained as required by 29 CFR 1926.62. Medical approval to perform lead work within the past 12 months. A respirator fit test for the type of respirator that will be used within the past 12 months.
E. Waste Transporter: Hazardous waste must be transported by a US DOT hazardous waste transporter.
F. Landfill Approval: The waste must be disposed in a facility approved by state and/or EPA for disposal of lead hazardous waste.
PART 2 - pRODUCTS [NOT USED]
PART 3 - eXECUTION
3.1 HIGH EXPOSURE RISK ACTIVITIES
A. Torch cutting and welding may not be done on a painted surface. Paint must first be removed.
B. Abrasive blasting is permitted on lead containing paint but if other techniques are practical, they are preferred. Prior to abrasive blasting on either lead-based paint or other paint, paint chip samples shall be collected and submitted for analys...
3.2 LEAD CONTROL AREA
A. All work disturbing lead will be done in a lead regulated area. Only approved workers may enter the lead control area. The are must be marked by DANGER tape or sealed with plastic sheeting, as appropriate. OSHA required signs shall be posted at ...
3.3 DECONTAMINATION
A. Lead dust and debris must be controlled such that it cannot leave the regulated area unless packaged for disposal
B. Hands and face must be washed each time a worker leaves a regulated area.
C. Workers exposed above the OSHA Permissible Exposure Limit must shower at the end of the shift.
3.4 WASTE MANAGEMENT
A. Roofing material shall be recycled, if practical. Otherwise, it shall be disposed as hazardous waste.
B. Paint chips shall be sampled and analyzed by the Toxicity Characteristic Leaching Protocol (TCLP) for lead. If TCLP result is greater than 5 mg/L, waste is hazardous.
C. Wash water from hand wash station and shower shall be sampled and analyzed by TCLP for lead. If TCLP result is greater than 5 mg/L, waste is hazardous.
D. Hazardous waste shall be transported in compliance with US DOT regulations.
E. Hazardous waste shall be disposed in compliance with US EPA regulations.
F. Non-hazardous waste containing lead shall be recycled or disposed in a landfill that is permitted to accept non-hazardous waste containing lead.