BOST 254798 - Restore Dorchester Heights Monument
Solicitation number
140P2023R0023
Issued by

About this file

This document contains questions and answers regarding Solicitation Number 140P2023R0023 to restore the Dorchester Heights Monument and hardscapes. The National Park Service is seeking to replace or restore existing light poles and globes to match existing character, provide revised specification documents that were included in prior addenda, and confirm that new light poles may be provided in lieu of restoring existing poles for cost savings. Clarification is also provided on including additional specification documents with the forthcoming Amendment 002.

View the file

Other files

File Type Posted
Sol_140P2023R0023_Amd_0004.pdf PDF
B08_Amend_4_-_Updated_Wage_Determination_0004.pdf PDF
2023-0213_NPS_BOST_254798_DD_CD_-_Addendum_G_Summary_Memo_0003.pdf PDF
Outstanding_Questions_as_of_20220715_0003.pdf PDF
140P2023R0023_02132023_-_Master_Question_Set_0003.pdf PDF
08_11_13_Monument_Hollow_Metal_Doors_and_Frames_0003.pdf PDF
CSS_-_Question___Answer_Set_6_0003.pdf PDF
09_90_00_Monument_Specialty_Finishes_-_Gilding_0003.pdf PDF
B08_BOST_254798_Contract_Price_Schedule_-_Template_0003.pdf PDF
2023-0213_NPS_BOST_254798_DD_CD_-_Addendum_G_Drawings_0003.pdf PDF
2022-0614_140P2022R0049_-_Contractor_Question_Set_4_0003.pdf PDF
140P2022R0049_-_Q_A_Set_3_Response_0003.pdf PDF
181117-BOST_457_25038_A__Partial_Sheets_1-29_0003.pdf PDF
140P2022R0049_Question_Set_1_20220606_JM_0003.pdf PDF
2022-0708_140P2022R0049_-_Contractor_Question_Set_5_0003.pdf PDF
2021-1210_Masonry_Restoration_Quantities_0003.xlsx XLSX spreadsheet
Sol_140P2023R0023_REV1_0003.pdf PDF
Sol_140P2023R0023_Amd_0003.pdf PDF
B09_PreBid_SignIn_Master_0002.pdf PDF
Addendum_A_07_61_00_-_MONUMENT_SHEET_METAL_ROOFING_-2022-0610_0002.pdf PDF
Addendum_D_07_18_00_-_MONUMENT_TRAFFIC_COATINGS_-__2022-0712_0002.pdf PDF
Addendum_D_00_00_00_-_SPEC_TOC_-__2022-0712_0002.pdf PDF
Addendum_B_Summary_Memo_2022-0622_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
Addendum_D_Summary_Memo_2022-0712_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
Addendum_C_Drawings_2022-0701_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
Addendum_F_02_83_13_-_MONUMENT_LEAD_IN_CONSTRUCTION_2022-1028_0002.pdf PDF
Sol_140P2023R0023_Amd_0002.pdf PDF
Addendum_E_Drawings_2022-0727_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
AD65A9_1_0002.PDF PDF
Addendum_A_00_00_00_-_SPEC_TOC_-__2022-0610_0002.pdf PDF
Addendum_C_00_00_00_-_SPEC_TOC_-_2022-0701_0002.pdf PDF
Addendum_A_04_20_00_-_MONUMENT_UNIT_MASONRY_-__2022-0610_0002.pdf PDF
Addendum_A_Drawings_2022-0610_NPS_BOST_254798_DD___CD_0002.pdf PDF
Addendum_A_Summary_Memo_2022-0610_NPS_BOST_254798_DD___CD_0002.pdf PDF
B11_Pre-Proposal_Presentation_0002.pptx PPTX presentation
Addendum_E_Summary_Memo_2022-0727_NPS_BOST_254798_DD_CD_0002.pdf PDF
Addendum_C_Summary_Memo_2022-0701_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
AD15EE_1_0002.PDF PDF
Addendum_B_Drawings_2022-0622_NPS_BOST_254798_DD_CD_0002.pdf PDF
DOHE_Red_line_Drawings_2015_0002.pdf PDF
Sol_140P2023R0023_Amd_0001.pdf PDF
Attachment_4_A06_Final_Specs_Rev_02_2022-0310.pdf PDF
Attachment_2__Certification_of_Vaccination_Form.pdf PDF
Attachment_9_Previous_Solicit_QA_Set.pdf PDF
Attachment_3_Vaccination_Certification_Notification_.pdf PDF
Attachment_8_2022-1028_NPS_BOST_254798_DD_CD_-_Addendum_F_Summary_Memo.pdf PDF
B08_140P2023R0023.pdf PDF
Attachment_1_B03_Wage_Determination_11182022.pdf PDF
Attachment_5_A06_Combined_Final_CD_Drawings_-_SIGNED_SEALED.pdf PDF
Attachment_6_Solit_PSP_Vol_I_REQD.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P2023R0023 1/13/22

Q&A

Discipline Spec Offeror Questions Technical Response Addressed By

1 General The previous solicitation of this project included Addenda A thru E from Smithgroup, issued under various Amendments to the NPS Solicitation. These Addenda included revised drawings and specifications. These previous Addenda are not included in the current solicitation, only the Summary Memo for Addendum F. Please provide all documents associated with Addenda A thru E, and the revised specification from Addendum F.

Addendum A thru F included in Amendment 002

CO/CS

2 General Attachment 8;

Attachment 4

Attachment 8, Addendum F Summary Memo, indicates that Specification Section 02 83 13 - Monument Lead in Construction was revised. However, when comparing Specification Section 02 83 13 contained within Attachment 4-Final Specs with the version of 02 83 13 which was included with the previous Solicitation, they are both the same. It appears that the Amended version of 02 83 13 was not included in the Solicitation package, only the summary memo was.

Please provide the revised Specification 02 83 13

Updated Addendum F 02 83 13 included in Amendment 002

CO/CS

3 General Attachment 7 The Solicitation posted to SAM.gov did not include Attachment 7, Addendum F Monument Lead in Construction. Please provide this document

Attachment 7, Addendum F will be include in Amendment 002

CO/CS

4 Electrical General note 3.1 on drawing E1 states the following "pole restoration process shall be performed by iron fabricator, with multi-step process to remove existing finish, clean and prepare pole to receive prime and final powder coat finish". Is it acceptable to provide new poles to match existing in lieu of restoration process as the cost for new is less expensive?

The light poles may be replaced with a matching profile and factory applied primer and powder coasting black finish.

The glass globes are to match the existing character and the luminaires must also match the specification and be dark sky compliant.

D&C