This document contains a technical specification for high-performance coatings on monument surfaces and hardscapes. The specification outlines coating systems for steel, galvanized metal, and concrete substrate interiors and exteriors. It defines requirements for product data, samples, mockups, storage, handling, application, field quality control, cleaning and protection. The related federal contract opportunity is to restore the Dorchester Heights Monument and surrounding hardscapes using the outlined coating systems. The solicitation is issued by the National Park Service for contract number 140P2023R0023.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOST - 227374 & BOST - 254798 09 96 00 - 1
MONUMENT HIGH-PERFORMANCE COATINGS
SECTION 09 96 00 – MONUMENT HIGH-PERFORMANCE COATINGS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes surface preparation and the application of high-performance coating systems on the following substrates:
1. Exterior Substrates:
a. Concrete, surfaces.
b. Galvanized metal.
2. Interior Substrates:
a. Concrete, vertical and horizontal surfaces.
b. Concrete masonry units (CMUs).
c. Galvanized metal.
3. Related Requirements:
4. Section 05 12 00 "Structural Steel Framing" for shop priming of structural steel with primers specified in this Section.
1.3 DEFINITIONS
A. MPI Gloss Level 5 (Semi-Gloss Finish): 35 to 70 units at 60 degrees, according to
ASTM D 523.
B. MPI Gloss Level 6 (Gloss Finish): 70 to 85 units at 60 degrees, according to ASTM D 523.
C. MPI Gloss Level 7 (High-Gloss Finish): More than 85 units at 60 degrees, according to
ASTM D 523.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions.
1. Include printout of current "MPI Approved Products List" for each product category specified, with the proposed product highlighted.
2. Indicate VOC content.
B. Samples for Initial Selection: For each type of topcoat product indicated.
C. Samples for Verification: For each type of coating system and each color and gloss of topcoat indicated.
1. Submit Samples on rigid backing, 8 inches square.
2. Apply coats on Samples in steps to show each coat required for system.
3. Label each coat of each Sample.
4. Label each Sample for location and application area.
BOST - 227374 & BOST - 254798 09 96 00 - 2
D. Product List: Cross-reference to coating system and locations of application areas. Use same designations indicated on Drawings and in schedules. Include color designations.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Coatings: 5 percent, but not less than 1 gal. of each material and color applied.
1.6 QUALITY ASSURANCE
A. Mockups: Apply mockups of each coating system indicated to verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Contracting Officer (CO) will select one surface to represent surfaces and conditions for application of each coating system.
a. Wall and Ceiling Surfaces: Provide samples of at least 100 sq. ft..
b. Other Items: Contracting Officer (CO) will designate items or areas required.
2. Final approval of color selections will be based on mockups.
a. If preliminary color selections are not approved, apply additional mockups of additional colors selected by Contracting Officer (CO) at no added cost to Owner.
3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Contracting Officer (CO) specifically approves such deviations in writing.
4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.8 FIELD CONDITIONS
A. Apply coatings only when temperature of surfaces to be coated and ambient air temperatures are between 50 and 95 deg F.
B. Do not apply coatings when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.
C. Do not apply exterior coatings in snow, rain, fog, or mist.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Benjamin Moore & Co.
http://www.specagent.com/LookUp/?uid=123457035177&mf=04&src=wd
BOST - 227374 & BOST - 254798 09 96 00 - 3
2. Corotech Coatings; Benjamin Moore & Co.
3. PPG Paints.
4. Rust-Oleum Corporation; a subsidiary of RPM International, Inc.
5. Sherwin-Williams Company (The).
6. Tnemec Company, Inc. For galvanized door frames, doors, stairs,and railings
B. Products: Subject to compliance with requirements, provide product listed in the Exterior High-Performance Coating Schedule or Interior High-Performance Coating Schedule for the coating category indicated.
2.2 HIGH-PERFORMANCE COATINGS, GENERAL
A. MPI Standards: Products shall comply with MPI standards indicated and shall be listed in its "MPI Approved Products Lists."
1. Provide products from manufacturer's premium or professional product line.
B. Material Compatibility:
1. Materials for use within each paint system shall be compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, products shall be recommended in writing by topcoat manufacturers for use in paint system and on substrate indicated.
3. Products shall be of same manufacturer for each coat in a coating system.
C. Colors: Match Contracting Officer (CO)'s samples or as indicated in color schedule Insert requirements.
2.3 SOURCE QUALITY CONTROL
A. Testing of Coating Materials: Owner reserves the right to invoke the following procedure:
1. Owner will engage the services of a qualified testing agency to sample coating materials.
Contractor will be notified in advance and may be present when samples are taken. If coating materials have already been delivered to Project site, samples may be taken at Project site. Samples will be identified, sealed, and certified by testing agency.
2. Testing agency will perform tests for compliance with product requirements.
3. Owner may direct Contractor to stop applying coatings if test results show materials being used do not comply with product requirements. Contractor shall remove noncomplying coating materials from Project site, pay for testing, and recoat surfaces coated with rejected materials. Contractor will be required to remove rejected materials from previously coated surfaces if, on recoating with complying materials, the two coatings are incompatible.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
http://www.specagent.com/LookUp/?uid=123457035178&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457035182&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457035183&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457035186&mf=04&src=wd
BOST - 227374 & BOST - 254798 09 96 00 - 4
1. Concrete: 12 percent.
C. Verify suitability of substrates, including surface conditions and compatibility, with existing finishes and primers.
D. Proceed with coating application only after unsatisfactory conditions have been corrected.
1. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Contracting Officer (CO)ural Painting Specification Manual" applicable to substrates and coating systems indicated.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.
C. Clean substrates of substances that could impair bond of coatings, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce coating systems indicated.
D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Do not coat surfaces if moisture content or alkalinity of surfaces to be coated exceeds that permitted in manufacturer's written instructions.
1. Clean surfaces with pressurized water. Use pressure range of 1500 to 4000 psi at 6 to 12 inches .
2. Abrasive blast clean surfaces to comply with SSPC-SP 7/NACE No. 4.
E. Steel Substrates: Remove rust, loose mill scale, and shop primer if any. Clean using methods recommended in writing by paint manufacturer.
F. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and areas where shop paint is abraded. Paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop-primed surfaces.
G. Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal by mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently applied coatings.
1. Surface Prep: Uniformly and thoroughly abrade galvanized surface
3.3 APPLICATION
A. Apply high-performance coatings according to manufacturer's written instructions and recommendations in "MPI Contracting Officer (CO)ural Painting Specification Manual."
1. Use applicators and techniques suited for coating and substrate indicated.
BOST - 227374 & BOST - 254798 09 96 00 - 5
2. Coat surfaces behind movable equipment and furniture same as similar exposed surfaces.
Before final installation, coat surfaces behind permanently fixed equipment or furniture with prime coat only.
3. Coat backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.
4. Do not apply coatings over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of the same material are to be applied. Tint undercoats to match color of finish coat, but provide sufficient difference in shade of undercoats to distinguish each separate coat.
C. If undercoats or other conditions show through final coat, apply additional coats until cured film has a uniform coating finish, color, and appearance.
D. Apply coatings to produce surface films without cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections. Produce sharp glass lines and color breaks.
3.4 FIELD QUALITY CONTROL
A. Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting agency to inspect and test coatings for dry film thickness.
1. Contractor shall touch up and restore coated surfaces damaged by testing.
2. If test results show that dry film thickness of applied coating does not comply with coating manufacturer's written recommendations, Contractor shall pay for testing and apply additional coats as needed to provide dry film thickness that complies with coating manufacturer's written recommendations.
3.5 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from coating operation. Correct damage to work of other trades by cleaning, repairing, replacing, and recoating, as approved by Contracting Officer (CO), and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced coated surfaces.
3.6 EXTERIOR HIGH-PERFORMANCE COATING SCHEDULE
A. Steel Substrates:
1. Pigmented Polyurethane over Epoxy System MPI EXT 5.1H:
a. Prime Coat: Primer, epoxy, anti-corrosive, for metal, MPI #101.
1) Tnemec; series 135, Chembuild; two coats minimum 5 mil DFT.
BOST - 227374 & BOST - 254798 09 96 00 - 6
b. First and Second Topcoat: Polyurethane, two component, pigmented, gloss (MPI Gloss Level 6), MPI #72.
1) Tnemec: series 73 Endura-Shield III, Polyurethane Enamel; provide two coats at minumum 2-4 mil DFT.
B. Galvanized-Metal Substrates:
1. Epoxy System MPI EXT 5.3C:
a. Prime Coat: Primer, epoxy, anti-corrosive, for metal, MPI #101.
1) Tnemec; series N69 Hi-Build Epoxoline II at 2.0 - 4.0 mils DFT.
b. Intermediate Coat: Epoxy, matching topcoat.
c. Topcoat: Epoxy, gloss, MPI #77.
1) Tnemec; series 1077 Enduralume at 2.0 -3.0 mils DFT.
3.7 INTERIOR HIGH-PERFORMANCE COATING SCHEDULE
A. Concrete Substrates, Vertical Surfaces:
1. Epoxy System MPI INT 3.1F:
a. Prime Coat: Epoxy, matching topcoat.
b. Intermediate Coat: Epoxy, matching topcoat.
c. Topcoat: Epoxy, gloss, MPI #77.
B. Galvanized-Metal Substrates:
1. Epoxy over Epoxy Primer System MPI INT 5.3D:
a. Prime Coat: Primer, epoxy, anti-corrosive, for metal, MPI #101.
1) Tnemec; series N69 Hi-Build Epoxoline II at 2.0 - 4.0 mils DFT.
b. Intermediate Coat: Epoxy, matching topcoat.
c. Topcoat: Epoxy, gloss, MPI #77.
1) Tnemec; series 1077 Enduralume at 2.0 -3.0 mils DFT.
END OF SECTION 09 96 00