BOST 254798 - Restore Dorchester Heights Monument
Solicitation number
140P2023R0023
Issued by

About this file

This document package includes construction drawings and specifications for the restoration of the Dorchester Heights Monument and surrounding hardscapes located within the Boston National Historical Park. The project involves dismantling and rebuilding the upper levels of the monument, structural stabilization, masonry restoration, new foundations and framing, roof replacements, and site work including utilities, grading, planting and irrigation. Bid options include items like cleaning and coating existing metalwork, replacing doors and windows, concrete repairs, and guardrails. Construction is scheduled to be completed by late 2023. The solicitation number for this opportunity is 140P2023R0023 and was issued by the National Park Service for the restoration work defined in the construction documents.

View the file

Other files

File Type Posted
Sol_140P2023R0023_Amd_0004.pdf PDF
B08_Amend_4_-_Updated_Wage_Determination_0004.pdf PDF
2023-0213_NPS_BOST_254798_DD_CD_-_Addendum_G_Summary_Memo_0003.pdf PDF
Outstanding_Questions_as_of_20220715_0003.pdf PDF
140P2023R0023_02132023_-_Master_Question_Set_0003.pdf PDF
08_11_13_Monument_Hollow_Metal_Doors_and_Frames_0003.pdf PDF
CSS_-_Question___Answer_Set_6_0003.pdf PDF
09_90_00_Monument_Specialty_Finishes_-_Gilding_0003.pdf PDF
B08_BOST_254798_Contract_Price_Schedule_-_Template_0003.pdf PDF
2023-0213_NPS_BOST_254798_DD_CD_-_Addendum_G_Drawings_0003.pdf PDF
2022-0614_140P2022R0049_-_Contractor_Question_Set_4_0003.pdf PDF
140P2022R0049_-_Q_A_Set_3_Response_0003.pdf PDF
181117-BOST_457_25038_A__Partial_Sheets_1-29_0003.pdf PDF
140P2022R0049_Question_Set_1_20220606_JM_0003.pdf PDF
2022-0708_140P2022R0049_-_Contractor_Question_Set_5_0003.pdf PDF
2021-1210_Masonry_Restoration_Quantities_0003.xlsx XLSX spreadsheet
Sol_140P2023R0023_REV1_0003.pdf PDF
Sol_140P2023R0023_Amd_0003.pdf PDF
B09_PreBid_SignIn_Master_0002.pdf PDF
Addendum_A_07_61_00_-_MONUMENT_SHEET_METAL_ROOFING_-2022-0610_0002.pdf PDF
Addendum_D_07_18_00_-_MONUMENT_TRAFFIC_COATINGS_-__2022-0712_0002.pdf PDF
Addendum_D_00_00_00_-_SPEC_TOC_-__2022-0712_0002.pdf PDF
Addendum_B_Summary_Memo_2022-0622_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
Addendum_D_Summary_Memo_2022-0712_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
140P2023R0023_-_Master_Question_Set_1-24-2023_0002.pdf PDF
Addendum_F_02_83_13_-_MONUMENT_LEAD_IN_CONSTRUCTION_2022-1028_0002.pdf PDF
Sol_140P2023R0023_Amd_0002.pdf PDF
Addendum_E_Drawings_2022-0727_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
AD65A9_1_0002.PDF PDF
Addendum_A_00_00_00_-_SPEC_TOC_-__2022-0610_0002.pdf PDF
Addendum_C_00_00_00_-_SPEC_TOC_-_2022-0701_0002.pdf PDF
Addendum_A_04_20_00_-_MONUMENT_UNIT_MASONRY_-__2022-0610_0002.pdf PDF
Addendum_A_Drawings_2022-0610_NPS_BOST_254798_DD___CD_0002.pdf PDF
Addendum_A_Summary_Memo_2022-0610_NPS_BOST_254798_DD___CD_0002.pdf PDF
B11_Pre-Proposal_Presentation_0002.pptx PPTX presentation
Addendum_E_Summary_Memo_2022-0727_NPS_BOST_254798_DD_CD_0002.pdf PDF
Addendum_C_Summary_Memo_2022-0701_NPS_BOST_254798_DD_CD_-__0002.pdf PDF
AD15EE_1_0002.PDF PDF
Addendum_B_Drawings_2022-0622_NPS_BOST_254798_DD_CD_0002.pdf PDF
DOHE_Red_line_Drawings_2015_0002.pdf PDF
Sol_140P2023R0023_Amd_0001.pdf PDF
Attachment_4_A06_Final_Specs_Rev_02_2022-0310.pdf PDF
Attachment_2__Certification_of_Vaccination_Form.pdf PDF
Attachment_9_Previous_Solicit_QA_Set.pdf PDF
Attachment_3_Vaccination_Certification_Notification_.pdf PDF
Attachment_8_2022-1028_NPS_BOST_254798_DD_CD_-_Addendum_F_Summary_Memo.pdf PDF
B08_140P2023R0023.pdf PDF
Attachment_1_B03_Wage_Determination_11182022.pdf PDF
Attachment_5_A06_Combined_Final_CD_Drawings_-_SIGNED_SEALED.pdf PDF
Attachment_6_Solit_PSP_Vol_I_REQD.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PROJECT

HARDSCAPE PROJECT

(BOST 227374)

MONUMENT

RESTORATION

PROJECT

(BOST 254798)

THIS PROJECT

PMIS/PKG NO.

DRAWING NO.

SHEET

CONSULTANT:

TITLE OF DRAWING

OF

BUILDING

CONSERVATION

ASSOCIATES

BOSTON, MA

LOCATION WITHIN PARK

NAME OF PARK

COUNTY STATEREGION

NATIONAL PARK SERVICE

UNITED STATES

DEPARTMENT OF THE INTERIOR

STRUCTURAL:

SILMAN

BOSTON, MAWASHINGTON, DC

smithgroup.com

PRIME/ARCH:

SMITHGROUP

SMITHGROUP Mark Sheet(s) REVISION Date Initial

APPROVED:

Regional Director Date

Superintendent Date

RECOMMENDED:

RECOMMENDED:

Project Manager Date

:3 :4

A M

B

IM

C li e n t P ro je c ts

N a ti o n a l P a rk

S e rv ic e N P S B O S T

D D

C D .r v t

A u th o r

MONUMENT AND HARDSCAPE

RESTORATION

254798

165882

691SUFFOLK

DORCHESTER HEIGHTS

DORCHESTER HEIGHTS MONUMENT

NE MA

FINAL CONSTRUCTION DOCUMENTS

BOSTON NATIONAL HISTORICAL SITE

(BOST)

DRAWING LIST

SHEET # OF # SUBSHEET SHEET TITLE

GENERAL

2 OF 69 G0.1 ABBREVIATIONS AND SYMBOLS

3 OF 69 G0.2 SITE STAGING AND ACCESS PLAN

4 OF 69 G1.0 PROJECT NARRATIVE & BUILDING CODE SUMMARY

ARCHITECTURAL DEMOLITION

5 OF 69 AD2.1 CRAWL SPACE AND LEVEL 1 DEMOLITION FLOOR PLANS

6 OF 69 AD2.2 LEVEL 2, LEVEL 3, AND LANTERN DEMOLITION FLOOR PLANS

7 OF 69 AD3.1 CRAWL SPACE AND LEVEL 1 DEMOLITION REF CEILING PLANS

8 OF 69 AD3.2 LEVEL 2, LEVEL 3, AND LANTERN DEMOLITION REF CEILING PLANS

9 OF 69 AD4.1 BUILDING DEMOLITION SECTIONS

10 OF 69 AD4.2 DEMOLITION DETAILS

11 OF 69 HD1.0 HAZMAT ABATEMENT SITE PLAN

12 OF 69 HD1.1 HAZMAT ABATEMENT FLOOR PLAN & BUILDING SECTION

ARCHITECTURAL

13 OF 69 A1.1 ARCHITECTURAL SITE PLAN

14 OF 69 A2.1 CRAWL SPACE AND LEVEL 1 FLOOR PLANS

15 OF 69 A2.2 LEVEL 2, LEVEL 3, AND LANTERN FLOOR PLANS

16 OF 69 A3.1 CRAWL SPACE AND LEVEL 1 REF CEILING PLANS

17 OF 69 A3.2 LEVEL 2, LEVEL 3, AND LANTERN REF CEILING PLANS

18 OF 69 A4.1 WEST ELEVATION

19 OF 69 A4.2 NORTH ELEVATION

20 OF 69 A4.3 EAST ELEVATION

21 OF 69 A4.4 SOUTH ELEVATION

22 OF 69 A4.5 EAST-WEST SECTION

23 OF 69 A4.6 NORTH-SOUTH SECTION

24 OF 69 A5.1 LEVEL 2 & LEVEL 3 SECTION DETAILS

25 OF 69 A5.2 LEVEL 3 SECTION DETAILS

26 OF 69 A5.3 LEVEL 4, DRUM, AND LANTERN SECTION DETAILS

27 OF 69 A5.4 ENLARGED ROOF PLAN DETAILS

28 OF 69 A5.5 ENLARGED ROOF PLAN DETAILS

29 OF 69 A5.6 ENLARGED ROOF PLAN DETAILS

30 OF 69 A5.7 ROOFING AND FLASHING DETAILS

31 OF 69 A6.1 CRAWL SPACE AND PLINTH SLAB

32 OF 69 A6.2 LEVEL 1 FLOOR GRATE DETAILS

33 OF 69 A6.3 ENTRY DOOR DETAILS

34 OF 69 A6.4 "SQUARE" STAIR ELEVATIONS

35 OF 69 A6.5 "SQUARE" STAIR ELEVATIONS

36 OF 69 A6.6 "SQUARE" STAIR DETAILS

37 OF 69 A6.7 LEVEL 2 AND LEVEL 3 DOOR DETAILS

38 OF 69 A6.8 LEVEL 2 AND LEVEL 3 DOOR DETAILS

39 OF 69 A6.9 LEVEL 3 FLASHING AND LANTERN WATERPROOFING & FLASHING DETAILS

40 OF 69 A6.10 LEVEL 3 SPIRAL STAIR ENCLOSURE DETAILS

41 OF 69 A6.11 LEVEL 3 SPIRAL STAIR ENCLOSURE DETAILS

MASONRY RESTORATION

42 OF 69 R1.1 MASONRY RESTORATION WEST ELEVATION

43 OF 69 R1.2 MASONRY RESTORATION NORTH ELEVATION

44 OF 69 R1.3 MASONRY RESTORATION EAST ELEVATION

45 OF 69 R1.4 MASONRY RESTORATION SOUTH ELEVATION

46 OF 69 R1.5 MASONRY RESTORATION WEST INTERIOR

47 OF 69 R1.6 MASONRY RESTORATION NORTH INTERIOR

48 OF 69 R1.7 MASONRY RESTORATION EAST INTERIOR

49 OF 69 R1.8 MASONRY RESTORATION SOUTH INTERIOR

50 OF 69 R1.9 MASONRY RESTORATION QUANTITY SCHEDULE - BASE BID

51 OF 69 R1.10 MASONRY RESTORATION QUANTITY SCHEDULE - OPTIONS

52 OF 69 R1.11 MASONRY RESTORATION DETAILS

STRUCTURAL

53 OF 69 S0.1 GENERAL STRUCTURAL NOTES AND LEGEND

54 OF 69 S0.2 DESIGN PARAMETERS AND LOAD SCHEDULE

55 OF 69 S2.1 FOUNDATION PLAN AND FRAMING PLANS

56 OF 69 S4.1 SECTIONS

57 OF 69 S4.2 SECTIONS

58 OF 69 S5.1 TYPICAL DETAILS

59 OF 69 S5.2 TYPICAL DETAILS

ELECTRICAL

60 OF 69 E0.1 ELECTRICAL ABBREVIATIONS AND SYMBOLS

61 OF 69 E1.1 ELECTRICAL SITE POWER AND LIGHTING PLAN

62 OF 69 E1.2 ELECTRICAL SITE UTILITY PLAN

63 OF 69 ED2.1 ELECTRICAL CRAWL SPACE AND LEVEL 1 DEMOLITION FLOOR PLANS

64 OF 69 ED2.2 ELECTRICAL LEVEL 2, LEVEL 3, AND LANTERN DEMOLITION FLOOR PLANS

65 OF 69 E2.1 ELECTRICAL CRAWL SPACE AND LEVEL 1 POWER AND LIGHTING PLANS

66 OF 69 E2.2 ELECTRICAL LEVEL 2, LEVEL 3, AND LANTERN POWER AND LIGHTING PLANS

67 OF 69 E6.0 ELECTRICAL DETAILS

68 OF 69 E6.1 ELECTRICAL DETAILS

69 OF 69 E7.0 ELECTRICAL SCHEDULES

VICINITY MAP (NOT TO SCALE) LOCATION PLAN (NOT TO SCALE)

DRAWING LIST

SHEET # OF # SUBSHEET SHEET TITLE

1 OF 92 LP1 LOGISTICS PLAN

(NOT INCLUDED, SEE BOST 254798)

2 OF 92 LN GENERAL NOTES

3 OF 92 LG KEY PLAN

4 OF 92 LA ACCESSIBILITY PLAN

5 OF 92 L1 SITE PREP AND DEMOLITION

6 OF 92 L2 SITE PREP AND DEMOLITION

7 OF 92 L3 SITE PREP AND DEMOLITION

8 OF 92 L4 SITE PREP AND DEMOLITION

9 OF 92 L5 SITE PREP AND DEMOLITION

10 OF 92 L6 SITE PREP AND DEMOLITION

11 OF 92 L7 MATERIALS AND LAYOUT

12 OF 92 L8 MATERIALS AND LAYOUT

13 OF 92 L9 MATERIALS AND LAYOUT

14 OF 92 L10 MATERIALS AND LAYOUT

15 OF 92 L11 MATERIALS AND LAYOUT

16 OF 92 L12 MATERIALS AND LAYOUT

17 OF 92 L13 GRADING AND PLANTING

18 OF 92 L14 GRADING AND PLANTING

19 OF 92 L15 GRADING AND PLANTING

20 OF 92 L16 GRADING AND PLANTING

21 OF 92 L17 GRADING AND PLANTING

22 OF 92 L18 GRADING AND PLANTING

23 OF 92 L19 TREE PROTECTION

24 OF 92 L20 TREE PROTECTION

25 OF 92 L21 TREE PROTECTION

26 OF 92 L22 TREE PROTECTION

27 OF 92 L23 TREE PROTECTION

28 OF 92 L24 TREE PROTECTION

29 OF 92 L25 SITE DETAILS

30 OF 92 L26 SITE DETAILS

31 OF 92 L27 SITE DETAILS

32 OF 92 L28 SITE DETAILS

33 OF 92 L29 SITE DETAILS

34 OF 92 L30 SITE DETAILS

35 OF 92 L31 SITE DETAILS

36 OF 92 L32 IRRIGATION DETAILS

37 OF 92 L33 IRRIGATION DETAILS

38 OF 92 L34 IRRIGATION DETAILS

BOST 254798 - MONUMENT RESTORATION PROJECT BOST 227374 - HARDSCAPE PROJECT

DRAWING LIST

SHEET # OF # SUBSHEET SHEET TITLE

39 OF 92 C000 CIVIL NOTES

40 OF 92 C100 SITE UTILITY DEMOLITION & EROSION

CONTROL PLAN

41 OF 92 C101 SITE UTILITY DEMOLITION & EROSION

CONTROL PLAN SHEET 1

42 OF 92 C102 SITE UTILITY DEMOLITION & EROSION

CONTROL PLAN SHEET 2

43 OF 92 C103 SITE UTILITY DEMOLITION & EROSION

CONTROL PLAN SHEET 3

44 OF 92 C104 SITE UTILITY DEMOLITION & EROSION

CONTROL PLAN SHEET 4

45 OF 92 C105 SITE UTILITY DEMOLITION & EROSION

CONTROL PLAN SHEET 5

46 OF 92 C106 SITE UTILITY DEMOLITION & EROSION

CONTROL PLAN SHEET 6

47 OF 92 C200 SITE LAYOUT PLAN

48 OF 92 C201 SITE LAYOUT PLAN SHEET 1

49 OF 92 C202 SITE LAYOUT PLAN SHEET 2

50 OF 92 C203 SITE LAYOUT PLAN SHEET 3

51 OF 92 C204 SITE LAYOUT PLAN SHEET 4

52 OF 92 C205 SITE LAYOUT PLAN SHEET 5

53 OF 92 C206 SITE LAYOUT PLAN SHEET 6

54 OF 92 C207 UTILITY PROFILE WEST WALL

55 OF 92 C208 UTILITY PROFILE NORTH WALL

56 OF 92 C209 UTILITY PROFILE SOUTH WALL

57 OF 92 C300 EROSION CONTROL DETAILS

58 OF 92 C301 UTILITY DETAILS

59 OF 92 C302 STAIR, RAMP, & WALL ELEVATION VIEWS

DRAWING LIST

SHEET # OF # SUBSHEET SHEET TITLE

60 OF 92 S1.00 GENERAL STRUCTURAL PLAN & NOTES

61 OF 92 S1.01 DEMOLITION PLAN

62 OF 92 S1.02 WALL ALIGNMENT PLAN

63 OF 92 S1.03 WALL ALIGNMENT PLAN

64 OF 92 S2.00 MICROPILE LOCATION PLAN

65 OF 92 S2.01 MICROPILE LOCATION PLAN

66 OF 92 S2.02 MICROPILE LOCATION PLAN

67 OF 92 S2.03 MICROPILE LOCATION PLAN

68 OF 92 S2.04 MICROPILE LOCATION PLAN

69 OF 92 S2.05 MICROPILE LOCATION PLAN

70 OF 92 S2.06 MICROPILE LOCATION PLAN

71 OF 92 S2.07 MICROPILE LOCATION PLAN

72 OF 92 S2.08 MICROPILE LOCATION PLAN

73 OF 92 S2.09 MICROPILE LOCATION PLAN

74 OF 92 S3.00 FOUNDATION & WALL PLAN

75 OF 92 S3.01 FOUNDATION & WALL PLAN

76 OF 92 S3.02 FOUNDATION & WALL PLAN

77 OF 92 S3.03 FOUNDATION & WALL PLAN

78 OF 92 S3.04 FOUNDATION & WALL PLAN

79 OF 92 S3.05 FOUNDATION & WALL PLAN

80 OF 92 S3.06 FOUNDATION & WALL PLAN

81 OF 92 S3.07 FOUNDATION & WALL PLAN

82 OF 92 S3.08 FOUNDATION & WALL PLAN

83 OF 92 S3.09 FOUNDATION & WALL PLAN

84 OF 92 S4.00 WALL PROFILES

85 OF 92 S4.01 WALL PROFILES

86 OF 92 S4.02 ELEVATIONS VIEWS

87 OF 92 S4.03 ELEVATIONS VIEWS

88 OF 92 S4.04 ELEVATIONS VIEWS

89 OF 92 S5.00 SECTION VIEWS

90 OF 92 S5.01 SECTION VIEWS

91 OF 92 S6.00 STRUCTURAL DETAILS

92 OF 92 E1 SITE LIGHTING PLAN

DORCHESTER HEIGHTS MONUMENT AND HARDSCAPE RESTORATION PROJECTS

A2.2, A3.2, A4.1-A4.4, A5.1-A5.7, A6.3, A6.8-A6.11 ADDENDUM A 6/10/22A

AD4.1, AD4.2, A1.1, A5.2, R1.1-R1.4, S4.1 ADDENDUM BB 6/22/22

B

A2.1, A2.2, S2.1, S5.2 ADDENDUM CC 7/1/22

UP

REPOINT STONE FOUNDATION

WALL SURFACES WITHIN

CRAWL SPACE

A6.1

A4.2

A4.4

A4.3

A4.1

REMOVE EXISTING DEBRIS

AND LEVEL DIRT FLOOR

USING HAND TOOLS ONLY.

COVER PREPARED GRADE

AND FOUNDATION WALLS WITH

MIN 10 MIL CLEAR

REINFORCED POLYETHYLENE

VAPOR RETARDER AND SEAL

ALL SEAMS AND EDGES.

EXISTING HISTORIC STONE

PIER AND SPIRAL STAIR

STANCHION TO BE

RETAINED AND PROTECTED

EXISTING CONDUIT UP TO EXISTING

IRRIGATION SYSTEM CONTROLS TO

REMAIN, SEE ELECTRICAL DWGS

EXISTING CONDUIT UP TO SERVICE

DISCONNECT AND DOWN FROM

POWER COMPANY C.T. CAB TO

REMAIN, SEE ELECTRICAL DWGS

EXISTING CONDUIT UP TO

PANELBOARD TO REMAIN, SEE

ELECTRICAL DWGS

EXISTING CONDUIT FOR

TELEPHONE SERVICE TO REMAIN,

SEE ELECTRICAL DWGS

EXISTING FIVE (5) 5" PVC

SLEEVES INSTALLED BELOW

PLINTH PAVING TO REMAIN,

SEE ELECTRICAL DWGS

EXISTING LIGHTNING

PROTECTION GROUND RODS,

SEE ELECTRICAL DRAWINGS

EXISTING MTL GRATE

IN FLOOR ABOVE

A4.2

A4.4

A4.6

A4.5

REPLACE BASEPLATE AT ONE

(1) OF THE FOUR (4)

BEARING POSTS WHICH HAS

CORRODED SEVERELY; ANCHOR

NEW BEARING PLATE

SECURELY TO NEW CONCRETE

FLOOR SLAB; REFER TO

STRUCTURAL DWGS

REPLACE THE EXISTING

FLOOR AND STRUCTURAL

FRAMING WITH NEW HOT-DIP

GALVANIZED STEEL FRAMING

AND EITHER CONCRETE ON

METAL DECK OR CAST-IN-

PLACE CONCRETE SLAB

WITH POLISHED CONCRETE

FINISH; REFER TO

STRUCTURAL DWGS

(OPTION K)

PROVIDE GRATED ACCESS

PANEL IN LEVEL 1 FLOOR

TO CRAWL SPACE BELOW;

SEE SHEET A6.2

A6.3

CLEAN AND RECOAT ALL

EXPOSED SURFACES OF THE

EXISTING STEEL STAIR AND

CIRCULAR STAIR; REMOVE

CORROSION AND LEAD-BASED

PAINT TO PREP SURFACE FOR

NEW COATING; TREAT ALL

EXPOSED STEEL SURFACES

WITH A PRIMER AND HIGH-

PERFORMANCE COATING

(OPTION F)

GUARDRAIL WITH NEW

PICKETS, REUSE

EXISTING TOP CAP

(OPTION G)

WALL MOUNTED PAINTED

METAL HANDRAIL (OPTION G)

A6.1

REPLACE PLINTH CONCRETE

PAVING WITH SPLIT SLAB

SLOPED TO DRAIN (OPTION J)

A4.3

A4.1

EXISTING STEEL

STAIR POST TO

REMAIN

EXISTING STEEL STAIR

POST TO REMAIN

CONTROL JOINTS IN

CONCRETE SLAB

(OPTION K)

EXISTING LEVEL 1 SLAB TO

REMAIN; PROVIDE REINFORCING

PER STRUCTURAL DWGS

C

1. DISMANTLING (FOR REASSEMBLY) OF THE UPPER

LEVELS OF THE MONUMENT REQUIRES DETAILED

EXISTING CONDITION DOCUMENTATION, CATALOGING,

AND PROTECTION OF SALVAGE MATERIALS FOR

CONTRACTING OFFICER (CO) APPROVAL BEFORE WORK

CAN BEGIN. CONTRACTOR TO PROVIDE SITE AND

MONUMENT PROTECTION AND LOGISTICAL PLAN FOR

APPROVAL PRIOR TO DISMANTLING ACTIVITIES PER

SPECIFICATIONS.

2. PROTECT EXISTING TO REMAIN MASONRY STRUCTURES

AND SURROUNDING LANDSCAPE AND HARDSCAPE

WITHIN THOMAS PARK.

3. ASSUME ALL SCOPE IS INCLUDED IN THE BASE BID

UNLESS NOTED AS AN OPTION. SEE SHEET G1.0 FOR

LIST OF ALL BID OPTIONS.

4. CAREFULLY DISMANTLE MASONRY WALL AS INDICATED.

TAKE CARE TO SALVAGE EXISTING MARBLE AND

BRICKS FOR REUSE PER SPECIFICATIONS.

5. REFER TO SHEET G1.0 FOR LIST OF ALL ITEMS TO

BE SALVAGED.

6. REFER TO THE RESTORATION SERIES DRAWINGS FOR

SCOPE OF BRICK MASONRY REBUILDING, REPAIR, AND

CLEANING.

7. REFER TO THE STRUCTURAL SERIES DRAWINGS FOR

ALL STRUCTURAL STABILIZATION OF MASONRY.

8. REFER TO THE STRUCTURAL SERIES DRAWINGS FOR

ALL STRUCTURAL SUPPORT AND DETAILS.

4 4 80

SCALE OF FEET

WASHINGTON, DC

PMIS/PKG NO.

DRAWING NO.

SHEET

SUB SHEET NO.DESIGNED:PRIME/ARCHITECTURE: TITLE OF SHEET

OF

CADD:

TECH REVIEW:

DATE:

SCALE A

SmithGroup

Structural:

Silman Boston, MA

Consultant 2:

Building Conser Assoc Boston, MA

165882

:3 :3

A M

B

IM

C li e n t P ro je c ts

N a ti o n a l P a rk

S e rv ic e N P S B O S T

D D

C D .r v t

S J P

CRAWL SPACE AND

LEVEL 1 FLOOR PLANS

254798A2.1

SJP

SJP

DORCHESTER HEIGHTS MONUMENT1/21/2022

SCALE AA2.1

1 CRAWL SPACE FLOOR PLAN

SCALE AA2.1

2 LEVEL 1 FLOOR PLAN

GENERAL SHEET NOTES

A4.6

A4.5

PROVIDE NEW NORMAL WEIGHT

MESH-REINFORCED CAST-IN-

PLACE TOPPING SLAB SLOPED

TO DRAIN; POLISHED CONCRETE

FINISH

REPLACE EXISTING ALUMINUM

DOORS AND FRAMES;

REPLACE STEEL LINTELS

ABOVE MASONRY OPENINGS

PER STRUCTURAL DWGS;

REPLACE EXISTING

BALUSTERS AT EACH

BALCONY WITH NEW

TO MATCH EXISTING

A5.1

A6.7

CLEAN AND RECOAT ALL

EXPOSED SURFACES OF THE

EXISTING STEEL STAIR AND

CIRCULAR STAIR; REMOVE

CORROSION AND LEAD-BASED

PAINT TO PREP SURFACE FOR

NEW COATING; TREAT ALL

EXPOSED STEEL SURFACES

WITH A PRIMER AND HIGH-

PERFORMANCE COATING

(OPTION F)

GUARDRAIL WITH NEW

PICKETS, RESUSE

EXISTING TOP CAP.

NEW WALL

MOUNTED PAINTED

METAL HANDRAIL

A4.2

A4.4

A4.3

A4.1

A6.7

DOOR 202

TO BE FIXED

IN PLACE

CLEAN AND RECOAT ALL EXPOSED

SURFACES OF THE EXISTING STEEL

STAIR AND CIRCULAR STAIR; REMOVE

CORROSION AND LEAD-BASED PAINT

TO PREP SURFACE FOR NEW

COATING; TREAT ALL EXPOSED STEEL

SURFACES WITH A PRIMER AND

HIGH-PERFORMANCE COATING

(OPTION H)

CONTROL JOINTS IN

CONCRETE SLAB

C

C

ROOF 4: TOWER CHAMBER CORNICE

INSTALL 20 OZ. ZINC-TIN COATED

COPPER ROOFING OVER SELF-ADHERED

POLYETHYLENE FACED UNDERLAYMENT

INSTALL NEW NORMAL

WEIGHT CONCRETE FLOOR

PITCHED TO DRAIN; APPLY

PMMA ROOFING MEMBRANE

ON NEW CONCRETE

REINSTALL OBELISKS, CORNER PIERS,

BALUSTRADE, AND RAILINGS THAT WERE

REMOVED DURING PREVIOUS EMERGENCY

STABILIZATION; REFER TO MASONRY

RESTORATION DWGS

A6.7

A4.2

A4.4

A4.3

A4.1

INSTALL BIRD NET

WITHIN ARCHED

MASONRY OPENINGS;

TYPICAL

23'-9"

SLOPE TOPPING SLAB

TO DRAIN TO DOORS

201, 203, AND 204

WITH CRICKETS AT

EACH CORNER TO

DIRECT WATER AWAY

FROM CORNERS AND

OUT THROUGH ARCHED

OPENINGS

A

PROVIDE NEW PAINTED METAL

GRAVITY VENTILATOR SET ON

MANUFACTURER PROVIDED

CURB IN PLACE OF EXISTING

SKYLIGHT AT THE TOP OF

THE LEVEL 3 BELFRY

A5.4

REPLACE EIGHT (8)

LANTERN TIE RODS WITH

NEW STN STL TIE RODS;

SEE STRUCTURAL DWGS;

PROVIDE FLUID APPLIED

PMMA FLASHING AT BASE

OF RODS TO ZINC-TIN

COATED COPPER; SEE

STRUCTURAL DWGS

ROOF 1: LANTERN BASE

REPLACE ROOFING WITH NEW

20 OZ. ZINC-TIN COATED

COPPER WITH 2 LAYERS RED

ROSIN PAPER OVER SELF-

ADHERED POLYETHYLENE FACED

UNDERLAYMENT; INSTALL NEW

FLASHING AND COUNTER

FLASHING AT PILASTERS

ROOF 2: URN PLATFORM

INSTALL 20 OZ. ZINC-TIN

COATED COPPER ROOFING

OVER SELF-ADHERED

POLYETHYLENE FACED

UNDERLAYMENT

A

A A

1. DISMANTLING (FOR REASSEMBLY) OF THE UPPER

LEVELS OF THE MONUMENT REQUIRES DETAILED

EXISTING CONDITION DOCUMENTATION, CATALOGING,

AND PROTECTION OF SALVAGE MATERIALS FOR

CONTRACTING OFFICER (CO) APPROVAL BEFORE WORK

CAN BEGIN. CONTRACTOR TO PROVIDE SITE AND

MONUMENT PROTECTION AND LOGISTICAL PLAN FOR

APPROVAL PRIOR TO DISMANTLING ACTIVITIES PER

SPECIFICATIONS.

2. PROTECT EXISTING TO REMAIN MASONRY STRUCTURES

AND SURROUNDING LANDSCAPE AND HARDSCAPE

WITHIN THOMAS PARK.

3. ASSUME ALL SCOPE IS INCLUDED IN THE BASE BID

UNLESS NOTED AS AN OPTION. SEE SHEET G1.0 FOR

LIST OF ALL BID OPTIONS.

4. CAREFULLY DISMANTLE MASONRY WALL AS INDICATED.

TAKE CARE TO SALVAGE EXISTING MARBLE AND

BRICKS FOR REUSE PER SPECIFICATIONS.

5. REFER TO SHEET G1.0 FOR LIST OF ALL ITEMS TO

BE SALVAGED.

6. REFER TO THE RESTORATION SERIES DRAWINGS FOR

SCOPE OF BRICK MASONRY REBUILDING, REPAIR, AND

CLEANING.

7. REFER TO THE STRUCTURAL SERIES DRAWINGS FOR

ALL STRUCTURAL STABILIZATION OF MASONRY.

8. REFER TO THE STRUCTURAL SERIES DRAWINGS FOR

ALL STRUCTURAL SUPPORT AND DETAILS.

4 4 80

SCALE OF FEET

WASHINGTON, DC

PMIS/PKG NO.

DRAWING NO.

SHEET

SUB SHEET NO.DESIGNED:PRIME/ARCHITECTURE: TITLE OF SHEET

OF

CADD:

TECH REVIEW:

DATE:

SCALE A

SmithGroup

Structural:

Silman Boston, MA

Consultant 2:

Building Conser Assoc Boston, MA

165882

:3 :4

A M

B

IM

C li e n t P ro je c ts

N a ti o n a l P a rk

S e rv ic e N P S B O S T

D D

C D .r v t

S J P

LEVEL 2, LEVEL 3, AND

LANTERN FLOOR PLANS

254798A2.2

SJP

SJP

DORCHESTER HEIGHTS MONUMENT1/21/2022

SCALE AA2.2

1 LEVEL 2 FLOOR PLAN

SCALE AA2.2

2 LEVEL 3 FLOOR PLAN

SCALE AA2.2

3 LANTERN FLOOR PLAN

GENERAL SHEET NOTES

WASHINGTON, DC

PRIME/ARCHITECTURE:

SmithGroup

Consultant 1:

Silman Boston, MA Consultant 2:

Building Conser Assoc.

Boston, MA

AutoCAD SHX Text

EXISTING STONE PIER TO REMAIN

AutoCAD SHX Text

EXISTING STONE BEARING WALL TO REMAIN

AutoCAD SHX Text W 10 x 26

AutoCAD SHX Text W 10 x 26

AutoCAD SHX Text S1

AutoCAD SHX Text

BP1

AutoCAD SHX Text

BP1

AutoCAD SHX Text

BP1

AutoCAD SHX Text

BP1

AutoCAD SHX Text

NOTES: 1. IF OPTION K IS SELECTED, THIS FRAMING PLAN REPLACES THE FRAME PLAN SHOWN IN 2/S2.1. IF OPTION K IS SELECTED, THIS FRAMING PLAN REPLACES THE FRAME PLAN SHOWN IN 2/S2.1. OTHERWISE, IF OPTION K IS NOT SELECTED, THIS FRAMING PLAN IS NOT APPLICABLE. 2. WHEN PRICING OPTION K, INCLUDE CREDITS FROM ELIMINATING SCOPE OF WORK IN 2/S2.1 AS WELL WHEN PRICING OPTION K, INCLUDE CREDITS FROM ELIMINATING SCOPE OF WORK IN 2/S2.1 AS WELL AS COST OF SCOPE OF WORK SHOWN HERE ON THIS PLAN 3. ALL NEW STEEL AT LEVEL 1 FRAMING SHALL BE HOT DIP GALVANIZED ALL NEW STEEL AT LEVEL 1 FRAMING SHALL BE HOT DIP GALVANIZED 4. SCRAPE AND PAINT WITH CORROSION-RESISTANT PAINT ALL EXISTING STEEL SCRAPE AND PAINT WITH CORROSION-RESISTANT PAINT ALL EXISTING STEEL 5. AREAS OF DAMAGED BRICK IN THE EXISTING BRICK WALLS SHALL BE INFILLED WITH NEW BRICK AREAS OF DAMAGED BRICK IN THE EXISTING BRICK WALLS SHALL BE INFILLED WITH NEW BRICK 6. REPOINT ALL EXPOSED BRICK MASONRY SURFACES AT THE FOUNDATION WALLSREPOINT ALL EXPOSED BRICK MASONRY SURFACES AT THE FOUNDATION WALLS

AutoCAD SHX Text

EXISTING STONE CLADDING TO REMAIN

AutoCAD SHX Text

EXISTING STEEL ANGLE STAIR POST TO REMAIN, (4) LOCATIONS

AutoCAD SHX Text

EXISTING STONE SLAB

AutoCAD SHX Text REINFORCE EXISTING STEEL BEAM FRAMING OUT STAIR SLAB OPENING WITH SUPPLEMENTAL STEEL PLATE WELDED TO TOP AND BOTTOM FLANGES

AutoCAD SHX Text

(E) ARCH

AutoCAD SHX Text

(E) ARCH

AutoCAD SHX Text T

AutoCAD SHX Text

(E) WF

AutoCAD SHX Text

(E) WF

AutoCAD SHX Text

(E) WF

AutoCAD SHX Text

(E) WF

AutoCAD SHX Text

(E) ARCH

AutoCAD SHX Text NOTES: 1. SCRAPE AND PAINT WITH CORROSION -RESISTANT PAINT ALL EXISTING SCRAPE AND PAINT WITH CORROSION -RESISTANT PAINT ALL EXISTING STEEL 2. EXPOSE BEAM ENDS AT BEARING POCKETS FOR OBSERVATION, SCRAPING, EXPOSE BEAM ENDS AT BEARING POCKETS FOR OBSERVATION, SCRAPING, AND PAINTING WITH CORROSION-RESISTANT PAINT 3. EXISTING STEEL BEAMS MAY NEED TO BE REINFORCED BASED UPON EXISTING STEEL BEAMS MAY NEED TO BE REINFORCED BASED UPON OBSERVED SECTION LOSS ONCE TOPPING SLAB HAS BEEN REMOVED. NOTIFY CONTRACTING OFFICER UPON TOP OF BEAM EXPOSURE FOR EVALUATION 4. AREAS OF DAMAGED BRICK IN THE EXISTING BRICK VAULTS SHALL BE AREAS OF DAMAGED BRICK IN THE EXISTING BRICK VAULTS SHALL BE INFILLED WITH NEW BRICK. SEE RESTORATION "R-" DRAWINGS FOR MORE INFORMATION.

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text

BP3

AutoCAD SHX Text

BP3

AutoCAD SHX Text

BP3

AutoCAD SHX Text

BP3

AutoCAD SHX Text W16X100

AutoCAD SHX Text NOTES: 1. ALL NEW STEEL SHALL BE HOT-DIP GALVANIZED ALL NEW STEEL SHALL BE HOT-DIP GALVANIZED 2. AT INNER W12 AROUND STAIR OPENING, HUNG L-ANGLE IS A CONTINUOUS HUNG L6x6x TO AT INNER W12 AROUND STAIR OPENING, HUNG L-ANGLE IS A CONTINUOUS HUNG L6x6x TO 38 TO SUPPORT THE INNER END OF THE BRICK ARCH. ANGLE IS HUNG FROM W12 WITH MATCHING ANGLE AT 2'-0" ON CENTER, AND BRACED BACK TO W12x152 WITH 4"x " PLATE AT 2'-0" ON 12" PLATE AT 2'-0" ON CENTER. TYPICAL ALL SIDES OF STAIR. 3. REPLACE EXISTING HORIZONTAL STEEL TIE-RODS WITH NEW STAINLESS STEEL TIE-RODS. REPLACE EXISTING HORIZONTAL STEEL TIE-RODS WITH NEW STAINLESS STEEL TIE-RODS. 4. "ARCH" INDICATES THE FOLLOWING: "ARCH" INDICATES THE FOLLOWING: A. AT FLOOR LEVEL: 1" FORM DECK (TYPE 1.0 C BY VULCRAFT OR APPROVED EQUAL) WITH 1.5" AT FLOOR LEVEL: 1" FORM DECK (TYPE 1.0 C BY VULCRAFT OR APPROVED EQUAL) WITH 1.5" NORMAL WEIGHT CONCRETE (TOTAL THICKNESS = 2.5"). B. AT CEILING BELOW (UNDERSIDE OF FRAMING): 2 WYTHE BRICK VAULT CEILING, TO BEAR ON AT CEILING BELOW (UNDERSIDE OF FRAMING): 2 WYTHE BRICK VAULT CEILING, TO BEAR ON INSIDE AND OUTSIDE ANGLES.

AutoCAD SHX Text NOTES: 1. ALL NEW STEEL SHALL BE HOT-DIP GALVANIZED ALL NEW STEEL SHALL BE HOT-DIP GALVANIZED UNLESS NOTED OTHERWISE 2. NEW LINTELS SHALL BE (1) W8x31 AND (1) NEW LINTELS SHALL BE (1) W8x31 AND (1) L4x3-1/2x5/16. 3. ALIGN TOP OF STEEL BEAMS. BOTTOM OF DEEPER ALIGN TOP OF STEEL BEAMS. BOTTOM OF DEEPER BEAMS TO BE 2" ABOVE TOP OF STONE SLABS

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text

BP4

AutoCAD SHX Text

BP4

AutoCAD SHX Text

BP4

AutoCAD SHX Text

BP4

AutoCAD SHX Text

(E) ARCH

AutoCAD SHX Text

SPIRAL STAIRCASE ABOVE

AutoCAD SHX Text

(E) WF

AutoCAD SHX Text PROVIDE NEW LANTERN TIE-DOWN RODS AT EIGHT LOCATIONS AT LANTERN. PROVIDE NEW STAINLESS STEEL GALVANIZED 1-1/4" DIAMETER RODS WITH NUTTED ATTACHMENT TO ANGLE ARMATURE TO FLOOR BEAMS. AT TOP OF RODS, PROVIDE 4"x4"x1" FISH PLATE WITHIN DOME STONE. ALL HARDWARE ASSOCIATED WITH TIE-DOWN RODS SHALL BE STAINLESS STEEL

AutoCAD SHX Text

ARCH

AutoCAD SHX Text

ARCH

AutoCAD SHX Text

ARCH

AutoCAD SHX Text

ARCH

AutoCAD SHX Text W16x100

AutoCAD SHX Text PROVIDE 1/4" THICK PLATE WELDED TO TOP OF BEAMS ALONG ITS ENTIRE LENGTH, TYP. (4) TRIPLE BEAMS. WELD BOTTOM FLANGES OF PARALLEL BEAMS TOGETHER AT MOMENT CONNECTIONS

L

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text

BP3

AutoCAD SHX Text

BP3

AutoCAD SHX Text

BP3

AutoCAD SHX Text

BP3

AutoCAD SHX Text

(E) WF

AutoCAD SHX Text

(E) WF

AutoCAD SHX Text

(E) ARCH

AutoCAD SHX Text

(E) ARCH

C8x11.5

AutoCAD SHX Text C8x11.5

AutoCAD SHX Text C8x11.5

AutoCAD SHX Text C8x11.5

AutoCAD SHX Text

BP2

AutoCAD SHX Text

BP2

AutoCAD SHX Text

BP2

AutoCAD SHX Text

BP2

AutoCAD SHX Text NOTES: 1. ALL NEW STEEL SHALL BE HOT-DIP GALVANIZED UNLESS NOTED OTHERWISEALL NEW STEEL SHALL BE HOT-DIP GALVANIZED UNLESS NOTED OTHERWISE

AutoCAD SHX Text

NEW GRAVITY VENTILATOR. SEE ARCHITECTURAL DRAWINGS

AutoCAD SHX Text L6x6x LEDGER 38 LEDGER

AutoCAD SHX Text L6x6x LEDGER 38 LEDGER

AutoCAD SHX Text W12x40+L-ANGLE

AutoCAD SHX Text W12x40+L-ANGLE

AutoCAD SHX Text 14" THICK CIRCULAR BENT PLATE POUR STOP TO SUPPORT EDGE OF SLAB AND PERIMETER OF STAIR ENCLOSURE, ALL AROUND

AutoCAD SHX Text L6x6x LEDGER 38 LEDGER

AutoCAD SHX Text L6x6x LEDGER 38 LEDGER

AutoCAD SHX Text W12x40+L-ANGLE

AutoCAD SHX Text W12x40+L-ANGLE

AutoCAD SHX Text W16X100

AutoCAD SHX Text W16X100

AutoCAD SHX Text W16x100

AutoCAD SHX Text W16x100

AutoCAD SHX Text W16x100

AutoCAD SHX Text

EXISTING BRICK BEARING WALL TO REMAIN

AutoCAD SHX Text NEW 10" CMU FULLY GROUTED WITH #5x8" O/C VERTICAL REINFORCEMENT AND LADDER-TYPE HORIZONTAL REINFORCEMENT AT 16" O/C. REBAR SHALL BE ASTM A706 GRADE 60 WELDABLE REBAR, WELDED TO THE TOP OF THE NEW STEEL BEAMS

AutoCAD SHX Text NEW 12" CMU FULLY GROUTED WITH #5x8" O/C VERTICAL REINFORCEMENT AND LADDER-TYPE HORIZONTAL REINFORCEMENT AT 16" O/C. REBAR SHALL BE ASTM A706 GRADE 60 WELDABLE REBAR, WELDED TO THE TOP OF THE NEW STEEL BEAMS. CMU BLOCKS SHALL BE CUSTOM FABRICATED TO MATCH CURVED SHAPE OF DRUM STRUCTURE TO ALLOW ADJACENT BLOCKS TO BUTT TIGHT.

AutoCAD SHX Text NEW 6" CMU WITH #4@16" O/C VERTICAL REBAR (CELLS WITH REBAR GROUTED). NEW CMU TO BE BEHIND FACE STONE. REBAR TO BE ANCHORED INTO TOP OF STONE BELOW WITH HILTI HIT-HY 270 EPOXY (EMBED 4"). REBAR TO BE HOT-DIP GALVANIZED. TYPICAL ALL AROUND.

AutoCAD SHX Text W16X100

AutoCAD SHX Text NOTE: SEE GENERAL NOTE 2 ON S0.1 FOR REQUIREMENTS FOR TEMPORARY SHORING AND BRACING. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN, LAYOUT, AND SEQUENCING OF ALL TEMPORARY SHORING AND BRACING NECESSARY TO COMPLETE THE SCOPE OF WORK, AND SHALL SUBMIT SHOP DRAWINGS AND CALCULATIONS PREPARED BY, AND SIGNED AND SEALED BY, A LICENSED ENGINEER IN THE STATE OF MASSACHUSETTS.

AutoCAD SHX Text W 10 x 26

AutoCAD SHX Text W10x26

AutoCAD SHX Text

BP1

AutoCAD SHX Text

BP1

AutoCAD SHX Text

BP1

AutoCAD SHX Text

BP1

AutoCAD SHX Text NOTES: 1. SCRAPE AND PAINT ALL EXISTING STEEL AT EXPOSED LOCATIONS (UNDERSIDE OF BOTTOM FLANGE, SCRAPE AND PAINT ALL EXISTING STEEL AT EXPOSED LOCATIONS (UNDERSIDE OF BOTTOM FLANGE, ETC.) 2. NEW W10x26 SHALL BE INSTALLED TIGHT TO UNDERSIDE OF EXISTING STEEL BEAMS. BEAMS NEW W10x26 SHALL BE INSTALLED TIGHT TO UNDERSIDE OF EXISTING STEEL BEAMS. BEAMS BROUGHT IN IN SEGMENTS WILL NEED TO BE SPLICED. PROVIDE SPLICES AT THIRD POINTS OF BEAMS. SEE TYPICAL DETAIL. FILL GAPS BETWEEN BOTTOM FLANGE OF EXISTING BEAM AND TOP FLANGE OF NEW BEAM WITH NON-SHRINK GROUT. 3. ALL NEW STEEL AT LEVEL 1 FRAMING SHALL BE HOT DIP GALVANIZED ALL NEW STEEL AT LEVEL 1 FRAMING SHALL BE HOT DIP GALVANIZED 4. AREAS OF DAMAGED BRICK IN THE EXISTING BRICK WALLS SHALL BE INFILLED WITH NEW BRICK AREAS OF DAMAGED BRICK IN THE EXISTING BRICK WALLS SHALL BE INFILLED WITH NEW BRICK 5. SHORE EXISTING STEEL SO THAT NEW BEARING POCKETS CAN BE MADE AND NEW STEEL INSTALLED.SHORE EXISTING STEEL SO THAT NEW BEARING POCKETS CAN BE MADE AND NEW STEEL INSTALLED.

AutoCAD SHX Text

EXISTING STONE CLADDING TO REMAIN. SEE OTHER DRAWINGS FOR STONE CLADDING SCOPE.

AutoCAD SHX Text

EXISTING BRICK BEARING WALL TO REMAIN

AutoCAD SHX Text

EXISTING STEEL ANGLE STAIR POST TO REMAIN, (4) LOCATIONS

AutoCAD SHX Text REPLACE DETERIORATED POST BASE PLATE WITH NEW BASE PLATE. PROVIDE 12"x12"x " 516" BASEPLATE (HD GALV.), ANCHORED TO SLAB WITH (4) " DIAMETER 12" DIAMETER HIT-Z-R ANCHOR WITH HILTI HIT-HY 200 EPOXY (EMBED 5")

AutoCAD SHX Text C8x11.5

AutoCAD SHX Text

BP2

AutoCAD SHX Text

BP2

AutoCAD SHX Text

(E) ARCH

AutoCAD SHX Text

(E) ARCH

AutoCAD SHX Text

(E) ARCH

AutoCAD SHX Text C8x11.5

AutoCAD SHX Text C8x11.5

AutoCAD SHX Text W24x192 (H.D. GALV.)

AutoCAD SHX Text W24x192 (H.D. GALV.)

AutoCAD SHX Text W18x97 (H.D. GALV.)

AutoCAD SHX Text W18x97 (H.D. GALV.)

AutoCAD SHX Text PROVIDE CMU PIER (SIZE OF BLOCK AND REINFORCEMENT TO MATCH TYPICAL NEW PERIMETER FACE STONE BACKUP WALL). PIER TO MATCH EXISTING PIER SIZE (APPROXIMATELY 12"x12" INBOARD OF NEW BACKUP WALL. DRILL AND EPOXY BARS INTO TOP OF STONE BASE (EMBED 4" WITH HILTI HIT-HY 27O EPOXY). TYPICAL FOUR CORNER LOCATIONS.

AutoCAD SHX Text

AutoCAD SHX Text S4.2

AutoCAD SHX Text

AutoCAD SHX Text S4.1

AutoCAD SHX Text C8x11.5

AutoCAD SHX Text C8x11.5

AutoCAD SHX Text C8x11.5

REPLACE DETERIORATED POST BASE PLATE WITH NEW BASE PLATE. PROVIDE 12"x12"x " 516" BASEPLATE (HD GALV.), ANCHORED TO SLAB WITH (4) " DIAMETER 12" DIAMETER HIT-Z-R ANCHOR WITH HILTI HIT-HY 200 EPOXY (EMBED 5")

AutoCAD SHX Text

BP2

AutoCAD SHX Text

BP2

AutoCAD SHX Text 12/2/21 12:26 MAM R24 \\BOSFS\PROJECTS\19000\19603\DRAWINGS\19603 S2.1.DWG XREFS: .\FLOORPLAN-LEVEL2FLOORPLAN.DWG; .\FLOORPLAN-LEVEL3FLOORPLAN.DWG; .\FLOORPLAN-LANTERNFLOORPLAN.DWG; .\FLOORPLAN-LEVEL1FLOORPLAN.DWG; .\FLOORPLAN-CRAWLSPACEFLOORPLAN.DWG;

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

FOUNDATION PLAN AND

AutoCAD SHX Text

FRAMING PLANS

AutoCAD SHX Text

AutoCAD SHX Text 165882

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RJ

AutoCAD SHX Text

MJM/MAM

AutoCAD SHX Text 1/21/2022

AutoCAD SHX Text

DORCHESTER HEIGHTS MONUMENT

AutoCAD SHX Text 254798

AutoCAD SHX Text S2.1

AutoCAD SHX Text

NOT FOR CONSTRUCTION

AutoCAD SHX Text

FOUNDATION PLAN

AutoCAD SHX Text

AutoCAD SHX Text S2.1

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text

LEVEL 1 FRAMING PLAN

AutoCAD SHX Text

AutoCAD SHX Text S2.1

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text

SCALE

AutoCAD SHX Text A

AutoCAD SHX Text

LEVEL 2 FRAMING PLAN

AutoCAD SHX Text

AutoCAD SHX Text S2.1

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text

LEVEL 3 FRAMING PLAN

AutoCAD SHX Text

AutoCAD SHX Text S2.1

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text

LEVEL 4 FLOOR FRAMING PLAN

AutoCAD SHX Text

AutoCAD SHX Text S2.1

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text

LANTERN FRAMING PLAN

AutoCAD SHX Text

AutoCAD SHX Text S2.1

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text

OPTION K: LEVEL 1 FRAMING PLAN

AutoCAD SHX Text 2A

AutoCAD SHX Text S2.1

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

C

WASHINGTON, DC

PRIME/ARCHITECTURE:

SmithGroup

Consultant 1:

Silman Boston, MA Consultant 2:

Building Conser Assoc.

Boston, MA

AutoCAD SHX Text %%uNOTES:

AutoCAD SHX Text 1.

AutoCAD SHX Text DENOTES BRICK TO BE REPLACED. WHERE CRACK IS THRU WALL, REPLACE ALL WYTHES OF BRICK ON EACH SIDE OF CRACK TO 1st MORTAR JOINT. REPLACE EXISTING HEADERS WITH NEW HEADERS. REPLACE LOOSE AND CRACKED BRICKS. WHERE CRACK IS ONLY IN OUTER WYTHE, REPLACE ONLY OUTER WYTHE. WHERE CRACK IS OPEN AND " OR LESS AND IS PRESENT ONLY IN 14" OR LESS AND IS PRESENT ONLY IN THE OUTER WYTHE AND ONLY IN JOINTS, RAKE AND REPOINT JOINTS ONLY.

AutoCAD SHX Text 2.

AutoCAD SHX Text

EL.

AutoCAD SHX Text

SEE PLAN

AutoCAD SHX Text

T.O. SLAB

AutoCAD SHX Text L6x4x " LLV (CONT.) 38" LLV (CONT.) WITH " DIA. HOLES 1316" DIA. HOLES FOR ANCHORS

AutoCAD SHX Text

34" DIA. ADHESIVE ANCHORS @ 1'-4" O.C. (MIN. 2 PER ANGLE)

AutoCAD SHX Text

EXISTING CONCRETE OR SOLID MASONRY WALL

AutoCAD SHX Text

DRYPACK

AutoCAD SHX Text

PACK SOLID WITH MASONRY AND/ OR GROUT

AutoCAD SHX Text NEW ANGLE LINTELS, ONE FOR EACH 4" OF WALL WIDTH. SEE PLAN OR SCHEDULE FOR SIZE. BEAR LINTELS, 6" AT EACH END

AutoCAD SHX Text

TYPICAL BEAM TO BEAM MOMENT CONNECTION

AutoCAD SHX Text

AutoCAD SHX Text

STEEL BEAM SEE PLAN

AutoCAD SHX Text

BOLTS " MIN.34" MIN.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

FULL PENETRATION WELD

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

2" SPACE FILLED SOLID W/ MASONRY

AutoCAD SHX Text

TYPICAL WIDE FLANGE AND ANGLE STEEL LINTEL IN EXTERIOR MASONRY WALL

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text TYP. WF LINTEL (SEE STRUCTURAL PLAN FOR SIZE). SEE ARCH. DWGS. FOR STEEL ELEVATION

AutoCAD SHX Text 14"x2"x (WIDTH OF BEAM) PL. SPACER @ 2'-0"o/c WELD TO BEAM AND CONTINUOUS BOTTOM PLATE

AutoCAD SHX Text 14" CONT. BOTTOM PLATE x WIDTH OF WALL

AutoCAD SHX Text NOTE: IF EXISTING CONNECTIONS INTERFERE WITH THIS DETAIL, CONTRACTOR SHALL SUBMIT ALTERNATE DETAIL FOR REVIEW.

AutoCAD SHX Text

TYPICAL DETAIL CONNECTION OF NEW STEEL BEAM TO EXISTING STEEL BEAM

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

NEW BEAM

AutoCAD SHX Text

EXISTING BEAM

AutoCAD SHX Text

AutoCAD SHX Text SHEAR END CONNECTION BY STEEL DETAILER - SEE SUGGESTED SHEAR CONNECTION DETAIL. SEE GENERAL NOTES - STRUCTURAL STEEL FOR REQUIRED END CONNECTION CAPACITY

AutoCAD SHX Text

9/11/20 15:51 MAGHAKIAN R23 \\BOSFS\PROJECTS\19000\19603\DRAWINGS\19603 S5.2.DWG

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

TYPICAL DETAILS

AutoCAD SHX Text

AutoCAD SHX Text 165882

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RJ

AutoCAD SHX Text

MJM/SL

AutoCAD SHX Text 1/21/2022

AutoCAD SHX Text

DORCHESTER HEIGHTS MONUMENT

AutoCAD SHX Text 254798

AutoCAD SHX Text S5.2

AutoCAD SHX Text

NOT FOR CONSTRUCTION

AutoCAD SHX Text

TYPICAL DETAIL SHEAR

AutoCAD SHX Text

REPAIR IN BRICK MASONRY

AutoCAD SHX Text

TYPICAL DETAIL SHELF ANGLE AT

AutoCAD SHX Text

EXISTING LOAD BEARING WALL FOR

AutoCAD SHX Text

COMPOSITE FLOOR DECK SUPPORT

AutoCAD SHX Text

TYPICAL DETAIL ANGLE LINTEL

AutoCAD SHX Text

IN EXISTING MASONRY WALL

C

Sheets
CS - COVER SHEET
A2.1 - CRAWL SPACE AND LEVEL 1 FLOOR PLANS
A2.2 - LEVEL 2, LEVEL 3, AND LANTERN FLOOR PLANS