2023-0213_NPS_BOST_254798_DD_CD_-_Addendum_G_Drawings_0003.pdf
PDF 4 MB Posted
- Solicitation number
- 140P2023R0023
About this file
This document package includes construction drawings and specifications for the restoration of the Dorchester Heights Monument and hardscapes located within Boston National Historical Park. Key details include restoring and stabilizing the monument's masonry, replacing doors, balustrades and roofing materials, installing drainage and waterproofing systems, and rehabilitating hardscape areas. The related solicitation seeks bids for carrying out preservation work depicted in the drawings, including dismantling and rebuilding upper levels of the monument, masonry restoration, structural stabilization, and site work. The anticipated award date is February 2023. The National Park Service is the contracting agency managing the project.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PROJECT
HARDSCAPE PROJECT
(BOST 227374)
MONUMENT
RESTORATION
PROJECT
(BOST 254798)
THIS PROJECT
PMIS/PKG NO.
DRAWING NO.
SHEET
CONSULTANT:
TITLE OF DRAWING
OF
BUILDING
CONSERVATION
ASSOCIATES
BOSTON, MA
LOCATION WITHIN PARK
NAME OF PARK
COUNTY STATREGION
NATIONAL PARK SERVICE
UNITED STATES
DEPARTMENT OF THE INTERIOR
STRUCTURAL:
SILMAN
BOSTON, MAWASHINGTON, DC
smithgroup.com
PRIME/ARCH:
SMITHGROUP
SMITHGROUP Mark Sheet(s) REVISION Date Initial
APPROVED:
Regional Director Date
Superintendent Date
RECOMMENDED:
RECOMMENDED:
Project Manager Date
:3 :3
A M
A u to d e s k
D o c s C li e n t P ro je c ts
N a ti o n a l P a rk
S e rv ic e N P S B O S T
D D
C D .r v t
A u th o r
MONUMENT AND HARDSCAPE
RESTORATION
254798
165882
691SUFFOLK
DORCHESTER HEIGHTS
DORCHESTER HEIGHTS MONUMENT
NE MA
FINAL CONSTRUCTION DOCUMENTS
BOSTON NATIONAL HISTORICAL SITE
(BOST)
DRAWING LIST
SHEET # OF # SUBSHEET SHEET TITLE
GENERAL
2 OF 69 G0.1 ABBREVIATIONS AND SYMBOLS
3 OF 69 G0.2 SITE STAGING AND ACCESS PLAN
4 OF 69 G1.0 PROJECT NARRATIVE & BUILDING CODE SUMMARY
ARCHITECTURAL DEMOLITION
5 OF 69 AD2.1 CRAWL SPACE AND LEVEL 1 DEMOLITION FLOOR PLANS
6 OF 69 AD2.2 LEVEL 2, LEVEL 3, AND LANTERN DEMOLITION FLOOR PLANS
7 OF 69 AD3.1 CRAWL SPACE AND LEVEL 1 DEMOLITION REF CEILING PLANS
8 OF 69 AD3.2 LEVEL 2, LEVEL 3, AND LANTERN DEMOLITION REF CEILING PLANS
9 OF 69 AD4.1 BUILDING DEMOLITION SECTIONS
10 OF 69 AD4.2 DEMOLITION DETAILS
11 OF 69 HD1.0 HAZMAT ABATEMENT SITE PLAN
12 OF 69 HD1.1 HAZMAT ABATEMENT FLOOR PLAN & BUILDING SECTION
ARCHITECTURAL
13 OF 69 A1.1 ARCHITECTURAL SITE PLAN
14 OF 69 A2.1 CRAWL SPACE AND LEVEL 1 FLOOR PLANS
15 OF 69 A2.2 LEVEL 2, LEVEL 3, AND LANTERN FLOOR PLANS
16 OF 69 A3.1 CRAWL SPACE AND LEVEL 1 REF CEILING PLANS
17 OF 69 A3.2 LEVEL 2, LEVEL 3, AND LANTERN REF CEILING PLANS
18 OF 69 A4.1 WEST ELEVATION
19 OF 69 A4.2 NORTH ELEVATION
20 OF 69 A4.3 EAST ELEVATION
21 OF 69 A4.4 SOUTH ELEVATION
22 OF 69 A4.5 EAST-WEST SECTION
23 OF 69 A4.6 NORTH-SOUTH SECTION
24 OF 69 A5.1 LEVEL 2 & LEVEL 3 SECTION DETAILS
25 OF 69 A5.2 LEVEL 3 SECTION DETAILS
26 OF 69 A5.3 LEVEL 4, DRUM, AND LANTERN SECTION DETAILS
27 OF 69 A5.4 ENLARGED ROOF PLAN DETAILS
28 OF 69 A5.5 ENLARGED ROOF PLAN DETAILS
29 OF 69 A5.6 ENLARGED ROOF PLAN DETAILS
30 OF 69 A5.7 ROOFING AND FLASHING DETAILS
31 OF 69 A6.1 CRAWL SPACE AND PLINTH SLAB
32 OF 69 A6.2 LEVEL 1 FLOOR GRATE DETAILS
33 OF 69 A6.3 ENTRY DOOR DETAILS
34 OF 69 A6.4 "SQUARE" STAIR ELEVATIONS
35 OF 69 A6.5 "SQUARE" STAIR ELEVATIONS
36 OF 69 A6.6 "SQUARE" STAIR DETAILS
37 OF 69 A6.7 LEVEL 2 AND LEVEL 3 DOOR DETAILS
38 OF 69 A6.8 LEVEL 2 AND LEVEL 3 DOOR DETAILS
39 OF 69 A6.9 LEVEL 3 FLASHING AND LANTERN WATERPROOFING & FLASHING DETAILS
40 OF 69 A6.10 LEVEL 3 SPIRAL STAIR ENCLOSURE DETAILS
41 OF 69 A6.11 LEVEL 3 SPIRAL STAIR ENCLOSURE DETAILS
MASONRY RESTORATION
42 OF 69 R1.1 MASONRY RESTORATION WEST ELEVATION
43 OF 69 R1.2 MASONRY RESTORATION NORTH ELEVATION
44 OF 69 R1.3 MASONRY RESTORATION EAST ELEVATION
45 OF 69 R1.4 MASONRY RESTORATION SOUTH ELEVATION
46 OF 69 R1.5 MASONRY RESTORATION WEST INTERIOR
47 OF 69 R1.6 MASONRY RESTORATION NORTH INTERIOR
48 OF 69 R1.7 MASONRY RESTORATION EAST INTERIOR
49 OF 69 R1.8 MASONRY RESTORATION SOUTH INTERIOR
50 OF 69 R1.9 MASONRY RESTORATION QUANTITY SCHEDULE - BASE BID
51 OF 69 R1.10 MASONRY RESTORATION QUANTITY SCHEDULE - OPTIONS
52 OF 69 R1.11 MASONRY RESTORATION DETAILS
STRUCTURAL
53 OF 69 S0.1 GENERAL STRUCTURAL NOTES AND LEGEND
54 OF 69 S0.2 DESIGN PARAMETERS AND LOAD SCHEDULE
55 OF 69 S2.1 FOUNDATION PLAN AND FRAMING PLANS
56 OF 69 S4.1 SECTIONS
57 OF 69 S4.2 SECTIONS
58 OF 69 S5.1 TYPICAL DETAILS
59 OF 69 S5.2 TYPICAL DETAILS
ELECTRICAL
60 OF 69 E0.1 ELECTRICAL ABBREVIATIONS AND SYMBOLS
61 OF 69 E1.1 ELECTRICAL SITE POWER AND LIGHTING PLAN
62 OF 69 E1.2 ELECTRICAL SITE UTILITY PLAN
63 OF 69 ED2.1 ELECTRICAL CRAWL SPACE AND LEVEL 1 DEMOLITION FLOOR PLANS
64 OF 69 ED2.2 ELECTRICAL LEVEL 2, LEVEL 3, AND LANTERN DEMOLITION FLOOR PLANS
65 OF 69 E2.1 ELECTRICAL CRAWL SPACE AND LEVEL 1 POWER AND LIGHTING PLANS
66 OF 69 E2.2 ELECTRICAL LEVEL 2, LEVEL 3, AND LANTERN POWER AND LIGHTING PLANS
67 OF 69 E6.0 ELECTRICAL DETAILS
68 OF 69 E6.1 ELECTRICAL DETAILS
69 OF 69 E7.0 ELECTRICAL SCHEDULES
VICINITY MAP (NOT TO SCALE) LOCATION PLAN (NOT TO SCALE)
DRAWING LIST
SHEET # OF # SUBSHEET SHEET TITLE
1 OF 92 LP1 LOGISTICS PLAN
(NOT INCLUDED, SEE BOST 254798)
2 OF 92 LN GENERAL NOTES
3 OF 92 LG KEY PLAN
4 OF 92 LA ACCESSIBILITY PLAN
5 OF 92 L1 SITE PREP AND DEMOLITION
6 OF 92 L2 SITE PREP AND DEMOLITION
7 OF 92 L3 SITE PREP AND DEMOLITION
8 OF 92 L4 SITE PREP AND DEMOLITION
9 OF 92 L5 SITE PREP AND DEMOLITION
10 OF 92 L6 SITE PREP AND DEMOLITION
11 OF 92 L7 MATERIALS AND LAYOUT
12 OF 92 L8 MATERIALS AND LAYOUT
13 OF 92 L9 MATERIALS AND LAYOUT
14 OF 92 L10 MATERIALS AND LAYOUT
15 OF 92 L11 MATERIALS AND LAYOUT
16 OF 92 L12 MATERIALS AND LAYOUT
17 OF 92 L13 GRADING AND PLANTING
18 OF 92 L14 GRADING AND PLANTING
19 OF 92 L15 GRADING AND PLANTING
20 OF 92 L16 GRADING AND PLANTING
21 OF 92 L17 GRADING AND PLANTING
22 OF 92 L18 GRADING AND PLANTING
23 OF 92 L19 TREE PROTECTION
24 OF 92 L20 TREE PROTECTION
25 OF 92 L21 TREE PROTECTION
26 OF 92 L22 TREE PROTECTION
27 OF 92 L23 TREE PROTECTION
28 OF 92 L24 TREE PROTECTION
29 OF 92 L25 SITE DETAILS
30 OF 92 L26 SITE DETAILS
31 OF 92 L27 SITE DETAILS
32 OF 92 L28 SITE DETAILS
33 OF 92 L29 SITE DETAILS
34 OF 92 L30 SITE DETAILS
35 OF 92 L31 SITE DETAILS
36 OF 92 L32 IRRIGATION DETAILS
37 OF 92 L33 IRRIGATION DETAILS
38 OF 92 L34 IRRIGATION DETAILS
BOST 254798 - MONUMENT RESTORATION PROJECT BOST 227374 - HARDSCAPE PROJECT
DRAWING LIST
SHEET # OF # SUBSHEET SHEET TITLE
39 OF 92 C000 CIVIL NOTES
40 OF 92 C100 SITE UTILITY DEMOLITION & EROSION
CONTROL PLAN
41 OF 92 C101 SITE UTILITY DEMOLITION & EROSION
CONTROL PLAN SHEET 1
42 OF 92 C102 SITE UTILITY DEMOLITION & EROSION
CONTROL PLAN SHEET 2
43 OF 92 C103 SITE UTILITY DEMOLITION & EROSION
CONTROL PLAN SHEET 3
44 OF 92 C104 SITE UTILITY DEMOLITION & EROSION
CONTROL PLAN SHEET 4
45 OF 92 C105 SITE UTILITY DEMOLITION & EROSION
CONTROL PLAN SHEET 5
46 OF 92 C106 SITE UTILITY DEMOLITION & EROSION
CONTROL PLAN SHEET 6
47 OF 92 C200 SITE LAYOUT PLAN
48 OF 92 C201 SITE LAYOUT PLAN SHEET 1
49 OF 92 C202 SITE LAYOUT PLAN SHEET 2
50 OF 92 C203 SITE LAYOUT PLAN SHEET 3
51 OF 92 C204 SITE LAYOUT PLAN SHEET 4
52 OF 92 C205 SITE LAYOUT PLAN SHEET 5
53 OF 92 C206 SITE LAYOUT PLAN SHEET 6
54 OF 92 C207 UTILITY PROFILE WEST WALL
55 OF 92 C208 UTILITY PROFILE NORTH WALL
56 OF 92 C209 UTILITY PROFILE SOUTH WALL
57 OF 92 C300 EROSION CONTROL DETAILS
58 OF 92 C301 UTILITY DETAILS
59 OF 92 C302 STAIR, RAMP, & WALL ELEVATION VIEWS
DRAWING LIST
SHEET # OF # SUBSHEET SHEET TITLE
60 OF 92 S1.00 GENERAL STRUCTURAL PLAN & NOTES
61 OF 92 S1.01 DEMOLITION PLAN
62 OF 92 S1.02 WALL ALIGNMENT PLAN
63 OF 92 S1.03 WALL ALIGNMENT PLAN
64 OF 92 S2.00 MICROPILE LOCATION PLAN
65 OF 92 S2.01 MICROPILE LOCATION PLAN
66 OF 92 S2.02 MICROPILE LOCATION PLAN
67 OF 92 S2.03 MICROPILE LOCATION PLAN
68 OF 92 S2.04 MICROPILE LOCATION PLAN
69 OF 92 S2.05 MICROPILE LOCATION PLAN
70 OF 92 S2.06 MICROPILE LOCATION PLAN
71 OF 92 S2.07 MICROPILE LOCATION PLAN
72 OF 92 S2.08 MICROPILE LOCATION PLAN
73 OF 92 S2.09 MICROPILE LOCATION PLAN
74 OF 92 S3.00 FOUNDATION & WALL PLAN
75 OF 92 S3.01 FOUNDATION & WALL PLAN
76 OF 92 S3.02 FOUNDATION & WALL PLAN
77 OF 92 S3.03 FOUNDATION & WALL PLAN
78 OF 92 S3.04 FOUNDATION & WALL PLAN
79 OF 92 S3.05 FOUNDATION & WALL PLAN
80 OF 92 S3.06 FOUNDATION & WALL PLAN
81 OF 92 S3.07 FOUNDATION & WALL PLAN
82 OF 92 S3.08 FOUNDATION & WALL PLAN
83 OF 92 S3.09 FOUNDATION & WALL PLAN
84 OF 92 S4.00 WALL PROFILES
85 OF 92 S4.01 WALL PROFILES
86 OF 92 S4.02 ELEVATIONS VIEWS
87 OF 92 S4.03 ELEVATIONS VIEWS
88 OF 92 S4.04 ELEVATIONS VIEWS
89 OF 92 S5.00 SECTION VIEWS
90 OF 92 S5.01 SECTION VIEWS
91 OF 92 S6.00 STRUCTURAL DETAILS
92 OF 92 E1 SITE LIGHTING PLAN
DORCHESTER HEIGHTS MONUMENT AND HARDSCAPE RESTORATION PROJECTS
A2.2, A3.2, A4.1-A4.4, A5.1-A5.7, A6.3, A6.8-A6.11 ADDENDUM A 6/10/22A
AD4.1, AD4.2, A1.1, A5.2, R1.1-R1.4, S4.1 ADDENDUM BB 6/22/22
B
A2.1, A2.2, S2.1, S5.2 ADDENDUM CC 7/1/22
R1.1-R1.4, R1.10E ADDENDUM E 7/27/22
A2.2, A5.1, A5.2, A6.11G ADDENDUM G 2/13/23
A4.6
A4.5
PROVIDE NEW NORMAL WEIGHT
MESH-REINFORCED CAST-IN-
PLACE TOPPING SLAB SLOPED
TO DRAIN; POLISHED CONCRETE
FINISH
REPLACE EXISTING DOORS
AND FRAMES; REPLACE
STEEL LINTELS ABOVE
MASONRY OPENINGS PER
STRUCTURAL DWGS; TYPICAL
ALL DOORS - 201, 202,
203, AND 204
REPLACE EXISTING
BALUSTERS AT EACH
BALCONY WITH NEW
TO MATCH EXISTING
A5.1
A6.7
CLEAN AND RECOAT ALL
EXPOSED SURFACES OF THE
EXISTING STEEL STAIR AND
CIRCULAR STAIR; REMOVE
CORROSION AND LEAD-BASED
PAINT TO PREP SURFACE FOR
NEW COATING; TREAT ALL
EXPOSED STEEL SURFACES
WITH A PRIMER AND HIGH-
PERFORMANCE COATING
(OPTION F)
GUARDRAIL WITH NEW
PICKETS, RESUSE
EXISTING TOP CAP.
NEW WALL
MOUNTED PAINTED
METAL HANDRAIL
A4.2
A4.4
A4.3
A4.1
A6.7
DOOR 202
TO BE FIXED
IN PLACE
CLEAN AND RECOAT ALL EXPOSED
SURFACES OF THE EXISTING STEEL
STAIR AND CIRCULAR STAIR; REMOVE
CORROSION AND LEAD-BASED PAINT
TO PREP SURFACE FOR NEW
COATING; TREAT ALL EXPOSED STEEL
SURFACES WITH A PRIMER AND
HIGH-PERFORMANCE COATING
(OPTION H)
CONTROL JOINTS IN
CONCRETE SLAB
C
C
DG
ROOF 4: TOWER CHAMBER CORNICE
INSTALL 20 OZ. ZINC-TIN COATED
COPPER ROOFING OVER SELF-ADHERED
POLYETHYLENE FACED UNDERLAYMENT
INSTALL NEW NORMAL
WEIGHT CONCRETE FLOOR
PITCHED TO DRAIN; APPLY
PMMA ROOFING MEMBRANE
ON NEW CONCRETE
REINSTALL OBELISKS, CORNER PIERS,
BALUSTRADE, AND RAILINGS THAT WERE
REMOVED DURING PREVIOUS EMERGENCY
STABILIZATION; REFER TO MASONRY
RESTORATION DWGS
A6.7
A4.2
A4.4
A4.3
A4.1
INSTALL BIRD NET
WITHIN ARCHED
MASONRY OPENINGS;
TYPICAL
23'-9"
SLOPE TOPPING SLAB
TO DRAIN TO DOORS
201, 203, AND 204
WITH CRICKETS AT
EACH CORNER TO
DIRECT WATER AWAY
FROM CORNERS AND
OUT THROUGH ARCHED
OPENINGS
A
PROVIDE NEW PAINTED METAL
GRAVITY VENTILATOR SET ON
MANUFACTURER PROVIDED
CURB IN PLACE OF EXISTING
SKYLIGHT AT THE TOP OF
THE LEVEL 3 BELFRY
A5.4
REPLACE EIGHT (8)
LANTERN TIE RODS WITH
NEW STN STL TIE RODS;
SEE STRUCTURAL DWGS;
PROVIDE FLUID APPLIED
PMMA FLASHING AT BASE
OF RODS TO ZINC-TIN
COATED COPPER; SEE
STRUCTURAL DWGS
ROOF 1: LANTERN BASE
REPLACE ROOFING WITH NEW
20 OZ. ZINC-TIN COATED
COPPER WITH 2 LAYERS RED
ROSIN PAPER OVER SELF-
ADHERED POLYETHYLENE FACED
UNDERLAYMENT; INSTALL NEW
FLASHING AND COUNTER
FLASHING AT PILASTERS
ROOF 2: URN PLATFORM
INSTALL 20 OZ. ZINC-TIN
COATED COPPER ROOFING
OVER SELF-ADHERED
POLYETHYLENE FACED
UNDERLAYMENT
A
A A
1. DISMANTLING (FOR REASSEMBLY) OF THE UPPER
LEVELS OF THE MONUMENT REQUIRES DETAILED
EXISTING CONDITION DOCUMENTATION, CATALOGING,
AND PROTECTION OF SALVAGE MATERIALS FOR
CONTRACTING OFFICER (CO) APPROVAL BEFORE WORK
CAN BEGIN. CONTRACTOR TO PROVIDE SITE AND
MONUMENT PROTECTION AND LOGISTICAL PLAN FOR
APPROVAL PRIOR TO DISMANTLING ACTIVITIES PER
SPECIFICATIONS.
2. PROTECT EXISTING TO REMAIN MASONRY STRUCTURES
AND SURROUNDING LANDSCAPE AND HARDSCAPE
WITHIN THOMAS PARK.
3. ASSUME ALL SCOPE IS INCLUDED IN THE BASE BID
UNLESS NOTED AS AN OPTION. SEE SHEET G1.0 FOR
LIST OF ALL BID OPTIONS.
4. CAREFULLY DISMANTLE MASONRY WALL AS INDICATED.
TAKE CARE TO SALVAGE EXISTING MARBLE AND
BRICKS FOR REUSE PER SPECIFICATIONS.
5. REFER TO SHEET G1.0 FOR LIST OF ALL ITEMS TO
BE SALVAGED.
6. REFER TO THE RESTORATION SERIES DRAWINGS FOR
SCOPE OF BRICK MASONRY REBUILDING, REPAIR, AND
CLEANING.
7. REFER TO THE STRUCTURAL SERIES DRAWINGS FOR
ALL STRUCTURAL STABILIZATION OF MASONRY.
8. REFER TO THE STRUCTURAL SERIES DRAWINGS FOR
ALL STRUCTURAL SUPPORT AND DETAILS.
4 4 80
SCALE OF FEET
WASHINGTON, DC
PMIS/PKG NO.
DRAWING NO.
SHEET
SUB SHEET NO.DESIGNED:PRIME/ARCHITECTURE: TITLE OF SHEET
OF
CADD:
TECH REVIEW:
DATE:
SCALE A
SmithGroup
Structural:
Silman Boston, MA
Consultant 2:
Building Conser Assoc Boston, MA
165882
:3 :3
A M
A u to d e s k
D o c s C li e n t P ro je c ts
N a ti o n a l P a rk
S e rv ic e N P S B O S T
D D
C D .r v t
S J P
LEVEL 2, LEVEL 3, AND
LANTERN FLOOR PLANS
254798A2.2
SJP
SJP
DORCHESTER HEIGHTS MONUMENT1/21/2022
SCALE AA2.2
1 LEVEL 2 FLOOR PLAN
SCALE AA2.2
2 LEVEL 3 FLOOR PLAN
SCALE AA2.2
3 LANTERN FLOOR PLAN
GENERAL SHEET NOTES
LEVEL 3
TOP TREAD OF STAIR 7
7'-2 1/2"
LEVEL 2
STEEL LEDGER; SEE
STRUCTURAL DWGS
STEEL LEDGER; SEE
STRUCTURAL DWGS
CONT. STL PLATE; SEE
STRUCTURAL DWGS
SEE STRUCTURAL
DWGS FOR FRAMING
SUPPORT
8 1/2" 1'-0"
BOLTED CONNECTION BETWEEN STEEL
STAIR ENCLOSURE AND STRUCTURAL
FRAMING; SEE STRUCTURAL DWGS
CIRCULAR BENT PLATE POUR STOP TO
SUPPORT SLAB EDGE AND STAIR
ENCLOSURE; SEE STRUCTURAL DWGS
EXISTING MARBLE
CORNICE STONE
1/4" PER FT (2%) SLOPED CONCRETE
TOPPING SLAB WITH CURB AT STAIR EDGE
FINISHED WITH FLUID APPLIED URETHANE
TRAFFIC COATING OVER PMMA ROOFING
ROOF 4: TOWER CHAMBER CORNICE
20 OZ. ZINC-TIN COATED COPPER
WITH 2 LAYERS RED ROSIN PAPER
OVER SELF-ADHERED POLYETHYLENE
FACED UNDERLAYMENT
SPIRAL STAIR ENCLOSURE; SEE
SHEET A6.10 & A6.11 FOR DETAILS
HISTORIC
SPIRAL STAIR;
PROTECT
DURING
CONSTRUCTION
C E N T E R L
IN
E
O F
S P
IR
A L
S T A
IR
NON-SHRINK GROUT
MARBLE JAMB
1'-8 1/2"
SELF-ADHERED POLYETHYLENE
FACED UNDERLAYMENT AND PMMA
ROOFING INSTALLED CONTINUOUS
UNDER MARBLE THRESHOLD
GALVANIZED STEEL BASE RING WITH
HIGH PERFROMANCE COATING
GENERAL NOTE:
PROVIDE SOLDERED FLAT SEAM 20 OZ. ZINC-TIN COATED
COPPER, SEAMS ARE TO BE PERPENDICULAR TO THE WALLS
OF THE TOWER, SLOPE TO DRAIN, UNLESS NOTED OTHERWISE
EXISTING MARBLE FACE
STONE TO REMAIN
EXISTING BACKUP WALL TO REMAIN
LINE DENOTING LIMIT OF
MONUMENT DISMANTLING AND
REBUILDING; MONUMENT
STRUCTURAL FRAMING AND
MASONRY TO BE DISMANTLED
FROM LEVEL 3 STRUCTURE TO
TO THE TOP OF THE SPIRE &
WEATHERVANE
BRICK BARREL VAULT
BETWEEN STEEL
LEDGERS, 3-WYTHES;
7'-0" RADIUS AT
BOTTOM EDGE
SEE STRUCTURAL DWGS
FOR FRAMING SUPPORT
4" CLEATED
DRIP EDGE
A6.9
MAINTAIN 1" UNDERCUT
BELOW BALUSTRADE
REPAIR AND REBUILD UPPER
PORTIONS OF LEVEL 2 WALLS
AS REQUIRED FOLLOWING
INSTALLATION OF NEW STEEL
STRUCTURE AT LEVEL 3
A6.11
A6.9
PMMA ROOFING TO
LAP OVER BACK LEG
OF SILL PAN; SILL
PAN WITH END DAMS
INSTALLED UNDER
MARBLE THRESHOLD;
INCLUDE DRAINAGE
PAN BETWEEN THE
STONE AND SILL PAN;
SEE DETAIL 1/A6.9
A
A
INSTALL ADDITIONAL TREAD ON HISTORIC
SPIRAL STAIR TO MITIGATE STEP UP AND
OVER ELEVATED CONCRETE CURB
BG
REPLACE SELECT
BALUSTERS AT
BALCONIES; REFER TO
RESTORATION DWGS
6"11"
METAL GUARDRAIL
INSTALLED WITHIN
EXISTING MASONRY JAMB
IN FRONT OF LEVEL 2
DOORS; FINISH STEEL
SURFACES WITH A
PRIMER AND HIGH-
PERFORMANCE COATING
PROVIDE METAL DOOR, W/ SIX (6) GLAZED
PANELS AND TWO (2) PASSIVE VENTILATION
LOUVERS AT THE BASE; PROVIDE LOUVERS
WITH INTEGRAL BIRD SCREEN IN BOTTOM
RECESSED PANELS OF DOOR
INSTALL BIRD NET
ON EXTERIOR SIDE
OF GUARDRAIL
A6.8
2 Sim
12 0 126
SCALE OF INCHES
WASHINGTON, DC
PMIS/PKG NO.
DRAWING NO.
SHEET
SUB SHEET NO.DESIGNED:PRIME/ARCHITECTURE: TITLE OF SHEET
OF
CADD:
TECH REVIEW:
DATE:
SCALE A
SmithGroup
Structural:
Silman Boston, MA
Consultant 2:
Building Conser Assoc Boston, MA
165882
:3 :3
A M
A u to d e s k
D o c s C li e n t P ro je c ts
N a ti o n a l P a rk
S e rv ic e N P S B O S T
D D
C D .r v t
A u th o r
LEVEL 2 & LEVEL 3
SECTION DETAILS
254798A5.1
Designer
Author
DORCHESTER HEIGHTS MONUMENT1/21/2022
SCALE AA5.1
2 LEVEL 3 SECTION DETAIL AT DOOR
SCALE AA5.1
1 LEVEL 2 BALCONY ROOFING DETAIL
LEVEL 3
TOP TREAD OF STAIR
BOLTED CONNECTION BETWEEN STEEL
STAIR ENCLOSURE AND STRUCTURAL
FRAMING; SEE STRUCTURAL DWGS
7'-2 1/2"
LEVEL 2
SEE STRUCTURAL DWGS
FOR FRAMING SUPPORT
STEEL LEDGER; SEE
STRUCTURAL DWGS
STEEL LEDGER; SEE
STRUCTURAL DWGS
CONT. STL PLATE; SEE
STRUCTURAL DWGS
CIRCULAR BENT PLATE POUR STOP TO
SUPPORT SLAB EDGE AND STAIR
ENCLOSURE; SEE STRUCTURAL DWGS
SEE STRUCTURAL DWGS
FOR FRAMING SUPPORT
EXISTING MARBLE
CORNICE STONE
1/4" PER FT (2%) SLOPED CONCRETE
TOPPING SLAB WITH CURB AT STAIR EDGE
FINISHED WITH FLUID APPLIED URETHANE
TRAFFIC COATING OVER PMMA ROOFING
RESET MARBLE FACE
STONE; SEE
RESTORATION DWGS
GROUTED CMU; SEE
STRUCTURAL DWGS
BUFF/ YELLOW BRICK
VENEER TO MATCH
ORIGINAL
5 1/2"
10"
5"
20 OZ. THROUGH
WALL FLASHING
DAMPPROOFING ON CMU WALL, BOTH SIDES
ROOF 4: TOWER CHAMBER CORNICE
20 OZ. ZINC-TIN COATED COPPER
WITH 2 LAYERS RED ROSIN PAPER
OVER SELF-ADHERED POLYETHYLENE
FACED UNDERLAYMENT
SPIRAL STAIR ENCLOSURE; SEE
SHEET A6.10 & A6.11 FOR DETAILS
HISTORIC SPIRAL
STAIR; PROTECT
DURING CONSTRUCTION
4'-10 1/2"
C E N T E R L
IN
E
O F
S P
IR
A L
S T A
IR
GALVANIZED STEEL BASE RING WITH
HIGH PERFROMANCE COATING
BRICK BARREL VAULT BETWEEN
STEEL LEDGERS, 2-WYTHES;
7'-0" RADIUS AT BOTTOM EDGE
EXISTING MARBLE FACE
STONE TO REMAIN
EXISTING BRICK BACKUP
WALL TO REMAIN
LINE DENOTING LIMIT OF
MONUMENT DISMANTLING AND
REBUILDING; MONUMENT
STRUCTURAL FRAMING AND
MASONRY TO BE DISMANTLED
FROM LEVEL 3 STRUCTURE
TO TO THE TOP OF THE
SPIRE & WEATHERVANE
4" CLEATED
DRIP EDGE
A6.11
MAINTAIN 1" UNDERCUT
BELOW BALUSTRADE
GENERAL NOTE:
PROVIDE SOLDERED FLAT SEAM 20 OZ. ZINC-TIN COATED
COPPER, SEAMS ARE TO BE PERPENDICULAR TO THE WALLS
OF THE TOWER, SLOPE TO DRAIN, UNLESS NOTED OTHERWISE
REPAIR AND REBUILD UPPER
PORTIONS OF LEVEL 2 WALLS
AS REQUIRED FOLLOWING
INSTALLATION OF NEW STEEL
STRUCTURE AT LEVEL 3
A5.7
1 AXO
VIEW
PARGE BRICK
AS PREP FOR
PMMA ROOFING
OPEN HEAD JOINT
WEEP HOLES @ 24"
O.C. MINIMUM ABOVE
FLASHING
OPEN HEAD JOINT
WEEP HOLES @ 24"
O.C. MINIMUM ABOVE
FLASHING
SEALANT OR
TRANSITION PER
PMMA MANUFACTURER
ADJUSTABLE HEIGHT PINTEL TIE WITH LADDER-
TYPE HORIZONTAL REINFORCEMENT EVERY 16”
O.C. VERTICAL AND 16" O.C. HORIZONTALLY
SPLIT TAIL ANCHORS,
SEE MASONRY
RESTORATION DWGS;
SEAL ALL ANCHOR
PENETRATIONS
SET LADDER-TYPE REINFORCEMENT
AND ANCHORS IN SEALANT WHERE
THEY PENETRATE THE DAMPROOFING;
APPLY DAMPPROOFING AROUND
PENETRATIONS TO PROPERLY SEAL
GROUT VOIDS
UNDER FLASHING
A
A
A
A
A
B
INSTALL ADDITIONAL TREAD ON HISTORIC
SPIRAL STAIR TO MITIGATE STEP UP AND
OVER ELEVATED CONCRETE CURB
CG
12 0 126
SCALE OF INCHES
WASHINGTON, DC
PMIS/PKG NO.
DRAWING NO.
SHEET
SUB SHEET NO.DESIGNED:PRIME/ARCHITECTURE: TITLE OF SHEET
OF
CADD:
TECH REVIEW:
DATE:
SCALE A
SmithGroup
Structural:
Silman Boston, MA
Consultant 2:
Building Conser Assoc Boston, MA
165882
:3 :3
A M
A u to d e s k
D o c s C li e n t P ro je c ts
N a ti o n a l P a rk
S e rv ic e N P S B O S T
D D
C D .r v t
A u th o r
LEVEL 3 SECTION
DETAILS
254798A5.2
Designer
Author
DORCHESTER HEIGHTS MONUMENT1/21/2022
SCALE AA5.2
1 LEVEL 3 SECTION DETAIL AT WALL
1/2" DIAMETER PULL AT
STEEL STAIR ENCLOSURE
1/4" GALVANIZED STEEL
DRUM ENCLOSURE WITH
HIGH PERFORMANCE
COATING
2"
1/4"
2"
CURVED HINGED STEEL DOOR,
GALVANIZED WITH PRIMER AND
HIGH PERFORMANCE COATING
AND WATERSEAL AT ALL SIDES
STEEL PULL
BOTH SIDES
1/4" GALVANIZED STEEL
DRUM ENCLOSURE WITH
PRIMER AND HIGH
PERFORMANCE COATING
ALL SIDES
A6.11
R 2
5 1 /4"
SIMILAR SECURITY LATCH
(BASIS OF DESIGN)
CUSTOM LATCH
INSIDE ENCLOSURE
RUBBER GASKET AT ALL
SIDES OF HINGED DOOR
LEVEL 3
BOLTED CONNECTION BETWEEN
STEEL STAIR ENCLOSURE AND
STRUCTURAL FRAMING; SEE
STRUCTURAL DWGS
STEEL LEDGER; SEE
STRUCTURAL DWGS
CIRCULAR BENT PLATE POUR STOP TO
SUPPORT SLAB EDGE AND STAIR
ENCLOSURE; SEE STRUCTURAL DWGS
SEE STRUCTURAL DWGS
FOR FRAMING SUPPORT
1/4" PER FT (2%) SLOPED
CONCRETE SLAB WITH CURB
AT STAIR EDGE FINISHED WITH
PMMA ROOFING; APPLY PMMA
ROOFING UP AND OVER STEEL
FLANGE OF STEEL ENCLOSURE
GALVANIZED SPIRAL STAIR ENCLOSURE
WITH HIGH PERFROMANCE COATING;
SEE SHEET A6.9 FOR DETAILS
GALVANIZED STEEL BASE RING
WITH HIGH PERFROMANCE COATING
BRICK BARREL VAULT BETWEEN
STEEL LEDGERS, 3-WYTHES;
7'-0" RADIUS AT BOTTOM EDGE
FLANGE AT BOTTOM OF STAIR
ENCLOSURE SUPPORTED BY
CONCRETE CURB SET IN SEALANT
SEE STRUCTURAL DWGS
FOR FRAMING SUPPORT
SEE STRUCTURAL DWGS FOR SIZE AND
REINFORCING AT CONC CURB
TOP TREAD
INSTALL FLUID
APPLIED URETHANE
TRAFFIC COATING
OVER PMMA ROOFING
AT LEVEL 03 SLAB
INSTALL ADDITIONAL TREAD ON HISTORIC
SPIRAL STAIR TO MITIGATE STEP UP AND
OVER ELEVATED CONCRETE CURB
EXISTING STEEL
SPIRAL STAIR
A
A
BG
6"
DRAWBAND
SEALANTSTN STL TIE DOWN ROD AT
EIGHT (8) LOCATIONS; SEE
STRUCTURAL DWGS
20 OZ. ZINT-TIN FLASHING
AT STN STL TIE RODS
INSTALL METAL HOOD, SEALED WITH
A CLAMP TO SHED BULK WATER
AWAY FROM THE TERMINATION OF
THE METAL ROOFING
PMMA FLASHING; PROVIDE
INSTALLATION AT BASE OF TIE
ROD ONLY AT A DISTANCE OF
6" MINIMUM OFF FACE OF TIE
ROD TO AVOID EXCESSIVE
COATING ON HISTORIC MARBLE
TWO (2) LAYERS RED
ROSIN PAPER OVER SELF
ADHERED UNDERLAYMENT
M
IN
MARBLE ROOF DECK
PLYWOOD DECKING
AND FRAMING AT
GRAVITY VENTILATOR
A
6" 6"
6 63 0
SCALE OF INCHES
2 2 40
SCALE OF FEET
WASHINGTON, DC
PMIS/PKG NO.
DRAWING NO.
SHEET
SUB SHEET NO.DESIGNED:PRIME/ARCHITECTURE: TITLE OF SHEET
OF
CADD:
TECH REVIEW:
DATE:
SCALE A
SCALE B
SmithGroup
Structural:
Silman Boston, MA
Consultant 2:
Building Conser Assoc Boston, MA
165882
:3 :3
A M
A u to d e s k
D o c s C li e n t P ro je c ts
N a ti o n a l P a rk
S e rv ic e N P S B O S T
D D
C D .r v t
A u th o r
LEVEL 3 SPIRAL STAIR
ENCLOSURE DETAILS
254798A6.11
Designer
Author
DORCHESTER HEIGHTS MONUMENT1/21/2022
SCALE AA6.11
1 SPIRAL STAIR ENCLOSURE DOOR PULL
SCALE AA6.11
2 SPIRAL STAIR ENCLOSURE DOOR LATCH
SCALE BA6.11
3 SPIRAL STAIR ENCLOSURE CURB DETAIL
SCALE AA6.11
4 TIE ROD FLASHING DETAIL
| Sheets |
| CS - COVER SHEET |
| A2.2 - LEVEL 2, LEVEL 3, AND LANTERN FLOOR PLANS |
| A5.1 - LEVEL 2 & LEVEL 3 SECTION DETAILS |
| A5.2 - LEVEL 3 SECTION DETAILS |
| A6.11 - LEVEL 3 SPIRAL STAIR ENCLOSURE DETAILS |
File details come from the government source that posted it. Updated .