This addendum modifies drawings and specifications for the restoration of the Dorchester Heights Monument located in Boston National Historical Park. It adds Alternate Options B and C to drawings and a schedule for interior and exterior masonry repairs. The solicitation seeks restoration of the Dorchester Heights Monument and hardscapes. The opportunity was issued by the National Park Service National Office within the Department of the Interior. It involves repair and restoration work at a historic monument site managed by the National Park Service.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM
www.smithgroup.com
PROJECT BOST 254798: Dorchester Heights Monument Restoration Design Development & Construction Documents
ADDENDUM
NUMBER
E
PROJECT NO. 13188 DATE 7/27/2022
PROJECT
LOCATION
Boston National Historical Park Thomas Park, Boston, MA
OWNER National Park Service
PREPARED BY Susan Pommerer, AIA
DISTRIBUTION
NAME COMPANY EMAIL PHONE
Tracy McConner NPS, Denver Service
Center (DSC) Tracy_mcconner@nps.gov
Jon Mitchell NPS, Denver Service Center (DSC)
Jon_mitchell@nps.gov
Dave Gustavson NPS, Denver Service Center (DSC)
Dave_Gustavson@contractor.nps.gov
This Addendum is issued pursuant to the Instructions to Bidders and/or Conditions of the Contract. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.
PART 1 - NEW DOCUMENTS ISSUED WITH THIS DOCUMENT
1.1 NEW PROJECT MANUAL DOCUMENTS AND SPECIFICATIONS
A. None.
1.2 NEW DRAWING SHEETS
A. None.
1.3 NEW SKETCHES
A. None.
PART 2 - DOCUMENTS DELETED BY THIS DOCUMENT
2.1 DELETE THE FOLLOWING FROM THE PROJECT MANUAL
A. None.
2.2 DELETE THE FOLLOWING DRAWING SHEETS
A. None.
PART 3 - REVISED DOCUMENTS ISSUED WITH THIS DOCUMENT
3.1 REVISED PROJECT MANUAL DOCUMENTS AND SPECIFICATIONS
A. None.
ADDENDUM
www.smithgroup.com
3.2 REVISED DRAWING SHEETS
A. R1.1 MASONRY RESTORATION WEST ELEVATION: Add Alternate Option B is for
Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies.
B. R1.2 MASONRY RESTORATION NORTH ELEVATION: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies.
C. R1.3 MASONRY RESTORATION EAST ELEVATION: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies.
D. R1.4 MASONRY RESTORATION SOUTH ELEVATION: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies.
E. R1.10 MASONRY RESTORATION QUANTITY SCHEDULE OPTIONS: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies.
PART 4 - PROPOSED CHANGES IN THE WORK
4.1 None.
PART 5 - CLARIFICATIONS
5.1 None.
| PART 1 - NEW DOCUMENTS ISSUED WITH THIS DOCUMENT |
| 1.1 NEW PROJECT MANUAL DOCUMENTS AND SPECIFICATIONS |
| A. None. |
| 1.2 NEW DRAWING SHEETS |
| A. None. |
| 1.3 NEW SKETCHES |
| A. None. |
| PART 2 - DOCUMENTS DELETED BY THIS DOCUMENT |
| 2.1 DELETE THE FOLLOWING FROM THE PROJECT MANUAL |
| A. None. |
| 2.2 DELETE THE FOLLOWING DRAWING SHEETS |
| A. None. |
| PART 3 - REVISED DOCUMENTS ISSUED WITH THIS DOCUMENT |
| 3.1 REVISED PROJECT MANUAL DOCUMENTS AND SPECIFICATIONS |
| A. None. |
| 3.2 REVISED DRAWING SHEETS |
| A. R1.1 MASONRY RESTORATION WEST ELEVATION: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies. |
| B. R1.2 MASONRY RESTORATION NORTH ELEVATION: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies. |
| C. R1.3 MASONRY RESTORATION EAST ELEVATION: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies. |
| D. R1.4 MASONRY RESTORATION SOUTH ELEVATION: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies. |
| E. R1.10 MASONRY RESTORATION QUANTITY SCHEDULE OPTIONS: Add Alternate Option B is for Interior Masonry Repairs and Repointing. Add Alternate Option C is for Exterior Masonry Restoration Below Level 2 Balconies. |
| PART 4 - PROPOSED CHANGES IN THE WORK |
| 4.1 None. |
| PART 5 - CLARIFICATIONS |
| 5.1 None. |