C04. J35_Seed TOPR LPF, 20260712.pdf
PDF 16 MB Posted
- Solicitation number
- 127EAS26R0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Task Order Proposal Request (TOPR) for vault toilet pumping and septic tank services at Los Padres National Forest under the USFS California Regional Vault and Septic Pumping Services IDIQ contract (127EAS26R0003).
The contractor shall furnish all labor, equipment, supplies, transportation, supervision, and permits to perform vault toilet pumping, septic pumping, debris removal, cleaning, sanitizing, waste hauling, and disposal at recreation sites across three ranger districts (Ojai, Santa Lucia, and Monterey) spanning Ventura, Monterey, Santa Barbara, and San Luis Obispo counties. Work is limited to PWS Tasks 1–4 and excludes repair, replacement, construction, or plumbing work. The period of performance runs from August 7, 2026, through August 31, 2027, not exceeding 365 days. Routine pumping requests must begin service within 72 hours of request; emergency requests within 48 hours. Pumping operations are restricted to 8am–5pm Monday through Friday. The contractor is solely responsible for determining round-trip frequency based on its place of business, disposal facility capacity, anticipated tank volumes, and site access conditions; COR estimates are advisory only. Travel is reimbursed according to IDIQ travel tiers. Service documentation deliverables include pumping logs, volumes pumped, dates/times, debris removal notes, waste manifests from disposal facilities, and incident/spill reports submitted within 24 hours. The contractor must identify a Task Order point of contact prior to NTP and comply with applicable SCA wage determinations. Proposals are due July 26, 2026, by 2359 PST, submitted to klenise.wallace@usda.gov, with questions due by July 23, 2026, at 1300 PST. Evaluation criteria include responsiveness, technical capability, experience and past performance, price, and compliance with representations and bio-based requirements, using best-value methodology under FAR 16.505.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE
Task Order Proposal Request (TOPR)
USFS California Regional Vault & Septic Pumping Services IDIQ
TO Solicitation No.: 127EAS26R0003 TO Project Title: LPF-EVO-FY26 Toilet Pumping TO Forest: Los Padres National Forest (LPF) Geographic Zone CA Southern WEST Parent IDIQ No.: TBD TO No.: TBD Contractor: TBD
1. GENERAL INFORMATION
1.1 Scope Summary
The Contractor shall furnish all labor, equipment, supplies, transportation, supervision, and permits necessary to perform vault toilet pumping, septic pumping, debris removal, cleaning, sanitizing, waste hauling, and disposal at the recreation sites identified in this Task Order (TO).
Project locations may include campgrounds, trailheads, day‑use areas, administrative sites, dispersed sites, OHV sites, and remote locations accessed via paved, gravel, or dirt roads. All work shall be performed in accordance with the IDIQ Performance Work Statement (PWS), this TOPR, and all applicable Federal, State, Tribal, and local regulations.
All pumping, cleaning, debris removal, sanitizing, and recharge procedures must comply with IDIQ Attachment J2 (PWS). Deliverables shall be provided as required under IDIQ Section H.1.13.
Scope Limitation Reminder This Task Order may include only those services authorized under PWS Tasks 1–4: pumping, cleaning, debris removal, sanitizing, waste hauling and disposal, and basic inspections. The Contractor is not authorized to perform repair, replacement, construction, infrastructure work, plumbing, excavation, or any activity outside the scope of the Vault Pumping IDIQ.
1.2 Applicable Contract
This TOPR is issued under the USFS California Regional Vault and Septic Pumping Services IDIQ. All parent-contract terms and conditions remain in effect unless expressly modified herein.
2. PERIOD OF PERFORMANCE
2.1 Start and End Dates
• Start Date: On or before 08/07/2026
• End Date: No later than 08/31/2027
The PoP must comply with IDIQ Section H.1.2, including:
• Not to exceed 365 days
• Multiple Year order are prohibited
• Must fall within the IDIQ ordering period
TO Solicitation No.: 127EAS26R0003 Parent IDIQ No.: TBD Forest: Los Padres National Forest (LPNF) TO No.: TBD TO Project Title: LPF-EVO-FY26 Toilet Pumping TO
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 2 of 13
2.2 Notice to Proceed
Work may begin only upon receipt of a properly executed Task Order and a written notice to proceed, with the schedule coordinated and approved by the FS CO, CS/Agent or personnel designated in writing by the CO (e.g. COR). NTP may be included in the SF 1449 or OF347, via email, etc. Work may not begin until the Contractor receives a written NTP.
3. RESPONSE REQUIREMENTS
3.1 Scheduling
The Contractor shall provide a scheduled service date within 5 business days of COR request.
3.2 Performance
• Routine pumping requests: Begin service within 72 hours of COR/CO/GTM request.
• Emergency requests: Begin service within 48 hours, consistent with the IDIQ PWS.
These requirements supplement, but do not replace, PWS Section C.2.3.
3.3 Emergency Service Requirements
If this Task Order includes emergency pumping, the Contractor shall respond and begin service within 48 hours of Government request, as defined in the PWS. Emergency services must be clearly identified within the TOPR and SOI.
3.3.1 Emergency Service Identification. If this Task Order includes emergency pumping requirements, the TOPR must clearly identify the service request as an emergency. The SOI shall reflect this by marking the “Emergency (Y/N)” checkbox for each affected line item.
4. LOCATIONS OF WORK
All sites and estimated quantities for this Task Order are identified in Attachment A — SOI (Excel).
4.1 Location Identification
Work under this Task Order includes vault/septic pumping and associated services across the following:
• Forest: Los Padres National Forest
• Ranger District(s): Ojai Ranger District, Monterey Ranger District, Santa Lucia Ranger District
• Site Types: Trailheads/ Day Use Areas (DUA), Campgrounds
• Place of Performance Counties: Ventura, Monterey, Santa Barbara, and San Luis Obispo
4.2 Vault Coordinates
Coordinates for each site shall be included in:
• Attachment B — Maps
• Attachment C — Coordinates Table
The SOI will identify:
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 3 of 13
• Unit quantities
• Estimated vault volumes
• Any unique access or equipment conditions
5. PROJECT-SPECIFIC REQUIREMENTS
Insert Project Specific Requirements Below (if any):
5.1 Access and Site Conditions
For Access please see GPS coordinates and driving directions for Recreation sites, please see table at end of this document. The following sites on the Monterey Ranger District 4WD vehicle recommended to access vaults: China Camp campground, White Oak campground, and Escondido campground.
5.2 Pumping Requirements
Pumping of vault toilets will occur within 8am to 5pm (Mon-Fri), or as close to this time frame as possible.
Vault access with Yale Forest Service, older SST’s and Outhouses can be serviced directly from the riser.
5.3 Hours of Operation
8am to 5pm, Mon-Friday
5.4 Spill Response
In the event of spillage, contact Forest Dispatch, 805 938-9142
5.5 Equipment Requirements
Reserved
5.6 Public Interaction and Conduct
Reserved
5.7 Service Ordering and Completion
5.7 Service Ordering and Completion
5.7.1 Travel Application for Multiple Sites, Multiple Dumps, and On-Call Services
5.7.1.1 General Rule – Parent IDIQ Round Trip Definition
Travel shall be priced using the IDIQ travel tiers and represents one (1) round trip (RT) from the Contractor’s established place of business to the service location(s), to the disposal facility as required, and return to the place of business. Travel tier selection and CTR Round Trip Frequency shall be entered for each applicable travel tier in the SOI. Travel must be invoiced according to the IDIQ Schedule of Items (SOI) travel tier for the applicable performance year.
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 4 of 13
Round Trip Determination The Contractor is solely responsible for determining CTR Round Trip Frequency for this Task Order. COR estimates are advisory only and may not be interpreted as direction or Government estimation.
5.7.1.2 Multiple Vaults/Septic Tanks in One Run
When the Contractor services multiple vaults, septic tanks, or portable toilets on a single mobilization, and is able to complete all work and disposal within a single RT, the Contractor shall price one (1) RT, regardless of the number of units serviced.
5.7.1.3 Multiple Disposal Trips
If the Contractor must off-load waste before completing all assigned units, each required disposal trip constitutes an additional RT, to be priced at the applicable IDIQ travel tier.
The Contractor shall record the number of required disposal trips in the SOI under “CTR Round Trip Frequency,” and provide disposal manifests supporting each dump.
5.7.1.4 Contractor Responsibility for Determining Round Trips The Contractor is solely responsible for determining and proposing the CTR Round Trip Frequency required to complete the services under this Task Order. The COR is not required to estimate or validate the Contractor’s travel time, travel distance, disposal‑site routing, or the number of required mobilizations. The Contractor shall base its proposed RT frequency on:
• Its place of business,
• Its disposal facility selection and capacity constraints,
• Anticipated tank volumes and pumping requirements,
• Site access conditions, and
• Any mid‑route dumping requirements.
The Government will evaluate the Contractor’s proposed RT frequency for reasonableness and consistency with known site conditions. The Contractor shall allocate CTR Round Trip Frequency across travel tiers in the SOI based on the estimated distribution of service calls, pumping frequencies, and site distances.
Please note that the COR may identify the anticipated number of service calls (reference 5.7.1.5); however, the COR does not estimate or prescribe the number of Contractor round trips. All RT estimation remains the responsibility of the Contractor.
5.7.1.5 On-Call Services
For on‑call services initiated by the Government during the period of performance, each Contractor mobilization constitutes one (1) Round Trip (RT). The Contractor is responsible for determining and proposing the number of RTs required for each on‑call response, including any additional RTs required due to disposal‑site limitations or tank‑capacity constraints. The COR is not required to estimate travel time, determine Contractor routing, or project the number of RTs needed for any on‑call action. All travel pricing for on‑call services shall be based on the Contractor‑proposed CTR Round Trip Frequency documented in the SOI.
5.7.1.6 Proposal Requirement – Round Trip Frequency
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 5 of 13
The Contractor shall propose, in the SOI, the total CTR Round Trip Frequency required for the full scope of the Task Order, including:
1. Number of mobilizations required,
2. Number of required disposal trips (if applicable),
3. Identification of factors necessitating additional trips (e.g., tank capacity limits, remote sites, disposal‑site routing).
The Government may negotiate the proposed RT frequency where it is inconsistent with known site conditions; however, the Contractor is responsible for establishing the RT estimate in its proposal.
5.7.2 Limits on Additional Pumping
The Contractor shall perform services only for the vaults, septic tanks, and locations listed in the Task Order Schedule of Items (SOI). Each vault or septic tank listed in the SOI has an associated pumping quantity representing the number of pumping events ordered for the period of performance. A pumping event, whether completed in a single mobilization or in multiple trips due to tank-capacity limitations, shall be counted as one (1) pumping event against the ordered quantity for that specific vault or septic tank.
The Contractor is not authorized to pump additional vaults or septic tanks beyond those quantities ordered in the SOI, even if remaining tank capacity exists after servicing assigned units. Performing pumping services for unlisted units—or for listed units in excess of the ordered quantity—constitutes work outside the scope of this Task Order.
If the Government determines that additional pumping is required, the Government may, at its sole discretion, increase the quantity for a listed vault or septic tank, or add new pumping quantities for other listed units, through a written modification issued by the Contracting Officer or an authorized ordering official. The Contractor shall not perform any additional pumping beyond the awarded SOI quantities until such written direction is issued.
Optional COR Information:
The COR may identify that additional units appear to require service; however, the COR shall not authorize, direct, or permit the Contractor to pump beyond the awarded SOI quantities. Any additional pumping can only be ordered through a Contracting Officer-issued modification that adjusts the SOI quantities.
Note: All procedures in the PWS remain in effect. If conflicts arise, the PWS governs.
6. DELIVERABLES
6.1 Required
The Contractor shall provide the following deliverables to the Government for this Task Order:
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 6 of 13
1. Service Documentation, including:
o pumping logs o volumes pumped, o dates/times of service, o debris removal notes, and o any other contractor-generated records supporting performance and service completion.
2. Waste Manifests / Disposal Receipts including:
Documentation from the disposal facility identifying o Facility name o date, o load number, and o any pertinent information confirming legal disposal.
3. Incident or Spill Reports (if applicable)
Submitted within 24 hours, consistent with IDIQ Section H.8.1.
Note:
The Forest Service COR will complete and retain the Service Report referenced in IDIQ Section E.1.2 as part of the Government’s inspection and acceptance procedures. Contractors are not required to generate the Service Report form.
7. WAGE DETERMINATION
The appropriate SCA Wage determination(s) shall be incorporated into the award in accordance with IDIQ Section H.1.12.
WD(s) Incorporated:
List WD numbers and revision dates
If additional counties are identified during performance, the Contracting Officer will incorporate the appropriate Wage Determinations by modification. The Contractor shall comply with the Wage Determination applicable to the county in which each service is performed and is responsible for ensuring wage and fringe benefit compliance for each covered location.
Labor Classification Requirements (SF-1444):
If any labor classification required to perform services under this Task Order does not appear on the incorporated SCA Wage Determination(s), the Contractor shall submit a conformance request (SF-1444) to the Task Order Contracting Officer within the timelines established in IDIQ Section H. The Contractor must use the Government-provided conformance package and shall pay the proposed conformance rate from the first day any unlisted classification performs work pending DOL approval.
The Contractor shall use the SF-1444 Conformance Package provided with the Parent IDIQ attachments if a conformance request is required.
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 7 of 13
8. TRAVEL
Travel will be reimbursed according to IDIQ travel tiers. The Contractor shall price travel using the TOPR SOI, which includes separate travel-tier line items.
All contractor travel must comply with FMCSA driving regulations.
9. GOVERNMENT FURNISHED INFORMATION (GFI)
• Access keys (if required)
• Maps (Attachment B)
• Any Forest-specific supplemental instructions
10. CONTRACTOR KEY PERSONNEL
• IDIQ-level: Contractor Representative only
• Task Order level: Contractor must identify the Task Order POC prior to NTP
TO Point(s) of Contact (to be identified prior to award and the issuance of the NTP)
11. ADMINISTRATIVE
All administrative processes—including invoicing, inspection, acceptance, subcontract approvals, modifications, and COR/GTM responsibilities—shall follow IDIQ Section G.
12. ATTACHMENTS
• A – SOI (Excel)
• B – Maps (for TO location)
• C – Project Coordinates
• D – Wage Determination (for TO location)
• E – FS-6300-11 Subcontractor Approval Form (only applicable if subcontracting)
13. PROPOSAL SUBMISSION INSTRUCTIONS (ORDER LEVEL)
Proposals are due by: July 26, 2026 no later than 2359 PST.
Submit proposals to:
CO: klenise.wallace@usda.gov
Required Submission Items:
• Ability to meet required start date
• Approach to servicing the locations
• Staffing and equipment availability
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 8 of 13
• TO Point of Contact
• FS-6300-11 (if subcontracting)
Incomplete submissions may be deemed non-responsive.
14. ORDER-LEVEL EVALUATION (BEST VALUE UNDER FAR 16.505)
Evaluation shall follow IDIQ Section M, including:
• Responsiveness
• Technical Capability
• Experience & Past Performance
• Price
• Compliance with representations, bio-based requirements, etc.
Comparative evaluation will be conducted per FAR 12.602 and 13.106-2(b).
The Government may select a higher priced proposal if it provides higher confidence or lower performance -risk.
15. QUESTIONS
Questions must be submitted in writing to the CO and COR by: July 23, 2026, 1300 PST
Only written responses from the CO/COR (or CO designated personnel) are binding.
END OF TOPR DETAILS
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 9 of 13
ATTACHMENT A
(External – SOI (Excel))
See Attachment J36.
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 10 of 13
ATTACHMENT B
(TO Location Maps)
B.1 LPR ORD Map 1 B.2 LPR SLRD Map 2 B.3 LPR MRD Map 3
150150
126 126
9N03A
6N06A
5N42A
6N16B
7N11A
5N24
5N24
6N31B
7N03D
4N17
5N42.1
8N01B
6N31C
8N01.2
6N03
5N05.1
7N03A
7N03B6N06.2
7N11
7N03C
6N16.2
5N42.2
6N01.1
6N16.1
6N10
5N13.1
6N06.1
6N31
7N03.2
8N01.3
5N08
¯ 0 3.1 6.21.55 Miles
Legend
LP Vault Toilets
ROADS
Road Type Interstate
State Highway
US Highway
Forest Roads
Map 1 Ojai Ranger District
Dough Flat Trailhead
Reyes Peak Trailhead
Piedra Blanca Trailhead
Upper & Lower Rose Valley Lake DUA
1 166
58 58
8N09B
10N05
30S05B
30S11B
8N16A
11N01A
10N06A
29S02.2
7N07E
10N04A
11N03A
32S13B
30S03
28S02.2
32S13D
11N04B
29S18.1
7N07.4
8N02A
9N11.4
29S14
8N32
11N04A
7N07.5
11N04.4
12N03.1
11N01.2
10N06.1
8N02
10N10
29S02.1
11N04.3
7N07.3
29S18.2
30S06.1
7N07.2
11N04.2
11N01.3
8N09
29S28
30S11
11N03
32S13.1
¯ 0 4.45 8.92.23 Miles
Legend
LP Vault Toilets Forest Roads
ROADS
Road Type
Interstate
State Highway US Highway
Map 2 Santa Lucia Ranger District
Hi Mountain CG
Bates Canyon CG
Miranda Pines CG
Horseshoe Springs & Brookshire CG's
Pine Alto, Cumbre, and Figueroa Lookout DUA
20S02
22S01C
19S09F
22S03
20S05D
19S03B
22S01B
19S03A
23S06
19S09D
19S09A
23S02.1
21S03
22S04A
20S05.5
19S10.1
20S05.4
20S05.3
¯ 0 3.4 6.81.7 Miles
Legend
LP Vault Toilets
ROADS
Road Type
Interstate
State Highway
US Highway
Forest Roads
Map 3 Monterey Ranger District
White Oak CG
China Camp CG
Escondido
CG
Santa Lucia Memorial Park CG
Nacimiento CG
Ponderosa CG
King City
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 11 of 13
ATTACHMENT C
(TO Project Coordinates)
LPF Vault Toilets (by Ranger District)
Ojai Ranger District
Vault Name Longitude Latitude Driving Directions From District Office
Piedra Blanca Trailhead 119°09'53.80"W 34°33'36.94"N
Turn right from District Office and go 1.8 miles on the E. Ojai Ave towards HWY 33. Turn right onto HWY 33 and go 14.7 miles. Turn right onto Forest Road 6N31 (Rose Valley Rd/Sespe River Rd) for 5.5 miles and slightly turn left towards the trailhead.
Lower Lake Rose Valley
DUA 119°11'20.92"W 34°32'29.15"N
Turn right from District Office and go 1.8 miles on the E. Ojai Ave towards HWY 33. Turn right onto HWY 33 and go 14.7 miles. Turn right onto Forest Road 6N31 (Rose Valley Rd/Sespe River Rd) for 3.0 miles and turn left onto Rose Valley Lake Road towards the lower lake.
Upper Lake Rose Valley
DUA 119°10'57.29"W 34°32'02.23"N
Turn right from District Office and go 1.8 miles on the E. Ojai Ave towards HWY 33. Turn right onto HWY 33 and go 14.7 miles. Turn right onto Forest Road 6N31 (Rose Valley Rd/Sespe River Rd) for 3.0 miles and turn right onto Rose Valley Lake Road for .5 mile and vault toilet will be on the righthand side.
Reyes Peak Trailhead 119°17'33.60"W 34°38'05.59"N
Turn right from District Office and go 1.8 miles on the E. Ojai Ave towards HWY 33. Turn right onto HWY 33 and go 31.3 miles. Turn right onto Pine Mountain Ridge Road and drive 7.1 miles until the end of the road.
Dough Flat Trailhead 118°53'44.21"W 34°31'20.50"N
Turn left from District Office and go 16.5 miles on the 150 HWY towards HWY 126. Go East on the 126 for 6.2 miles and turn left onto Telegraph Road for 2.4 miles. Then turn left onto Goodenough road for 3.3 miles and turn right onto Forest Road 6N16 for 10.1 miles until you reach the trailhead.
Santa Lucia Ranger District
From District Office
Miranda Pines Campground -120.0340938 35.0326978 From the city of Santa Maria, Take Hwy 166, 25 miles northeast to Sierra Ridge travel 10 miles southeast
Bates Canyon Campground -119.907942 34.953231 From the city of Santa Maria, Take Hwy 166 east to Cottonwood Canyon Road travel 7.5 Miles Southwest
Horseshoe Springs Campground -120.1253221 34.9975916
From Santa Maria, take Hwy 166 to Sierra Madre Road, take SM Road to Miranda Pines Road, take Miranda Pines Road to Forest Road #11N04 to Brookshire Campground and Horseshoe Campground
Brookshire Campground -120.11492300 35.02100300
From Santa Maria: Highway 166 to Sierra Madre Road. Sierra Madre Road to Miranda Pines Road. Take Miranda Pines Road to Forest Road #11N04 and make a right into Brookshire Campground.
Figueroa Lookout Day Use Area -119.985073 34.743736 From Hwy 154, travel North to Figueroa Mountain Road for 13 miles, then turn left onto Figueroa Lookout Road
Cumbre Day Use Area -119.99070500 34.74321300
From Hwy 154, travel North on Figueroa Mountain Road for 13 miles.
Turn left onto Figueroa Lookout Road and stay left to continue on Cumber Day Use Area Road
Pino Alto Day Use Area -119.981529 34.740382 From Hwy 154 make a right onto Figueroa Mountain Road for 12.5 miles Northeast
Hi Mountain Campground -120.41268574 35.25984686
From San Luis Obispo take Hwy 101, eight miles north to Hwy 58 for three miles east to Pozo Road for sixteen miles southeast. Alternate route- Ten miles northeast of Arroyo Grande Forest Service Station off Pozo-Hi Mountain Road, Note: Forest Road 3OS05 may be impassable when the Salinas River is high, use alternate route as noted.
Monterey Ranger District
From District Office
China Camp 36.29554 -121.567507
From Greenfield take County Road G16 (Elm Ave/Arroyo Seco Rd/Carmel Valley Rd) and turn left on Tassajara Rd (3618S02). Continue 10.4 miles to China Camp. (Note: route may be impassable with no alternate route in winter)
White Oak Campground 36.3263326 -121.575148
From Greenfield take County Road G16 (Elm Ave/Arroyo Seco Rd/Carmel Valley Rd) and turn left on Tassajara Rd (18S02). Continue 7.7 miles to White Oak. (Note: route may be impassable with no alternate route in winter)
Santa Lucia Memorial Park Campground 36.118173 -121.466459
From Fort Hunter Liggett take Del Venturi Rd. to the National Forest boundary. Continue straight as the road becomes Milpitas/Indians Rd and continue 5.2 miles to Memorial CG. (Note: route partially closed in winter, use Mission Rd./Red Grade Rd. to bypass closed portion of Del Venturi)
Escondido Campground 36.1412457 -121.49507
From Fort Hunter Liggett take Del Venturi Rd. to the National Forest boundary. Continue straight as the road becomes Milpitas/Indians Rd and continue 5.3 miles to Arroyo Seco/Indians Rd. Turn right and continue 2.5 miles to Escondido CG. (Note: route closed in winter)
Ponderosa Campground 35.9974962 -121.381246 From Fort Hunter Liggett take Nacimiento- Fergusson Rd to the National Forest boundary.
Continue 2.5 miles to Ponderosa Campground.
Nacimiento Campground 36.014078 -121.412263 From Fort Hunter Liggett take Nacimiento- Fergusson Rd to the National Forest boundary.
Continue 5 miles to Nacimiento Campground.
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 12 of 13
ATTACHMENT D
(TO Wage Determination(s))
No applicable SCA Wage Determination currently exists for some counties included in this Task Order. The contractor shall review all place-of-performance counties during proposal preparation. If the contractor determines that the applicable WD does not contain a required classification for the services performed, the contractor shall be prepared to submit an SF 1444 Conformance Request immediately upon receipt of award and Notice to Proceed.
To avoid delays in project start-up, the contractor is encouraged to pre-identify the anticipated labor classifications and prepare draft SF-1444 materials in advance. The Government will incorporate the appropriate WD(s) as soon as they become available via modification; however, performance may begin under pending conformance in accordance with IDIQ Section H.1.12 and the Davis-Bacon/SCLS conformance procedures.
Instruction to pull Wage Determinations
• Go to SAM.gov>Wage-Determinations (https://sam.gov/wage-determinations). Select Service Contracts.
• Use carrot to select state.
• County/Independent City?
• You will need to select the applicable county for each area.
• Previously Performed? Yes, but in a different locality.
• Non-Standard Services? Yes;
• Select Non-Standard Service>Use carrot to select Hazardous Waste Pickup and Disposal Services.
• Status? Active
Government Intent Note: The instructions above describe how the contractor is to identify the applicable Wage Determination for each place of performance. If, after following these steps, an appropriate Wage Determination is not available or does not contain a required labor classification, the contractor shall be prepared to submit an SF-1444 Conformance Request immediately upon award and Notice to Proceed. This clarification is provided to avoid delays in establishing the required conformed rate(s).
https://sam.gov/wage-determinations
Request For Authorization Of Additional Classification And Rate
Instructions: The Contractor shall complete items 3 through 16, keep a pending copy, and submit the request, in quadruplicate, to the Contracting Officer.
1. To:
Administrator, Wage And Hour Division U.S. Department Of Labor Washington, DC 20210
2. From: (Reporting Office)
3. Contractor 4. Date Of Request
5. Contract Number 6. Date Bid Opened (Sealed Bidding)
7. Date Of Award
8. Date Contract Work Started
9. Date Option Exercised (If Applicable) (Service Contract Only)
10. Subcontractor (If Any)
11. Project And Description Of Work (Attach Additional Sheet If Needed)
12. Location (City, County, And State)
13. In Order To Complete The Work Provided For Under The Above Contract, It Is Necessary To Establish The Following Rate(s) For The Indicated Classification(s) Not Included In The Department Of Labor Determination
Number: Dated:
a. List In Order: Proposed Classification Title(s); Job
Description(s); Duties; And Rationale For Proposed Classifications (Service contracts only)
b. Wage Rate(s) c. Fringe Benefits Payments
(Use reverse or attach additional sheets, if necessary)
14. Signature And Title Of Subcontractor Representative (If Any)
15. Signature And Title Of Prime Contractor Representative
STANDARD FORM 1444 (REV. 10/2023)
Prescribed by GSA-FAR (48 CFR) 53.222(f)
Check Appropriate Box Service Contract Construction Contract
OMB Control Number: 9000-0066 Expiration Date: 5/31/2027
Authorized For Local Reproduction Previous Edition Is Not Usable
Paperwork Reduction Act Statement
This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the
Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0066. We estimate that it will take .5 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services
Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
To Be Completed By Contracting Officer (Check As Appropriate - See FAR 22.1019 (Service Contract Labor Standards) Or FAR 22.406-3 (Construction Wage Rate Requirements))
The Interested Parties Agree And The Contracting Officer Recommends Approval By The Wage And Hour Division. Available Information And Recommendations Are Attached.
The Interested Parties Cannot Agree On The Proposed Classification And Wage Rate. A Determination Of The Question By The Wage And Hour Division Is Therefore Requested. Available Information And Recommendations Are Attached.
(Send 3 copies to the Department of Labor)
Date SubmittedTitle And Commercial Telephone Number
Signature Of Contracting Officer Or Representative
DisagreeAgree
Check Appropriate Box - Referencing Block 13.
Title16. Signature Of Employee Or Representative
STANDARD FORM 1444 (REV. 10/2023) BACK
SF 1444 Additional Information
� Block 11 — Project and Description of Work
This request applies to vault toilet pumping, septic tank pumping, portable toilet pumping, vault structure cleaning, debris removal, waste transport, waste disposal, reporting, spill response, remote/winter access, and compliance with Federal, State, Tribal, county, and local wastewater handling and transportation regulations, as required under USFS California Regional Vault and Septic Pumping Services IDIQ 127EAS26R0003 (Sections B and C).
These duties include operation of pump trucks, DOT compliant wastewater hauling vehicles, PPE use per 29 CFR 1910.120, required waste manifests, and compliance with environmental, health, and transportation regulations.
� Block 13 — Classification Requested
Proposed Classification Title: Vault/Septic Pumping Technician
Job Description & Duties:
Performs vault toilet pumping, septic tank pumping, portable toilet servicing, vault cleaning, debris removal, and pumping operations using specialized pump trucks.
Handles, transports, and disposes of sewage, graywater, septage, and associated waste in compliance with Federal, State, Tribal, county, and local regulations.
Operates DOT-regulated wastewater hauling vehicles; completes waste manifests;
performs spill response; uses PPE meeting 29 CFR 1910.120; provides documentation and reporting as required by the USFS Performance Work Statement (Attachment J2).
Work includes remote-access and winter-access pumping, emergency response capability, and safe operation on National Forest lands.
Rationale for Proposed Classification:
No existing SCA classification adequately captures the combination of specialized pumping equipment operation, regulated wastewater handling, environmental compliance duties, PPE/hazmat-related requirements, and DOT-regulated wastewater hauling required under the IDIQ.
The duties do not align with 23370 (General Maintenance Worker), which does not include regulated waste handling or specialized equipment operation.
The duties do not align with 23810 (Plumber, Maintenance), which covers plumbing craft work such as repair and installation, not sewage pumping and regulated waste transportation.
Therefore, an additional classification is required for lawful compliance with the Service Contract Labor Standards.
USFS California Regional Vault and Septic Pumping Services IDIQ | Page 13 of 13
ATTACHMENT E
(FS-6300-11, Subcontractor Approval Form)
USDA – Forest Service FS-6300-11 (10/81)
SUBCONTRACTOR
APPROVAL
REQUEST
SOLICITATION NUMBER CONTRACT NUMBER
UNIT
PROJECT TITLE
PRIME CONTRACTOR NAME, ADDRESS AND POC+EMAIL
APPROVAL IS HEREBY REQUESTED TO SUBCONTRACT WORK ON ABOVE REFERENCED CONTRACT.
SUBCONTRACTOR DETAILS
SUBCONTRACTOR NAME:
SUBCONTRACTOR UEI NO:
SUBCONTRACTOR ADDRESS:
SUBCONTRACTOR TAX ID (IF NO UEI NO.):
WORK DETAILS
TYPE OF WORK TO BE SUBCONTRACTED:
% OF WORK TO BE SUBCONTRACTED:
PRIME CONTRACTOR CONTACT NAME/ TITLE PRIME CONTRACTOR DIGITAL / WET SIGNATURE DATE (wet signature only)
STOP. BELOW TO BE COMPLETED BY USDA FOREST SERVICE CONTRACTING OFFICER ONLY.
APPROVER NAME/ TITLE APPROVER DIGITAL / WET SIGNATURE DATE APPROVED (wet signature only)
INSTRUCTIONS:
Complete and return to Forest Service.
| SOLICITATION NUMBER: 127EAS26R0003 |
| CONTRACT NUMBER: |
| UNIT: USFS California National Forests |
| PROJECT TITLE: USFS California Regional Vault and Septic Pumping Services IDIQ |
| PRIME CONTRACTOR NAME ADDRESS AND POCEMAIL: |
| PRIME CONTRACTOR CONTACT NAME TITLE: |
| DATE wet signature only: |
| APPROVER NAME TITLE: |
| DATE APPROVED wet signature only: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Service Contract: On |
| Construction Contract: Off |
| 2 From Reporting Office: USDA - Procurement Operations |
Ordering Contracting Officer - NAME Enter Order CO Division
| 3 Contractor: To be completed by the awarded contractor |
| 4 Date Of Request: |
| 5 Contract Number: Enter Parent No. |
| 6 Date Bid Opened Sealed Bidding: |
| 7 Date Of Award: |
| 8 Date Contract Work Started: |
| 9 Date Option Exercised If Applicable Service Contract Only: |
| 11 Project And Description Of Work Attach Additional Sheet If Needed: |
| 11 Project Title: Enter Task Order Project title |
| 12: |
| City: Enter City of Work Performance |
| State: California |
| b Wage RatesUse reverse or attach additional sheets: |
| 1: |
| 41: |
| 3: |
| 2: |
| 5: |
| 6: |
| c Fringe Benefits PaymentsUse reverse: |
| 1: |
| 6: |
| 5: |
| 4: |
| 3: |
| 2: |
| 5 Task Number: |
| 11: |
| Project Description: See Additional Sheet |
| 12 County: Enter County of Work Performance |
| Text1: |
| Text2: |
| a: |
| Classification: |
| 1: Vault/Septic Pumping Technician |
| 2: Sanitation Worker |
| 3: |
| 4: |
| 5: |
| 6: |
| Title: |
| Agree: Off |
| Disagree: Off |
| The Interested Parties Agree And The Contracting Officer Recommends Approval By The Wage: Off |
| The Interested Parties Cannot Agree On The Proposed Classification And Wage Rate A: Off |
| Contracting Officer Title: |
| Date Submitted: |
| STANDARD FORM 1444 REV 102023 BACK: |
| Contracting Officer Telephone Number: |
File details come from the government source that posted it. Updated .