C04. J20_Seed SOI TNF Sierraville RD.xlsx
XLSX spreadsheet 77 KB Posted
- Solicitation number
- 127EAS26R0003
- Issued by
-
Department of Agriculture Forest Service
About this file
This file is a Task Order Schedule of Items (TOPR SOI) for vault toilet and septic pumping services under IDIQ Contract 127EAS26R0003. The task order is issued to the Tahoe National Forest (TNF5) in California's Central Sierra region, with project number TNF5-1171357 for Fiscal Year 2026 Sierraville Road pumping operations. The schedule presents four line items organized by transit time categories: 1-2 hours (120 minutes), 3-5 hours (121-300 minutes), 6-8 hours (301-480 minutes), and 9+ hours (481 minutes and over), each specified as a lump sum (LS) unit of measure.
All four line items currently show zero unit prices and zero total prices, indicating this is a template or seed document awaiting contractor pricing input. This SOI seeds Task 1 (Vault Toilet Small/Medium category) within the larger IDIQ framework established under Solicitation 127EAS26R0003, which establishes multiple-award, firm-fixed-price contracts for USDA Forest Service Region 5 to provide vault toilet pumping, septic tank pumping, portable toilet servicing, waste hauling, emergency pumping services (48-hour response), and remote/winter access across California. The structure allows the Government to issue task orders based on transit time requirements and frequency of service, with pricing to be determined upon contractor selection and proposal submission.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOPR SOI
| ORDER SCHEDULE OF ITEMS |
| USFS California Regional Vault and Septic Pumping Services IDIQ |
| TO PROJECT TITLE | TNF5-1171357 FY26 Sierraville RD Pumping TO | |||||||
| UNIT (FOREST) | Tahoe National Forest (TNF5) | |||||||
| GEO ZONE | CA Central Sierra NORTH | |||||||
| TASK ORDER SOL # | 127EAS26R0003 | |||||||
| Item No. | Transit time | UoM | MoM | Unit Price | CTR Round Trip Frequency | Total Price | ||
| 0001 | 1-2 Hours (120 mins) | LS | Each | $0.00 | $0.00 | |||
| 0002 | 3-5 Hours (121-300 mins) | LS | Each | $0.00 | $0.00 | |||
| 0003 | 6-8 Hourss (301-480 mins) | LS | Each | $0.00 | $0.00 | |||
| 0004 | 9 Hours and more (481 mins and over) | LS | Each | $0.00 | $0.00 | |||
| Task 1 - Vault Toilet (Small/Medium) (<1,000 gal) | ||||||||
| Item No. | Vault Name | Map No. | QTY | Emergency | ||||
| Work? | Unit Price | PUMPING FREQUENCY | Total Price | |||||
| 0006 | Calpine Lookout | B.1 | 1 | $0.00 | 1 | $0.00 | ||
| 0007 | Kyburz Flat | B.1 | 1 | $0.00 | 1 | $0.00 | ||
| 0008 | Lake of the Woods Campground | B.1 | 1 | $0.00 | 1 | $0.00 | ||
| 0009 | Little Lasier Campground | B.1 | 2 | $0.00 | 1 | $0.00 | ||
| 0010 | Sardine Peak Lookout | B.1 | 1 | $0.00 | 1 | $0.00 | ||
| 0011 | Sierra Valley Shooting Area | B.1 | 2 | $0.00 | 1 | $0.00 | ||
| 0012 | Aspen Picnic | B.2 | 1 | $0.00 | 1 | $0.00 | ||
| 0013 | Pass Creek Boat Launch | B.2 | 2 | $0.00 | 1 | $0.00 | ||
| 0014 | Pass Creek Campground | B.2 | 2 | $0.00 | 1 | $0.00 | ||
| 0015 | Milton Campground | B.1 | 1 | $0.00 | 1 | $0.00 | ||
| 0016 | Woodcamp Campground | B.2 | 2 | $0.00 | 1 | $0.00 | ||
| 0017 | Woodcamp Picnic Area | B.2 | 2 | $0.00 | 1 | $0.00 | ||
| 0018 | East Meadows Campground | B.2 | 1 | $0.00 | 1 | $0.00 | ||
| 0019 | Jackson Meadows Vista | B.2 | 1 | $0.00 | 1 | $0.00 | ||
| 0020 | East Meadows Holding Tank | B.2 | 1 | $0.00 | 1 | $0.00 | ||
| 0021 | Fir Top Campground Holding Tank | B.2 | 1 | $0.00 | 1 | $0.00 | ||
| 0022 | Findley Campground Holding Tank | B.2 | 1 | $0.00 | 1 | $0.00 | ||
| 0023 | Cold Creek Campground | B.1 | 4 | $0.00 | 1 | $0.00 | ||
| 0024 | Cottonwood Campground | B.1 | 16 | $0.00 | 1 | $0.00 | ||
| Basic Inspection and Reporting | ||||||||
| Item No. | Inspection | UoM | QTY | Unit Price | Total Price | |||
| 0025 | Per Vault | Each | 1 | $0.00 | $0.00 | |||
| Optional | Winterization | LSQ | 1 | $0.00 | $0.00 | |||
| ORDER TOTAL VALUE | $0.00 |
| Schedule Notes | 1. Vault Quantity represents the number of vaults in the Vault Name "area" (ex. if "Vault Name" has a double vault- that is a building with two 1,000 gal tanks, the Qty would be represented as "2" vaults for that location under the applicable heading (e.g. Task 1 - Vault Toilet (Small/Medium) (<1,000 gal)) |
| 2. Per IDIQ Section H and TOPR Section 5.7, the Contractor shall propose the CTR Round Trip Frequency for this Task Order. If multiple dumps are required due to tank volume limitations, each disposal trip constitutes an additional round trip. The COR may identify anticipated RTs as an estimate only; Contractor is responsible for proposing actual RT frequency. | |
| 3. CTR Round Trip Frequency = total number of required round trips for all units listed, including additional RTs for each required disposal run. A single mobilization covering multiple units counts as one RT unless additional dumps are required. | |
| 4. Travel Time is the transportation transit time -- not the time on site pumping. | |
| 5. UOM - Unit of Measure | |
| 6. MoM - Method of Measure for travel price equates to transit time = (IDIQ Travel Tier Rate for selected Geographic Zone) × (Contractor‑proposed CTR Round Trip Frequency) | |
| 7. Scope Limitation Reminder. This SOI includes only services authorized under PWS Tasks 1–4. No repair, replacement, construction, infrastructure, or plumbing work may be performed under this Task Order. | |
| 8. Emergency (Y/N) Checkbox. If emergency pumping is required, select the Emergency checkbox for affected line items. Emergency services require contractor response within 48 hours of Government request, as identified in the TOPR. | |
| PRICE SUBMITTED BY | |
| Vendor | |
| SAM UEI | |
| Parent Contract No. | |
| Contact Name | |
| Contact Email | |
| Contact Phone |
Sheet1
| Task Number | Geographic Zone. | Travel Time Per Round Trip |
| Select IDIQ Task No. | Select Geographic Zone | Select Travel Time |
| Task 1 - Vault Toilet (Small/Medium) (<1,000 gal) | CA Northern EAST | 1-2 Hours (120 mins) |
| Task 1 - Vault Toilet (Large) (<1,001-2,500 gal) | CA Northern WEST | 3-5 Hours (121-300 mins) |
| Task 1 - Vault Toilet (Extra Large) (<2,501 -4,000 gal) | CA Central Sierra NORTH | 6-8 Hourss (301-480 mins) |
| Task 2 - Septic Tank (Small/Medium) (<1,000 gal) | CA Central Sierra SOUTH | 9 Hours and more (481 mins and over) |
| Task 2 - Septic Tank (Large) (<1,001-2,500 gal) | CA Southern Sierra NORTH | |
| Task 2 - Septic Tank (Extra Large) (<2,501 -4,000 gal) | CA Southern Sierra SOUTH | |
| Task 3 - Servicing of USFS Owned Portable Toilet | CA Southern EAST | |
| Task 4 - Basic Inspections and Reporting | CA Southern WEST | |
| Alaska National Forests | ||
| Arizona National Forests | ||
| New Mexico National Forests | ||
| Oregon National Forests | ||
| Washington State National Forests |
File details come from the government source that posted it. Updated .