This is a Key Personnel Designation of Representatives form for the USFS California Regional Vault and Septic Pumping Services IDIQ contract (Solicitation No. 127EAS26R0003). The form establishes the required key personnel positions that contractors must identify and maintain throughout contract performance.

The form designates five key personnel categories: a Contractor Representative (required at IDIQ award) who serves as the primary administrative contact for all contract administration matters; a Project Manager (if applicable) responsible for overall project execution and coordination; a Project Foreman/Site Lead (required at Task Order award) responsible for onsite supervision and day-to-day performance; a Contractor Quality Control Inspector (if applicable) responsible for the contractor's internal quality assurance; and a 24/7 Emergency Contact available for urgent matters. The form also includes a Contractor Internal Delegation of Authority section where the Contractor Representative can be delegated specific internal authorities including acknowledgment of Notices to Proceed, suspension/resume orders, payment estimates and invoices, contract modifications, final payments, termination settlements, and full contractual authority. Contractors must acknowledge key personnel substitution requirements, including a 90-day freeze on substitutions without Contracting Officer approval, the need for written justification, and that replacement personnel must possess necessary qualifications. All listed personnel must be available for contract and Task Order performance, and contractor personnel are explicitly prohibited from modifying contract terms, directing changes, or obligating the Government in any manner.

View the file

Other files

File Type Posted
C05-1. J37_Q&A_127EAS26R0003, v4, 20260727.pdf PDF
C05-1. J2_PWS v5.1_127EAS26R0003 20260525.pdf PDF
C05-1. J3_SOI 127EAS26R0003, 20260721.xlsx XLSX spreadsheet
C05-1. J37_Q&A_127EAS26R0003, v3, 20260721.pdf PDF
C05-1. J1_SF30_127EAS26R0003, 20260722.pdf PDF
C05-1. J1_SF1449&TermsB-M_127EAS26R0003, 20260722.pdf PDF
C04. J23_ Seed TOPR TMU, 20260712.pdf PDF
C04. J36_Seed SOI LPF-EVO, 20260712.xlsx XLSX spreadsheet
C04. J32_Seed SOI SQF Hume Lake-1171645.xlsx XLSX spreadsheet
C04. J28_Seed SOI STF-1149457.xlsx XLSX spreadsheet
C04. J21_Seed TOPR TNF5 N. Yuba-1171347.pdf PDF
C04. J4_Geographic Locations, v4.pdf PDF
C04. J9_Biobased-Sustainable Statement.pdf PDF
C04. J3_SOI 127EAS26R0003, 20260711.xlsx XLSX spreadsheet
C04. J20_Seed SOI TNF Sierraville RD.xlsx XLSX spreadsheet
C04. J26_Seed SOI SNF5-1171334, 20260712.xlsx XLSX spreadsheet
C04. J19_Seed TOPR TNF5 Sierraville-1171357.pdf PDF
C04. J15_ Seed TOPR MDF-1171248.pdf PDF
C04. J30_Seed SOI SNF5 Bass Lake-1171333.xlsx XLSX spreadsheet
C04. J16_Seed SOI MDF-1171248, 20260711.xlsx XLSX spreadsheet
C04. J24_Seed SOI TMU, 20260712.xlsx XLSX spreadsheet
C04. J13_Seed TOPR LNF5-1171338F, 20260712.pdf PDF
C04. J27_Seed TOPR STF-1149457, 20260712.pdf PDF
C04. J5_Maps.pdf PDF
C04. J35_Seed TOPR LPF, 20260712.pdf PDF
C04. J1_SF1449&TermsB-M_127EAS26R0003.pdf PDF
C04. J31_Seed TOPR SQF Hume Lake-1171645.pdf PDF
C04. J6_Past Performance & Exp Questionnaire.pdf PDF
C04. J34_Seed SOI BDF-1165566.xlsx XLSX spreadsheet
C04. J2_PWS v5_127EAS26R0003 20260525.pdf PDF
C04. J29_Seed TOPR SNF5 BassLake-1171333.pdf PDF
C04. J7_Reps and Certs_52.212-3, 202607.pdf PDF
C04. J8_Contractor Responsibility Cert, 202607.pdf PDF
C04. J18_Seed SOI SRF, 20260712.xlsx XLSX spreadsheet
C04. J14_Seed SOI LNF5-1171338, 20260711.xlsx XLSX spreadsheet
C04. J25_Seed TOPR SNF5 High Sierra-1171334.pdf PDF
C04. J17_Seed TOPR SRF, 20260712.pdf PDF
C04. J22_Seed SOI TNF5 N. Yuba-1171347.xlsx XLSX spreadsheet
C04. J12_SF 1444 - ReqforAuthofAdd'lClassif&Rate.pdf PDF
C04. J11_FS 6300-11_SubkApp, 202602.pdf PDF
C04. J33_Seed TOPR BDF-1165566.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY PERSONNEL

Designation of Representatives

Solicitation/Contract No. Project Title.

Contractor Name. UEI No.

1. KEY PERSONNEL IDENTIFICATION

In accordance with the solicitation/contract, the following individuals are designated as key personnel for this contract. Personnel may hold multiple roles.

1.1 Contractor Representative (Required at IDIQ Award)

Primary administrative representative authorized to act on behalf of the company in all contract administration matters.

Name: Phone: Email:

1.2 Project Manager (If applicable)

Responsible for overall project execution and coordination.

Name: Phone: Email:

1.3 Project Foreman / Site Lead (Required at TO Award)

Responsible for onsite supervision and day-to-day performance.

Name: Phone: Email:

1.4 Contractor Quality Control (QC) Inspector (If applicable) Responsible for contractor’s internal quality assurance.

Name: Phone: Email:

1.5 24/7 Emergency Contact Name: Phone (24/7):

KEY PERSONNEL

Designation of Representatives

Solicitation No. Project Title

2. CONTRACTOR INTERNAL DELEGATION OF AUTHORITY

The Contractor Representative identified above is delegated internal authority by the Contractor to take the following actions on behalf of the company (check all that apply):

☐ Acknowledge receipt of Notice to Proceed ☐ Acknowledge Suspend / Resume Work Orders ☐ Sign progress payment estimates and invoices ☐ Sign contract modifications (on behalf of the Contractor) ☐ Sign final payment estimate and release ☐ Execute contract termination settlement agreements ☐ Full internal authority for all contractual matters

Note:

This delegation reflects internal authority within the Contractor’s organization. Nothing in this form authorizes contractor personnel to bind the Government.

3. REQUIRED CONTRACTOR ACKNOWLEDGMENTS

3.1 Substitution of Key Personnel

Contractor acknowledges the requirements of IDIQ Section H.5(b)-(c) regarding substitutions, including:

• No substitutions during the first 90 days without CO approval

• Written justification required

• Replacement personnel must possess necessary qualifications

3.2 Availability

All personnel listed will be available for contract/TO performance.

3.3 No Authority to Bind the Government

Contractor personnel cannot modify contract terms, direct changes, or obligate the Government in any manner.

Company Name:

Authorized Representative Name:

Authorized Representative Title:

Signature:

Date:

1. KEY PERSONNEL IDENTIFICATION
In accordance with the solicitation/contract, the following individuals are designated as key personnel for this contract. Personnel may hold multiple roles.
1.1 Contractor Representative (Required at IDIQ Award)
Primary administrative representative authorized to act on behalf of the company in all contract administration matters.
1.2 Project Manager (If applicable)
Responsible for overall project execution and coordination.
1.3 Project Foreman / Site Lead (Required at TO Award)
Responsible for onsite supervision and day-to-day performance.
1.4 Contractor Quality Control (QC) Inspector (If applicable)
Responsible for contractor’s internal quality assurance.
1.5 24/7 Emergency Contact
2. CONTRACTOR INTERNAL DELEGATION OF AUTHORITY
The Contractor Representative identified above is delegated internal authority by the Contractor to take the following actions on behalf of the company (check all that apply):
☐ Acknowledge receipt of Notice to Proceed ☐ Acknowledge Suspend / Resume Work Orders ☐ Sign progress payment estimates and invoices ☐ Sign contract modifications (on behalf of the Contractor) ☐ Sign final payment estimate and rele...
Note: This delegation reflects internal authority within the Contractor’s organization. Nothing in this form authorizes contractor personnel to bind the Government.
3. REQUIRED CONTRACTOR ACKNOWLEDGMENTS
3.1 Substitution of Key Personnel
Contractor acknowledges the requirements of IDIQ Section H.5(b)-(c) regarding substitutions, including:
No substitutions during the first 90 days without CO approval
Written justification required
Replacement personnel must possess necessary qualifications
3.2 Availability
All personnel listed will be available for contract/TO performance.
3.3 No Authority to Bind the Government
Contractor personnel cannot modify contract terms, direct changes, or obligate the Government in any manner.
UEI NoRow1:
NameRow1:
PhoneRow1:
EmailRow1:
NameRow1_2:
PhoneRow1_2:
EmailRow1_2:
NameRow1_3:
PhoneRow1_3:
EmailRow1_3:
NameRow1_4:
PhoneRow1_4:
EmailRow1_4:
NameRow1_5:
Phone 247Row1:
Authorized Representative Name:
Authorized Representative Title:
Date:
Solicitation NoRow1: 127EAS26R0003
Contractor NameRow1:
Project TitleRow1: USFS California Regional Vault and Septic Pumping Services IDIQ
Check Box5: Off
Check Box7: Off
Check Box6: Off
Check Box4: Off
Check Box3: Off
Check Box2: Off
Check Box1: Off

File details come from the government source that posted it. Updated .