C04. J22_Seed SOI TNF5 N. Yuba-1171347.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
USFS California State Regional Vault Toilet and Septic Pumping IDIQ
Solicitation number
127EAS26R0003
Issued by

About this file

This file is a Task Order Schedule of Items for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract under Solicitation 127EAS26R0003. The task order pertains to vault toilet and septic pumping services for the Tahoe National Forest (TNF5) in California's Central Sierra region, designated as project TNF5-1171347 for fiscal year 2026 on the North Yuba River Ranger District.

The schedule outlines four line items for vault toilet pumping services categorized by transit time requirements: 1-2 hours (120 minutes), 3-5 hours (121-300 minutes), 6-8 hours (301-480 minutes), and 9+ hours (481 minutes or more). Each item is priced on a lump sum (LS) basis per service call. All pricing is currently listed as $0.00, indicating this is a template document awaiting contractor pricing input. The measure of merit is "Each" (per service call), and the unit of measure is listed as monthly (MoM), suggesting regular service frequency. This task order falls under the broader USFS California Regional vault and septic pumping services IDIQ contract, which provides multiple services including pumping, portable toilet servicing, inspections, cleaning, disinfection, waste hauling, and emergency 48-hour response services across USDA Forest Service Region 5.

View the file

Other files

File Type Posted
C05-1. J37_Q&A_127EAS26R0003, v4, 20260727.pdf PDF
C05-1. J2_PWS v5.1_127EAS26R0003 20260525.pdf PDF
C05-1. J3_SOI 127EAS26R0003, 20260721.xlsx XLSX spreadsheet
C05-1. J37_Q&A_127EAS26R0003, v3, 20260721.pdf PDF
C05-1. J1_SF30_127EAS26R0003, 20260722.pdf PDF
C05-1. J1_SF1449&TermsB-M_127EAS26R0003, 20260722.pdf PDF
C04. J23_ Seed TOPR TMU, 20260712.pdf PDF
C04. J36_Seed SOI LPF-EVO, 20260712.xlsx XLSX spreadsheet
C04. J32_Seed SOI SQF Hume Lake-1171645.xlsx XLSX spreadsheet
C04. J28_Seed SOI STF-1149457.xlsx XLSX spreadsheet
C04. J21_Seed TOPR TNF5 N. Yuba-1171347.pdf PDF
C04. J4_Geographic Locations, v4.pdf PDF
C04. J9_Biobased-Sustainable Statement.pdf PDF
C04. J3_SOI 127EAS26R0003, 20260711.xlsx XLSX spreadsheet
C04. J20_Seed SOI TNF Sierraville RD.xlsx XLSX spreadsheet
C04. J26_Seed SOI SNF5-1171334, 20260712.xlsx XLSX spreadsheet
C04. J19_Seed TOPR TNF5 Sierraville-1171357.pdf PDF
C04. J15_ Seed TOPR MDF-1171248.pdf PDF
C04. J30_Seed SOI SNF5 Bass Lake-1171333.xlsx XLSX spreadsheet
C04. J16_Seed SOI MDF-1171248, 20260711.xlsx XLSX spreadsheet
C04. J24_Seed SOI TMU, 20260712.xlsx XLSX spreadsheet
C04. J13_Seed TOPR LNF5-1171338F, 20260712.pdf PDF
C04. J27_Seed TOPR STF-1149457, 20260712.pdf PDF
C04. J5_Maps.pdf PDF
C04. J35_Seed TOPR LPF, 20260712.pdf PDF
C04. J1_SF1449&TermsB-M_127EAS26R0003.pdf PDF
C04. J31_Seed TOPR SQF Hume Lake-1171645.pdf PDF
C04. J6_Past Performance & Exp Questionnaire.pdf PDF
C04. J34_Seed SOI BDF-1165566.xlsx XLSX spreadsheet
C04. J2_PWS v5_127EAS26R0003 20260525.pdf PDF
C04. J29_Seed TOPR SNF5 BassLake-1171333.pdf PDF
C04. J7_Reps and Certs_52.212-3, 202607.pdf PDF
C04. J8_Contractor Responsibility Cert, 202607.pdf PDF
C04. J18_Seed SOI SRF, 20260712.xlsx XLSX spreadsheet
C04. J14_Seed SOI LNF5-1171338, 20260711.xlsx XLSX spreadsheet
C04. J25_Seed TOPR SNF5 High Sierra-1171334.pdf PDF
C04. J10_KeyPersonnel-DesgofReps, 202604.pdf PDF
C04. J17_Seed TOPR SRF, 20260712.pdf PDF
C04. J12_SF 1444 - ReqforAuthofAdd'lClassif&Rate.pdf PDF
C04. J11_FS 6300-11_SubkApp, 202602.pdf PDF
C04. J33_Seed TOPR BDF-1165566.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOPR SOI

ORDER SCHEDULE OF ITEMS
USFS California Regional Vault and Septic Pumping Services IDIQ
TO PROJECT TITLETNF5- 1171347 FY26 North Yuba River RD Pumping TO
UNIT (FOREST)Tahoe National Forest (TNF5)
GEO ZONECA Central Sierra NORTH
TASK ORDER SOL #127EAS26R0003
Item No.Transit timeUoMMoMUnit PriceCTR Round Trip FrequencyTotal Price
00011-2 Hours (120 mins)LSEach$0.00$0.00
00023-5 Hours (121-300 mins)LSEach$0.00$0.00
00036-8 Hourss (301-480 mins)LSEach$0.00$0.00
00049 Hours and more (481 mins and over)LSEach$0.00$0.00
Task 1 - Vault Toilet (Small/Medium) (<1,000 gal)
Item No.Vault NameMap No.QTYEmergency
Work?Unit PricePUMPING FREQUENCYTotal Price
0005Berger Creek CampgroundB1$0.001$0.00
0006Cal Ida CampgroundB3$0.002$0.00
0007Carlton Flat CampgroundB1$0.002$0.00
0008Chapman CampgroundB6$0.001$0.00
0009Convict Flat Day Use AreaB2$0.001$0.00
0010Diablo CampgroundB2$0.001$0.00
0011Fiddle Creek CampgroundB2$0.002$0.00
0012Indian Valley CampgroundB8$0.002$0.00
0013Loganville CampgroundB2$0.001$0.00
0014Packer Lake Day UseB2$0.001$0.00
0015Packsaddle CampgroundB2$0.001$0.00
0016Rocky Rest CampgroundB1$0.003$0.00
0017Sardine Lake CampgroundB6$0.002$0.00
0018Salmon Creek CampgroundB8$0.002$0.00
0019Salmon Lake Boat LaunchB2$0.001$0.00
0020Sand Pond Picnic AreaB4$0.001$0.00
0021Sierra CampgroundB4$0.001$0.00
0022Snag Lake CampgroundB2$0.001$0.00
0023Union Flat CampgroundB2$0.001$0.00
0024Wild Plum CampgroundB8$0.002$0.00
0025Bassets StationB2$0.001$0.00
Basic Inspection and Reporting
Item No.InspectionUoMQTYUnit PriceTotal Price
26Per VaultEach1$0.00$0.00
OptionalWinterizationLSQ1$0.00$0.00
ORDER TOTAL VALUE$0.00
Schedule Notes1. Vault Quantity represents the number of vaults in the Vault Name "area" (ex. if "Vault Name" has a double vault- that is a building with two 1,000 gal tanks, the Qty would be represented as "2" vaults for that location under the applicable heading (e.g. Task 1 - Vault Toilet (Small/Medium) (<1,000 gal))
2. Per IDIQ Section H and TOPR Section 5.7, the Contractor shall propose the CTR Round Trip Frequency for this Task Order. If multiple dumps are required due to tank volume limitations, each disposal trip constitutes an additional round trip. The COR may identify anticipated RTs as an estimate only; Contractor is responsible for proposing actual RT frequency.
3. CTR Round Trip Frequency = total number of required round trips for all units listed, including additional RTs for each required disposal run. A single mobilization covering multiple units counts as one RT unless additional dumps are required.
4. Travel Time is the transportation transit time -- not the time on site pumping.
5. UOM - Unit of Measure
6. MoM - Method of Measure for travel price equates to transit time = (IDIQ Travel Tier Rate for selected Geographic Zone) × (Contractor‑proposed CTR Round Trip Frequency)
7. Scope Limitation Reminder. This SOI includes only services authorized under PWS Tasks 1–4. No repair, replacement, construction, infrastructure, or plumbing work may be performed under this Task Order.
8. Emergency (Y/N) Checkbox. If emergency pumping is required, select the Emergency checkbox for affected line items. Emergency services require contractor response within 48 hours of Government request, as identified in the TOPR.
PRICE SUBMITTED BY
Vendor
SAM UEI
Parent Contract No.
Contact Name
Contact Email
Contact Phone

&P of &N

Sheet1

Task NumberGeographic Zone.Travel Time Per Round Trip
Select IDIQ Task No.Select Geographic ZoneSelect Travel Time
Task 1 - Vault Toilet (Small/Medium) (<1,000 gal)CA Northern EAST1-2 Hours (120 mins)
Task 1 - Vault Toilet (Large) (<1,001-2,500 gal)CA Northern WEST3-5 Hours (121-300 mins)
Task 1 - Vault Toilet (Extra Large) (<2,501 -4,000 gal)CA Central Sierra NORTH6-8 Hourss (301-480 mins)
Task 2 - Septic Tank (Small/Medium) (<1,000 gal)CA Central Sierra SOUTH9 Hours and more (481 mins and over)
Task 2 - Septic Tank (Large) (<1,001-2,500 gal)CA Southern Sierra NORTH
Task 2 - Septic Tank (Extra Large) (<2,501 -4,000 gal)CA Southern Sierra SOUTH
Task 3 - Servicing of USFS Owned Portable ToiletCA Southern EAST
Task 4 - Basic Inspections and ReportingCA Southern WEST
Alaska National Forests
Arizona National Forests
New Mexico National Forests
Oregon National Forests
Washington State National Forests

File details come from the government source that posted it. Updated .