Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
Closed State & local contract opportunity
- Solicitation number
- 26-B-109JD
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141502 Land pre-construction assessment service
- 72141126 Underground utilities construction service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 72140000 Heavy construction services
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- Point of contact
-
- Jennifer Ditslear jditslear@volusia.gov (386) 626-6627
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Volusia County, Florida is requesting bids on clearing and grubbing for advance utility removal and relocations for the Veterans Memorial Parkway Extension project under ITB 26-B-109JD, with bids due August 27, 2026 at 3:01 p.m. and a 120-day bid-price-firm period from opening. A 3% local-business preference applies to respondents with a documented permanent location in Brevard, Lake, Orange, Osceola, Seminole, or Volusia County for at least six months prior to the solicitation closing.
The scope encompasses clearing and grubbing of the new Veterans Memorial Parkway right-of-way, temporary construction easements, Kentucky Avenue corridor, and Pond Parcel #100 across approximately 23.50 acres from E. Graves Avenue to Dr. Martin Luther King Jr. Boulevard. Work includes sediment barrier installation over 9,649 linear feet, inlet protection at four locations, gopher tortoise survey and relocation, and mobilization and traffic control. All work must comply with the State of Florida Erosion and Sediment Control Design and Reviewer Manual standards. The contractor must investigate existing site conditions, assume full responsibility for utility protection and coordination of all relocations (including utilities not depicted on plans), and conduct gopher tortoise survey within 90 days prior to construction at the contractor's expense if relocation is required by permit.
The estimated construction cost is $1,550,000. Substantial completion is required within 150 days of the Notice to Proceed, with final completion within 30 days thereafter, for a total contract time of 180 days. Liquidated damages are set at $1,685 per day for failure to meet the completion deadline. Payment and performance bonds are required. The contractor must hold a General Contractor license and register with the Florida Department of State. The County retains 5% of each monthly payment per Florida Statute 255.078 until final payment.
Questions are due August 13, 2026 at 11:59 p.m., with responses due by August 27, 2026 at 3:01 p.m. Bid opening will occur August 27, 2026 at 3:01 p.m. via Microsoft Teams. No mandatory pre-bid conference is scheduled. The contractor must maintain a field office with both contractor and engineer present. Multiple utility companies require advance relocation or coordination, including AT&T Transmission (180-day relocation window), Spectrum, Duke Energy (133 days), CenturyLink, Orange City Utilities (21 days pre-construction), Florida Public Utilities, and Zayo. The St. Johns River Water Management District Environmental Resource Permit requires Construction Commencement Notice at least 48 hours before work begins and As-Built Certification within 30 days of completion.
Opportunity text
Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
The purpose of this project is for the clearing and grubbing of the existing and proposed right-of-way for the Volusia County Veterans Memorial Parkway Extension (VMP) project followed by advanced utility removal/relocations work. Not all areas within the project limits require clearing and grubbing as a part of this construction contract.
The Clearing and Grubbing part of this contract contains instructions for the following activities occurring in the VMP Extension project:
- The clearing and grubbing of all areas within the new right-of-way of VMP, as well as within the temporary construction easements (TCE) adjacent to the new right-of-way with the exception of areas that are not depicted as such in the plans.
- The clearing and grubbing of all areas within the new right-of-way of Kentucky Avenue as well as the TCE adjacent to the new right-of-way with the exception of areas that are not depicted as such in the plans.
- The clearing and grubbing of a portion of east side of existing Kentucky Avenue where the new roadway will tie in.
- The clearing and grubbing of Pond Parcel #100 from the limits of the new VMP/Kentucky Avenue right-of-way to the existing tree line on the west side of existing Kentucky Avenue.
- The clearing and grubbing of the western roadside of existing Kentucky Avenue to the western limits of the existing or proposed VMP/Kentucky Avenue right-of-way, whichever is further west, with the exception of the area that is not depicted as such in the plans.
- The clearing and grubbing of the eastern roadside of existing Kentucky Avenue only where depicted as such in the plans.
- The Contractor is to follow standard clearing and grubbing Best Management Practices (BMP) at all times, as dictated in the State of Florida Erosion and Sediment Control Design and Reviewer Manual.
- The Contractor shall abide by all the terms, conditions, requirements and limitations set forth in all permits. A Gopher Tortoise Survey shall be conducted by an Authorized Gopher Tortoise Agent within 90 days prior to start of construction work. A Gopher Tortoise Relocation Permit with FWC may be required depending upon the number of burrows located. The Contractor shall be responsible for all costs associated with the survey, excavation and relocation of gopher tortoises to an Authorized Gopher Tortoise Recipient Site.
The Utility Removal/Relocations part of this contract will involve advance removal and/or relocation of existing underground or above ground utilities within the existing and proposed right-of-way for the successful future construction of Volusia County's Veterans Memorial Parkway Extension (VMP) project. The VMP Extension plans are solely to assist the Contractor in assessing the nature and extent of the existing conditions and convey the intent of the construction plans. The Contractor is responsible for any and all utility protection, preservation of service, utility adjustments, and coordination of all relocations required for the successful future construction of the VMP Extension project, including utilities which may not be shown on the VMP Extension plans. There will be no additional cost to the County for any impacts to the Contractor's work activities or work schedules as a result of utility protection, preservation, adjustments, or removals.
The Contractor is responsible to investigate the existing site conditions including all surface and subsurface conditions, existing features and infrastructures, all available reports and records the work required, and all other conditions that may affect the successful completion of the Clearing and Grubbing and Advance Utility Removals/Relocations work prior to submitting a construction bid and again prior to commencement of these construction activities.