Exhibit_U-_UWS_-_Spectrum.pdf

PDF 626 KB Posted

Attached to
Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
Solicitation number
26-B-109JD
Issued by
Volusia County, Florida

About this file

This is a Utility Work Schedule document prepared by the Florida Department of Transportation (FDOT) in compliance with Florida Administrative Code Rule 14-46.001 and Section 337.403 F.S., establishing a utility relocation and adjustment agreement between FDOT and Spectrum (the Utility Agency Owner) for the Veterans Memorial Parkway Extension project in Volusia County, Florida. The schedule addresses the relocation and adjustment of Spectrum's underground and overhead fiber optic facilities along a 195-station segment (15+00 to 210+00) of the project corridor. The utility work includes moving 432-count underground fiber to the opposite side of the street, relocating 120-count overhead fiber to run underground along the same path as the underground fiber, and moving a 3-by-4-foot vault 10 feet east at station 163+40. Spectrum's project representative is Edwin Encarnacion, reachable at 386-414-5086 or edwin.encarnacion@charter.com, with Amr H. Malek identified as the Principal Engineer of Record. The utility work schedule is effective as of the FDOT plan date referenced in the document.

The utility work is segmented into phases with permitting and engineering activities requiring 30 consecutive calendar days each, followed by construction activities with varying durations ranging from 7 to 15 consecutive calendar days depending on the specific work activity. The schedule establishes that Spectrum is responsible for obtaining a utility permit and complying with all requirements of the 2017 Utility Accommodation Manual for work performed under this schedule. Spectrum must provide written notification to FDOT and the construction contractor prior to starting, stopping, resuming, and completing work. The document explicitly states that Spectrum is not responsible for events beyond its control that could not be reasonably anticipated or avoided with due diligence, and any deviation by FDOT or its contractor from the referenced FDOT plans may void this utility work schedule.

View the file

Other files

File Type Posted
Veterans_Memorial_Parkway_Extension_-_Clearing_&_Grubbing_for_Advance_Utility_Removal_Relocations.pdf PDF
Exhibit_FF-_Conflict_Matrix.xlsx XLSX spreadsheet
Exhibit_EE-_UWS_-_Zayo.pdf PDF
Exhibit_DD-_RGBs_-_Zayo.pdf PDF
Exhibit_CC-_No_Conflict_Letter_-_Uniti_Fiber.pdf PDF
Exhibit_BB-_No_Conflict_Letter_-_Lumen.pdf PDF
Exhibit_AA-_UWS_-_Florida_Public_Utilities.pdf PDF
Exhibit_Z-_UWS_-_Duke_Energy.pdf PDF
Exhibit_Y-_RGBs_-_Duke_Energy.pdf PDF
Exhibit_X-_UWS_-_City_of_Orange_City.pdf PDF
Exhibit_W-_RGBs_-_City_of_Orange_City.pdf PDF
Exhibit_V-_No_Facilities_-_City_of_DeLand.pdf PDF
Exhibit_T-_RGBs_-_Spectrum.pdf PDF
Exhibit_S-_UWS_-_Century_Link.pdf PDF
Exhibit_R-_RGBs_-_Century_Link.pdf PDF
Exhibit_Q-_UWS_-_ATT-Transmission.pdf PDF
RGBs_-_ATT-Transimission.pdf PDF
Exhibit_O-_Clear_-_No_Facilities-ATT-D.docx DOCX document
Exhibit_N-26-B-109JD,_Payment_and_Performance_Bond.pdf PDF
Exhibit_M-SJRWMD_Permit_Approval.pdf PDF
Exhibit_L-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_K-_BASE-UTILITY01.dwg DWG drawing
Exhibit_J-SURVRD01_VMP.dwg DWG drawing
Exhibit_I-_Project_Survey.pdf PDF
Exhibit_H-_Utility_Adjustment_Sheets.pdf PDF
Exhibit_G-_Pricing_Sheet,_26-B-109JD.xlsx XLSX spreadsheet
Exhibit_F-Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Exhibit_E-Roadway_Technical_Specifications.pdf PDF
Exhibit_D-_CLEARING_&_GRUBBING_PLANS.pdf PDF
Exhibit_C-Draft_Contract,_26-B-109JD,_C2086.pdf PDF
Exhibit_B-PRIME-SUB_FORM_26-B-109JD.xls XLS spreadsheet
Exhibit_A-_26-B-109JD_Veterans_Memorial_Extension-Clearing_and_Grubbing-Required_Insurance_Limits.pdf PDF
SURVRD01_VMP.dwg DWG drawing
6-Project_Survey.pdf PDF
VMP_-_CLEARING_&_GRUBBING_PLANS.pdf PDF
VMP_-_Ut._Adj._Sheets.pdf PDF
Signed_&_Sealed_VC_Tech_Specs_08.11.25_-_Exhibit_B.pdf PDF
Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Revised_Estimate_-_C&G.pdf PDF
VMP_-SJRWMD_Permit_Approval.pdf PDF
BASE-UTILITY01.dwg DWG drawing
Conflict_Matrix.xlsx XLSX spreadsheet
Project_Description_-_Scope_of_Work_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations_5-28-26.docx DOCX document
Construction_Bid_Request_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations(5.28.26).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pricing_Sheet_-_C&G.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rule 14-46.001 F.A.C

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Pursuant to Section 337.403 F.S., the UAO and FDOT agree to the UAO’s need for relocation or adjustment to its utilities and FDOT’s need for a schedule for the UAO to effect the relocation or adjustment. This utility work schedule is based on FDOT plans dated in the project information box below. Any deviation by FDOT or its contractor from these plans, may void this utility work schedule. Upon notification by FDOT of a change to these plans, the UAO may negotiate a new utility work schedule. The UAO agrees to notify FDOT and the contractor in writing prior to starting, stopping, resuming, and completing work in accordance with this utility work schedule. The UAO shall obtain a utility permit and comply with requirements of the 2017 Utility Accommodation Manual (UAM) for all work done under this utility work schedule. The UAO is not responsible for events beyond the control of the UAO that could not be reasonably anticipated by the UAO and which could not be avoided by the UAO with exercise of due diligence at the time of the occurrence.

FDOT PROJECT INFORMATION

Financial Project ID: Federal Project ID:

State Road Number: County:

FDOT Plans Dated: District Document No.:

UTILITY AGENCY/OWNER (UAO)

Utility Company:

UAO Project Rep: Phone: E-mail:

UAO Field Rep: Phone: E-mail:

UTILITY SIGNATURE

I have reviewed the FDOT plans referenced above and submit this utility work schedule in compliance with UAM Section 5 and agree to be bound by the terms of this utility work schedule.

UAO Rep. Date

Name

Title

ENGINEER OF RECORD SIGNATURE

I attest this utility work schedule is compatible with the FDOT plans referenced above.

EOR. Date

Name

Title

APPROVAL BY DISTRICT UTILITIES

This utility work schedule is complete and acceptable to FDOT.

FDOT Rep. Date / /

Name

Title

SECTION A: SUMMARY OF UTILITY WORK

The below days are the total numbers of days shown for all activities in Section C of this utility work schedule. The breakdown of how these days are to be incorporated into the FDOT project and the dependence of these days upon the completion of other activities by the UAO or others is shown in Section C.

Days prior to FDOT project construction: Days during FDOT project construction:

Amr H. Malek Principal

2026/05/20 khamphl Text Box Volusia County

P2172752 Text Box

SPECTRUM

P2172752 Text Box

EDWIN.ENCARNACION@CHARTER.COM

P2172752 Text Box

EDWIN ENCARNACION

P2172752 Text Box

CC2

P2172752 Text Box 5/6/2026

P2172752 Text Box

EDWIN ENCARNACION

P2172752 Text Box

EDWIN ENCARNACION

P2172752 Text Box 386-414-5086

P2172752 Text Box

VETERANS MEMORIAL PKWY

P2172752 Text Box P5984

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Financial Project ID: Entered on page 1

Utility Company: : Entered on page 1

FDOT Plans Dated: Entered on page 1

SECTION B: UAO SPECIAL CONDITIONS/CONSTRAINTS

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Financial Project ID: Entered on page 1

Utility Company: : Entered on page 1

FDOT Plans Dated: Entered on page 1

SECTION C: UAO’s WORK ACTIVITIES

Act.

No.

Utility Facility

(type, size, material, status)

From

Station/

Offset

To

Station/

Offset

Utility Work Activity

Description

Dependent

Activity TCP Phase

Consecutive

Calendar Days

Prior to During

Const. Const.

P2172752

P2172752 Text Box

P2172752 Text Box

P2172752 Text Box 15+00

P2172752 Text Box 210+00

P2172752 Text Box 15+00

P2172752 Text Box 210+00

P2172752 Text Box move UG 432ct fiber to other side of street

P2172752 Text Box move OH 120ct fiber to other side of street UG same path of 432 ct

P2172752 Text Box

P2172752 Text Box

P2172752 Text Box 432ct fiber

P2172752 Text Box 120ct fiber

P2172752 Text Box 3x4 vault

P2172752 Text Box 163+40

P2172752 Text Box 163+40

P2172752 Text Box move 3x4 vault 10' east

P2172752 Text Box

P2172752 Text Box

P2172752 Text Box

P2172752 Text Box

P2172752 Text Box

P2172752 Text Box

P2172752 Text Box

PERMITTING

P2172752 Text Box

ENGINEEING (DESIGN)

P2172752 Text Box

P2172752