This document is an engineering plan set for the Veterans Memorial Parkway Extension project in Volusia County, Florida, prepared by MetaWorld Civil Consulting. The project encompasses the construction of Veterans Memorial Parkway Extension from East Graves Avenue to Dr. Martin Luther King Jr. Boulevard, with associated work on Kentucky Avenue and related roadway improvements. The plans detail comprehensive utility adjustments, including the relocation and removal of existing CenturyLink infrastructure (identified as 90% responsibility), water and sewer lines, storm drainage systems, and other utilities throughout the project corridor. The project extends approximately 159+43.77 stations to 26+20.23 stations with associated construction on Kentucky Avenue and Dr. Martin Luther King Jr. Boulevard. The plans indicate three detention ponds, drainage basin mapping for the Middle St. Johns River Basin Planning Unit, and extensive directional boring operations with multiple trenching sections of varying lengths, including segments of 955 feet, 1,070 feet, and 1,275 feet. Multiple utility features are marked for removal, including BFO-84 bore carriers, BT-300-24 conduits, pedestrian structures, and various hand holes that require relocation or abandonment as part of the project scope.

The utility adjustment plans prepared as of April 1, 2026 by Ty Leslie of CenturyLink (352-932-2401) serve as the engineering reference for advance utility work required before main construction activities commence. The plans incorporate Florida Department of Environmental Protection water body identification data and comply with the State of Florida Erosion and Sediment Control Design and Reviewer Manual requirements. The document provides detailed station-by-station guidance for utility contractors performing clearing, grubbing, and advance utility removal and relocation work, which is the subject of the associated Volusia County construction contract for clearing and grubbing activities. All utility work must follow standard best management practices throughout the project limits, including areas within new right-of-way, temporary construction easements, and designated pond parcels.

View the file

Other files

File Type Posted
Veterans_Memorial_Parkway_Extension_-_Clearing_&_Grubbing_for_Advance_Utility_Removal_Relocations.pdf PDF
Exhibit_FF-_Conflict_Matrix.xlsx XLSX spreadsheet
Exhibit_EE-_UWS_-_Zayo.pdf PDF
Exhibit_DD-_RGBs_-_Zayo.pdf PDF
Exhibit_CC-_No_Conflict_Letter_-_Uniti_Fiber.pdf PDF
Exhibit_BB-_No_Conflict_Letter_-_Lumen.pdf PDF
Exhibit_AA-_UWS_-_Florida_Public_Utilities.pdf PDF
Exhibit_Z-_UWS_-_Duke_Energy.pdf PDF
Exhibit_Y-_RGBs_-_Duke_Energy.pdf PDF
Exhibit_X-_UWS_-_City_of_Orange_City.pdf PDF
Exhibit_W-_RGBs_-_City_of_Orange_City.pdf PDF
Exhibit_V-_No_Facilities_-_City_of_DeLand.pdf PDF
Exhibit_U-_UWS_-_Spectrum.pdf PDF
Exhibit_T-_RGBs_-_Spectrum.pdf PDF
Exhibit_S-_UWS_-_Century_Link.pdf PDF
Exhibit_Q-_UWS_-_ATT-Transmission.pdf PDF
RGBs_-_ATT-Transimission.pdf PDF
Exhibit_O-_Clear_-_No_Facilities-ATT-D.docx DOCX document
Exhibit_N-26-B-109JD,_Payment_and_Performance_Bond.pdf PDF
Exhibit_M-SJRWMD_Permit_Approval.pdf PDF
Exhibit_L-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_K-_BASE-UTILITY01.dwg DWG drawing
Exhibit_J-SURVRD01_VMP.dwg DWG drawing
Exhibit_I-_Project_Survey.pdf PDF
Exhibit_H-_Utility_Adjustment_Sheets.pdf PDF
Exhibit_G-_Pricing_Sheet,_26-B-109JD.xlsx XLSX spreadsheet
Exhibit_F-Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Exhibit_E-Roadway_Technical_Specifications.pdf PDF
Exhibit_D-_CLEARING_&_GRUBBING_PLANS.pdf PDF
Exhibit_C-Draft_Contract,_26-B-109JD,_C2086.pdf PDF
Exhibit_B-PRIME-SUB_FORM_26-B-109JD.xls XLS spreadsheet
Exhibit_A-_26-B-109JD_Veterans_Memorial_Extension-Clearing_and_Grubbing-Required_Insurance_Limits.pdf PDF
SURVRD01_VMP.dwg DWG drawing
6-Project_Survey.pdf PDF
VMP_-_CLEARING_&_GRUBBING_PLANS.pdf PDF
VMP_-_Ut._Adj._Sheets.pdf PDF
Signed_&_Sealed_VC_Tech_Specs_08.11.25_-_Exhibit_B.pdf PDF
Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Revised_Estimate_-_C&G.pdf PDF
VMP_-SJRWMD_Permit_Approval.pdf PDF
BASE-UTILITY01.dwg DWG drawing
Conflict_Matrix.xlsx XLSX spreadsheet
Project_Description_-_Scope_of_Work_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations_5-28-26.docx DOCX document
Construction_Bid_Request_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations(5.28.26).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pricing_Sheet_-_C&G.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

lesliem Image lesliem Image lesliem Image lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Typewritten Text Plans Prepared By:

lesliem Image lesliem Text Box

CENTURYLINK

(90%) Ty Leslie

(352) 932-2401 lesliem Typewritten Text 4/1/2026 P.375745

KE

N

TU

C

KY

A

VE

I-4

SR-472

E. GRAVES AVE.

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

OVERALL DRAINAGE MAP

BEGIN PROJECT

STA. 159+43.77 BL VMP

END PROJECT

STA. 26+20.23 BL MLK

MIDDLE ST. JOHNS RIVER BASIN

PLANNING UNIT 4D: LAKE MONROE UNIT

SUB BASIN 7: CHAIN OF LAKES

FDEP WBID #: 2938

NON-CONTRIBUTING BASIN

LAKE GEORGE BASIN

PLANNING UNIT 5A: LAKE WOODRUFF UNIT

SUB BASIN 1: NON-CONTRIBUTING AREA

FDEP WBID #: 2941

NON-CONTRIBUTING BASIN

EX. R/W

(TYP.)

D R

. M

LK

J R

. B

LT

W Y.

PR. R/W

(TYP.)

POND #3

POND #2

POND #1

KENTUCKY END STATION

STA. 29+05.13 BL KENTUCKY

KENTUCKY BEGIN STATION

STA. 16+35.04 BL KENTUCKY

STA. 212+03.11 BL VMP=

STA. 10+00.00 BL MLK

REGIONAL DRAINAGE BASIN LINE

(TYP.)

OFF-SITE SUB-BASIN LINE

(TYP.)

lesliem Length Measurement 331'-6"

+0

+0

+0

+0

PI: 50+00.00

163+40 164+00 165+00 166+00

167+00

168+00

PC

: 1

+0

9.

162+00 163+00 163+40

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

O E

O E

O E

O E

O E

O

FO

C O

FO

C

O

FO

C O

FO

C

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

UTILITY ADJUSTMENTS

VETERANS MEM. PKWY.

GR

AV

ES

A

VE

lesliem PolyLine lesliem PolyLine

PolyLine

169+00

170+00 171+00 172+00

173+00

174+00

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

UTILITY ADJUSTMENTS

Stamp

175+00 176+00 177+00 178+00 179+00 180+00

PT

: 1

+5

1.

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

UTILITY ADJUSTMENTS

+0

+0 0181+00 182+00 183+00 184+00 185+00 186+00 187+00

PC

: 1

+8

5.

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

UTILITY ADJUSTMENTS

VETERANS MEM. PKWY.

KE

N

TU

CK

Y

AV

E.

lesliem Callout

CTL

PLACE NEW H/H

lesliem Callout

CTL

DIRECTIONAL BORE

BFO-288

lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

TRENCH IN 1,070' OF

BFO-288

lesliem Callout

CTL

TRENCH IN 955' OF

BFO-288

lesliem Stamp lesliem Callout

CTL

PLACE NEW H/H

51 52

49 50

49 50

50 51

49 50 51

187+00

188+00 189+00 190+00

191+00

192+00

193+00

PC

: 1

+8

5.

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)BT(B)BT(B)BT(B)BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

UTILITY ADJUSTMENTS

lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

BFO-84

TO BE REMOVED

lesliem Callout

CTL

TRENCH IN 1,070' OF

BFO-288

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

49 49

54 53

54535251

191+00

192+00

193+00

194+00

195+00

W(B) W(B) W(B)

W(B) W(B)

W(B) W(B) W(B)

W(B)W(B)W(B)W(B)W(B)W(B)W(B) W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BT(B) BT(B) BT(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BT(B)BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

OE

OE

OE

OE

OE

OE

OE

OE

OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE

BFOC(B) BFOC(B) BFOC(B)

OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE

OE OE OE OE OE OE OE

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N lesliem Callout

CTL

TRENCH IN 1,070' OF

BFO-288

lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

BFO-84

TO BE REMOVED

lesliem Callout

CTL

195+00

196+00 197+00 198+00 199+00 200+00 201+00

PT

: 1

+3

7.

W(B) W(B) W(B) W(B) W(B)W(B)

W(B)

W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B)

W(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B)

BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)

BT(B)

BT(B)

BT(B)BT(B)BT(B)BT(B)

OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE

OE

OE

OE

OE

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B)

OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE

NPW(B)

NPW(B) NPW(B) NPW(B) NPW(B) NPW(B) NPW(B) NPW(B)

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

UTILITY ADJUSTMENTS

VETERANS MEM. PKWY.

lesliem Stamp lesliem Callout

CTL

PED #12599

TO BE REMOVED

lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

BFO-84

TO BE REMOVED

lesliem Callout

CTL

TRENCH IN 1,271' OF

BFO-288

lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem Stamp lesliem Callout

CTL

PLACE NEW H/H

lesliem Callout

CTL

TRENCH IN 1,070' OF

BFO-288

201+00 202+00 203+00 204+00 205+00 206+00 207+00

W(B) W(B) W(B)

W(B) W(B) W(B) W(B) W(B)

W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)

OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE

BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

OE OE OE OE OE OE OE OE OEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE

NPW(B) NPW(B) NPW(B) NPW(B) NPW(B) NPW(B)

NPW(B) NPW(B) NPW(B) NPW(B) NPW(B)

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N lesliem PolyLine lesliem Callout

CTL

BFO-84

TO BE REMOVED

lesliem Callout

CTL

TRENCH IN 1,271' OF

BFO-288

lesliem PolyLine lesliem Callout

CTL

10+00 11+00 208+00 209+00 210+00 211+00

W(B) W(B)

W(B) W(B) W(B) W(B)

W(B) W(B)

W(B)W(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

O

FO

C O

FO

C

OFOC

OFOC

BT(B) BT(B)

BT(B) BT(B) BT(B) BT(B)

BT(B) BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BT(B) BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)

OEOEOEOEOEOEOEOEOEOEOEOEOEOE

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B)

OE

OE OE OE OE OE OE OE OE OE OE

OE

OE

OE

O E

O E

O E

O E

O E

O E

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

UTILITY ADJUSTMENTS

VETERANS MEM. PKWY.

SR

SR

lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

BFO-84

TO BE REMOVED

lesliem Stamp lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

TRENCH IN 1,275' OF

BFO-288

lesliem PolyLine lesliem Stamp lesliem Callout

CTL

PLACE NEW H/H

lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

BFO-84

lesliem PolyLine lesliem Callout

CTL

DIRECTIONAL BORE

250' X BFO-288

lesliem Callout

CTL

DIRECTIONAL BORE

185' X TO HH#14325 BFO-288

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem PolyLine lesliem Stamp lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem Callout

CTL

BT-25-24

TO BE REMOVED

lesliem Stamp lesliem Callout

CTL

PED #11382

TO BE REMOVED

lesliem Callout

CTL

HH #60812

TO BE REMOVED

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem Stamp

Line

12+00 13+00 14+00 15+00 16+00 17+00

PC

: 1

7+

.5

BFOC(B)

W(B)

W(B) W(B) W(B)

W(B)

W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B)

W(B) W(B) W(B) W(B) W(B)

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

DR. MLK. JR. BLTWY.

lesliem PolyLine lesliem Callout

CTL

BFO-84

lesliem Stamp lesliem Callout

CTL

18+00 19+00 20+00 21+00 22+00 23+00

PT

: 2

3+

.3

G(B) G(B)

W(B) W(B) W(B) W(B)

W(B) W(B) W(B) W(B) W(B) W(B) W(B)

W(B)

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

PED #12159 TO BE REMOVED

lesliem Callout

CTL

BFO-84

F704, 21-22 F704, 27-48

LGORCYXA06, 1-36

lesliem Stamp lesliem Callout

CTL

BT-300-24

PL OUT OF SERVICE LEFT IN PLACE

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

24+00 25+00

26+00 27+00

28+00 29+00 30+00

PT

: 2

3+

.3

PC

: 2

8+

.7

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

UTILITY ADJUSTMENTS

Line lesliem Line lesliem Callout

CTL

BFO-84

lesliem Callout

CTL

PL OUT OF SERVICE LEFT IN PLACE

17+00 18+00 19+00

20+00

21+00

22+00

23+00

PC

: 1

7+

.0

W(B)

W(B) W(B) W(B)W(B)

W(B)W(B)W(B)

W(B)W(B)W(B) W(B) W(B) W(B) W(B)

W(B) W(B)

W (B)

BT(B) BT(B) BT(B) BT(B)

BT(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)BT(B) BT(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BT(B) BT(B) BT(B) BT(B) BT(B)

BT(B) BT(B)

BT(B)

BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)BT(B)BT(B)

BT(B)BT(B)BT(B)BT(B)

OEOEOEOEOEOEOEOEOE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE

O E

O E

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

KENTUCKY AVE.

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem PolyLine lesliem Callout

CTL

TRENCH IN 955' OF

BFO-288

lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

TRENCH IN BFO-288

FROM H/H #59863 AT

E GRAVES AVE 840' SOUTH

lesliem Callout

CTL

PLACE NEW H/H

lesliem Callout

CTL

BFO-84

TO BE REMOVED

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem Stamp lesliem Callout

CTL

PED #12597

TO BE REMOVED

lesliem PolyLine

23+00

W(B) W(B) W(B) W(B)W(B)W(B)W(B)W(B)W(B)

W(B)W(B)

W(B) W(B) W(B)

W(B) W(B) W(B) W(B)

W(B) W(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)

BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B)

BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)

BT(B)

OEOEOEOEOEOEOEOEOEOEOEOEOEOE

OEOEOEOEOEOEOEOEOEOEOEOEOE

OE OE OE OE

OE OE OE OE OE OE OE OE OE

OE OE OE OE OE OE OE OE OE OE OE OE OE OE

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N lesliem Callout

CTL

TRENCH IN 955' OF

BFO-288

lesliem PolyLine lesliem Stamp lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

BFO-84

TO BE REMOVED

lesliem Callout

CTL

PED #12598

TO BE REMOVED

lesliem Callout

CTL

BT-300-24

TO BE REMOVED

lesliem Stamp lesliem Length Measurement 640'-0"

42 4647

40 41

24+00 25+00 26+00 27+00 28+00 29+00

4+

5+

6+

7+

PC: 186+85.74

PT

: 2

4+

.6

BFO

C

(B)

BFO

C (B)

BFO

C

(B)

BFO

C (B)

BFO

C

(B)

BFO

C (B)

BFO

C

(B)

BFO

C

(B)

BFO

C (B)

BFO

C

(B)

BFO

C (B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)

BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)

OE

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

UTILITY ADJUSTMENTS

VETERAN

S M

EM

. PKW

Y.

lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout

CTL

TRENCH IN 955' OF

BFO-288

lesliem Callout

CTL

DIRECTIONAL BORE

150' X BFO-288

lesliem Callout

CTL

PLACE NEW H/H

lesliem Stamp lesliem Stamp lesliem Callout

CTL

PLACE NEW H/H

lesliem Callout

CTL

TRENCH IN 1,070' OF

BFO-288

Sheets and Views
PLAN-SIGNATURE SHEET 01-2
PLOVDR01-4
PLOVDR02-5
TYPICAL SECTION-6
TYPICAL SECTION-7
TYPICAL SECTION-8
TYPICAL SECTION-9
PLAN-BENCHMARKS & REF POINTS01-10
PLAN-BENCHMARKS & REF POINTS01-11
PLAN-BENCHMARKS & REF POINTS01-12
PLAN-BENCHMARKS & REF POINTS01-13
PLAN-COUNTY NOTES01-19
PLAN-NOTES-DETAILS01-20
PLPRRD01-VMP-21
PLPRRD01-VMP-22
PLPRRD01-VMP-23
PLPRRD01-VMP-24
PLPRRD01-VMP-25
PLPRRD01-VMP-26
PLPRRD01-VMP-27
PLPRRD01-VMP-28
PLPRRD01-VMP-29
PLPRRD01-VMP-30
PLPRRD02-MLK-31
PLPRRD02-MLK-32
PLPRRD02-MLK-33
PLPRRD03-KENTUCKY-34
PLPRRD03-KENTUCKY-35
PLPRRD03-KENTUCKY-36
PLXSRD02-MLK-70
PLXSRD02-MLK-71
PLXSRD02-MLK-72
PLXSRD02-MLK-73
PLXSRD02-MLK-74
PLXSRD02-MLK-75
PLXSRD02-MLK-76
PLXSRD02-MLK-77
PLXSRD02-MLK-78
PLXSRD02-MLK-79
PLXSRD03-KENTUCKY-80
PLXSRD03-KENTUCKY-81
PLXSRD03-KENTUCKY-82
PLXSRD03-KENTUCKY-83
PLXSRD03-KENTUCKY-84
PLXSRD03-KENTUCKY-85
PLXSRD03-KENTUCKY-86
PLXSRD03-KENTUCKY-87
PLXSRD03-KENTUCKY-88
PLAN-PONDS-89
PLAN-PONDS-90
PLAN-PONDS-91
PLAN-PONDS-92
PLAN-INTERSECTION DETAIL-93
PLAN-INTERSECTION DETAIL-94
PLAN-INTERSECTION DETAIL-95
PLAN-INTERSECTION DETAIL-96
PLAN-INTERSECTION DETAIL-97
PLAN-INTERSECTION DETAIL-98
PLSUMDR01-99
PLAN-SWPP-101
PLUTIL01-102
PLUTIL01-103
PLUTIL01-104
PLUTIL01-105
PLUTIL01-106
PLUTIL01-107
PLUTIL01-108
PLUTIL01-109
PLUTIL01-110
PLUTIL01-111
PLUTIL01-112
PLUTIL01-113
PLUTIL01-114
PLUTIL01-115
PLUTIL01-116
PLAN-GEOTECH PROFILES01-117
PLAN-GEOTECH PROFILES01-118
PLAN-GEOTECH PROFILES01-119
PLAN-GEOTECH PROFILES01-120
PLAN-GEOTECH PROFILES01-121
PLAN-GEOTECH PROFILES01-122
PLAN-GEOTECH PROFILES01-123
PLAN-GEOTECH PROFILES01-124
PLAN-KEY-SPM01-1
PLAN-SIGNATURE SHEET 01-S-2
PLAN-NOTES-SPM-NOTES01-S-3
PLNSPM01-S-4
PLNSPM01-S-5
PLNSPM01-S-6
PLNSPM01-S-7
PLNSPM01-S-8
PLNSPM01-S-9
PLNSPM01-S-10
PLNSPM01-S-11
PLNSPM01-S-12
PLNSPM01-S-13
PLNSPM01-S-14
PLNSPM01-S-15
PLNSPM01-S-16
PLNSPM01-S-17
PLNSPM01-S-18
PLNSPM01-S-19
PLNSPM01-S-20
PLNSPM01-S-21
PLSUMDR01-100.pdf
Sheets and Views
PLSUMDR01-100
PLAN-KEY-SHEET01-1.pdf
Sheets and Views
PLAN-KEY SHEET01-1
PLAN-COUNTY NOTES01-14.pdf
Sheets and Views
PLAN-COUNTY NOTES01-14
PLAN-COUNTY NOTES01-15.pdf
Sheets and Views
PLAN-COUNTY NOTES01-15
PLAN-COUNTY NOTES01-16.pdf
Sheets and Views
PLAN-COUNTY NOTES01-16
PLAN-COUNTY NOTES01-17.pdf
Sheets and Views
PLAN-COUNTY NOTES01-17
PLAN-COUNTY NOTES01-18.pdf
Sheets and Views
PLAN-COUNTY NOTES01-18

File details come from the government source that posted it. Updated .