- Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
- Solicitation number
- 26-B-109JD
- Issued by
- Volusia County, Florida
About this file
This document is an engineering plan set for the Veterans Memorial Parkway Extension project in Volusia County, Florida, prepared by MetaWorld Civil Consulting. The project encompasses the construction of Veterans Memorial Parkway Extension from East Graves Avenue to Dr. Martin Luther King Jr. Boulevard, with associated work on Kentucky Avenue and related roadway improvements. The plans detail comprehensive utility adjustments, including the relocation and removal of existing CenturyLink infrastructure (identified as 90% responsibility), water and sewer lines, storm drainage systems, and other utilities throughout the project corridor. The project extends approximately 159+43.77 stations to 26+20.23 stations with associated construction on Kentucky Avenue and Dr. Martin Luther King Jr. Boulevard. The plans indicate three detention ponds, drainage basin mapping for the Middle St. Johns River Basin Planning Unit, and extensive directional boring operations with multiple trenching sections of varying lengths, including segments of 955 feet, 1,070 feet, and 1,275 feet. Multiple utility features are marked for removal, including BFO-84 bore carriers, BT-300-24 conduits, pedestrian structures, and various hand holes that require relocation or abandonment as part of the project scope.
The utility adjustment plans prepared as of April 1, 2026 by Ty Leslie of CenturyLink (352-932-2401) serve as the engineering reference for advance utility work required before main construction activities commence. The plans incorporate Florida Department of Environmental Protection water body identification data and comply with the State of Florida Erosion and Sediment Control Design and Reviewer Manual requirements. The document provides detailed station-by-station guidance for utility contractors performing clearing, grubbing, and advance utility removal and relocation work, which is the subject of the associated Volusia County construction contract for clearing and grubbing activities. All utility work must follow standard best management practices throughout the project limits, including areas within new right-of-way, temporary construction easements, and designated pond parcels.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
lesliem Image lesliem Image lesliem Image lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Typewritten Text Plans Prepared By:
lesliem Image lesliem Text Box
CENTURYLINK
(90%) Ty Leslie
(352) 932-2401 lesliem Typewritten Text 4/1/2026 P.375745
KE
N
TU
C
KY
A
VE
I-4
SR-472
E. GRAVES AVE.
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N
OVERALL DRAINAGE MAP
BEGIN PROJECT
STA. 159+43.77 BL VMP
END PROJECT
STA. 26+20.23 BL MLK
MIDDLE ST. JOHNS RIVER BASIN
PLANNING UNIT 4D: LAKE MONROE UNIT
SUB BASIN 7: CHAIN OF LAKES
FDEP WBID #: 2938
NON-CONTRIBUTING BASIN
LAKE GEORGE BASIN
PLANNING UNIT 5A: LAKE WOODRUFF UNIT
SUB BASIN 1: NON-CONTRIBUTING AREA
FDEP WBID #: 2941
NON-CONTRIBUTING BASIN
EX. R/W
(TYP.)
D R
. M
LK
J R
. B
LT
W Y.
PR. R/W
(TYP.)
POND #3
POND #2
POND #1
KENTUCKY END STATION
STA. 29+05.13 BL KENTUCKY
KENTUCKY BEGIN STATION
STA. 16+35.04 BL KENTUCKY
STA. 212+03.11 BL VMP=
STA. 10+00.00 BL MLK
REGIONAL DRAINAGE BASIN LINE
(TYP.)
OFF-SITE SUB-BASIN LINE
(TYP.)
lesliem Length Measurement 331'-6"
+0
+0
+0
+0
PI: 50+00.00
163+40 164+00 165+00 166+00
167+00
168+00
PC
: 1
+0
9.
162+00 163+00 163+40
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
O E
O E
O E
O E
O E
O
FO
C O
FO
C
O
FO
C O
FO
C
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N
UTILITY ADJUSTMENTS
VETERANS MEM. PKWY.
GR
AV
ES
A
VE
lesliem PolyLine lesliem PolyLine
PolyLine
169+00
170+00 171+00 172+00
173+00
174+00
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
UTILITY ADJUSTMENTS
Stamp
175+00 176+00 177+00 178+00 179+00 180+00
PT
: 1
+5
1.
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
UTILITY ADJUSTMENTS
+0
+0 0181+00 182+00 183+00 184+00 185+00 186+00 187+00
PC
: 1
+8
5.
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
UTILITY ADJUSTMENTS
VETERANS MEM. PKWY.
KE
N
TU
CK
Y
AV
E.
lesliem Callout
CTL
PLACE NEW H/H
lesliem Callout
CTL
DIRECTIONAL BORE
BFO-288
lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
TRENCH IN 1,070' OF
BFO-288
lesliem Callout
CTL
TRENCH IN 955' OF
BFO-288
lesliem Stamp lesliem Callout
CTL
PLACE NEW H/H
51 52
49 50
49 50
50 51
49 50 51
187+00
188+00 189+00 190+00
191+00
192+00
193+00
PC
: 1
+8
5.
W(B)
W(B)
W(B)
W(B)
W(B)
W(B)
W(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)BT(B)BT(B)BT(B)BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
UTILITY ADJUSTMENTS
lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
BFO-84
TO BE REMOVED
lesliem Callout
CTL
TRENCH IN 1,070' OF
BFO-288
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
49 49
54 53
54535251
191+00
192+00
193+00
194+00
195+00
W(B) W(B) W(B)
W(B) W(B)
W(B) W(B) W(B)
W(B)W(B)W(B)W(B)W(B)W(B)W(B) W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BT(B) BT(B) BT(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BT(B)BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
OE
OE
OE
OE
OE
OE
OE
OE
OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
BFOC(B) BFOC(B) BFOC(B)
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
OE OE OE OE OE OE OE
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N lesliem Callout
CTL
TRENCH IN 1,070' OF
BFO-288
lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
BFO-84
TO BE REMOVED
lesliem Callout
CTL
195+00
196+00 197+00 198+00 199+00 200+00 201+00
PT
: 1
+3
7.
W(B) W(B) W(B) W(B) W(B)W(B)
W(B)
W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B)
W(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B)
BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)
BT(B)
BT(B)
BT(B)BT(B)BT(B)BT(B)
OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
OE
OE
OE
OE
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B)
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
NPW(B)
NPW(B) NPW(B) NPW(B) NPW(B) NPW(B) NPW(B) NPW(B)
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N
UTILITY ADJUSTMENTS
VETERANS MEM. PKWY.
lesliem Stamp lesliem Callout
CTL
PED #12599
TO BE REMOVED
lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
BFO-84
TO BE REMOVED
lesliem Callout
CTL
TRENCH IN 1,271' OF
BFO-288
lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem Stamp lesliem Callout
CTL
PLACE NEW H/H
lesliem Callout
CTL
TRENCH IN 1,070' OF
BFO-288
201+00 202+00 203+00 204+00 205+00 206+00 207+00
W(B) W(B) W(B)
W(B) W(B) W(B) W(B) W(B)
W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)W(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)
OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE
BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
OE OE OE OE OE OE OE OE OEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
NPW(B) NPW(B) NPW(B) NPW(B) NPW(B) NPW(B)
NPW(B) NPW(B) NPW(B) NPW(B) NPW(B)
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N lesliem PolyLine lesliem Callout
CTL
BFO-84
TO BE REMOVED
lesliem Callout
CTL
TRENCH IN 1,271' OF
BFO-288
lesliem PolyLine lesliem Callout
CTL
10+00 11+00 208+00 209+00 210+00 211+00
W(B) W(B)
W(B) W(B) W(B) W(B)
W(B) W(B)
W(B)W(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
O
FO
C O
FO
C
OFOC
OFOC
BT(B) BT(B)
BT(B) BT(B) BT(B) BT(B)
BT(B) BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BT(B) BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)
OEOEOEOEOEOEOEOEOEOEOEOEOEOE
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B)
OE
OE OE OE OE OE OE OE OE OE OE
OE
OE
OE
O E
O E
O E
O E
O E
O E
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
UTILITY ADJUSTMENTS
VETERANS MEM. PKWY.
SR
SR
lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
BFO-84
TO BE REMOVED
lesliem Stamp lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
TRENCH IN 1,275' OF
BFO-288
lesliem PolyLine lesliem Stamp lesliem Callout
CTL
PLACE NEW H/H
lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
BFO-84
lesliem PolyLine lesliem Callout
CTL
DIRECTIONAL BORE
250' X BFO-288
lesliem Callout
CTL
DIRECTIONAL BORE
185' X TO HH#14325 BFO-288
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem PolyLine lesliem Stamp lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem Callout
CTL
BT-25-24
TO BE REMOVED
lesliem Stamp lesliem Callout
CTL
PED #11382
TO BE REMOVED
lesliem Callout
CTL
HH #60812
TO BE REMOVED
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem Stamp
Line
12+00 13+00 14+00 15+00 16+00 17+00
PC
: 1
7+
.5
BFOC(B)
W(B)
W(B) W(B) W(B)
W(B)
W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B) W(B)
W(B) W(B) W(B) W(B) W(B)
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N
DR. MLK. JR. BLTWY.
lesliem PolyLine lesliem Callout
CTL
BFO-84
lesliem Stamp lesliem Callout
CTL
18+00 19+00 20+00 21+00 22+00 23+00
PT
: 2
3+
.3
G(B) G(B)
W(B) W(B) W(B) W(B)
W(B) W(B) W(B) W(B) W(B) W(B) W(B)
W(B)
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
PED #12159 TO BE REMOVED
lesliem Callout
CTL
BFO-84
F704, 21-22 F704, 27-48
LGORCYXA06, 1-36
lesliem Stamp lesliem Callout
CTL
BT-300-24
PL OUT OF SERVICE LEFT IN PLACE
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
24+00 25+00
26+00 27+00
28+00 29+00 30+00
PT
: 2
3+
.3
PC
: 2
8+
.7
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
UTILITY ADJUSTMENTS
Line lesliem Line lesliem Callout
CTL
BFO-84
lesliem Callout
CTL
PL OUT OF SERVICE LEFT IN PLACE
17+00 18+00 19+00
20+00
21+00
22+00
23+00
PC
: 1
7+
.0
W(B)
W(B) W(B) W(B)W(B)
W(B)W(B)W(B)
W(B)W(B)W(B) W(B) W(B) W(B) W(B)
W(B) W(B)
W (B)
BT(B) BT(B) BT(B) BT(B)
BT(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)BT(B) BT(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BT(B) BT(B) BT(B) BT(B) BT(B)
BT(B) BT(B)
BT(B)
BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)BT(B)BT(B)
BT(B)BT(B)BT(B)BT(B)
OEOEOEOEOEOEOEOEOE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE
O E
O E
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N
KENTUCKY AVE.
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem PolyLine lesliem Callout
CTL
TRENCH IN 955' OF
BFO-288
lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
TRENCH IN BFO-288
FROM H/H #59863 AT
E GRAVES AVE 840' SOUTH
lesliem Callout
CTL
PLACE NEW H/H
lesliem Callout
CTL
BFO-84
TO BE REMOVED
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem Stamp lesliem Callout
CTL
PED #12597
TO BE REMOVED
lesliem PolyLine
23+00
W(B) W(B) W(B) W(B)W(B)W(B)W(B)W(B)W(B)
W(B)W(B)
W(B) W(B) W(B)
W(B) W(B) W(B) W(B)
W(B) W(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B) BT(B)
BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B)
BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B) BFOC(B)
BT(B)
OEOEOEOEOEOEOEOEOEOEOEOEOEOE
OEOEOEOEOEOEOEOEOEOEOEOEOE
OE OE OE OE
OE OE OE OE OE OE OE OE OE
OE OE OE OE OE OE OE OE OE OE OE OE OE OE
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
N lesliem Callout
CTL
TRENCH IN 955' OF
BFO-288
lesliem PolyLine lesliem Stamp lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
BFO-84
TO BE REMOVED
lesliem Callout
CTL
PED #12598
TO BE REMOVED
lesliem Callout
CTL
BT-300-24
TO BE REMOVED
lesliem Stamp lesliem Length Measurement 640'-0"
42 4647
40 41
24+00 25+00 26+00 27+00 28+00 29+00
4+
5+
6+
7+
PC: 186+85.74
PT
: 2
4+
.6
BFO
C
(B)
BFO
C (B)
BFO
C
(B)
BFO
C (B)
BFO
C
(B)
BFO
C (B)
BFO
C
(B)
BFO
C
(B)
BFO
C (B)
BFO
C
(B)
BFO
C (B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)
BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)BT(B)
OE
VETERANS MEMORIAL PKWY. EXTENSION
E. GRAVES AVE. TO
DR. MARTIN LUTHER KING JR. BLTWY.
VOL. CO. PROJECT #P5894
COUNTY OF VOLUSIA, FL
MetaWorld Civil Consulting
ENGINEERING SOLUTIONS
3930 S. Nova Rd., #104 Port Orange, FL 32127
(386) 944-9737
Know what's below.
before you dig.Call
R
UTILITY ADJUSTMENTS
VETERAN
S M
EM
. PKW
Y.
lesliem PolyLine lesliem PolyLine lesliem PolyLine lesliem Callout
CTL
TRENCH IN 955' OF
BFO-288
lesliem Callout
CTL
DIRECTIONAL BORE
150' X BFO-288
lesliem Callout
CTL
PLACE NEW H/H
lesliem Stamp lesliem Stamp lesliem Callout
CTL
PLACE NEW H/H
lesliem Callout
CTL
TRENCH IN 1,070' OF
BFO-288
| Sheets and Views |
| PLAN-SIGNATURE SHEET 01-2 |
| PLOVDR01-4 |
| PLOVDR02-5 |
| TYPICAL SECTION-6 |
| TYPICAL SECTION-7 |
| TYPICAL SECTION-8 |
| TYPICAL SECTION-9 |
| PLAN-BENCHMARKS & REF POINTS01-10 |
| PLAN-BENCHMARKS & REF POINTS01-11 |
| PLAN-BENCHMARKS & REF POINTS01-12 |
| PLAN-BENCHMARKS & REF POINTS01-13 |
| PLAN-COUNTY NOTES01-19 |
| PLAN-NOTES-DETAILS01-20 |
| PLPRRD01-VMP-21 |
| PLPRRD01-VMP-22 |
| PLPRRD01-VMP-23 |
| PLPRRD01-VMP-24 |
| PLPRRD01-VMP-25 |
| PLPRRD01-VMP-26 |
| PLPRRD01-VMP-27 |
| PLPRRD01-VMP-28 |
| PLPRRD01-VMP-29 |
| PLPRRD01-VMP-30 |
| PLPRRD02-MLK-31 |
| PLPRRD02-MLK-32 |
| PLPRRD02-MLK-33 |
| PLPRRD03-KENTUCKY-34 |
| PLPRRD03-KENTUCKY-35 |
| PLPRRD03-KENTUCKY-36 |
| PLXSRD02-MLK-70 |
| PLXSRD02-MLK-71 |
| PLXSRD02-MLK-72 |
| PLXSRD02-MLK-73 |
| PLXSRD02-MLK-74 |
| PLXSRD02-MLK-75 |
| PLXSRD02-MLK-76 |
| PLXSRD02-MLK-77 |
| PLXSRD02-MLK-78 |
| PLXSRD02-MLK-79 |
| PLXSRD03-KENTUCKY-80 |
| PLXSRD03-KENTUCKY-81 |
| PLXSRD03-KENTUCKY-82 |
| PLXSRD03-KENTUCKY-83 |
| PLXSRD03-KENTUCKY-84 |
| PLXSRD03-KENTUCKY-85 |
| PLXSRD03-KENTUCKY-86 |
| PLXSRD03-KENTUCKY-87 |
| PLXSRD03-KENTUCKY-88 |
| PLAN-PONDS-89 |
| PLAN-PONDS-90 |
| PLAN-PONDS-91 |
| PLAN-PONDS-92 |
| PLAN-INTERSECTION DETAIL-93 |
| PLAN-INTERSECTION DETAIL-94 |
| PLAN-INTERSECTION DETAIL-95 |
| PLAN-INTERSECTION DETAIL-96 |
| PLAN-INTERSECTION DETAIL-97 |
| PLAN-INTERSECTION DETAIL-98 |
| PLSUMDR01-99 |
| PLAN-SWPP-101 |
| PLUTIL01-102 |
| PLUTIL01-103 |
| PLUTIL01-104 |
| PLUTIL01-105 |
| PLUTIL01-106 |
| PLUTIL01-107 |
| PLUTIL01-108 |
| PLUTIL01-109 |
| PLUTIL01-110 |
| PLUTIL01-111 |
| PLUTIL01-112 |
| PLUTIL01-113 |
| PLUTIL01-114 |
| PLUTIL01-115 |
| PLUTIL01-116 |
| PLAN-GEOTECH PROFILES01-117 |
| PLAN-GEOTECH PROFILES01-118 |
| PLAN-GEOTECH PROFILES01-119 |
| PLAN-GEOTECH PROFILES01-120 |
| PLAN-GEOTECH PROFILES01-121 |
| PLAN-GEOTECH PROFILES01-122 |
| PLAN-GEOTECH PROFILES01-123 |
| PLAN-GEOTECH PROFILES01-124 |
| PLAN-KEY-SPM01-1 |
| PLAN-SIGNATURE SHEET 01-S-2 |
| PLAN-NOTES-SPM-NOTES01-S-3 |
| PLNSPM01-S-4 |
| PLNSPM01-S-5 |
| PLNSPM01-S-6 |
| PLNSPM01-S-7 |
| PLNSPM01-S-8 |
| PLNSPM01-S-9 |
| PLNSPM01-S-10 |
| PLNSPM01-S-11 |
| PLNSPM01-S-12 |
| PLNSPM01-S-13 |
| PLNSPM01-S-14 |
| PLNSPM01-S-15 |
| PLNSPM01-S-16 |
| PLNSPM01-S-17 |
| PLNSPM01-S-18 |
| PLNSPM01-S-19 |
| PLNSPM01-S-20 |
| PLNSPM01-S-21 |
| PLSUMDR01-100.pdf |
| Sheets and Views |
| PLSUMDR01-100 |
| PLAN-KEY-SHEET01-1.pdf |
| Sheets and Views |
| PLAN-KEY SHEET01-1 |
| PLAN-COUNTY NOTES01-14.pdf |
| Sheets and Views |
| PLAN-COUNTY NOTES01-14 |
| PLAN-COUNTY NOTES01-15.pdf |
| Sheets and Views |
| PLAN-COUNTY NOTES01-15 |
| PLAN-COUNTY NOTES01-16.pdf |
| Sheets and Views |
| PLAN-COUNTY NOTES01-16 |
| PLAN-COUNTY NOTES01-17.pdf |
| Sheets and Views |
| PLAN-COUNTY NOTES01-17 |
| PLAN-COUNTY NOTES01-18.pdf |
| Sheets and Views |
| PLAN-COUNTY NOTES01-18 |