Exhibit_CC-_No_Conflict_Letter_-_Uniti_Fiber.pdf

PDF 130 KB Posted

Attached to
Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
Solicitation number
26-B-109JD
Issued by
Volusia County, Florida

About this file

This is a no-conflict letter from Uniti Fiber to Volusia County, Florida, dated January 5, 2025, regarding the Veterans Memorial Parkway Extension (VMP) project at 90% design phase. Uniti Fiber confirms that it has no conflicts with the proposed construction in the project area and has underground facilities present. The company requires that Volusia County contact Sunshine State One-call at (800) 432-4770 at least 48 hours prior to the start of work to locate existing underground facilities in the field. If locates are extensive, Uniti Fiber requests that appropriate drawings be provided at the time of notification. The letter is signed by James Mosley, OSP Engineer, and dated October 28, 2022.

Uniti Fiber indicates that if the proposed construction activity conflicts with existing facilities and requires revision or adjustment, costs may be incurred. However, the company has stated it has no objection to the referenced Veterans Memorial Parkway Extension project. Contact information for questions is provided through James Mosley's cell phone at 251.654.8216. This no-conflict letter is a standard utility coordination document required for infrastructure projects to ensure that existing utility infrastructure is identified and protected during construction.

View the file

Other files

File Type Posted
Veterans_Memorial_Parkway_Extension_-_Clearing_&_Grubbing_for_Advance_Utility_Removal_Relocations.pdf PDF
Exhibit_FF-_Conflict_Matrix.xlsx XLSX spreadsheet
Exhibit_EE-_UWS_-_Zayo.pdf PDF
Exhibit_DD-_RGBs_-_Zayo.pdf PDF
Exhibit_BB-_No_Conflict_Letter_-_Lumen.pdf PDF
Exhibit_AA-_UWS_-_Florida_Public_Utilities.pdf PDF
Exhibit_Z-_UWS_-_Duke_Energy.pdf PDF
Exhibit_Y-_RGBs_-_Duke_Energy.pdf PDF
Exhibit_X-_UWS_-_City_of_Orange_City.pdf PDF
Exhibit_W-_RGBs_-_City_of_Orange_City.pdf PDF
Exhibit_V-_No_Facilities_-_City_of_DeLand.pdf PDF
Exhibit_U-_UWS_-_Spectrum.pdf PDF
Exhibit_T-_RGBs_-_Spectrum.pdf PDF
Exhibit_S-_UWS_-_Century_Link.pdf PDF
Exhibit_R-_RGBs_-_Century_Link.pdf PDF
Exhibit_Q-_UWS_-_ATT-Transmission.pdf PDF
RGBs_-_ATT-Transimission.pdf PDF
Exhibit_O-_Clear_-_No_Facilities-ATT-D.docx DOCX document
Exhibit_N-26-B-109JD,_Payment_and_Performance_Bond.pdf PDF
Exhibit_M-SJRWMD_Permit_Approval.pdf PDF
Exhibit_L-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_K-_BASE-UTILITY01.dwg DWG drawing
Exhibit_J-SURVRD01_VMP.dwg DWG drawing
Exhibit_I-_Project_Survey.pdf PDF
Exhibit_H-_Utility_Adjustment_Sheets.pdf PDF
Exhibit_G-_Pricing_Sheet,_26-B-109JD.xlsx XLSX spreadsheet
Exhibit_F-Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Exhibit_E-Roadway_Technical_Specifications.pdf PDF
Exhibit_D-_CLEARING_&_GRUBBING_PLANS.pdf PDF
Exhibit_C-Draft_Contract,_26-B-109JD,_C2086.pdf PDF
Exhibit_B-PRIME-SUB_FORM_26-B-109JD.xls XLS spreadsheet
Exhibit_A-_26-B-109JD_Veterans_Memorial_Extension-Clearing_and_Grubbing-Required_Insurance_Limits.pdf PDF
SURVRD01_VMP.dwg DWG drawing
6-Project_Survey.pdf PDF
VMP_-_CLEARING_&_GRUBBING_PLANS.pdf PDF
VMP_-_Ut._Adj._Sheets.pdf PDF
Signed_&_Sealed_VC_Tech_Specs_08.11.25_-_Exhibit_B.pdf PDF
Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Revised_Estimate_-_C&G.pdf PDF
VMP_-SJRWMD_Permit_Approval.pdf PDF
BASE-UTILITY01.dwg DWG drawing
Conflict_Matrix.xlsx XLSX spreadsheet
Project_Description_-_Scope_of_Work_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations_5-28-26.docx DOCX document
Construction_Bid_Request_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations(5.28.26).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pricing_Sheet_-_C&G.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITI FIBER

DATE:

TO:

ATTN:

RE:

1/5/2025

Volusia County

Melissa N. Malek

VMP - 90%

Thank you for your letter advising us of your proposed plans. Please be advised that:

___x_

__X__

We have no conflicts in the area of your construction.

We have overhead facilities in the area which will not be involved in your Construction.

We have underground facilities in the area. Please contact Sunshine State One-call at (800) 432-4770, 48 hours prior to the start of your work so they may locate these facilities in the field for you. If required, locates are extensive, please furnish them with any appropriate drawings at time of notification.

If the proposed activity as depicted conflicts with existing facilities and requires revision or adjustment of the existing facilities, there may be a cost.

(UNITI) has no objection to the above referenced project. If you have any questions, please call me at (___) ___-____ ext. ____

Sincerely, James Mosley OSP Engineer Cell 251.654.8216 James Mosley <James.Mosley@uniti.com>

DATE: 10/28/2022

File details come from the government source that posted it. Updated .