Project_Description_-_Scope_of_Work_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations_5-28-26.docx

DOCX document 21 KB Posted

Attached to
Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
Solicitation number
26-B-109JD
Issued by
Volusia County, Florida

About this file

Project Description and Scope of Work for Volusia County Veterans Memorial Parkway Extension

This is a Project Description and Scope of Work document prepared for Volusia County, Florida, detailing clearing and grubbing services followed by advance utility removal and relocation work for the Veterans Memorial Parkway (VMP) Extension project. The scope of work encompasses clearing and grubbing activities within the new VMP right-of-way, temporary construction easements, Kentucky Avenue right-of-way, and adjacent areas as depicted in the project plans. Specific work areas include the clearing and grubbing of Pond Parcel #100, portions of existing Kentucky Avenue, and roadsides within designated limits. All work must comply with standard Best Management Practices as outlined in the State of Florida Erosion and Sediment Control Design and Reviewer Manual. The contractor must also coordinate the advance removal and relocation of existing underground and above-ground utilities within the right-of-way to facilitate future VMP Extension construction. A Gopher Tortoise Survey must be conducted by an Authorized Gopher Tortoise Agent within 90 days prior to construction commencement, with the contractor bearing all costs associated with survey, excavation, and relocation activities if required by permit.

The contractor is responsible for investigating all existing site conditions, including surface and subsurface conditions, existing features and infrastructures, available reports and records, and any other conditions affecting project completion prior to bid submission and construction commencement. The contractor assumes full responsibility for utility protection, preservation of service, utility adjustments, and coordination of all relocations required for successful project completion, including utilities not depicted on project plans. No additional compensation will be provided to Volusia County for any impacts to contractor work activities or schedules resulting from utility protection, preservation, adjustments, or removals. The construction procurement package includes the Project Description, Construction Bid Request Form, VMP Clearing & Grubbing Plans, Standard and Specifications Technical Specs, Bid Tab, Construction Cost Estimate, permits, utility coordination documents, SUE information, CAD files, and topographic survey plans.

View the file

Other files

File Type Posted
Veterans_Memorial_Parkway_Extension_-_Clearing_&_Grubbing_for_Advance_Utility_Removal_Relocations.pdf PDF
Exhibit_FF-_Conflict_Matrix.xlsx XLSX spreadsheet
Exhibit_EE-_UWS_-_Zayo.pdf PDF
Exhibit_DD-_RGBs_-_Zayo.pdf PDF
Exhibit_CC-_No_Conflict_Letter_-_Uniti_Fiber.pdf PDF
Exhibit_BB-_No_Conflict_Letter_-_Lumen.pdf PDF
Exhibit_AA-_UWS_-_Florida_Public_Utilities.pdf PDF
Exhibit_Z-_UWS_-_Duke_Energy.pdf PDF
Exhibit_Y-_RGBs_-_Duke_Energy.pdf PDF
Exhibit_X-_UWS_-_City_of_Orange_City.pdf PDF
Exhibit_W-_RGBs_-_City_of_Orange_City.pdf PDF
Exhibit_V-_No_Facilities_-_City_of_DeLand.pdf PDF
Exhibit_U-_UWS_-_Spectrum.pdf PDF
Exhibit_T-_RGBs_-_Spectrum.pdf PDF
Exhibit_S-_UWS_-_Century_Link.pdf PDF
Exhibit_R-_RGBs_-_Century_Link.pdf PDF
Exhibit_Q-_UWS_-_ATT-Transmission.pdf PDF
RGBs_-_ATT-Transimission.pdf PDF
Exhibit_O-_Clear_-_No_Facilities-ATT-D.docx DOCX document
Exhibit_N-26-B-109JD,_Payment_and_Performance_Bond.pdf PDF
Exhibit_M-SJRWMD_Permit_Approval.pdf PDF
Exhibit_L-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_K-_BASE-UTILITY01.dwg DWG drawing
Exhibit_J-SURVRD01_VMP.dwg DWG drawing
Exhibit_I-_Project_Survey.pdf PDF
Exhibit_H-_Utility_Adjustment_Sheets.pdf PDF
Exhibit_G-_Pricing_Sheet,_26-B-109JD.xlsx XLSX spreadsheet
Exhibit_F-Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Exhibit_E-Roadway_Technical_Specifications.pdf PDF
Exhibit_D-_CLEARING_&_GRUBBING_PLANS.pdf PDF
Exhibit_C-Draft_Contract,_26-B-109JD,_C2086.pdf PDF
Exhibit_B-PRIME-SUB_FORM_26-B-109JD.xls XLS spreadsheet
Exhibit_A-_26-B-109JD_Veterans_Memorial_Extension-Clearing_and_Grubbing-Required_Insurance_Limits.pdf PDF
SURVRD01_VMP.dwg DWG drawing
6-Project_Survey.pdf PDF
VMP_-_CLEARING_&_GRUBBING_PLANS.pdf PDF
VMP_-_Ut._Adj._Sheets.pdf PDF
Signed_&_Sealed_VC_Tech_Specs_08.11.25_-_Exhibit_B.pdf PDF
Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Revised_Estimate_-_C&G.pdf PDF
VMP_-SJRWMD_Permit_Approval.pdf PDF
BASE-UTILITY01.dwg DWG drawing
Conflict_Matrix.xlsx XLSX spreadsheet
Construction_Bid_Request_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations(5.28.26).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pricing_Sheet_-_C&G.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Veterans Memorial Parkway Extension Project – Clearing & Grubbing for Advance Utility Removal/Relocations

Scope of Work:

The purpose of this project is for the clearing and grubbing of the existing and proposed right-of-way for the Volusia County Veterans Memorial Parkway Extension (VMP) project followed by advanced utility removal/relocations work. Not all areas within the project limits require clearing and grubbing as a part of this construction contract.

The Clearing and Grubbing part of this contract contains instructions for the following activities occurring in the VMP Extension project:

1. The clearing and grubbing of all areas within the new right-of-way of VMP, as well as within the temporary construction easements (TCE) adjacent to the new right-of-way with the exception of areas that are not depicted as such in the plans.

2. The clearing and grubbing of all areas within the new right-of-way of Kentucky Avenue as well as the TCE adjacent to the new right-of-way with the exception of areas that are not depicted as such in the plans.

3. The clearing and grubbing of a portion of east side of existing Kentucky Avenue where the new roadway will tie in.

4. The clearing and grubbing of Pond Parcel #100 from the limits of the new VMP/Kentucky Avenue right-of-way to the existing tree line on the west side of existing Kentucky Avenue.

5. The clearing and grubbing of the western roadside of existing Kentucky Avenue to the western limits of the existing or proposed VMP/Kentucky Avenue right-of-way, whichever is further west, with the exception of the area that is not depicted as such in the plans.

6. The clearing and grubbing of the eastern roadside of existing Kentucky Avenue only where depicted as such in the plans.

7. The Contractor is to follow standard clearing and grubbing Best Management Practices (BMP) at all times, as dictated in the State of Florida Erosion and Sediment Control Design and Reviewer Manual.

8. The Contractor shall abide by all the terms, conditions, requirements and limitations set forth in all permits. A Gopher Tortoise Survey shall be conducted by an Authorized Gopher Tortoise Agent within 90 days prior to start of construction work. A Gopher Tortoise Relocation Permit with FWC may be required depending upon the number of burrows located. The Contractor shall be responsible for all costs associated with the survey, excavation and relocation of gopher tortoises to an Authorized Gopher Tortoise Recipient Site.

The Utility Removal/Relocations part of this contract will involve advance removal and/or relocation of existing underground or above ground utilities within the existing and proposed right-of-way for the successful future construction of Volusia County’s Veterans Memorial Parkway Extension (VMP) project. The VMP Extension plans are solely to assist the Contractor in assessing the nature and extent of the existing conditions and convey the intent of the construction plans. The Contractor is responsible for any and all utility protection, preservation of service, utility adjustments, and coordination of all relocations required for the successful future construction of the VMP Extension project, including utilities which may not be shown on the VMP Extension plans. There will be no additional cost to the County for any impacts to the Contractor’s work activities or work schedules as a result of utility protection, preservation, adjustments, or removals.

The Contractors is responsible to investigate the existing site conditions including all surface and subsurface conditions, existing features and infrastructures, all available reports and records the work required, and all other conditions that may affect the successful completion of the Clearing and Grubbing and Advance Utility Removals/Relocations work prior to submitting a construction bid and again prior to commencement of these construction activities.

Attachments for Clearing & Grubbing for Advance Utility Removal/Relocations - Construction Procurement:

1. Project Description (shown above)

2. Construction Bid Request Form

3. VMP Clearing & Grubbing Plans from Metaworld

4. VC S&S Tech Specs

5. Bid Tab

6. Revised Construction Cost Estimate prepared by Metaworld

7. SJRWMD Permit

8. Utility Coordination Folder (contains Utility Conflict Matrix, RGBs, UWSs, Clear/No Facilities Letters)

9. SUE Information Folder (contains Test Hole Reports)

10. CADD Files

11. VMP Extension Utility Adjustment Plan Sheets

12. Topographic Survey Plans from McKim & Creed