Exhibit_S-_UWS_-_Century_Link.pdf

PDF 1 MB Posted

Attached to
Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
Solicitation number
26-B-109JD
Issued by
Volusia County, Florida

About this file

This is a Utility Work Schedule exhibit prepared by the Florida Department of Transportation (FDOT) for the Veterans Memorial Parkway Extension project in Volusia County, detailing special conditions and constraints for CenturyLink/Lumen utility work. The project involves the clearing, grubbing, and advanced utility removal/relocations along the Veterans Memorial Parkway Extension, with work required in multiple areas including the new right-of-way, temporary construction easements, and portions of Kentucky Avenue. The contractor must contact Spencer Hunter, a CenturyLink employee, at (352) 205-6678 at least 30 days prior to construction commencement. CenturyLink and contractor normal business hours are Monday through Friday, 8:00 a.m. to 5:00 p.m., excluding holidays.

The utility work schedule establishes specific notification requirements for construction activities: any work during normal business hours that is not pre-scheduled requires 30 days' advance notice, while any work outside normal business hours must be scheduled with a minimum of 72 hours' notice. CenturyLink requests that the road contractor provide staking prior to activities as detailed in Section C of the schedule. The project includes existing buried telephone lines consisting of both copper and fiber infrastructure that must be managed in accordance with the contractor's compliance with Florida Erosion and Sediment Control Design and Reviewer Manual standards and all applicable best management practices. The utility work schedule was dated November 17, 2025, with the original document dated December 14, 2016.

View the file

Other files

File Type Posted
Veterans_Memorial_Parkway_Extension_-_Clearing_&_Grubbing_for_Advance_Utility_Removal_Relocations.pdf PDF
Exhibit_FF-_Conflict_Matrix.xlsx XLSX spreadsheet
Exhibit_EE-_UWS_-_Zayo.pdf PDF
Exhibit_DD-_RGBs_-_Zayo.pdf PDF
Exhibit_CC-_No_Conflict_Letter_-_Uniti_Fiber.pdf PDF
Exhibit_BB-_No_Conflict_Letter_-_Lumen.pdf PDF
Exhibit_AA-_UWS_-_Florida_Public_Utilities.pdf PDF
Exhibit_Z-_UWS_-_Duke_Energy.pdf PDF
Exhibit_Y-_RGBs_-_Duke_Energy.pdf PDF
Exhibit_X-_UWS_-_City_of_Orange_City.pdf PDF
Exhibit_W-_RGBs_-_City_of_Orange_City.pdf PDF
Exhibit_V-_No_Facilities_-_City_of_DeLand.pdf PDF
Exhibit_U-_UWS_-_Spectrum.pdf PDF
Exhibit_T-_RGBs_-_Spectrum.pdf PDF
Exhibit_R-_RGBs_-_Century_Link.pdf PDF
Exhibit_Q-_UWS_-_ATT-Transmission.pdf PDF
RGBs_-_ATT-Transimission.pdf PDF
Exhibit_O-_Clear_-_No_Facilities-ATT-D.docx DOCX document
Exhibit_N-26-B-109JD,_Payment_and_Performance_Bond.pdf PDF
Exhibit_M-SJRWMD_Permit_Approval.pdf PDF
Exhibit_L-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_K-_BASE-UTILITY01.dwg DWG drawing
Exhibit_J-SURVRD01_VMP.dwg DWG drawing
Exhibit_I-_Project_Survey.pdf PDF
Exhibit_H-_Utility_Adjustment_Sheets.pdf PDF
Exhibit_G-_Pricing_Sheet,_26-B-109JD.xlsx XLSX spreadsheet
Exhibit_F-Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Exhibit_E-Roadway_Technical_Specifications.pdf PDF
Exhibit_D-_CLEARING_&_GRUBBING_PLANS.pdf PDF
Exhibit_C-Draft_Contract,_26-B-109JD,_C2086.pdf PDF
Exhibit_B-PRIME-SUB_FORM_26-B-109JD.xls XLS spreadsheet
Exhibit_A-_26-B-109JD_Veterans_Memorial_Extension-Clearing_and_Grubbing-Required_Insurance_Limits.pdf PDF
SURVRD01_VMP.dwg DWG drawing
6-Project_Survey.pdf PDF
VMP_-_CLEARING_&_GRUBBING_PLANS.pdf PDF
VMP_-_Ut._Adj._Sheets.pdf PDF
Signed_&_Sealed_VC_Tech_Specs_08.11.25_-_Exhibit_B.pdf PDF
Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Revised_Estimate_-_C&G.pdf PDF
VMP_-SJRWMD_Permit_Approval.pdf PDF
BASE-UTILITY01.dwg DWG drawing
Conflict_Matrix.xlsx XLSX spreadsheet
Project_Description_-_Scope_of_Work_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations_5-28-26.docx DOCX document
Construction_Bid_Request_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations(5.28.26).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pricing_Sheet_-_C&G.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04 15 2026

Rule 14-46.001 F.A.C Page 2 ofS

Financial Project ID:

Utility Company:

FDOT Plans Dated:

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

P� - Veterans Memorial Pkwy Ext.

CenturyLink/Lumen (Local)

11.17.25

SECTION B: UAO SPECIAL CONDITIONS/CONSTRAINTS

1. Existing facilities include Buried Telephone Lines, both copper and fiber.

2. The Contractor is to contact Spencer Hunter Century Link Employee at (352) 205-6678, 30 days. prior to the start of construction.

3. CenturyLink and Contractor's normal business hours are from 8am to 5pm, Monday through Friday (excluding Holidays).

4. Any work during normal business hours not scheduled needs 30-day notice.

5. Any work outside of normal business hours to be scheduled a minimum of 72 hours in advance.

6. Century Link requests for the Road Contractor to provide Staking prior to activities as listed in Section C.

December 14, 2016

File details come from the government source that posted it. Updated .