Construction_Bid_Request_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations(5.28.26).pdf
PDF 195 KB Posted
- Attached to
- Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
- Solicitation number
- 26-B-109JD
- Issued by
- Volusia County, Florida
About this file
This is a Construction Bid Request form issued by Volusia County, Florida, Public Works/Engineering Department for the Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations project. The project involves clearing and grubbing of the existing and proposed right-of-way for the Veterans Memorial Parkway Extension and adjacent temporary construction easements, along with advanced utility removal and relocation work. The scope includes clearing and grubbing activities at multiple locations including the new Veterans Memorial Parkway right-of-way, Kentucky Avenue right-of-way and roadside areas, and Pond Parcel #100, with all work to comply with Florida's Erosion and Sediment Control Design and Reviewer Manual. The engineer's estimate is $1,550,000, and the contract requires a General Contractor license. The construction timeline is 150 days for substantial completion and 30 days for final completion, totaling 180 days. Liquidated damages are set at $1,685.00 per day. The request date is June 18, 2026, and no mandatory pre-bid conference is scheduled.
Performance and payment bonds are required as the project exceeds the $200,000 threshold mandated by Florida Statute. Multiple permits must be obtained by both Volusia County (SJRWMD, FDOT, Fish & Wildlife Commission, FDEP) and the contractor (FDEP NPDES and Gopher Tortoise Survey/Permit). Project signs are required, and a field office/trailer is required with both contractor and engineer present. The contract is structured as either a Unit Price or Lump Sum type, with the specific format to be determined by bid submission. Grant funding involvement has not been confirmed in this bid request form. Bidders must submit required documents including the completed Construction Bid Request form, scope of services, technical specifications, drawings/plans, and copies of permits in PDF format to the OpenGov intake system.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised 08/30/2024
CONSTRUCTION BID REQUEST
(Please complete this form and submit with the corresponding documents)
Request date 6/18/26 https://vcgov-my.sharepoint.com/personal/scuratolo_volusia_gov/Documents/Desktop/Construction_Bid_Request_-_Clearing & Grubbing for Advance Utility Removal-Relocations(5.28.26).docx
Project Title: Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
Address and/or location of work: Veterans Memorial Parkway
Is this project in your Capital Improvement Plan? Yes No
Engineer’s estimate: $1,550,000
Performance and payment bonds required?. Yes No (Florida Statute requires projects estimated at more than $200,000.00 to be bonded. For projects less than $200,000, bonding is at the department's discretion)
Time to bring construction to completion:
A. Substantial: 150 days B. Final: 30 days C. Total days (A+B): 180 days
Liquidated Damages (actual damages sustained due to delays): $ $1,685.00 per day
Contract type (check one): Unit Price (attach line item spread sheet in Excel) or Lump Sum
Any “Special Conditions” associated with this project? Yes No If yes, please list on a separate sheet.
What type of license is required from the bidder? General Contractor (Prime or Sub)
What permits are to be obtained by the County? SJRWMD; FDOT; Fish & Wildlife Comm.; FDEP; OTHER:
What permits are to be obtained by the contractor? BUILDING OTHER: FDEP NPDES and Gopher
Tortoise Survey/Permit
If a building permit is required, please state the jurisdiction for work: N/A
Are project signs required? Yes No If yes, number of signs: PP
Is a field office/trailer required? Yes No If yes, check one or both: Contractor Engineer.
If plans/drawings were developed by an A/E, what were the RSQ & TA #s assigned? N/A
Is there any I.T. work (cabling for networks, etc.) involved in this project? Yes No
Pre-bid conference meeting? Yes No Pre-bid location: N/A
(Please contact the Contracts Manager if you would like a Mandatory pre-bid meeting.)
Please provide a list of all individuals required to be invited to the pre-bid meeting. Provide name and e-mail on a separate document.
Requesting Department/Division: Public Works / Engineering
Dept./Division Project Manager: Dennisse R. Zornan Phone #: 386-736-5967, ext.
Account No. for legal advertisement: 133 - 710 - 8133 - 6530; Account No(s). for the Project: 133 - 710 - 8133 - 6530;
Is any Grant money involved? Yes No If yes, please explain any bid requirements of the Grant. Attach any documents that the bidders are required to sign. NOTE: It is the Project Manager’s responsibility to ensure that all of the Grant bidding requirements are communicated to the Purchasing Analyst.
Revised 08/30/2024
CONSTRUCTION BID REQUEST
(Please complete this form and submit with the corresponding documents)
Request date 6/18/26 https://vcgov-my.sharepoint.com/personal/scuratolo_volusia_gov/Documents/Desktop/Construction_Bid_Request_-_Clearing & Grubbing for Advance Utility Removal-Relocations(5.28.26).docx
REQUIRED DOCUMENTS: Please attach the following documents, in PDF format (except the Excel bid form, if applicable), to the intake form in OpenGov:
Completed Construction Bid Request form; scope of services; technical specifications; drawings/plans; copies of permits;
and any other documents required for this request.
| REQUIRED DOCUMENTS: Please attach the following documents, in PDF format |
| (except the Excel bid form, if applicable), to the intake form in OpenGov: |
| Completed Construction Bid Request form; scope of services; technical specifications; drawings/plans; copies of permits; and any other documents required for this request. |
File details come from the government source that posted it. Updated .