About this file

This is a Utility Coordination Conflict Matrix for the Turnbull Bay Road Paved Shoulders/Safety Improvements project in Volusia County, Florida (Project #P5757). The document provides a comprehensive assessment of utility conflicts along the project corridor, identifying the locations, types, and ownership of existing utilities that require removal, relocation, or protection during construction. The matrix details conflicts involving FPL Distribution and Transmission poles, AT&T distribution and transmission fiber optic conduits, CenturyLink buried fiber optic lines, Charter/Spectrum underground and overhead fiber facilities, Duke Energy overhead power and fiber, Florida Public Utilities gas mains, Volusia County water and wastewater infrastructure, Lumen and Uniti fiber facilities, Zayo fiber optic lines, and other utility systems. The document specifies station ranges, pole types (primarily wood), offset measurements, and conflict classifications including clear zone conflicts, stable shoulder conflicts, and pavement conflicts across the project limits from Kentucky Avenue through Veterans Memorial Parkway to State Road 472.

The conflict matrix documents utility company contact responses received by March 10, 2021, with notation of agencies that have provided RGB (Right-of-Way, Grading, Boring) approvals, facilities letters, and conflict letters. Several utilities, including AT&T Transmission, required special handling per existing agreements with Volusia County, while others such as CenturyLink, Charter/Spectrum, Duke Energy, Florida Public Utilities, and Volusia County utilities indicated conflicts requiring removal, relocation, protection, and adjustment of their facilities. The matrix serves as a critical planning document for the advance utility removal and relocations phase of the Veterans Memorial Parkway Extension project, ensuring coordination among multiple utility providers and the local jurisdiction to prevent construction delays and safety hazards.

View the file

Other files

File Type Posted
Veterans_Memorial_Parkway_Extension_-_Clearing_&_Grubbing_for_Advance_Utility_Removal_Relocations.pdf PDF
Exhibit_EE-_UWS_-_Zayo.pdf PDF
Exhibit_DD-_RGBs_-_Zayo.pdf PDF
Exhibit_CC-_No_Conflict_Letter_-_Uniti_Fiber.pdf PDF
Exhibit_BB-_No_Conflict_Letter_-_Lumen.pdf PDF
Exhibit_AA-_UWS_-_Florida_Public_Utilities.pdf PDF
Exhibit_Z-_UWS_-_Duke_Energy.pdf PDF
Exhibit_Y-_RGBs_-_Duke_Energy.pdf PDF
Exhibit_X-_UWS_-_City_of_Orange_City.pdf PDF
Exhibit_W-_RGBs_-_City_of_Orange_City.pdf PDF
Exhibit_V-_No_Facilities_-_City_of_DeLand.pdf PDF
Exhibit_U-_UWS_-_Spectrum.pdf PDF
Exhibit_T-_RGBs_-_Spectrum.pdf PDF
Exhibit_S-_UWS_-_Century_Link.pdf PDF
Exhibit_R-_RGBs_-_Century_Link.pdf PDF
Exhibit_Q-_UWS_-_ATT-Transmission.pdf PDF
RGBs_-_ATT-Transimission.pdf PDF
Exhibit_O-_Clear_-_No_Facilities-ATT-D.docx DOCX document
Exhibit_N-26-B-109JD,_Payment_and_Performance_Bond.pdf PDF
Exhibit_M-SJRWMD_Permit_Approval.pdf PDF
Exhibit_L-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_K-_BASE-UTILITY01.dwg DWG drawing
Exhibit_J-SURVRD01_VMP.dwg DWG drawing
Exhibit_I-_Project_Survey.pdf PDF
Exhibit_H-_Utility_Adjustment_Sheets.pdf PDF
Exhibit_G-_Pricing_Sheet,_26-B-109JD.xlsx XLSX spreadsheet
Exhibit_F-Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Exhibit_E-Roadway_Technical_Specifications.pdf PDF
Exhibit_D-_CLEARING_&_GRUBBING_PLANS.pdf PDF
Exhibit_C-Draft_Contract,_26-B-109JD,_C2086.pdf PDF
Exhibit_B-PRIME-SUB_FORM_26-B-109JD.xls XLS spreadsheet
Exhibit_A-_26-B-109JD_Veterans_Memorial_Extension-Clearing_and_Grubbing-Required_Insurance_Limits.pdf PDF
SURVRD01_VMP.dwg DWG drawing
6-Project_Survey.pdf PDF
VMP_-_CLEARING_&_GRUBBING_PLANS.pdf PDF
VMP_-_Ut._Adj._Sheets.pdf PDF
Signed_&_Sealed_VC_Tech_Specs_08.11.25_-_Exhibit_B.pdf PDF
Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Revised_Estimate_-_C&G.pdf PDF
VMP_-SJRWMD_Permit_Approval.pdf PDF
BASE-UTILITY01.dwg DWG drawing
Conflict_Matrix.xlsx XLSX spreadsheet
Project_Description_-_Scope_of_Work_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations_5-28-26.docx DOCX document
Construction_Bid_Request_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations(5.28.26).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pricing_Sheet_-_C&G.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

LEGEND:
OWNED AND MAINTAINED BY FPL TRANSMISSION
CONFLICT - WITHIN STAB. SHOULDER/PAVEMENT
CONFLICT - WITHIN CLEAR ZONE
NO CONFLICT
STATIONOFFSET SIDEOFFSETOFFSET FROM EOP (FT.)POLE TYPE/MATERIALCONFLICTOWNED AND MAINTAINED BY:
22138.86+R52.514N/AWOODNO CONFLICTFPL Distribution
22183.84+R21.659N/AWOODNO CONFLICTFPL Distribution
22266.30+R49,207N/AWOODNO CONFLICTFPL Distribution
22259.03+R28.852N/AWOODNO CONFLICTFPL Distribution
22258.18+R42.977N/AWOODNO CONFLICTFPL Distribution
22293.65+R28.698N/AWOODNO CONFLICTFPL Distribution
22376.88+R25.81512.78WOODCLEAR ZONEFPL Distribution
22586.75+R24.33312.39WOODCLEAR ZONEFPL Distribution
22691.25+RGW MISSINGN/AWOODNO CONFLICTFPL Distribution
22790.68+R17.3087.21WOODSTAB. SHOULDERFPL Distribution
22888.37+R24.51413.39WOODCLEAR ZONEFPL Distribution
22987.91+R15.2234.79WOODPAVEMENTFPL Distribution
23086.27+R24.10912.93WOODCLEAR ZONEFPL Distribution
23187.59+R23.54212.43WOODCLEAR ZONEFPL Distribution
23288.32+R13.542.93WOODPAVEMENTFPL Distribution
23387.84+R31.938N/AWOODNO CONFLICTFPL Distribution
23485.09+R24.43113.93WOODCLEAR ZONEFPL Distribution
23587.68+R28.068N/AWOODCLEAR ZONEFPL Distribution
23686.76+R24.35813.41WOODCLEAR ZONEFPL Distribution
23791.01+R19.5518.82WOODSTAB. SHOULDERFPL Distribution
23892.23+R23.16412.73WOODCLEAR ZONEFPL Distribution
23988.74+R23.00112.65WOODCLEAR ZONEFPL Distribution
24085.78+R14.884.78WOODPAVEMENTFPL Distribution
24188.74+R23.00812.61WOODCLEAR ZONEFPL Distribution
24291.45+R16.6676.42WOODSTAB. SHOULDERFPL Distribution
24387.87+R23.53313.45WOODCLEAR ZONEFPL Distribution
24486.75+R22.89112.56WOODCLEAR ZONEFPL Distribution
24589.27+R19.4338.90WOODSTAB. SHOULDERFPL Distribution
24690.93+R18.1688.18WOODSTAB. SHOULDERFPL Distribution
24692.29+R17.9317.39WOODSTAB. SHOULDERFPL Distribution
24791.83+R23.61413.22WOODCLEAR ZONEFPL Distribution
24891.40+R19.9349.10WOODCLEAR ZONEFPL Distribution
24983.20+R18.2117.70WOODSTAB. SHOULDERFPL Distribution
24985.56+R20.2510.49WOODCLEAR ZONEFPL Distribution
24990.18+R16.5735.35WOODPAVEMENTFPL Distribution
25091.21+R22.54711.44WOODCLEAR ZONEFPL Distribution
25188.53+R23.3088.42WOODSTAB. SHOULDERFPL Distribution
25288.95+R24.10813.79WOODCLEAR ZONEFPL Distribution
25388.17+R47.394N/AWOODNO CONFLICTFPL Distribution
25490.86+R24.96814.89WOODCLEAR ZONEFPL Distribution
25589.74+R27.13N/AWOODNO CONFLICTFPL Distribution
25684.14+R25.42414.85WOODCLEAR ZONEFPL Distribution
25788.55+R24.22714.40WOODCLEAR ZONEFPL Distribution
25886.14+R42.16N/AWOODNO CONFLICTFPL Distribution
26087.80+R18.6949.22WOODCLEAR ZONEFPL Distribution
26220.65+R44.364N/AWOODNO CONFLICTFPL Distribution
26355.65+R25.23615.53WOODCLEAR ZONEFPL Distribution
26488.79+R14.815.45WOODSTAB. SHOULDERFPL Distribution
26545.54+R24.39115.34WOODCLEAR ZONEFPL Distribution
26800.40+R28.132N/AWOODNO CONFLICTFPL Distribution
26884.09+R14.3814.95WOODPAVEMENTFPL Distribution
26885.22+R28.253N/AWOODNO CONFLICTFPL Distribution
27090.47+R18.167.57WOODSTAB. SHOULDERFPL Distribution
27187.61+R24.65716.95WOODCLEAR ZONEFPL Distribution
27285.27+R24.14616.26WOODCLEAR ZONEFPL Distribution
27385.79+R17.8167.93WOODSTAB. SHOULDERFPL Distribution
27492.91+R28.497N/AWOODNO CONFLICTFPL Distribution
27597.46+R15.2846.78WOODPAVEMENTFPL Distribution
27686.85+R15.7246.98WOODPAVEMENTFPL Distribution
27785.17+R27.45717.27WOODCLEAR ZONEFPL Distribution
27883.13+R28.779N/AWOODNO CONFLICTFPL Distribution
27885.78+R21.70311.46WOODCLEAR ZONEFPL Distribution
27994.22+R25.31815.21WOODCLEAR ZONEFPL Distribution
27995.86+R23.10812.29WOODCLEAR ZONEFPL Distribution
28089.20+R21.28611.68WOODCLEAR ZONEFPL Distribution
28091.55+R21.51910.71WOODCLEAR ZONEFPL Distribution
28122.24+R19.2667.91WOODSTAB. SHOULDERFPL Distribution
28124.30+RN/AWOODNO CONFLICTFPL Distribution
28262.69+R17.3076.79WOODSTAB. SHOULDERFPL Distribution
28264.81+R25.902N/AWOODNO CONFLICTFPL Distribution

&"-,Bold"Utility Coordination Conflict Matrix Turnbull Bay Rd. Paved Shoulders/Safety Improvements Volusia County Project #P5757

COMPREHENSIVE

CERTIFIED READY FOR SIGNATURE RGBS UWS NO CONFLICT UTILITY COMPANY NOTES EXISTING FACILITY WORK PROPOSED CONFLICT APPROX. STATION RANGE

NOTES
XXATT-DISTRIBUTION
XXATT-TRANSMISSIONBASED ON CONVERSATIONS WITH MR. PETRIE, ATT-T WON'T SIGN UWS PER PREVIOUS AGREEEMENT WITH VOLUSIA COUNTY.FOC W/IN 6-1.5" HDPE CONDUITEXISTKENT. 12+90 TO MLK 29+25Spoke with Craig Petrie,
TO BE REMOVED / RECOVERED AFTER SPLICE EVENTNONE - REDUNTANT LINEKENT. 12+90 TO VMP 194+50ATT-T won't sign UWS
TO BE REMOVED / RECOVERED AFTER SPLICE EVENTUNDER AND PARALLEL TO ROADWAYVMP 194+50 TO 212+03.10per agreement with VC.
FOC W/IN 6-1.5" HDPE CONDUITEXISTVMP 159+50 TO 164+00
TO BE REMOVED / RELOCATED / PROTECTEDSTRUCTURES CD-1VMP 163+75
HAND-HOLES 454 AND 455TO BE REMOVED / RELOCATED / PROTECTED / ADJUSTEDELEVATION CHANGESVMP 163+90
NEW CONSTRUCTION/INSTALLATIONF&I 6-1.5" HDPE CONDUIT, HANDHOLES & FOCVMP 160+55 TO 198+00
F&I 6-1.5" HDPE CONDUIT, HANDHOLES & FOCVMP 198+00 TO SR 472
F&I 6-1.5" HDPE CONDUIT, HANDHOLES & FOCMLK 10+00 TO 11+75
XXXCENTURY LINKBURIED FIBER OPTICEXISTKENT. TO NORTH LIMIT
TO BE REMOVED / RELOCATEDPOND & RELATED EARTHWORKKENT. TO VMP 193+00
TO BE REMOVED / RELOCATEDUNDER AND PARALLEL TO ROADWAYVMP 193+00 TO SR 472
BURIED FIBER OPTICEXISTGRAVES - NORTH ROADSIDE
TO BE REMOVED / RELOCATED / PROTECTEDSTRUCTURES CD-1VMP 163+75
NEW CONSTRUCTION/INSTALLATION
F&I 2-2" HDPE CONDUIT, HANDHOLES, BT & FOC (TRENCH)KENT. 16+50 TO KENT. 28+00 (VMP 185+00)
F&I 2-2" HDPE CONDUIT, HANDHOLES, BT & FOC (DRILL)ACROSS VMP AT VMP 185+00
F&I 2-2" HDPE CONDUIT, HANDHOLES, BT & FOC (TRENCH)VMP 185+00 TO SR 472
XXXCHARTER/SPECTRUMUG FIBEREXISTVMP 159+50 TO 164+00
TO BE REMOVED / RELOCATED / PROTECTEDSTRUCTURES CD-1VMP 163+75
UG FIBEREXISTKENT. TO SR 472
TO BE REMOVED / RELOCATED / PROTECTEDPOND & RELATED EARTHWORKKENT. TO VMP 193+00
TO BE REMOVED / RELOCATEDUNDER AND PARALLEL TO ROADWAYVMP 193+00 TO 211+00
OH FIBEREXISTGRAVES - NORTH ROADSIDE
TO BE REMOVED / RELOCATEDSPAN WIRE / SIGNALS / POLESVMP 163+90
OH FIBEREXISTKENT. TO SR 472
TO BE REMOVED / RELOCATED / PROTECTEDPOND & RELATED EARTHWORKKENT. TO VMP 193+00
TO BE REMOVED / RELOCATEDWITHIN AND PARALLEL TO ROADWAYVMP 193+00 TO 211+00
TO BE REMOVED / RELOCATEDPOLE W/IN ROADWAYVMP 209+50
XXCITY OF DELAND
XXXCITY OF ORANGE CITY6" WMEXISTKENT. 16+20 TO SR 472
TO BE GROUT FILLEDNONE - REDUNTANT LINEKENT. 16+20 TO VMP 194+75
TO BE GROUT FILLEDUNDER AND PARALLEL TO ROADWAYVMP 194+75 TO SR 472
CAN BE REMOVED AS NEEDEDSTRUCTURE S-137VMP 194+75
CAN BE REMOVED AS NEEDEDPIPE BETWEEN S-139 & S-140VMP 197+90
CAN BE REMOVED AS NEEDEDSTRUCTURES CD-4 AND PIPE BETWEEN S-203 & S-202VMP 209+00 TO VMP 209+20
FIRE HYDRANTREMOVEVMP 210+40
FIRE HYDRANTREMOVEKENT. 17+80
NEW CONSTRUCTION/INSTALLATION
PR. 10" WMVMP 210+50
FHVMP 210+20
XXXDUKE ENERGYOH POWEREXISTKENT. TO NORTH LIMIT
TO BE REMOVED / RELOCATEDPOND & RELATED EARTHWORKKENTUCKY 18+20 TO VMP 193+00
RELOCATEUNDER AND PARALLEL TO ROADWAYVMP 193+00 TO VMP 210+70
OH FIBEREXISTGRAVES - NORTH ROADSIDE
TO BE REMOVED / RELOCATEDSPAN WIRE / SIGNALS / POLESVMP 163+90
NEW CONSTRUCTION/INSTALLATION
PR. OHE (WESTERN R/W LIMIT) TO EX. POLEVMP 193+00 TO VMP 210+70
PR. OHE (WESTERN R/W LIMIT) TO CONNECT TO EX. LINEKENTUCKY 18+20 TO VMP 193+00
XXFLORIDA PUBLIC UTILITIES6" HDPE MAIN GASEXISTMLK 11+80 TO MLK 12+80 (CROSSES)
TO BE REMOVED / RELOCATED / ADJUSTEDPIPE BETWEEN S-313 & S-312MLK 11+50
6" HDPE MAIN GASEXIST11+10 TO 16+80
TO BE PROTECTED / RELOCATED / ADJUSTEDNEAR & PARALLEL TO STORM NEAR S-307 & S-308MLK 15+00 TO MLK 16+50
4" HDPE MAIN GASEXISTMLK 16+80 TO MLK 26+00
TO BE REMOVED / RELOCATED / ADJUSTEDCROSSING OF PIPE BETWEEN S-301 AND S-302MLK 22+80
XXLUMEN
XXUNITI FIBER
VOLUSIA COUNTY!GOES WITH CONTRACT18" RWMEXISTKENT. TO NORTH LIMIT
TO BE REMOVED / RELOCATEDPARALLELS AND CROSSES STORM SYSTEMVMP 198+60 TO VMP 204+30
TO BE REMOVED / RELOCATED / PROTECTED / ADJUSTEDSTRUCTURES CD-4194+50 TO 13+00
16" WMEXISTSR 472 TO NORTH LIMIT
TO BE REMOVED / RELOCATEDPARALLELS AND CROSSES STORM SYSTEMMLK 12+00 TO MLK 16+50
TO BE REMOVED / RELOCATEDPARALLES SAME SPOT OF FUTURE ROADWAYMLK 16+50 TO MLK 21+00
12" WM LATERALEXISTCROSSES MLK
TO BE REMOVED / RELOCATED / ADJUSTEDCROSSING OF PIPE BETWEEN S-301 AND S-302MLK 22+40
XXXZAYOUNKN BFOEXISTGRAVES - NORTH ROADSIDE
HAND-HOLEREMOVE AND RELOCATEVMP 163+90

CONTACT

Response Received
DateActionAT&TCity of Daytona BeachCity of Ormond BeachCharterCrown CastleFPL DistributionFPL TransmissionTECOUnitiX - Received RGBs
3/10/21Initial ContactXXYXY - No Facilities Letter provided
Z - No Conflict Letter Provided