Exhibit_DD-_RGBs_-_Zayo.pdf

PDF 36 MB Posted

Attached to
Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
Solicitation number
26-B-109JD
Issued by
Volusia County, Florida

About this file

This is an engineering design exhibit document prepared by MetaWorld Civil Consulting for Volusia County, Florida, detailing the Veterans Memorial Parkway Extension project (Project #P5894), which extends from East Graves Avenue to Dr. Martin Luther King Jr. Boulevard. The document comprises comprehensive plan and profile sheets, typical cross-sections, and drainage maps for a roadway construction project. The project includes three primary construction areas: Veterans Memorial Parkway construction spanning stations 163+58.86 to 211+51.74 with a design speed of 45 mph; Dr. Martin Luther King Jr. Beltway milling and resurfacing from stations 10+61.11 to 26+20.23; and Kentucky Avenue construction from stations 16+35.04 to 28+72.13. The typical sections illustrate full-depth asphalt construction with Type FC 12.5 friction course and Type SP 12.5 structural course (PG 76-22), optional base group materials, and stabilization layers. The project includes three retention ponds for stormwater management and incorporates detailed drainage infrastructure with pipe sizes ranging from 18 inches to 36 inches. The document also identifies Zayo Group LLC utility facilities that require relocation, including high-density polyethylene ducts and hand-holes to be repositioned outside the proposed road and sidewalk areas.

The exhibit includes extensive cross-sectional details showing right-of-way widths of 140 feet with sodded medians, paved and stabilized shoulders, and clear zones of 24 feet on both sides. Superelevation transition zones are clearly marked at specific station ranges, with detailed elevation and slope information provided throughout. The project incorporates multiple benchmark and reference point locations with elevation data documented for construction control purposes. Horizontal and vertical scales on plan and profile sheets are set at 1"=40' and 1"=4' respectively. The document references a Phase III 90% design dated January 9, 2026, prepared in coordination with MetaWorld Civil Consulting's office in Port Orange, Florida. No specific pricing, contract award dates, or bidding information is contained within this technical design exhibit.

View the file

Other files

File Type Posted
Veterans_Memorial_Parkway_Extension_-_Clearing_&_Grubbing_for_Advance_Utility_Removal_Relocations.pdf PDF
Exhibit_FF-_Conflict_Matrix.xlsx XLSX spreadsheet
Exhibit_EE-_UWS_-_Zayo.pdf PDF
Exhibit_CC-_No_Conflict_Letter_-_Uniti_Fiber.pdf PDF
Exhibit_BB-_No_Conflict_Letter_-_Lumen.pdf PDF
Exhibit_AA-_UWS_-_Florida_Public_Utilities.pdf PDF
Exhibit_Z-_UWS_-_Duke_Energy.pdf PDF
Exhibit_Y-_RGBs_-_Duke_Energy.pdf PDF
Exhibit_X-_UWS_-_City_of_Orange_City.pdf PDF
Exhibit_W-_RGBs_-_City_of_Orange_City.pdf PDF
Exhibit_V-_No_Facilities_-_City_of_DeLand.pdf PDF
Exhibit_U-_UWS_-_Spectrum.pdf PDF
Exhibit_T-_RGBs_-_Spectrum.pdf PDF
Exhibit_S-_UWS_-_Century_Link.pdf PDF
Exhibit_R-_RGBs_-_Century_Link.pdf PDF
Exhibit_Q-_UWS_-_ATT-Transmission.pdf PDF
RGBs_-_ATT-Transimission.pdf PDF
Exhibit_O-_Clear_-_No_Facilities-ATT-D.docx DOCX document
Exhibit_N-26-B-109JD,_Payment_and_Performance_Bond.pdf PDF
Exhibit_M-SJRWMD_Permit_Approval.pdf PDF
Exhibit_L-_Sales_Tax_Exemption_Procedures.pdf PDF
Exhibit_K-_BASE-UTILITY01.dwg DWG drawing
Exhibit_J-SURVRD01_VMP.dwg DWG drawing
Exhibit_I-_Project_Survey.pdf PDF
Exhibit_H-_Utility_Adjustment_Sheets.pdf PDF
Exhibit_G-_Pricing_Sheet,_26-B-109JD.xlsx XLSX spreadsheet
Exhibit_F-Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Exhibit_E-Roadway_Technical_Specifications.pdf PDF
Exhibit_D-_CLEARING_&_GRUBBING_PLANS.pdf PDF
Exhibit_C-Draft_Contract,_26-B-109JD,_C2086.pdf PDF
Exhibit_B-PRIME-SUB_FORM_26-B-109JD.xls XLS spreadsheet
Exhibit_A-_26-B-109JD_Veterans_Memorial_Extension-Clearing_and_Grubbing-Required_Insurance_Limits.pdf PDF
SURVRD01_VMP.dwg DWG drawing
6-Project_Survey.pdf PDF
VMP_-_CLEARING_&_GRUBBING_PLANS.pdf PDF
VMP_-_Ut._Adj._Sheets.pdf PDF
Signed_&_Sealed_VC_Tech_Specs_08.11.25_-_Exhibit_B.pdf PDF
Roadway_Drainage_-_SS_MOT_Plans.pdf PDF
Revised_Estimate_-_C&G.pdf PDF
VMP_-SJRWMD_Permit_Approval.pdf PDF
BASE-UTILITY01.dwg DWG drawing
Conflict_Matrix.xlsx XLSX spreadsheet
Project_Description_-_Scope_of_Work_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations_5-28-26.docx DOCX document
Construction_Bid_Request_-_Clearing_&_Grubbing_for_Advance_Utility_Removal-Relocations(5.28.26).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pricing_Sheet_-_C&G.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Juan.Lorenzo Typewritten Text Zayo Group LLC RGB 90% Phase III dated 01/09/2026

Juan.Lorenzo Text Box

ZAYO FACILITIES BASED ON FACILITY RECORDS ONLY

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

SIGNATURE SHEET

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

SUMMARY OF QUANTITIES

KE

N

TU

C

KY

A

VE

I-4

SR-472

E. GRAVES AVE.

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

OVERALL DRAINAGE MAP

BEGIN PROJECT

STA. 159+43.77 BL VMP

END PROJECT

STA. 26+20.23 BL MLK

MIDDLE ST. JOHNS RIVER BASIN

PLANNING UNIT 4D: LAKE MONROE UNIT

SUB BASIN 7: CHAIN OF LAKES

FDEP WBID #: 2938

NON-CONTRIBUTING BASIN

LAKE GEORGE BASIN

PLANNING UNIT 5A: LAKE WOODRUFF UNIT

SUB BASIN 1: NON-CONTRIBUTING AREA

FDEP WBID #: 2941

NON-CONTRIBUTING BASIN

EX. R/W

(TYP.)

D R

. M

LK

J R

. B

LT

W Y.

PR. R/W

(TYP.)

POND #3

POND #2

POND #1

KENTUCKY END STATION

STA. 29+05.13 BL KENTUCKY

KENTUCKY BEGIN STATION

STA. 16+35.04 BL KENTUCKY

STA. 212+03.11 BL VMP=

STA. 10+00.00 BL MLK

REGIONAL DRAINAGE BASIN LINE

(TYP.)

OFF-SITE SUB-BASIN LINE

(TYP.)

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00 163+39.80165+09.73 175+51.64 186+85.74 197+37.84 212+03.11

1+

.0

2+

.0

3+

.0

4+

.0

5+

.0

6+

.0

7+

.0

8+

.0

9+

.0

0+

.0

1+

.0

2+

.0

3+

.0

4+

.0

5+

.0

6+

.0

7+

.0

8+

.0

9+

.0

0+

.0

1+

.0

2+

.0

3+

.0

4+

.0

5+

.0

6+

.0

7+

.0

8+

.0

9+

.0

0+

.0

1+

.0

2+

.0

3+

.0

4+

.0

5+

.0

6+

.0

7+

.0

8+

.0

9+

.0

0+

.0

1+

.0

2+

.0

3+

.0

4+

.0

5+

.0

6+

.0

7+

.0

8+

.0

9+

.0

0+

.0

1+

.0

2+

.0

3+

.0

4+

.0

5+

.0

5+

0+

5+

3+

0+

5+

0+

5+

0+

5+

0+

+0

+0

+0

+0

+0

+0

+0

+0

10.00

20.00

30.00

40.00

50.00

60.00

70.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00 17+95.04 24+13.61 29+05.13

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

+0

0.

SR

N. KENTUCKY AVE.

PGL (TYP.)

PR. 140' R/W

(TYP.)

EX. R/W (TYP.)

PR. PROFILE ALONG

KENTUCKY AVE.

RE-ALIGNMENT

EX. GROUND AT BL CONST.

(TYP.)

EX. PROFILE ALONG ALIGNMENT (TYP.)

E.

G

RA

VE

S

AV

E.

BL VMP

BL KENTUCKY

PR. POND #2

PR. POND #3

VET. MEM. PKWY.

PR. POND #1 DR. MLK JR. BLTWY.

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

PROJECT DRAINAGE MAP

ROADWAY BASIN #1A

BEGIN PROJECT

STA. 159+43.77 BL VMP

BEGIN KENTUCKY

STA. 16+35.04

BL KENTUCKY

END KENTUCKY

STA. 29+05.13

BL KENTUCKY

END PROJECT

STA. 26+20.23

BL MLK

BL MLK

STA. 212+03.11 BL VMP=

STA. 10+00.00 BL MLK

ROADWAY BASIN #2

ROADWAY BASIN #1B

REGIONAL DRAINAGE BASIN LINE

(TYP.)

OFF-SITE SUB-BASIN LINE

(TYP.)

ROADWAY SUB-BASIN LINE

(TYP.)

CD-1

PR. ROADW

AY BASIN #1A

PR. R

OADWAY BASIN #1B

EX. ROADWAY BASIN #3

PR. ROADWAY BASIN #2

EX. ROADWAY BASIN #3

CD-2

CD-3

CD-4

CD-N

CD-5

CD-5CD-3CD-2

CD-1

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

"X

PIPE

" P

IPE

" P

IPE

" P

IPE 18

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE 24

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

" P

IPE

CD-4

" P

IPE

" P

IPE

" P

IPE

" P

IPE

TYPE "E"

C&G

(2.25')

(4')

FULL DEPTH CONSTRUCTION

TYPE FC 12.5 FRICTION COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

OPTIONAL BASE GROUP 9 (10" DEPTH - LBR 100 LIMEROCK OR EQUIV.)

STABILIZATION (TYPE B)(12" DEPTH)NOTES:

1. THIS TYPICAL SECTION REPRESENTS THE MOST TYPICAL DESIGN FOR THE

STRETCH INDICATED. VARIATIONS EXISTS REGULARLY. SEE DESIGN PLANS AND

ASSOCIATED CROSS-SECTIONS FOR LOCATION SPECIFIC DESIGN DETAILS.

2. THE STATION RANGES FOR THIS TYPICAL SECTION EXPERIENCE

SUPERELEVATION/TRANSITION. SEE DETAILS ON NEXT SHEET.

3. ANY TURN LANE CONSTRUCTION SHALL FOLLOW THE PAVEMENT DESIGN

PRESENTED FOR FULL DEPTH CONSTRUCTION AND SHALL ALWAYS BE

CONSTRUCTED SUCH THAT RUNOFF FLOWS TOWARDS THE OUTSIDE CURB AND

GUTTER.

4. SLOPES STEEPER THAN 3:1 ARE NOT ALLOWED WITHIN THE CLEAR ZONE.

5. PGL_LT TAPERS FROM 11' TO 18' FROM BL CONST. BETWEEN STA. 204+62.84 AND

STA. 207+77.84 AND REMAINS AT 18' FOR REMAINDER OF THE BL VMP ALIGNMENT.

6. ROADSIDE CONSTRUCTION WILL VARY SIGNIFICANTLY BASED ON EXISTING

CONDITIONS. THE DITCH BOTTOM PROFILES SHOWN ABOVE MAY SERVE THE

ROADWAY OR OFF-SITE DRAINAGE PURPOSES OR THE ROADSIDE MAY RESEMBLE

THE ALTERNATE ROADSIDE DETAIL (THIS SHEET). REFER TO PROJECT PLAN &

PROFILE AND CROSS-SECTION SHEETS FOR LOCATION SPECIFIC INFORMATION.

PR. R/W

(140')

SODDED MEDIAN

(17.5')

FC & SP ASPHALT LAYERS

(TYP.)

OBG LAYER

(TYP.)

STABILIZATION LAYER

(TYP.)

.02

TRAVEL LANE

(11')

SOD TO TIE-IN

(WIDTH VARIES)

(8')(10')

4:14:1

PVD.

SHLDR.

(5')

.02

TYPE "E"

C&G

(2.25')

(4')

SOD TO TIE-IN

(WIDTH VARIES)

(8') (7.6')

4:1 3:1

VM

P

TYPICAL SECTION "A"

VETERANS MEMORIAL PKWY. CONSTRUCTION

STA. 163+58.86 TO STA. 211+51.74 BL VMP

N.T.S.

DESIGN SPEED = 45 MPH

POSTED SPEED = 45 MPH

TRAVEL LANE

(11')

PVD.

SHLDR.

(5')

.02 .02

(2') (2')

.02

(0.7')

SIDEWALK

(5')

SOD

(21.6')

.06 .06

PG

L_

LT

PG

L_

R T(11')(11')

STABILIZATION SHOULDER CONSTRUCTION

STABILIZATION (TYPE B)(14" DEPTH)

CLEAR ZONE

(24')

CLEAR ZONE

(24')

STAB. SHLDR.

(3')

STAB. SHLDR.

(3')

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R TYPICAL SECTIONS

*SEE NOTES

VARIES(2:1 MAX.) VARIES

(3:1 MAX.)

4:1

R /W

R /W

R /W

DBP-RD-RT/

DBP-OS-RT

DBP-RD-LT/

DBP-OS-LT

DBP-OS-LT DBP-RD-LT* *

ALT. ROADSIDE DETAIL

(LT. SIDE SHOWN - RT. SIDE SIMILAR)

* DEPTH/WIDTH VARY REGULARLY

(SEE CROSS-SECTION SHEETS)

4:1

3'

TYPE "E"

C&G

(2.25')

(4')

PR. R/W

(140')

SODDED MEDIAN

(17.5')

.02

TRAVEL LANE

(11')

SOD TO TIE-IN

(WIDTH VARIES)

(8')(10')

4:14:1

PVD.

SHLDR.

(5')

.02

TYPE "E"

C&G

(2.25') (4')

SOD TO TIE-IN

(WIDTH VARIES)

(8') (8.9')

4:1 3:1

TYPICAL SECTION "A" SUPERELEVATION DETAILS

VETERANS MEMORIAL PKWY. CONSTRUCTION

STA. 164+09.73 TO STA. 177+11.64 BL VMP

N.T.S.

TRAVEL LANE

(11')

PVD.

SHLDR.

(5')

(2') (2')

.02

(0.7')

SIDEWALK

(5')

SOD

(22.9')

.06

.05.02 .02

PG

L_

LT

PG

L_

R T(11')(11')

TYPICAL SECTION "A" SUPERELEVATION DETAILS

VETERANS MEMORIAL PKWY. CONSTRUCTION

STA. 185+25.74 TO STA. 198+97.84 BL VMP

N.T.S.

TYPE "E"

C&G

(2.25') (4')

PR. R/W

(140')

SODDED MEDIAN

(17.5')

.02

TRAVEL LANE

(11')

SOD TO TIE-IN

(WIDTH VARIES)

(8')(10')

PVD.

SHLDR.

(5')

.02

TYPE "E"

C&G

(2.25') (4')

SOD TO TIE-IN

(WIDTH VARIES)

(8') (7.6')

3:1

TRAVEL LANE

(11')

PVD.

SHLDR.

(5')

(2') (2')

.02

(0.7')

SIDEWALK

(5')

SOD

(21.6')

.06

.05 .02 .02

PG

L_

LT

PG

L_

R T(11')(11')

4:1 4:1

STAB. SHLDR.

(3')

STAB. SHLDR.

(3')

CLEAR ZONE

(24')

CLEAR ZONE

(24')

STAB. SHLDR.

(3')

STAB. SHLDR.

(3')

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R TYPICAL SECTIONS

CLEAR ZONE

(24')

CLEAR ZONE

(24')

DBP-RD-RT

DBP-RD-LT

DBP-OS-LT

FULL DEPTH CONSTRUCTION

TYPE FC 12.5 FRICTION COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

OPTIONAL BASE GROUP 9 (10" DEPTH - LBR 100 LIMEROCK OR EQUIV.)

STABILIZATION (TYPE B)(12" DEPTH)

STABILIZATION SHOULDER CONSTRUCTION

STABILIZATION (TYPE B)(14" DEPTH)

DBP-RD-RT

FULL DEPTH CONSTRUCTION

TYPE FC 12.5 FRICTION COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

OPTIONAL BASE GROUP 9 (10" DEPTH - LBR 100 LIMEROCK OR EQUIV.)

STABILIZATION (TYPE B)(12" DEPTH)

STABILIZATION SHOULDER CONSTRUCTION

STABILIZATION (TYPE B)(14" DEPTH)

FC & SP ASPHALT LAYERS

(TYP.)

OBG LAYER

(TYP.)

STABILIZATION LAYER

(TYP.)

FC & SP ASPHALT LAYERS

(TYP.)

OBG LAYER

(TYP.)

STABILIZATION LAYER

(TYP.)

FULL DEPTH CONSTRUCTION

TYPE FC 12.5 FRICTION COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

OPTIONAL BASE GROUP 9 (10" DEPTH - LBR 100 LIMEROCK OR EQUIV.)

STABILIZATION (TYPE B)(12" DEPTH)NOTES:

1. THIS TYPICAL SECTION REPRESENTS THE MOST TYPICAL DESIGN FOR THE

STRETCH INDICATED. VARIATIONS EXISTS REGULARLY. SEE DESIGN PLANS AND

ASSOCIATED CROSS-SECTIONS FOR LOCATION SPECIFIC DESIGN DETAILS.

2. THE STATION RANGES FOR THIS TYPICAL SECTION EXPERIENCE

SUPERELEVATION/TRANSITION. SEE DETAIL THIS SHEET.

3. ANY TURN LANE CONSTRUCTION SHALL FOLLOW THE PAVEMENT DESIGN

PRESENTED FOR FULL DEPTH CONSTRUCTION AND SHALL ALWAYS BE

CONSTRUCTED SUCH THAT RUNOFF FLOWS TOWARDS THE OUTSIDE CURB AND

GUTTER.

4. SLOPES STEEPER THAN 3:1 ARE NOT ALLOWED WITHIN THE CLEAR ZONE.

5. SIDEWALK SHOWN IS NOT TO BE CONSTRUCTED AS A PART OF THESE PLANS AND

IS SHOWN FOR INFORMATIONAL PURPOSES. WORK ENDS AT TIE-DOWN FROM

ROADWAY CONSTRUCTION.

TYPICAL SECTION "B"

DR. MARTIN LUTHER KING JR. BELTWAY CONSTRUCTION

STA. 10+61.11 TO STA. 26+20.23 BL MLK

N.T.S.

MILLING & RESURFACING

MILL SURFACE COURSE (11

2" DEPTH)

TYPE FC 12.5 FRICTION COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

STABILIZATION SHOULDER CONSTRUCTION

STABILIZATION (TYPE B)(12" DEPTH)

TYPE "E"

C&G

(2.25')

PR. R/W

(140')

SODDED MEDIAN

(VARIES - SEE NOTES)

.02

TRAVEL LANE

(11')

SOD TO TIE-IN

(WIDTH VARIES)

4:1

PVD.

SHLDR.

(5')

.02

TYPE "E"

C&G

(2.25')

M

LK

.02 .02.06 .06

PG

L_

LT

PG

L_

R T

VARIES

(0' TO 18')

CLEAR ZONE

(24')

STAB. SHLDR.

(3')

VARIES

(0' TO 11')

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R TYPICAL SECTIONS

TRAVEL LANE

(11')

SOD

(WIDTH VARIES)

PVD.

SHLDR.

(5')

CLEAR ZONE

(24')

STAB. SHLDR.

(3')

M & R

(WIDTH VARIES)

SOD TO TIE-IN

(WIDTH VARIES)

4:1

(2') (2')

.02

SIDEWALK

(5')

SOD

2:1 (M

AX

EX. SWALE TO REMAIN

(WIDTH VARIES)

FC & SP ASPHALT LAYERS

(TYP.)

OBG LAYER

(TYP.)

STABILIZATION LAYER

(TYP.)

FULL DEPTH CONST.

(WIDTH VARIES)FULL DEPTH CONST.

(16')

SAW CUT EX. PVMT.

(4')

FULL DEPTH CONSTRUCTION

TYPE FC 12.5 FRICTION COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

OPTIONAL BASE GROUP 9 (10" DEPTH - LBR 100 LIMEROCK OR EQUIV.)

STABILIZATION (TYPE B)(12" DEPTH)NOTES:

1. THIS TYPICAL SECTION REPRESENTS THE MOST TYPICAL DESIGN FOR THE

STRETCH INDICATED. VARIATIONS EXISTS REGULARLY. SEE DESIGN PLANS AND

ASSOCIATED CROSS-SECTIONS FOR LOCATION SPECIFIC DESIGN DETAILS.

2. THE STATION RANGES FOR THIS TYPICAL SECTION EXPERIENCE

SUPERELEVATION/TRANSITION. SEE DETAIL THIS SHEET.

3. ANY TURN LANE CONSTRUCTION SHALL FOLLOW THE PAVEMENT DESIGN

PRESENTED FOR FULL DEPTH CONSTRUCTION AND SHALL ALWAYS BE

CONSTRUCTED SUCH THAT RUNOFF FLOWS TOWARDS THE OUTSIDE CURB AND

GUTTER.

4. SLOPES STEEPER THAN 3:1 ARE NOT ALLOWED WITHIN THE CLEAR ZONE.

PR. R/W

(140')

FC & SP ASPHALT LAYERS

(TYP.)

OBG LAYER

(TYP.)

STABILIZATION LAYER

(TYP.)

.02

FULL DEPTH

TRAVEL LANE

(11')

STAB. SHLDR.

(3')

SOD TO TIE-IN

(WIDTH VARIES)

(8')

4:1

PVD.

SHLDR.

(5')

TYPICAL SECTION "C"

KENTUCKY AVE. CONSTRUCTION

STA. 16+35.04 TO STA. 28+72.13 BL KENTUCKY

N.T.S.

DESIGN SPEED = 45 MPH

POSTED SPEED = 45 MPH

(0.7')

.06

PAVED SHOULDER CONSTRUCTION

TYPE FC 12.5 FRICTION COURSE (TRAFFIC C)(PG 76-22)(11

2" DEPTH)

OPTIONAL BASE GROUP 4 (6" DEPTH - LBR 100 LIMEROCK OR EQUIV.)

STABILIZATION SHOULDER CONSTRUCTION

STABILIZATION (TYPE B)(12" DEPTH)

4:1

.02 .06

4:14:1

(8') (4')

STAB. SHLDR.

(3')

SOD TO TIE-IN

(WIDTH VARIES)

(8')

PVD.

SHLDR.

(5')

(0.7') (8')

CLEAR ZONE

(24')

CLEAR ZONE

(24')

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R TYPICAL SECTIONS

TU

C

KY

DBP-RD-RTDBP-RD-LT

PG

L

FULL DEPTH

TRAVEL LANE

(11')

49+00

50+00

PI: 5

0+

.00

3+

4+

5+

166+00

167+00 168+00

169+00 170+00

171+00 172+00 173+00 174+00 175+00 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 184+00

PC: 165+09.73

PT

: 1

+5

1.

3+

3+

+0

+0

+0

+0

180+00 181+00

182+00 183+00

184+00 185+00

186+00 187+00 188+00 189+00 190+00 191+00 192+00 193+00

194+00 195+00

196+00 197+00

198+00 199+00

200+00

PC

: 1

+8

5.

PT: 197+37.84

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

BENCHMARKS

AND

REFERENCE POINTS

10+00 11+00

193+00 194+00

195+00 196+00 197+00 198+00 199+00 200+00 201+00 202+00 203+00 204+00 205+00 206+00 207+00 208+00 209+00 210+00 211+00

PT

: 1

+3

7.

11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00

PC

: 1

7+

.5

PT

: 2

3+

.3

PC

: 2

8+

.7

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

BENCHMARKS

AND

REFERENCE POINTS

10+00 11+00

12+00 13+00

14+00 15+00

16+00 17+00

18+00 19+00

20+00 21+00 22+00 23+00 24+00 25+00

26+00 27+00

28+00 29+00

+0

+0

PI: 67+22.38

2+

3+

4+

5+

6+

7+

8+

189+00 190+00

PC: 186+85.74

PC

: 1

7+

.0

PT

: 2

4+

.6

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

BENCHMARKS

AND

REFERENCE POINTS

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

BENCHMARKS

AND

REFERENCE POINTS

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737 124

NOTES

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

.3

.9

.7

.4

0.36%

0.30%

PV

I S

TA

+6 0.

EL

EV

5.

SS-07

63.81'

PV

I S

TA

+6 0.

EL

EV

6.

PVI STA = 165+84.74

163+40 164+00 165+00

PC

: 1

+0

9.

159+43 160+00 161+00 162+00 163+00 163+40

163+39.80

164+00.00 165+00.00 165+09.73

PV

I S

TA

+6 1.

EL

EV

9.

43 PV

I S

TA

+6 4.

EL

EV

7.

PV

I S

TA

+7 4.

EL

EV

5.

PV

I S

TA

+0 1.

EL

EV

5.

159+43.00

160+00.00 161+00.00 162+00.00 163+00.00 163+39.60

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

4'

HORIZ. SCALE: 1"=40'

VETERANS MEM. PKWY.

E.

G

RA

VE

S

AV

Polyline Sketch to Scale 211'-7 3/4"

Juan.Lorenzo Callout ZAYO (3) 1-1/4" HDPE DUCTS (1) with 288 CT FOC to Remain.

Juan.Lorenzo Callout ZAYO 24"x36"x30" Hand-hole. Depth 4.0' to be removed.

Juan.Lorenzo Rectangle

Juan.Lorenzo Text Box

HH

Juan.Lorenzo Text Box

HH

Juan.Lorenzo Polyline Sketch to Scale 21'-4 1/4"

Juan.Lorenzo Callout Zayo contractor to trench 25', Place ZAYO (3) 1.25" HDPE DUCTS E/W (1) 144CT FOC to connect to proposed HH location to be outside of proposed road and sidewalk.

Juan.Lorenzo Callout Install ZAYO 24”x36”x30” Hand-hole due to proposed road.

Juan.Lorenzo Ellipse

Juan.Lorenzo

6.6ft

.5

.6

.6

.5

.0

.9

.1

.2

.1

.1

.5

.5

0.30%

3.50%

300.65VC

3.50%

300.66VC

BT @ 6.0'

3/14/2023

GNE

A-08 63'

BT @ 6.0'

8/31/2024

GNE

AA-21

64.54'

8/31/2024

AA-20

53.25'

PVI STA = 165+84.74

ELEV = 65.64

PV

C

S

TA

0+

.2

EL

EV

5.

PV

T

ST

A

=1

+8 9.

EL

EV

9.

PVC STA =165+88.48

ELEV = 65.63

P V

C S

TA

5+

.4

E

LE

V

5.

P V

T S

TA

8+

.1

E

LE

V

9.

P V

C S

TA

0+

.0

E

LE

V

5.

165+00

166+00 167+00 168+00

169+00

170+00

171+00

PC

: 1

+0

9.

165+09.73

166+00.00 167+00.00 168+00.00 169+00.00 170+00.00 171+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

VE

R

T.

S

C

AL

E:

4'

Juan.Lorenzo

NO ZAYO FACILITIES THIS SHEET

.9

.9

.8

.3

.8

.1

.5

.5

.4

.3

.8

.4

.9

.4

0.47%

0.69%

311.34VC

311.33VC

BT @ 6.0'

AA-20

53.25'

BT @ 6.0'

8/31/2024

GNE

AA-19

49.90'

-200 = 5 w = 6

3/15/2023

N

P-06 54'

N

SS-06

48.28'

9/6/2024

-200 = 18 w = 21

PV

T

ST

A

=1

+1 5.

EL

EV

9.

PV

I S

TA

+1 1.

EL

EV

8.

PV

I S

TA

+1 1.

EL

EV

7.

P V

T S

TA

3+

.3

E

LE

V

9.

171+00

172+00

173+00 174+00 175+00

176+00 177+00

PT

: 1

+5

1.

171+00.00 172+00.00 173+00.00 174+00.00 175+00.00 175+51.64

176+00.00 177+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

4'

.6

.1

.9

AA-16

47.28'

BT @ 6.0'

8/31/2024

GNE

PV

C

S

TA

2+

.9

EL

EV

5.

M

ATCH LIN

E

177+00 178+00 179+00 180+00 181+00 182+00 183+00

181+00.00 182+00.00 183+00.00

.5

.0

.5

.0

.4

0.47% 0.47%

BT @ 6.0'

8/31/2024

GNE

AA-18

48.23'

-200 = 3 w = 3

AA-17

42.02'

BT @ 6.0'

8/31/2024

GNE

PV

I S

TA

+1 1.

EL

EV

7.

M

AT

CH

L

IN

E

177+00.00 178+00.00 179+00.00 180+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

T.

S

C

AL

E:

4'

Juan.Lorenzo

.4

.7

.5

.4

1.69%304.38VC

1.69%

PV

I S

TA

+2 5.

EL

EV

7.

304.38VC

PV

T

ST

A

=1

+1 3.

EL

EV

6.

M

AT

CH

L

IN

E

+0

+0 0183+00 184+00 185+00 186+00 187+00

188+00

189+00

PC

: 1

+8

5.

184+00.00 185+00.00 186+00.00

.4

.2

.8

.1

.7

.4

1.69%

1.69%

1.91%

1.69%

PV

I S

TA

+2 5.

EL

EV

0.

N

SS-04

51.62'

N

P-05 54'

P V

C S

TA

8+

.5

E

LE

V

3.

PV

C

S

TA

8+

.5

EL

EV

2.

M

ATCH LIN

E

186+85.74

187+00.00 188+00.00 189+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

N

TU

CK

Y

AV

R

T.

S

C

AL

E:

.8

.7

.7

.9

.9

.0

.4

.2

.2

.4

.5

.6

0.93%

301.71VC

0.93%

301.71VC

-200 = 5 w = 5

AA-10

55.56'

BT @ 6.0'

8/31/2024

GNE

AA-09

52.60'

BT @ 6.0'

8/31/2024

GNE

P V

C S

TA

8+

.5

E

LE

V

3.

P V

T S

TA

1+

.2

E

LE

V

4.

P V

C S

TA

3+

.3

E

LE

V

2.

PV

C

S

TA

8+

.5

EL

EV

2.

PV

T

ST

A

=1

+5 7.

EL

EV

3.

PV

C

S

TA

3+

.3

EL

EV

1.

S

TA

4+

.3

E

LE

V

1.

189+00

190+00 191+00 192+00

193+00

194+00

189+00.00 190+00.00 191+00.00 192+00.00 193+00.00 194+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

.0

.8

.5

.2

.1

.0

.6

.3

.1

.8

.9

2.10%

302.96VC

2.10%

1.88%

2.10%

PV

I S

TA

+9 7.

EL

EV

4.

PV

I S

TA

+9 7.

EL

EV

8.

302.97VC

AA-09

52.60'

BT @ 6.0'

8/31/2024

GNE

AA-08

48.89'

-200 = 3 w = 3

9/3/2024

GNE

P V

C S

TA

3+

.3

E

LE

V

2.

22 P

V T

S

TA

6+

.3

E

LE

V

3.

PV

C

S

TA

3+

.3

EL

EV

1.

78 PV

T

ST

A =1

+8

5.

EL

EV

3.

PV

C

S

TA

9+

.5

EL

EV

8.

S

TA

4+

.3

E

LE

V

1.

S

TA

5+

.3

E

LE

V

1.

193+00

194+00

195+00

196+00 197+00 198+00 199+00

PT

: 1

+3

7.

193+00.00 194+00.00 195+00.00 196+00.00 197+00.00 197+37.84

198+00.00 199+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

.8

.9

.2

.7

.3

585.64VC

2.10%

585.64VC

AA-07

56.02'

BT @ 6.0'

9/3/2024

GNE

N

9/5/2024

BT @ 15.0'

SS-03

64.45'

BT @ 6.0'

9/3/2024

GNE

AA-06

55.60'

-200 = 6 w = 6

PV

T

ST

A

=2

+0 0.

EL

EV

6.

PV

C

S

TA

9+

.5

EL

EV

8.

199+00 200+00 201+00 202+00 203+00 204+00 205+00

199+00.00 200+00.00 201+00.00 202+00.00 203+00.00 204+00.00 205+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

Juan.Lorenzo

6 48 .3

.9

.7

1.43%

1.90%

314.04VC

1.43%

1.90%

PV

I S

TA

+7 2.

EL

EV

9.

BT @ 6.0'

9/3/2024

GNE

AA-04

47.06'

-200 = 2 w = 2

N

P-02 41'

AA-03

47.83'

BT @ 6.0'

9/3/2024

GNE

N

SP2-01

43.54'

PV

I S

TA

+7 2.

EL

EV

9.

PV

T

ST

A

=2

+1 9.

EL

EV

8.

61 PV

I S

TA

1+

.8

EL

EV

0.

S

TA

8+

.3

E

LE

V

7.

S

TA

9+

.5

E

LE

V

7.

M

ATCH LIN

E

205+00 206+00 207+00 208+00 209+00 210+00 211+00

209+00.00 210+00.00 211+00.00

.6

.8

.6

2.77%

AA-05

52.89'

BT @ 6.0'

9/3/2024

GNE

P V

C S

TA

7+

.2

E

LE

V

0.

M

AT

CH

L

IN

E

205+00.00 206+00.00 207+00.00 208+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

SR

R

T.

S

C

AL

E:

4'

Juan.Lorenzo

6 48 .3

.9

.7

1.28%

1.43%

1.90%

1.43%

1.90%

PV

I S

TA

+7 2.

EL

EV

9.

PV

I S

TA

+4 1.

EL

EV

0.

P-02 41'

AA-03

47.83'

BT @ 6.0'

9/3/2024

GNE

N

SP2-01

43.54'

PV

I S

TA

+6 2.

EL

EV

0.

PV

I S

TA

+7 2.

EL

EV

9.

PV

T

ST

A

=2

+1 9.

EL

EV

8.

61 PV

I S

TA

1+

.8

EL

EV

0.

S

TA

9+

.5

E

LE

V

7.

10+00 11+00 12+00 13+00209+00 210+00 211+00

209+00.00 210+00.00 211+00.00 212+00.00 212+03.11

11+00.00 12+00.00 13+00.00

0.36% 0.68%

PV

I S

TA

0+

.1

EL

EV

1.

PV

I S

TA

2+

.5

EL

EV

1.

.7

.8 2 52

.3

.3

0.34% 0.56%

PV

I S

TA

0+

.0

EL

EV

1.

N

SS-02

49.65'

PV

T

ST

A

=1 1+

.0

EL

EV

1.

PV

I S

TA

+1

7.

EL

EV

2.

P V

C S

TA

+9

2.

E

LE

V

2.

PV

C

S

TA

+0 5.

EL

EV

2.

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

DR. MLK JR. BLTWY

0.36% 0.68%

PV

I S

TA

2+

.5

EL

EV

1.

535.95VC

.7

.8 2 52

.3

.3

.7

.6

.3

.4

.3

.4

.7

.8

0.34% 0.56%

533.47VC

N

-200 = 16 w = 19

SS-02

49.65'

BT @ 6.0'

9/3/2024

GNE

AA-02

51.71'

PV

T

ST

A

=1 1+

.0

EL

EV

1.

PV

I S

TA

+1

7.

EL

EV

2.

P V

C S

TA

+9

2.

E

LE

V

2.

PV

C

S

TA

+0 5.

EL

EV

2.

11+00 12+00 13+00 14+00 15+00 16+00 17+00

PC

: 1

7+

.5

11+00.00 12+00.00 13+00.00 14+00.00 15+00.00 16+00.00 17+00.00 17+00.58

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

DR. MLK JR. BLTWY.

17+00 18+00 19+00 20+00 21+00

22+00 23+00

PC

: 1

7+

.5

17+00.00 18+00.00 19+00.00 20+00.00 21+00.00

2.75%

400.89VC2.77%

436.29VC

BT @ 6.0'

9/3/2024

GNE

AA-01

47.86'

P V

C S

TA

+0

0.

E

LE

V

4.

PV

C

S

TA

+8 5.

EL

EV

5.

P V

T S

TA

+2

8.

E

LE

V

6.

PV

T

ST

A

=1 8+

.2

EL

EV

6.

M

AT

CH

L

IN

E

0.04%

PV

I S

TA

3+

.2

EL

EV

9.

N

SP3-01

27.84'

P V

T S

TA

+0

1.

E

LE

V

9.

PV

T

ST

A

=2 3+

.7

EL

EV

9.

06M

ATCH LIN

E

22+00.00 23+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

T.

S C

AL

E:

4'

VE

R

T.

S

C

AL

E:

0.04%

PV

I S

TA

3+

.2

EL

EV

9.

.1

.0

.0

0.05%

PV

I S

TA

4+

.5

EL

EV

9.

N

SP3-02

27.75'

P V

T S

TA

+0

1.

E

LE

V

9.

PV

T

ST

A

=2 3+

.7

EL

EV

9.

23+00 24+00

25+00 26+00

27+00 28+00

29+00

PT

: 2 3+

.3

3 PC

: 2

8+

.7

23+00.00 23+69.33

24+00.00 25+00.00 26+00.00 27+00.00 28+00.00 28+48.71

29+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

0.67%

I S

TA

3+

.2

EL

EV

6.

300.179VC

AA-11

43.00'

.6

6 48 .1

.8

.7

5 PV

T

ST

A

=1 9+

.8

PV

C

S

TA

+2 9.

EL

EV

7.

13+00 14+00 15+00 16+00 17+00 18+00 19+00

PC

: 1

7+

.0

13+00.00 14+00.00 15+00.00 16+00.00 17+00.00

+9

5.

0418+00.00 19+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

KENTUCKY AVE.

AA-12

32.93'

580.10VC

SS-05

39.67'

AA-13

32.07'

SP1-02

40.56'

.0

.4

.3

.8

.8

PV

C

S

TA

+3 2.

EL

EV

4.

18+00

19+00

20+00

21+00 22+00 23+00

24+00

PC

: 1

7+

.0

PT

: 2

4+

.6

18+00.00 19+00.00

-1.72%

BT @ 6.0'

9/3/2024

GNE

AA-11

43.00'

.8

.7

5 PV

T

ST

A

=1 9+

.8

EL

EV

6.

20+00.00 21+00.00 22+00.00 23+00.00 24+00.00

+1

3.

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

T.

S

C

AL

E:

1.42%

I S

TA

8+

.1

EL

EV

7.

AA-13

32.07'

SP1-02

40.56'

AA-14

40.57'

BT @ 6.0'

8/31/2024

GNE

AA-15

42.15'

BT @ 6.0'

8/31/2024

GNE

.8

3 42 .3

.4

.8

.3

PV

T

ST

A

=2 6+

.1

EL

EV

3.

24+00 25+00 26+00 27+00 28+00 29+00

5+

6+

PT

: 2

4+

.6

24+00.00

+1

3.

61 25+00.00 26+00.00 27+00.00 28+00.00 29+00.00

+0

5.

13 30+00.00

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

PLAN AND PROFILE

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R

N

VE

R T.

S C

AL

E:

4'

HORIZ. SCALE: 1"=40'

VE

TE

RA

N

S M

EM

. P

KW

Y.

60.00

70.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=6

6.

O /S

=1 1.

PG

L

EL

=6

5.

0.020 0.012

3:14:1

3:1

4:1

3:1 0.060

0.060 0.0204:1 4:1

VO

L.

CO

. B

FO

C

15.0'

D

BP

-O S-

LT

EL

=6 5.

D

BP

-R D

-L T

EL

=6

4.

D

BP

-R D

-R T

EL

=6

3.

60.00

70.00

SS-07

63.81'

9/5/2024

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=6

6.

O /S

=1 1.

PG

L

EL

=6

5.

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

3:1

3:1 0.020 0.020

3:1

VO

L.

CO

. B

FO

CD

BP

-R

D -L

T

EL

=6 5.

0.060 0.020 15.0'

60.00

70.00

80.00

BF

O

(B

BF

O

(B

BF

O

C (B

BF

O C

(B

BF

O

C (B

BF

O C

(B

BF

O

C (B

BF

O C

(B

W (B

W

(B

STA. 163+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 164+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 164+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 164+09.73

TRANS. END= STA. 166+09.73

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=6

5.

O /S

=1 1.

PG

L

EL

=6

5.

4:1 3:1

3:1

0.020 0.018

0.060

0.050 0.020

4:1 4:1

VO

L.

CO

. B

FO

C

15.0'

D

BP

-O S-

LT

EL

=6 3.

D

BP

-R D

-R T

EL

=6

2.

60.00

70.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=6

5.

O /S

=1 1.

PG

L

EL

=6

5.

4:1 3:1 4:14:1

3:1

0.020 0.008

0.060

0.060 0.020

VO

L.

CO

. B

FO

C

15.0'

D

BP

-O S-

LT

EL

=6 3.

D

BP

-R D

-R T

EL

=6

2.

60.00

70.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=6

5.

O /S

=1 1.

PG

L

EL

=6

5.

0.020

3:14:1

0.002

3:1

4:1 4:1 0.060

0.060 0.0203:1 4:1

VO

L.

CO

. B

FO

C

15.0'

D

BP

-O S-

LT

EL

=6 4.

D

BP

-R D

-L T

EL

=6

4.

D

BP

-R D

-R T

EL

=6

2.

STA. 165+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 165+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 166+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 164+09.73

TRANS. END= STA. 166+09.73

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 164+09.73

TRANS. END= STA. 166+09.73

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

BT @ 6.0'

A-08 63'

3/14/2023

GNE

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=6

3.

O /S

=1 1.

PG

L

EL

=6

3.

4:1 3:1

3:1

0.020

0.020 0.060

0.050 0.020

4:1

4:1

VO

L.

CO

. B

FO

C

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

4.0'

D

BP

-O S-

LT

EL

=6 1.

D

BP

-R D

-R T

EL

=6

0.

60.00

70.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=6

4.

O /S

=1 1.

PG

L

EL

=6

4.

3:14:1

3:1

0.020

0.020 0.060

0.050 0.020

4:1

3:1

VO

L.

CO

. B

FO

C

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

10.5'

D

BP

-O S-

LT

EL

=6 2.

D

BP

-R D

-R T

EL

=6

1.

60.00

70.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=6

5.

O /S

=1 1.

PG

L

EL

=6

5.

4:1 3:1

3:1

0.020 0.018

0.060

0.050 0.020

4:1 4:1

VO

L.

CO

. B

FO

C

15.0'

D

BP

-O S-

LT

EL

=6 3.

D

BP

-R D

-R T

EL

=6

2.

STA. 166+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 167+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 167+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE SUPERELEVATED

*SB LANES ARE SUPERELEVATED

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

50.00

70.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

9.

O /S

=1 1.

PG

L

EL

=5

9.

4:1 3:1 4:1

0.020

0.020 0.060

0.050 0.020

4:1 4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=5 7.

D

BP

-R D

-R T

EL

=5

6.

50.00

60.00

70.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=6

1.

O /S

=1 1.

PG

L

EL

=6

0.

4:1 3:1 3:1

0.020

0.020 0.060

0.050 0.020

4:1

4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=5 9.

D

BP

-R D

-R T

EL

=5

8.

50.00

60.00

70.00

8/31/2024

GNE

BT @ 6.0'

AA-21

64.54'

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=6

2.

O /S

=1 1.

PG

L

EL

=6

2.

4:1 3:1 0.060

0.020 0.020

3:1

0.050 0.020

4:1

4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=6 0.

D

BP

-R D

-R T

EL

=5

9.

STA. 168+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 168+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 169+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE SUPERELEVATED

*SB LANES ARE SUPERELEVATED

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

4.

O /S

=1 1.

PG

L

EL

=5

3.

4:1 3:1

0.020 0.060

4:10.020 0.050

0.020 4:14:1

4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=5 2.

D

BP

-R D

-R T

EL

=5

1.

45 D

BP

-O S-

R T

EL

=5

3.

50.00

60.00 PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

6.

O /S

=1 1.

PG

L

EL

=5

5.

4:1 3:1

0.020

0.020 0.060

0.050 0.020

4:14:1 4:1 4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=5 4.

D

BP

-R D

-R T

EL

=5

3.

D

BP

-O S-

R T

EL

=5

4.

50.00

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

7.

O /S

=1 1.

PG

L

EL

=5

7.

4:1 3:1

0.020

0.020 0.060 4:1

0.050 0.020

4:14:1 4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=5 5.

D

BP

-R D

-R T

EL

=5

4.

D

BP

-O S-

R T

EL

=5

5.

STA. 169+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 170+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 170+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE SUPERELEVATED

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

0.

O /S

=1 1.

PG

L

EL

=5

0.

4:1 3:1

0.020 0.060

4:10.020 0.050

0.020 4:1

4:1 4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=4 9.

D

BP

-R D

-R T

EL

=4

7.

96 D

BP

-O S-

R T

EL

=4

9.

50.00

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

1.

O /S

=1 1.

PG

L

EL

=5

1.

4:1 3:1

0.020 0.060

4:10.020 0.050

0.020 4:14:1

4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=5 0.

D

BP

-R D

-R T

EL

=4

8.

88 D

BP

-O S-

R T

EL

=5

0.

50.00

60.00

BT @ 6.0'

AA-20

53.25'

8/31/2024

GNE

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

2.

O /S

=1 1.

PG

L

EL

=5

2.

4:1 3:1

0.020

0.0600.020 4:1

0.050 0.020

4:14:1

4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=5 1.

D

BP

-R D

-R T

EL

=5

0.

04 D

BP

-O S-

R T

EL

=5

2.

STA. 171+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 171+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 172+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

V

M

40.00

60.00

BT @ 6.0'

8/31/2024

GNE

-200 = 5 w = 6

AA-19

49.90'

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

9.

O /S

=1 1.

PG

L

EL

=4

9.

4:1 3:1

0.0200.050

0.0600.020 0.020

3:1

4:1 4:1

VO

L.

CO

. B

FO

C

35.0'

D

BP

-O S-

LT

EL

=4 7.

D

BP

-R D

-R T

EL

=4

6.

40.00

50.00

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

9.

O /S

=1 1.

PG

L

EL

=4

9.

4:1 3:1

0.0200.050

0.0600.020

3:1

0.020 4:1

4:1

VO

L.

CO

. B

FO

C

35.0'

D

BP

-O S-

LT

EL

=4 7.

D

BP

-R D

-R T

EL

=4

6.

40.00

50.00

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

0.

O /S

=1 1.

PG

L

EL

=4

9.

4:1 3:1

0.020

0.060 4:1

0.020 0.050

0.020 4:1

4:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=4 8.

D

BP

-R D

-R T

EL

=4

7.

D

BP

-O S-

R T

EL

=4

8.

STA. 172+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 173+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 173+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE SUPERELEVATED

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

8.

O /S

=1 1.

PG

L

EL

=4

8.

4:1 3:1

0.0200.050

0.020 0.060

0.020

3:1

4:1

4:1

VO

L.

CO

. B

FO

C

35.0'

D

BP

-O S-

LT

EL

=4 7.

D

BP

-R D

-R T

EL

=4

5.

40.00

50.00 PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

9.

O /S

=1 1.

PG

L

EL

=4

8.

4:1 3:1

0.0200.050

0.020 0.060

0.020

3:1

4:1 4:1

VO

L.

CO

. B

FO

C

35.0'

D

BP

-O S-

LT

EL

=4 7.

D

BP

-R D

-R T

EL

=4

6.

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

9.

O /S

=1 1.

PG

L

EL

=4

8.

4:1 3:1

0.0200.050

0.020 0.060

0.020

3:1

4:1 4:1

VO

L.

CO

. B

FO

C

35.0'

D

BP

-O S-

LT

EL

=4 7.

D

BP

-R D

-R T

EL

=4

6.

STA. 174+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 174+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 175+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE SUPERELEVATED

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

7.

O /S

=1 1.

PG

L

EL

=4

7.

4:1 4:1 4:1 3:1

0.0080.060 0.020 0.060 0.020

3:1

VO

L.

CO

. B

FO

C

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

10.0'

D

BP

-O S-

LT

EL

=4 5.

D

BP

-R D

-L T

EL

=4

6.

D

BP

-R D

-R T

EL

=4

5.

3:1

3:1

5.0'

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

8.

O /S

=1 1.

PG

L

EL

=4

7.

4:1 3:1

0.0020.060 0.020 0.060 0.020

4:1

4:1

VO

L.

CO

. B

FO

C

10.0'

D

BP

-O S-

LT

EL

=4 6.

D

BP

-R D

-R T

EL

=4

5.

3:1

40.00

50.00

N

-200 = 18 w = 21

BT @ 15.0'

SS-06

48.28'

9/6/2024

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

8.

O /S

=1 1.

PG

L

EL

=4

8.

4:1 3:1

0.0130.057

0.020 0.060

0.020

3:1

4:1

4:1

VO

L.

CO

. B

FO

C

35.0'

D

BP

-O S-

LT

EL

=4 6.

D

BP

-R D

-R T

EL

=4

5.

STA. 175+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 176+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 176+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 175+11.64

TRANS. END= STA. 177+11.64

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 175+11.64

TRANS. END= STA. 177+11.64

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 175+11.64

TRANS. END= STA. 177+11.64

8/31/2024

GNE

BT @ 6.0'

AA-18

48.23'

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

7.

O /S

=1 1.

PG

L

EL

=4

7.

0.0200.060 0.020 0.060 4:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

C

10.0'

D

BP

-R D

-L T

EL

=4

5.

D

BP

-O S-

LT

EL

=4 4.

D

BP

-R D

-R T

EL

=4

4.

2:1

3:1 0.020

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

7.

O /S

=1 1.

PG

L

EL

=4

7.

4:1 4:1 3:1

0.0200.060 0.020 0.060

0.020

3:1 4:1

VO

L.

CO

. B

FO

C

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

10.0'

D

BP

-O S-

LT

EL

=4 4.

D

BP

-R D

-L T

EL

=4

5.

D

BP

-R D

-R T

EL

=4

4.

3:1

2:1

5.0'

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

7.

O /S

=1 1.

PG

L

EL

=4

7.

4:1 4:1 4:1 3:10.0170.060 0.020 0.060

0.020 5:1

VO

L.

CO

. B

FO

C

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

10.0' D

BP

-R

D -L

T

EL

=4 6.

D

BP

-O S-

LT

EL

=4 2.

D

BP

-R D

-R T

EL

=4

6.

0.019

5.0'

3:1

STA. 177+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 177+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 178+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*SB LANES ARE WITHIN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 175+11.64

TRANS. END= STA. 177+11.64

-200 = 3 w = 3

8/31/2024

GNE

BT @ 6.0'

AA-17

42.02'

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

6.

O /S

=1 1.

PG

L

EL

=4

6.

0.0200.060 0.020 0.060 4:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

CD

BP

-O

S-

LT

EL

=4

3.

D

BP

-R D

-L T

EL

=4

4.

D

BP

-R D

-R T

EL

=4

3.

2:1

3:1 0.020

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

6.

O /S

=1 1.

PG

L

EL

=4

6.

0.0200.060 0.020 0.060 4:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

CD

BP

-O

S-

LT

EL

=4

3.

D

BP

-R D

-L T

EL

=4

5.

2:1

3:1 0.020

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

6.

O /S

=1 1.

PG

L

EL

=4

6.

0.0200.060 0.020 0.060 4:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

CD

BP

-O

S-

LT

EL

=4

4.

D

BP

-R D

-L T

EL

=4

5.

D

BP

-R D

-R T

EL

=4

4.

2:1

3:1 0.020

STA. 178+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 179+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 179+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

5.

O /S

=1 1.

PG

L

EL

=4

5.

0.0200.060 0.020 0.060 4:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

CD

BP

-O

S-

LT

EL

=4

3.

D

BP

-R D

-L T

EL

=4

4.

D

BP

-R D

-R T

EL

=4

3.

0.0203:1

2:1

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

5.

O /S

=1 1.

PG

L

EL

=4

5.

0.0200.060 0.020 0.060 4:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

CD

BP

-O

S-

LT

EL

=4

3.

D

BP

-R D

-L T

EL

=4

4.

D

BP

-R D

-R T

EL

=4

3.

0.020

2:1

3:1

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

6.

O /S

=1 1.

PG

L

EL

=4

6.

0.0200.060 0.020 0.060 4:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

CD

BP

-O

S-

LT

EL

=4

3.

D

BP

-R D

-L T

EL

=4

4.

D

BP

-R D

-R T

EL

=4

3.

2:1

3:1 0.020

STA. 180+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 180+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 181+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

4.

O /S

=1 1.

PG

L

EL

=4

4.

4:1 3:1

0.0200.060 0.020 0.060

0.020

3:1

4:14:1

VO

L.

CO

. B

FO

C

VO

L.

CO

. B

FO

C

30.0'

D

BP

-O S-

LT

EL

=4 2.

D

BP

-R D

-L T

EL

=4

3.

D

BP

-R D

-R T

EL

=4

3.

0.020

2:1

3:1

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

5.

O /S

=1 1.

PG

L

EL

=4

5.

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

4:1

0.0200.060 0.020 0.060 3:1

0.020

3:1

4:14:1

VO

L.

CO

. B

FO

C

VO

L.

CO

. B

FO

C

20.0'

D

BP

-O S-

LT

EL

=4 2.

D

BP

-R D

-L T

EL

=4

3.

D

BP

-R D

-R T

EL

=4

2.

0.020

2:1

3:1

40.00

50.00

8/31/2024

GNE

BT @ 6.0'

AA-16

47.28'

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

5.

O /S

=1 1.

PG

L

EL

=4

5.

0.0200.060 0.020 0.060 4:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

CD

BP

-O

S-

LT

EL

=4

2.

D

BP

-R D

-L T

EL

=4

3.

D

BP

-R D

-R T

EL

=4

2.

0.020

2:1

3:1

STA. 181+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 182+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 182+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

5.

O /S

=1 1.

PG

L

EL

=4

5.

0.0200.060 0.020 0.0604:14:1 4:1 3:1 0.020

3:1

VO

L.

CO

. B

FO

C

VO

L.

CO

. B

FO

C

30.0'

D

BP

-O S-

LT

EL

=4 0.

D

BP

-R D

-L T

EL

=4

3.

D

BP

-R D

-R T

EL

=4

3.

4:1

0.020

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

5.

O /S

=1 1.

PG

L

EL

=4

5.

0.0200.060 0.020 0.0604:14:1 4:1 3:1 0.020

3:1

VO

L.

CO

. B

FO

C

VO

L.

CO

. B

FO

C

30.0'

D

BP

-O S-

LT

EL

=4 1.

80 D

BP

-R D

-L T

EL

=4

3.

D

BP

-R D

-R T

EL

=4

3.

3:1 3:1

0.020

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

4.

O /S

=1 1.

PG

L

EL

=4

4.

0.0200.060 0.020 0.0604:14:1 4:1 3:1 0.020

3:1

VO

L.

CO

. B

FO

C

VO

L.

CO

. B

FO

C

30.0'

D

BP

-O S-

LT

EL

=4 2.

D

BP

-R D

-L T

EL

=4

3.

D

BP

-R D

-R T

EL

=4

3.

0.020 2:1

3:1

STA. 183+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 183+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 184+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

7.

O /S

=1 1.

PG

L

EL

=4

7.

0.0150.020 0.060

4:14:1 0.014

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=4 3.

D

BP

-R D

-L T

EL

=4

6.

3:1

0.020

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

6.

O /S

=1 1.

PG

L

EL

=4

6.

0.020

0.060 0.020 0.0604:14:1 4:1 3:1

0.020

3:1

VO

L.

CO

. B

FO

C

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=4 0.

D

BP

-R D

-L T

EL

=4

5.

D

BP

-R D

-R T

EL

=4

5.

3:1

0.020

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

PR

. T

EM

P.

C O

N

ST

. E

SM

T.

L

IN

E

O

FF

SE

T=

-1 1.

PG

L

EL

=4

6.

O /S

=1 1.

PG

L

EL

=4

6.

0.0200.060 0.020 0.0604:14:1 4:1 3:1 0.020

4:14:1

VO

L.

CO

. B

FO

C

30.0' D

BP

-R

D -L

T

EL

=4 4.

D

BP

-R D

-R T

EL

=4

4.

0.020

STA. 184+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 185+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 185+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*NB LANES ARE IN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 185+25.74

TRANS. END= STA. 187+25.74

PR. KENTUCKY AVE. R/W

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

9.

O /S

=1 1.

PG

L

EL

=4

9.

4:1 4:1 4:1 3:1

4:1

0.020 0.060

4:1

0.006 0.060

0.020

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=4

6.

D

BP

-R D

-R T

EL

=4

7.

D

BP

-O S-

LT

EL

=4 6.

4:1

0.020

10:1

4:1

40.00

50.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=4

8.

O /S

=1 1.

PG

L

EL

=4

8.

0.0050.020 0.060

4:1

0.060

0.020

3:1 5:1

4:14:1

VO

L.

CO

. B

FO

C

D

BP

-O S-

LT

EL

=4 5.

D

BP

-R D

-L T

EL

=4

6.

D

BP

-R D

-R T

EL

=4

6.

3:1

0.020

40.00

50.00

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

0.

O /S

=1 1.

PG

L

EL

=5

0.

4:1 4:1

4:1 3:1 0.0550.016

4:1 0.020

0.060

0.020

4:1

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=4

7.

D

BP

-R D

-R T

EL

=4

8.

D

BP

-O S-

LT

EL

=4 7.

10:1

4:1

0.020

4:1

STA. 186+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 186+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 187+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*NB LANES ARE IN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 185+25.74

TRANS. END= STA. 187+25.74

*NB LANES ARE IN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 185+25.74

TRANS. END= STA. 187+25.74

*NB LANES ARE IN

SUPERELEVATION TRANSITION

TRANS. BEGIN= STA. 185+25.74

TRANS. END= STA. 187+25.74

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

2.

O /S

=1 1.

PG

L

EL

=5

3.

4:1

4:1 3:1

0.020 0.050

0.020 5:1

0.020 0.060

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=5

0.

D

BP

-R D

-R T

EL

=5

1.

D

BP

-O S-

LT

EL

=5 1.

01 4:1

4:1 0.020

4:1

2:1

10:1

40.00

50.00

60.00

N

9/5/2024

SS-04

51.62'

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

1.

O /S

=1 1.

PG

L

EL

=5

2.

4:1 4:1

4:1 3:1 0.020

0.020 0.050

7:1

0.020 0.060

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=4

9.

D

BP

-R D

-R T

EL

=5

0.

D

BP

-O S-

LT

EL

=5 0.

51 4:1

10:1

4:1

4:1

0.0204:1 4:1

40.00

50.00

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

0.

O /S

=1 1.

PG

L

EL

=5

1.

4:1 4:1

4:1 3:1 5:10.020

0.020 0.060

0.020 0.050

4:1

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=4

8.

D

BP

-R D

-R T

EL

=4

9.

D

BP

-O S-

LT

EL

=4 8.

4:1

4:1

10:1

0.020

4:1

STA. 187+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 188+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 188+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*NB LANES ARE SUPERELEVATED

*NB LANES ARE SUPERELEVATED

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

4.

O /S

=1 1.

PG

L

EL

=5

4.

2:1

4:1

4:1

0.020 0.050

0.020

0.0200.060

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=5

1.

D

BP

-R D

-R T

EL

=5

2.

D

BP

-O S-

LT

EL

=5 2.

4:1

0.020

4:1

0.020 4:1

3:1

50.00

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

3.

O /S

=1 1.

PG

L

EL

=5

4.

2:1

4:1

4:1 3:1

0.020 0.050

0.020 6:1

0.0200.060

VO

L.

CO

. B

FO

C

D

BP

-R D

-R T

EL

=5

2.

D

BP

-R D

-L T

EL

=5

1.

D

BP

-O S-

LT

EL

=5 2.

4:1

0.020 4:1

4:1

10:1

50.00

60.00

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

3.

O /S

=1 1.

PG

L

EL

=5

3.

4:1 4:1

4:1 3:1

0.020 0.050

0.020

0.020

0.060

6:1

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=5

0.

D

BP

-R D

-R T

EL

=5

2.

D

BP

-O S-

LT

EL

=5 2.

4:1

10:1

0.020 4:1

2:1

STA. 189+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 189+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 190+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR. BLTWY.

VOL. CO. PROJECT #P5894

COUNTY OF VOLUSIA, FL

MetaWorld Civil Consulting

ENGINEERING SOLUTIONS

3930 S. Nova Rd., #104 Port Orange, FL 32127

(386) 944-9737

Know what's below.

before you dig.Call

R CROSS SECTIONS

*NB LANES ARE SUPERELEVATED

PR

. R

/W (7

0.

' L T)

EX

. R

/W (3

9.

' L T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

3.

O /S

=1 1.

PG

L

EL

=5

4.

4:1 4:1

4:1 3:1

0.020 0.050

0.020

0.0200.060

4:1 4:1

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=5

1.

D

BP

-R D

-R T

EL

=5

2.

D

BP

-O S-

LT

EL

=5 1.

2:1

0.020

50.00

60.00

PR

. R

/W (7

0.

' L T)

EX

. R

/W (6

7.

' L T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

4.

O /S

=1 1.

PG

L

EL

=5

4.

4:1 4:1

4:1 3:1

0.020 0.050

0.020

4:1 0.0200.060

4:1

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=5

1.

D

BP

-R D

-R T

EL

=5

2.

D

BP

-O S-

LT

EL

=5 1.

4:1

2:1

50.00

60.00

8/31/2024

GNE

-200 = 5 w = 5

AA-10

55.56'

BT @ 6.0'

PR

. R

/W (7

0.

' L T)

PR

. R

/W (7

0.

' R T)

EX

. R

/W (1

.4

5' L

T)

O

FF

SE

T=

-1 1.

PG

L

EL

=5

4.

O /S

=1 1.

PG

L

EL

=5

4.

4:1 4:1

4:1 3:1

0.020 0.050

0.020 10:1

0.0200.060

VO

L.

CO

. B

FO

C

D

BP

-R D

-L T

EL

=5

1.

D

BP

-R D

-R T

EL

=5

2.

D

BP

-O S-

LT

EL

=5 2.

0.020 4:1

2:1

STA. 190+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

STA. 191+00

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

STA. 191+50

HORIZONTAL SCALE: 1" = 20'

VE

RT

IC

AL

S

CA

LE

: 1

0'

20406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

020406080100120 20 40 60 80 100 120

VETERANS MEMORIAL PKWY. EXTENSION

E. GRAVES AVE. TO

DR. MARTIN LUTHER KING JR.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .