Grant Funded Construction of Rummell Road Trail

Closed State & local contract opportunity

Solicitation number
2025-131
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of St. Cloud, Florida is seeking bids for ITB No. 2025-131, a grant-funded construction project for the Rummell Road Trail, partially funded by the State of Florida Department of Environmental Protection Recreational Trails Program (RTP). The project involves constructing an 8-foot wide asphalt trail approximately 6,400 linear feet long and a 5-foot wide concrete sidewalk approximately 1,125 linear feet in length along Rummell Road. The comprehensive scope includes clearing and demolition of existing features, utility relocation, storm water piping and structure installation, concrete driveway and sidewalk construction, signage, and striping. A trail head park segment will be developed with an asphalt parking area, concrete sidewalks, stormwater infrastructure, and a dry pond excavation and grading component. The bid was released on August 31, 2025, with a non-mandatory pre-proposal meeting held on September 9, 2025, and responses are due by October 7, 2025, at 10:00 am via electronic submission. Bidders must submit a bid bond or cashier's check for 5% of their total bid and demonstrate a minimum of five years of experience in underground utilities, sidewalk construction, and paving, with appropriate state licensing.

The contract opportunity appears to have specific requirements for disadvantaged business enterprises, as evidenced by the USDOT non-discrimination assurances detailed in the contract documents. Contractors must comply with Disadvantaged Business Enterprise (DBE) program requirements, with potential sanctions for non-compliance including withholding payments, assessing penalties, and disqualifying contractors from future bidding. The total project budget is $1,600,000, with a 300-day timeline for substantial completion and an additional 60 days for final completion. The contract will be awarded to the lowest responsive and responsible bidder, with considerations given to past performance, financial capability, and experience in similar projects. Insurance requirements are comprehensive, including general liability, auto liability, workers' compensation, and additional insured status for the City of St. Cloud. The project involves multiple utility providers including Toho Water Authority, Osceola County, OUC, CenturyLink, and Brighthouse, suggesting complex utility coordination and potential infrastructure integration challenges.

Opportunity text

The project proposes to construct an 8-foot wide asphalt trail approximately 6,400 linear feet in length and a 5-foot wide concrete sidewalk approximately 1,125 linear feet in length in the right of way and within easements along Rummell Road in St. Cloud Florida. The project will include clearing and demolition of existing features, the relocation of various utilities, the installation of storm water piping and structures, concrete driveway and sidewalk construction, signage and striping for the trail. The trail head park segment will also include the installation of a asphalt parking area, concrete sidewalks, stormwater piping, stormwater structures and the excavation and grading of a dry pond.

This project will be partially funded by the State of Florida Department of Environmental Protection Recreational Trails Program (RTP).

Files

File Type Posted
Grant_Funded_Construction_of_Rummell_Road_Trail_(Addendum_#1_Revision).pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail_UPDATED.pdf PDF
Grant_Funded_Construction_of_Rummell_Road_Trail.pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail.pdf PDF
Performance_Bond.pdf PDF
Performance_Bond.pdf PDF
Payment_Bond.pdf PDF
Payment_Bond.pdf PDF
[D]_Payment_And_ContractCompletion_Forms.pdf PDF
[D]_Payment_And_ContractCompletion_Forms.pdf PDF
Sample_Certificate_of_Insurance.pdf PDF
Sample_Certificate_of_Insurance.pdf PDF
[C]_Contractual_Documents.pdf PDF
[C]_Contractual_Documents.pdf PDF
FDEP_Agreement_Attachment_9.pdf PDF
Building_Fees_Schedule_2025-004R.pdf PDF
FDEP_Agreement_Attachment_8.pdf PDF
FDEP_Agreement_Exhibit_H.pdf PDF
FDEP_Agreement_Exhibit_G.pdf PDF
FDEP_Agreement_Exhibit_F.pdf PDF
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx DOCX document
Insurance_Requirements_.pdf PDF
FDEP_Agreement_Exhibit_F.pdf PDF
FDEP_Agreement_Attachment_8.pdf PDF
SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc DOC document
SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc DOC document
FDEP_Agreement_Attachment_9.pdf PDF
SECT-59_REFLECTIVE_PAVEMENT_MARKERS.docx DOCX document
SECT-38_CONCRETE.docx DOCX document
FDEP_Agreement_Exhibit_G.pdf PDF
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
FDEP_Agreement_Exhibit_H.pdf PDF
Building_Fees_Schedule_2025-004R.pdf PDF
SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx DOCX document
Insurance_Requirements_.pdf PDF
SECT-38_CONCRETE.docx DOCX document
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
SECT-59_REFLECTIVE_PAVEMENT_MARKERS.docx DOCX document
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-31_SITE_PREP_SURF_REMOVE.docx DOCX document
SECT-30_GENERAL.docx DOCX document
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-58_HIGHWAY_SIGNING.docx DOCX document
SECT-30_GENERAL.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity