About this file

This document is a technical specification section (Section 59) from a transportation infrastructure project, specifically addressing reflective pavement markers (RPMs), prepared for the Florida Department of Transportation (FDOT). The specification details requirements for removing existing and installing new raised reflective pavement markers, focusing on four-inch by four-inch markers to be used on various road surfaces including interstate and highway systems. The document outlines comprehensive technical specifications for marker composition, which must be made of molded methyl methacrylate or acrylonitrile butadiene styrene (ABS) with prismatic reflectors, and must be selected from FDOT's Qualified Products List.

The specification includes detailed requirements for marker color (amber, red, or colorless depending on traffic configuration), optical performance standards, adhesive composition, and installation procedures. Safety protocols are specified, including the requirement for a follow vehicle with a sequential arrow panel during marker installation on limited access facilities. The contract compensation is structured as a unit price per reflective pavement marker, with the contractor responsible for replacing any markers that fail adhesion within the first 30 days. While this specification is not directly linked to the related state and local contract opportunity for the Rummell Road Trail project, it represents a standard technical specification that could be applicable to road infrastructure improvements.

View the file

Other files

File Type Posted
Grant_Funded_Construction_of_Rummell_Road_Trail_(Addendum_#1_Revision).pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail_UPDATED.pdf PDF
Grant_Funded_Construction_of_Rummell_Road_Trail.pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail.pdf PDF
Performance_Bond.pdf PDF
Payment_Bond.pdf PDF
[D]_Payment_And_ContractCompletion_Forms.pdf PDF
Sample_Certificate_of_Insurance.pdf PDF
[C]_Contractual_Documents.pdf PDF
FDEP_Agreement_Attachment_8.pdf PDF
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
FDEP_Agreement_Attachment_9.pdf PDF
Insurance_Requirements_.pdf PDF
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
FDEP_Agreement_Exhibit_H.pdf PDF
SECT-38_CONCRETE.docx DOCX document
FDEP_Agreement_Exhibit_F.pdf PDF
SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc DOC document
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
Building_Fees_Schedule_2025-004R.pdf PDF
SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx DOCX document
FDEP_Agreement_Exhibit_G.pdf PDF
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-31_SITE_PREP_SURF_REMOVE.docx DOCX document
SECT-58_HIGHWAY_SIGNING.docx DOCX document
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-30_GENERAL.docx DOCX document
SECT-57_INLETS_MANHOLES_AND_JUNCTION_BOXES.docx DOCX document
PLANS_APPROVED-SDP23-0139_2025-02-27.pdf PDF
SECT-42_MANHOLES.docx DOCX document
SECT-34_PRESSURE_PIPE_RESTRAINT.docx DOCX document
SECT-52_VALVES_HYDRANTS_&_ACCESS_FOR_WATER_MAINS.DOC DOC document
SECT-44_TESTING_OF_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-41_GRAVITY_SEWER_PIPE_LAYING_JOINTING_AND_MISC_CONSTRUCTION_DETAILS.doc DOC document
SECT-55_VALVES_AND_ACCESS_FOR_RECLAIMED_WATER_MAINS.doc DOC document
SECT-49_Blank.DOC DOC document
SECT-50_WATER_DISTRIBUTION.DOC DOC document
SECT-35_PRESSURE_CONNECTION.doc DOC document
SECT-53_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-45_WASTEWATER_FORCE_MAINS.DOC DOC document
SECT-40_PIPE_MATERIAL_FOR_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-51_PIPE_INSTALLATION_FOR_WATER_MAINS.DOC DOC document
SECT-54_PIPE_INSTALLATION_FOR_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-47_SUBMERSIBLE_WASTEWATER_PUMPS.DOC DOC document
SECT-33_BORING_&_JACKING.docx DOCX document
SECT-48_PUMP_STATION_ELECTRICAL_POWER_&_CONTROL_SYSTEM.DOC DOC document
SECT-43_SERVICE_LATERALS.docx DOCX document
SECT-46_SEWAGE_PUMPING_STATIONS.rtf RTF text file
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 59 – REFLECTIVE PAVEMENT MARKERS (RPM’S)

Item No. Title

59.1 DESCRIPTION

59.2 GENERAL

59.3 SAFETY

59.4 COLOR

59.5 OPTICAL REQUIREMENTS AND PERFORMANCE

59.6 ADHESIVE

59.7 INSTALLATION

59.8 COMPENSATION

59.1 DESCRIPTION

The work specified in this section consists of removing existing reflective pavement markers and installing new raised reflective pavement markers. The work shall be done in accordance with these specifications and the details shown in the current Roadway and Traffic Design Standards Index Nos. 17352, 17345, and 17346.

59.2 GENERAL

The reflective pavement marker shall consist of a molded methyl methacrylate or an acrylonitrile butadiene styrene (ABS) shell in the shape of a frustrum of a pyramid, filled with a mixture of an inert thermosetting compound and filler material. The face of the shell shall contain one or two prismatic reflectors. The raised reflective pavement marker used shall be those names on the F.D.O.T. Office of Materials and Research at Gainesville, Florida. It shall be the CONTRACTOR'S responsibility to determine the number of mono-directional raised reflective pavement markers required for this project.

For this project, only four-inch by four-inch reflective pavement markers will be permitted and shall be one of the appropriate products on the Qualified Products Lists, current at the time of the markers' proposal for use.

59.3 SAFETY

A follow vehicle shall be provided when removal and replacement of reflective pavement markers is to be accomplished on limited access facilities such as the interstate or toll highway system and/or for all nighttime operations. The follow vehicle shall be equipped with a sequential arrow panel mounted on the top rear of the vehicle in conformance with Section 6D-6 of the Manual on Traffic Control and Safe Practices and an approved crash cushion system that will be attached or towed.

59.4 COLOR

For center lane markings for two-way traffic, raised reflective pavement markers shall be bi-directional (amber and amber) except where passing is restricted in one direction only, the then raised reflective pavement marker shall be a combination of mono-directional and bi-directional pavement markers. The mono-directional marker shall be amber.

For lane lines separating one-way traffic, raised reflective markers shall be mono-directional (colorless).

59.5 OPTICAL REQUIREMENTS AND PERFORMANCE

A.) The glass elements shall be of the highest grade, optically polished and shall be hermetically sealed into the ABS shells.

B.) The brightness of the reflective surface shall exceed the following values:

Color Brightness in Candlepower per Square Inch

Crystal.07
Amber.06
Red.05

59.6 ADHESIVE

The adhesive for bonding the markers to the pavement shall be bituminous adhesive as recommended by the marker manufacturer. The adhesive used shall be one of the products included on the Qualified Products List, current at the time of the adhesive proposal for use.

The adhesive shall be material suitable for bonding pavement markers to Portland cement concrete pavement, hot bituminous pavement and chip-sealed surfaces when the road surface and marker temperatures are in the range of 50 degrees F to 160 degrees F. The composition of the adhesive must be such that its properties will not deteriorate when heated to and applied at temperatures up to 425 degrees F using either air or oil-jacketed melters.

The work shall be done in accordance with the current specifications 706-2.4 & 706-3.4 of the Standard Specifications for Road and Bridge Construction.

59.7 INSTALLATION

The portion of the pavement surface to which the marker is attached by the adhesive shall be cleaned of dirt, curing compound, grease, oil, moisture, loose or unsound pavement and any other material, which would adversely affect the bond of the adhesive.

The adhesive shall be spread on the bonding surface so that 100 per cent of the bonding area of the marker will be covered. The adhesive application shall be of sufficient thickness so that when the marker is pressed into the adhesive, excess adhesive shall be forced out around the entire perimeter of the marker. All excessive adhesive shall be removed from in front of the reflective faces. If any adhesive or foreign matter adheres to the reflective face of the marker, the markers shall be replaced.

When the project is complete, the markers shall be firmly bonded to the pavement. Lines formed by the markers shall be true and the entire installation shall present a neat appearance. If more than two per cent of the markers fail in adhesion within the first 30 days under traffic, the CONTRACTOR shall replace all failed markers at his expense.

59.8 COMPENSATION

The work specified in this section shall be paid for at the contract unit price each for reflective pavement marker, in place and accepted, and shall include all labor and equipment necessary for the installation. Such prices and payments shall be full compensation for all work required including the removal of existing pavement markers. Payment shall be made under:

Item No. A706-1-12 Reflective Pavement Marker (F & l)(Class B) - EA