SECT-36_PAVEMENT_REMOVAL_AND_RESTORATION.doc

DOC document 31 KB Posted

Attached to
Grant Funded Construction of Rummell Road Trail
Solicitation number
2025-131
Issued by
Polk County, Florida

About this file

This document is a technical specification section (Section 36) for pavement removal and restoration, involving multiple jurisdictions including the State of Florida, county, municipal, and private entities. The specification provides detailed guidelines for road and driveway surface restoration, focusing on excavation, cutting, temporary surface placement, and permanent repair requirements. The standards reference the Florida Department of Transportation's Standard Specifications for Road and Bridge Construction and apply to various right-of-way scenarios.

The specification establishes comprehensive technical requirements for pavement repair, including minimum subbase (12 inches), base layer (minimum 6 inches), surface coating, and asphalt concrete surfacing. Critical technical parameters include compaction standards (98% maximum density), material specifications (limerock, soil cement, Portland cement), and testing protocols. The contractor is responsible for repairs within one year after project acceptance, with specific obligations to match or exceed existing pavement quality, replace stabilization materials, and ensure proper roadway restoration. The document is directly related to a grant-funded trail construction project in St. Cloud, Florida, which involves constructing an 8-foot wide asphalt trail and 5-foot wide concrete sidewalk, partially funded by the Florida Department of Environmental Protection Recreational Trails Program.

View the file

Other files

File Type Posted
Grant_Funded_Construction_of_Rummell_Road_Trail_(Addendum_#1_Revision).pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail_UPDATED.pdf PDF
Grant_Funded_Construction_of_Rummell_Road_Trail.pdf PDF
Sect-20_Special_Conditions_Rummell_Road_Trail.pdf PDF
Performance_Bond.pdf PDF
Payment_Bond.pdf PDF
[D]_Payment_And_ContractCompletion_Forms.pdf PDF
Sample_Certificate_of_Insurance.pdf PDF
[C]_Contractual_Documents.pdf PDF
FDEP_Agreement_Attachment_8.pdf PDF
SECT-39_GRASSING_AND_SEEDING.docx DOCX document
FDEP_Agreement_Attachment_9.pdf PDF
Insurance_Requirements_.pdf PDF
SECT-61_PAVEMENT_MARKING_REMOVAL_(THERMPLASTIC).docx DOCX document
FDEP_Agreement_Exhibit_H.pdf PDF
SECT-38_CONCRETE.docx DOCX document
SECT-59_REFLECTIVE_PAVEMENT_MARKERS.docx DOCX document
FDEP_Agreement_Exhibit_F.pdf PDF
SECT-56_CULVERTS_AND_STORM_SEWERS.docx DOCX document
Building_Fees_Schedule_2025-004R.pdf PDF
SECT-60_THERMOPLASTIC_TRAFFIC_STRIPES_AND_MARKINGS.docx DOCX document
FDEP_Agreement_Exhibit_G.pdf PDF
SECT-32_EXCAVATION_BACKFILL_COMPACTION_GRADING.docx DOCX document
SECT-31_SITE_PREP_SURF_REMOVE.docx DOCX document
SECT-58_HIGHWAY_SIGNING.docx DOCX document
SECT-37_ROADWAY_CONSTRUCTION_STANDARDS.doc DOC document
SECT-30_GENERAL.docx DOCX document
SECT-57_INLETS_MANHOLES_AND_JUNCTION_BOXES.docx DOCX document
PLANS_APPROVED-SDP23-0139_2025-02-27.pdf PDF
SECT-42_MANHOLES.docx DOCX document
SECT-34_PRESSURE_PIPE_RESTRAINT.docx DOCX document
SECT-52_VALVES_HYDRANTS_&_ACCESS_FOR_WATER_MAINS.DOC DOC document
SECT-44_TESTING_OF_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-41_GRAVITY_SEWER_PIPE_LAYING_JOINTING_AND_MISC_CONSTRUCTION_DETAILS.doc DOC document
SECT-55_VALVES_AND_ACCESS_FOR_RECLAIMED_WATER_MAINS.doc DOC document
SECT-49_Blank.DOC DOC document
SECT-50_WATER_DISTRIBUTION.DOC DOC document
SECT-35_PRESSURE_CONNECTION.doc DOC document
SECT-53_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-45_WASTEWATER_FORCE_MAINS.DOC DOC document
SECT-40_PIPE_MATERIAL_FOR_GRAVITY_SANITARY_SEWERS.docx DOCX document
SECT-51_PIPE_INSTALLATION_FOR_WATER_MAINS.DOC DOC document
SECT-54_PIPE_INSTALLATION_FOR_RECLAIMED_WATER_SYSTEMS.DOC DOC document
SECT-47_SUBMERSIBLE_WASTEWATER_PUMPS.DOC DOC document
SECT-33_BORING_&_JACKING.docx DOCX document
SECT-48_PUMP_STATION_ELECTRICAL_POWER_&_CONTROL_SYSTEM.DOC DOC document
SECT-43_SERVICE_LATERALS.docx DOCX document
SECT-46_SEWAGE_PUMPING_STATIONS.rtf RTF text file
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 36 - PAVEMENT REMOVAL AND RESTORATION

Item No.

Title 36.1

GENERAL

36.2

RIGHTS-OF-WAY

36.3

SAW-CUTTING

36.4

TEMPORARY SURFACE

36.5

MINIMUM PAVEMENT REPAIR

36.6

SETTLEMENT OF PAVEMENT

36.7

STABILIZED ROADS

36.8

TESTING

36.1

GENERAL

DESCRIPTION:

1.)

The work under this section consists of removal and restoration of road pavement and driveways.

2.)

The following specifications are a direct reference to the Florida Department of Transportation Manual "Standard Specifications for Road and Bridge Construction," latest edition (F.D.O.T. Spec), unless stated otherwise.

36.2

RIGHTS-OF-WAY

1.)

STATE: Pavement, roadway surfaces, and rights-of-way under the jurisdiction of the State of Florida which are utilized in accordance with a State "Utility Permit" shall be protected, removed, and replaced in accordance with the Florida Department of Transportation Standard Specifications for Road and Bridge Construction.

2.)

COUNTY: Restoration and pavement within County rights-of-way shall be in accordance with applicable County Standards and "Right-Of-Way Utilization Regulations".

3.)

MUNICIPAL: Roadway and pavement restoration and right-of-way utilization within City limits shall be in accordance with applicable City standards and regulations.

4.)

PRIVATE: Driveway restoration within the City limits shall be in accordance with applicable City standards and regulations.

36.3

SAW-CUTTING

Where existing pavement is to be removed, saw-cut the surfacing leaving a uniform and straight edge with minimum disturbance to the remaining adjacent surfacing.

36.4

TEMPORARY SURFACE

Compact the backfill as specified and bring to 1-1/2 inches below existing roadway surface unless shown otherwise. Place cold asphaltic patch to existing roadway surface and properly maintain until restoration is to be completed. Within ten (10) days after pavement removal, place, compact, and seal the subbase and base.

Within sixty (60) days after pavement removal, place the finished surface course. Temporary and permanent repair shall at all times provide a smooth traffic surface.

36.5

MINIMUM PAVEMENT REPAIR

1.)

Provide the following minimum pavement structure:

a.)

SUBBASE: 12 inches of compacted material with a Florida Bearing Value of 50 psi. Compaction of minimum 98% of maximum density - AASHTO T-180 modified, or LBR of 40, compacted to 98% of maximum density AASHTO T-180 modified.

b.)

BASE: For existing limerock base - Match the existing base thickness or a minimum of six (6) inches, whichever is greater and compact to 98% maximum density AASHTO T-180 modified. Base shall extend beyond top of trench at least one (1) foot on both sides.

c.)

FOR EXISTING SOIL CEMENT BASE: Replace with either soil cement or Portland cement concrete (3,000 psi) of comparable thickness depending upon width of trench cut.

d.)

FOR EXISTING SOIL CEMENT BASE: Areas six (6) feet wide and over 50 feet long - Replace with Duro-Rock or equal.

e.)

COAT: Prime the limerock base with a minimum of 0.2 gallons per square yard and then sand as required.

f.)

CONCRETE BASE: If the area to be repaired is small and it would not be practical to mix and compact a subbase, the base may be made nine (9) inches thick using either limerock or Portland cement concrete (Type I).

g.) SURFACE: Shall be the thickness of existing pavement or a minimum of 1-1/2 inches of Type S-3 asphaltic concrete unless otherwise specified. Large areas (150 square yards or more) of existing Type S-3 asphaltic concrete shall be replaced with Type S-3 mix. Finish surface to proper grade and crossection to match original. Width of asphalt surface shall exceed width of top of trench by at least One (1) foot on both sides.

2.)

IF PAVEMENT REMOVED IS SUPERIOR TO THE MINIMUM SPECIFICATIONS SET FORTH ABOVE, MAKE THE PATCH EQUAL TO THE PAVEMENT REMOVED.

36.6

SETTLEMENT OF PAVEMENT

Any settlement of the pavement repairs occurring within the period of one (1) year after final acceptance of the project by the OWNER shall be repaired or replaced by the CONTRACTOR as required by, and at no cost to, the OWNER.

36.7

STABILIZED ROADS

On clay or other type stabilized roads, the stabilizing material must be replaced and the roadway compacted to at least its original condition.

36.8

TESTING

Unless otherwise stipulated on the plans, the following tests will be made by an independent testing laboratory:

1.)

Determination of the job mix formula.

2.)

Test of the asphalt concrete.

3.)

Sieve analysis of the aggregate.

4.)

Determination of bitumen content of the asphaltic concrete.

5.)

Determination of density of finished pavement.

6.)

Core boring to determine thickness.

SECTION 36 - PAVEMENT REMOVAL AND RESTORATION