Big Bend Road from US 41 to Covington Garden Dr.
Open State & local contract opportunity Posted
- Solicitation number
- IFB-26-00378
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91232 Construction, Street Lighting
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91327 Construction, Highway And Road
- 91344 Construction, Railroad
- 91347 Construction, Sidewalk And Driveway (Includes Pedestrian And Handicap Ramps)
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 91356 Construction, Utility/Underground Projects
- 91395 Paving/Resurfacing, Highway And Road
Opportunity details come from hillsboroughcounty.bonfirehub.com. Updated .
About this opportunity
Hillsborough County Engineering and Operations, through the Board of County Commissioners, is soliciting sealed bids under IFB-26-00378 for resurfacing and widening of Big Bend Road from US 41 to Covington Garden Drive, with bids due January 5, 2027 at 2:00 p.m. Eastern Time through the county's Euna Procurement system. The work is funded in part with federal American Rescue Plan Act funds and state Transportation Regional Incentive Program funds.
The scope converts approximately 0.75 miles of existing 4-lane divided rural highway into a 6-lane urban typical section with curb and gutter, closed drainage, 10-foot sidewalks on each side, and a median. It also includes milling and resurfacing of Kings Lake Drive from Big Bend Road to approximately 400 feet north of Old Big Bend Road, a concrete trail along Waterset Boulevard, and lighting and intelligent transportation systems components. Bidders must hold active Florida Department of Transportation Certificates of Qualification in Traffic Signals, Flexible Paving, Concrete, Drainage, Roadway Signing & Pavement Marking, Lighting, Underground Utilities, and ITS. The prime contractor must self-perform at least 40 percent of construction work, with subcontracting up to 60 percent.
The estimated project cost is $21.6 million. The contract allows 260 calendar days after award for utility relocations and mobilization before the Notice of Intent to Proceed takes effect, with substantial completion required 900 days and final completion 960 days from Notice to Proceed. Liquidated damages are $1,976.00 per day for missed substantial completion and $1,130.00 per day for missed final completion. Bid security is 5 percent of the bid amount, and performance and payment bonds are each 100 percent of the awarded amount. Five percent retainage applies throughout. Award goes to the lowest responsive and responsible bidder offering on all line items. Bidders must also submit a foreign-country-of-concern affidavit, a Florida Trench Safety Act certification, and a drug-free workplace certification.
Opportunity text
Hillsborough County Engineering and Operations requires a qualified Contractor to provide resurfacing and widening of approximately 0.75 miles of existing 4-lane divided rural highway to build a 6-lane urban typical section with curb & gutter, closed drainage system, 10-foot sidewalks on each side, and median. This project also includes the milling and resurfacing of Kings Lake Drive from Big Bend Road to approximately 400 feet north of Old Big Bend Road estimated at $21,624,946.34. Please see Section 5.1.2 for the estimated Notice of Intent to Proceed for this project.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity