8-Change Order Form.pdf.pdf

PDF 201 KB Posted

Attached to
Big Bend Road from US 41 to Covington Garden Dr.
Solicitation number
IFB-26-00378
Issued by
Hillsborough County, Florida

About this file

This is a Change Order Form used by Hillsborough County, Florida for modifying existing contracts. The form is designed to document and authorize changes to construction contracts, allowing for adjustments to contract sums, project completion timelines, and scope of work. The form accommodates four categories of changes: time changes, extra work, credits, and other modifications. It requires detailed documentation including the original contract sum, net changes from previous change orders, the cumulative contract sum prior to the current change order, and the final contract sum following approval. The form also captures any adjustments to the Final Completion Milestone, with provisions for extensions, reductions, or no change to the timeline measured in calendar days.

The Change Order Form includes comprehensive approval workflows requiring signatures from the Contractor, Hillsborough County Board of County Commissioners, County Attorney (for legal sufficiency), Department Fiscal Director, and Procurement staff. Notarization is required, with separate acknowledgment sections for corporations, partnerships, and individuals. The form mandates Surety consent to any change orders, requiring the surety to acknowledge adjustments to both the contract amount and completion date, with updated performance and payment bonds. The contractor is required to waive claims for additional time extensions or monetary compensation beyond those specified in the change order. The form was revised on January 29, 2025, and applies to the Big Bend Road project, a Hillsborough County infrastructure improvement valued at approximately $21.6 million for resurfacing, widening, and drainage improvements.

View the file

Other files

File Type Posted
Attachment E- 69692000 BigBendWest Drainage Design Documentation Vol. II Final.pdf PDF
21-Attachment B- Geo Report - 69692000 100P Misc Structures 2025-11-20.pdf PDF
Attachment I- Utility Relocation Schedule 69647.000 Spectrum Revised URS 7.13.2026 TR LS.pdf PDF
Attachment B- Geo Report - 69692000 100P Misc Structures 2025-11-20.pdf PDF
Attachment H- Plans- Lighting.pdf PDF
41-Attachment L- CSX Coordination.pdf PDF
Attachment G- FDOT Grant Agreement.pdf PDF
Attachment I- Utility Relocation Schedule CIP 69647.000 Utility Cert Letter 7.15.26.pdf PDF
27-Attachment I- Utility Relocation Schedule 69647.000 100% REVISED - TEC UWS - REV4 7.13.26 TR LS.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
43-Attachment M- Work Class Percentage.pdf PDF
34-Attachment I- Utility Relocation Schedule 69647.000 Spectrum Revised URS 7.13.2026 TR LS.pdf PDF
46-Attachment G- FDOT Grant Agreement.pdf PDF
Attachment B- Geo Report - 69692000 PhIV Rdwy Soil Survey Report 2025-11-20.pdf PDF
40-Attachment K- Insurance Requirements.pdf PDF
52-Attachment H- Plans- ITS.pdf PDF
48-Attachment H- Location Map.pdf PDF
Attachment I- Utility Relocation Schedule 69647.000 100% REVISED - TEC UWS - REV4 7.13.26 TR LS.pdf PDF
Attachment H- Location Map.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
3-Allowance Authorization Release Form.pdf.pdf PDF
29-Attachment I- Utility Relocation Schedule CIP 69647.000 100% URS PGS7-10-2026 REV 1SignedTR.pdf PDF
Attachment D- Permits - SWFWMD ERP 43024488.004 Approved.pdf PDF
17-Attachment F- 69692000 6050BigBend ROE ChildcareBrandon 10-9-25 Signed.pdf PDF
Agreement - Construction - Stand Alone.docx.pdf PDF
54-Attachment K- CSX Insurance Receipt.pdf PDF
Attachment I- Utility Relocation Schedule 69647.000 BIG BEND US 41 TO COVINGTON FTR URS 071426 TR LS.pdf PDF
39-Attachment J- CSX1036508- Agreement.pdf PDF
Attachment B- Geo Report - 69692000 Kings Lake Dr Misc Struc 100% Geo Report SS.pdf PDF
42-Agreement - Construction - Stand Alone.docx.pdf PDF
Attachment E- 69692000 BigBendWest Drainage Design Documentation Vol. I Final SS (1).pdf PDF
14-Attachment D- Permits - SWFWMD ERP 43024488.004 Approved.pdf PDF
23-Attachment E- 69692000 Waterset-Kings Lake Drainage Memo.pdf PDF
Attachment F- 669692000 6089BigBend ROE HomeDepot 10-9-25 signed.pdf PDF
20-Attachment B- Geo Report - 69692000 PhIV Rdwy Soil Survey Report 2025-11-20.pdf PDF
Attachment B- Geo Report - 69692000 Waterset Trail 100% RSS SS.pdf PDF
47-Attachment H- Clear Letters 2.pdf PDF
18-Attachment F- 669692000 BayIndustrial ROE 10-9-25. signed.pdf PDF
30-Attachment I- Utility Relocation Schedule CIP 69647.000 URS Uniti Fiber REV 3 7.10.26 TR LS.pdf PDF
Attachment F- 669692000 BayIndustrial ROE 10-9-25. signed.pdf PDF
Attachment I- Utility Relocation Schedule CIP 69647.000 100% URS PGS7-10-2026 REV 1SignedTR.pdf PDF
36-Bid Bond.doc.doc DOC document
9-Insurance Certificate.doc.doc DOC document
31-Attachment I- Utility Relocation Schedule MCI 69647.000 100% URS WSP-8-26 LS.pdf PDF
Attachment A- Construction Sign 2026.pdf PDF
32-Attachment I- Utility Relocation SchedCIP 69647 000 US 41 to Covington Garden Drive Zayo UWS 71326 TR LS.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
Attachment E- 69692000 Waterset-Kings Lake Drainage Memo.pdf PDF
Show 40 more

Latest 50 of 89 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 01.29.2025

HILLSBOROUGH COUNTY

CHANGE ORDER FORM

CONTRACT: CHANGE ORDER NO.:

BID NO:

CONTRACTOR: PROJECT NO:

CPA NO:

TIME CHANGE EXTRA WORK CREDIT OTHER

The Contractor is hereby authorized and directed to make the following changes and modifications to the aforesaid Contract in accordance with all requirements applicable thereto.

DESCRIPTION OF CHANGE:

COST

IMPACT

FINAL

COMPLETION

DAYS

REASON FOR CHANGE:

The original Contract Sum (TOTAL GMP) was . . . . . . . . . . . . $____________ Net change by previous Change Orders . . . . . . . . . . . . . . . . $____________ The Contract Sum prior to this Change Order was . . . . . . . . . . . . . $____________ The Contract Sum will be by this Change Order. . . . . . $ ____________ (increased, decreased or unchanged) The new Contract Sum including this Change Order will be . . . . . . . . . . $ ____________

The Final Completion Milestone prior to this Change Order was .

The time for Final Completion Milestone will be ______________ by __________( )days.

(extended, reduced or unchanged) The Final Milestone for this change order therefore is therefore

The Contractor waives any and all claims to additional time extension and/or additional monetary compensation resulting from these changes and all cost associated with the change order as herein addressed.

Excepting those terms and provisions conflicting with this Change Order which are hereby changed to conform hereto, the aforesaid Contract as amended by all previous change orders hereto is otherwise reaffirmed in its entirety.

IN WITNESS WHEREOF, this Change Order No. _______ to __________________________________ has been executed by the parties hereto or their duly authorized representatives.

ATTEST: VICTOR D. CRIST COUNTY: HILLSBOROUGH COUNTY FLORIDA

Clerk of Circuit Court

BY: BY:

Deputy Clerk Chair, Board of County Commissioners

BOCC Document Number Date of BOCC approval

ATTEST: CONTRACTOR:

BY:

Witness Authorized Signature (SEAL)

TITLE:

DATE:

BOCC Staff Approval Date

Department Fiscal Department Director Procurement County Attorney:

Approved as to Form and Legal Sufficiency

(ACKNOWLEDGMENT OF CONTRACTOR, IF A CORPORATION)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by ______________________ (Name of person) as____________________________ for ___________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

(ACKNOWLEDGMENT OF CONTRACTOR, IF A PARTNERSHIP OR INDIVIDUAL)

STATE OF )

COUNTY OF )

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this day of , 20 , by .

(Name of person acknowledging)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Known OR Produced Identification

Type of Identification Produced ______________________

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount (increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person) ________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public) (Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________

File details come from the government source that posted it. Updated .