29-Attachment I- Utility Relocation Schedule CIP 69647.000 100% URS PGS7-10-2026 REV 1SignedTR.pdf
PDF 344 KB Posted
- Attached to
- Big Bend Road from US 41 to Covington Garden Dr.
- Solicitation number
- IFB-26-00378
- Issued by
- Hillsborough County, Florida
About this file
This document is a Utility Relocation Schedule prepared by Peoples Gas System, a utility agency/owner, for the Big Bend Road project (County Road 672, CIP Number 69647.000) in Hillsborough County, Florida. The schedule outlines utility relocation, adjustment, and protection requirements for gas mains and associated infrastructure along Big Bend Road from US 41 to Covington Garden Drive, based on project plans dated June 12, 2026. The project encompasses the installation of new 6-inch and 2-inch coated steel gas mains, removal of retired gas mains, and installation of new gas valves at multiple locations along the roadway corridor. Work is estimated to require 120 calendar days for preliminary engineering and material procurement prior to county project construction, with zero calendar days allocated during construction. The schedule was authorized by Patrick Allen (Gas Design Project Manager) on July 10, 2026, and approved by Hillsborough County's Manuel E. Santos and Lisa Strout on the same date. The relocation schedule is valid for one year from the authorization date.
The document specifies that Peoples Gas System employees and subcontractors operate on a standard Monday through Friday, 8 a.m. to 5 p.m. schedule, excluding observed holidays, with any work outside these hours requiring 72 hours advance scheduling and verification. All work must comply with Hillsborough County's Utility Agreement Management (UAM) requirements and obtain appropriate utility permits. An 18-inch separation clearance must be maintained with all existing gas mains and facilities. The project contacts include UAO Project Representative Patrick Allen (813-460-0454) and UAO Field Representative Javier Vazquez (813-275-3726), with facility location available through Sunshine 811. The document notes that Peoples Gas System may grout fill and retire gas mains under paved roadways as an alternative to removal, and that crew availability may be limited due to emergency response obligations elsewhere. The overall Big Bend Road project, which includes resurfacing and widening approximately 0.75 miles of existing roadway with associated drainage and sidewalk improvements, carries an estimated cost of $21,624,946.34.
View the file
Other files
Show 40 more
Latest 50 of 89 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hillsborough County County Road: 672 (Big Bend Rd) Plans Dated: 6/12/2026
CIP Number: 69647.000 Project Name: Big Bend Road from US 41 to Covington Garden Drive
Utility Agency/Owner (UAO): Peoples Gas System
NON-CONSTRUCTION ITEMS
ESTIMATED
*CALENDAR DAYS
CONSTRUCTION ITEMS
ESTIMATED
*CALENDAR DAYS
Total Preliminary (Engineering) 0 Prior to County Project Construction 120
Total Material Procurement 120 During County Project Construction 0
Total Right-of-Way Acquisition 0 As-Built Information _____________
Total Other (Permitting) 30 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Hillsborough County, the roadway contractor, and other right-of-way users, the location, relocation, adjustment, installation, and/or protection of facilities, on this Hillsborough County project. The following data is based on the plans dated as listed in the Title Block.
Any deviation by Hillsborough County or its Contractor from plans, as provided may render this work schedule null and void.
Upon notification by, Hillsborough County of such change, this utility may require additional days for assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond the control of the UAO that could not reasonably be anticipated by the UAO and which could not be avoided by the UAO with the exercise of due diligence at the time of the occurrence. The UAO agrees to notify Hillsborough County in writing prior to starting, stopping, resuming, or completing work. The UAO is to provide As-Built information.
The UAO shall obtain a utility permit and comply with the requirements of the Hillsborough County UAM.
During the project, the UAO shall locate their facilities within 48 hours of notice to their Representative: Sunshine 811 Telephone Number: 811 -
UAO Project Representative: Patrick Allen Telephone Number: 813-460-0454
UAO Field Representative: Javier Vazquez Telephone Number: 813-275-3726
This document is a printout of a Hillsborough County form maintained in an electronic format and all revisions thereto by the UAO in the form of additions, deletions or substitutions are reflected only in an Appendix entitled “Changes to Form Document” and no change is made in the text of the document itself. Hand notations on affected portions of this document may refer to changes reflected in the above-named Appendix but are for reference purposes only and do not change the terms of the document. By signing this document, the UAO hereby represents that no change has been made to the text of this document except through the terms of the Appendix entitled “Changes to Form Document”.
You MUST signify by selecting or checking which of the following applies:
No changes to forms document.
Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.
Authorized Utility Agent: **Engineer of Record (EOR): Acceptance by Hillsborough
County:
(Signature) (Signature) (Signature)
Patrick Allen
Tamishe J. Rodriguez, P.E.
Manuel E. Santos, E.I.
(Printed Name) (Printed Name) (Printed Name)
Gas Design Project Manager
Engineer of Record
County Project Manager
(Title) (Title) (Title)
7/10/2026
(Date) (Date) (Date)
Final Approval by Hillsborough County:
(Signature) (Date)
Lisa Strout Capital Utility Manager (Printed Name) (Title)
(**When requested by the County, the EOR will attest to compatibility of plans, specifications and Utility Work Schedule)
Rodriguez, Tamishe (ChinTa) Text Box 7/10/2026
Special Conditions and Constraints
1. THE TECO PEOPLES GAS 24-HOUR EMERGENCY NUMBER 1-877-TECO-PGS (1-877-832-6747)
2. TECO PEOPLES GAS CREW AVAILABILITY MAY BE AFFECTED OR LIMITED DUE TO OUR REQUIRED
RESPONSE TO EMERGENCY CONDITIONS ELSEWHERE. THIS LIMITATION WILL BE DEPENDENT UPON THE
SEVERITY AND LOCATION OF THE EMERGENCY.
3. TECO PEOPLES GAS EMPLOYEES AND SUBCONTRACTORS NORMAL WORK SCHEDULE IS MONDAY
THROUGH FRIDAY FROM 8 A.M. TO 5 P.M., EXCLUDING TECO PEOPLES GAS OBSERVED HOLIDAYS (NEW YEARS
DAY, GOOD FRIDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER
THANKSGIVING DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY). ANY TECO PEOPLES GAS ASSISTANCE
REQUESTED FORM THE COUNTY, THEIR CONTRACTOR OF SUBCONTRACTOR OUTSIDE OF THESE NORMAL
WORKING HOURS MUST BE SCHEDULED 72 HOURS IN ADVANCE. TECO PEOPLES GAS REQUIRES VERIFICATION
THAT THE CREWS ARE STILL NEEDED ON THE ACTUAL WORKDAY (MONDAY THROUGH FRIDAY) THAT HAD
PREVIOUSLY BEEN REQUESTED OR THE LAST BUSINESS DAY BEFORE THE REQUESTED WEEKEND OR
HOLIDAY.
4. TECO PEOPLES GAS MAY GROUT FILL AND RETIRE GAS MAINS THAT ARE UNDER PAVED ROADWAYS
AND
DRIVEWAYS AS AN ALTERNATIVE TO REMOVING THEM.
5. AN 18” SEPARATION CLEARANCE MUST BE MAINTAINED WITH ALL EXISTING TECO PEOPLES GAS
MAINS/FACILITIES.
6. THIS RELOCATION SCHEDULE IS VALID FOR 1 YEAR FROM THE DATE SIGNED BY THE AUTHORIZED
UTILITY AGENT.
C. Disposition of Facilities (List All Existing & Proposed) on Project
TYPE / SIZE /
MATERIAL / OFFSET
TO BASELINE FROM
STA TO STA
DESCRIPTION
OF
UTILITY WORK
DEPENDENT
ACTIVITIES
M.O.T.
PHASE
NUMBER
CONSECUTIVE
CALENDAR
DAYS
Prior During
GAS MAIN / 6” /
COATED STEEL /
STA. 1082+35, 56’ RT
TO
STA. 1090+00, 117’ RT
INSTALL NEW 6” COATED STEEL
GAS MAIN 2’ N OF ROW AT >10’
DEPTH BELOW EXISTING
GRADE
APPROVED PERMIT, STAKING
OF STORM STRUCTURES AND
ROW,
N/A 25 0
GAS MAIN / 6” /
COATED STEEL /
STA. 1082+40, 56’ RT
TO
STA. 1089+95, 56’ RT
REMOVE RETIRED 6” COATED
STEEL GAS MAIN
INSTALLATION, TESTING, AND
ENRGIZING OF NEW 6” COATED
STEEL GAS MAIN,
N/A 5 0
GAS MAIN / 6” /
COATED STEEL /
STA. 1095+40, 56’ RT
TO
STA. 1095+60, 56’ RT
INSTALL NEW 6” COATED STEEL
GAS MAIN AT >10’ DEPTH
BELOW EXISTING GRADE
APPROVED PERMIT, STAKING
OF S-37,
N/A 20 0
GAS MAIN / 6” /
COATED STEEL /
STA. 1095+45, 56’ RT
TO
STA. 1095+55, 56’ RT
REMOVE RETIRED 6” COATED
STEEL GAS MAIN
INSTALLATION, TESTING, AND
ENRGIZING OF NEW 6” COATED
STEEL GAS MAIN,
N/A 1 0
GAS MAIN / 6” /
COATED STEEL /
STA. 1100+80, 56’ RT
TO
STA. 1118+40, 52 RT
INSTALL NEW 6” COATED STEEL
GAS MAIN
APPROVED PERMIT, STAKING
OF STORM STRUCTURES AND
ROW,
N/A 30 0
GAS MAIN / 6” /
COATED STEEL /
STA. 1100+85, 56’ RT
TO
STA. 1118+35, 54’ RT
REMOVE RETIRED 6” COATED
STEEL GAS MAIN
INSTALLATION, TESTING, AND
ENRGIZING OF NEW 6” COATED
STEEL GAS MAIN,
N/A 15 0
GAS MAIN / 2” /
COATED STEEL /
STA. 1115+30, 86’ RT
TO
STA. 1115+60, 126’ RT
INSTALL NEW 2” COATED STEEL
GAS MAIN
APPROVED PERMIT, STAKING
OF STORM STRUCTURES AND
ROW,
N/A 20 0
GAS MAIN / 2” /
COATED STEEL /
STA. 1115+30, 57’ RT
TO
STA. 1115+60, 118’ RT
REMOVE RETIRED 2” COATED
STEEL GAS MAIN AND EXISTING
VALVE
INSTALLATION, TESTING, AND
ENRGIZING OF NEW 2” COATED
STEEL GAS MAIN,
N/A 1 0
GAS MAIN / 6” /
COATED STEEL /
STA. 1082+35, 60’ RT
INSTALL NEW GAS VALVE APPROVED PERMIT, STAKING
OF STORM STRUCTURES AND
ROW,
N/A 1 0
GAS MAIN / 6” /
STA. 1100+80, 60’ RT
ROW,
N/A 1 0
GAS MAIN / 2” /
STA. 1115+60, 100’ RT
ROW,
N/A 1 0
| 2026-07-10T08:52:32-0400 | |
| Patrick Allen | |
| I have reviewed this document |
| 2026-07-10T11:28:46-0400 | |
| Tamishe J Rodriguez |
| 2026-07-10T13:59:17-0400 | |
| Manuel E. Santos |
| 2026-07-10T15:11:56-0400 | |
| Lisa Strout |
File details come from the government source that posted it. Updated .