About this file

Utility Relocation Schedule - Big Bend Road Project

This is a Utility Relocation Schedule prepared by Hillsborough County, Florida for utility work associated with the Big Bend Road Resurfacing and Widening Project (CIP Number 69647.000). The document details the utility relocation requirements for Spectrum Sunshine State, LLC, the utility agency/owner responsible for fiber optic cable (FOC), broadband fiber optic cable (BFOC), and cable television (CATV) facilities along Big Bend Road from US 41 to Covington Garden Drive. The project involves proposing new underground fiber optic and CATV conduits at various depths (ranging from 4 to 9 feet) and station locations, as well as removing and adjusting existing facilities. Non-construction activities include engineering design (47 calendar days), permitting (14 calendar days), and material procurement (20 calendar days). Construction-related activities are scheduled for prior to and during county project construction, with splicing work requiring 23 days. The utility representative designated for the project is Paul Bustamante, with contact numbers provided for both project and field representation.

The document was approved by Hillsborough County on July 13 and July 14, 2026, with final approval by Capital Utility Manager Lisa Strout, P.E. The schedule is contingent upon Spectrum Sunshine State, LLC obtaining a utility permit and complying with Hillsborough County utility requirements. The utility must notify the county in writing prior to starting, stopping, resuming, or completing work and must provide as-built information upon completion. The document includes a comprehensive disposition of facilities table identifying all existing and proposed utility work at specific station locations with dependent activities and calendar day estimates for each task. No changes to the form document were indicated by the utility agent.

View the file

Other files

File Type Posted
Attachment E- 69692000 BigBendWest Drainage Design Documentation Vol. II Final.pdf PDF
21-Attachment B- Geo Report - 69692000 100P Misc Structures 2025-11-20.pdf PDF
Attachment B- Geo Report - 69692000 100P Misc Structures 2025-11-20.pdf PDF
Attachment H- Plans- Lighting.pdf PDF
41-Attachment L- CSX Coordination.pdf PDF
Attachment G- FDOT Grant Agreement.pdf PDF
Attachment I- Utility Relocation Schedule CIP 69647.000 Utility Cert Letter 7.15.26.pdf PDF
27-Attachment I- Utility Relocation Schedule 69647.000 100% REVISED - TEC UWS - REV4 7.13.26 TR LS.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
43-Attachment M- Work Class Percentage.pdf PDF
34-Attachment I- Utility Relocation Schedule 69647.000 Spectrum Revised URS 7.13.2026 TR LS.pdf PDF
46-Attachment G- FDOT Grant Agreement.pdf PDF
Attachment B- Geo Report - 69692000 PhIV Rdwy Soil Survey Report 2025-11-20.pdf PDF
40-Attachment K- Insurance Requirements.pdf PDF
52-Attachment H- Plans- ITS.pdf PDF
48-Attachment H- Location Map.pdf PDF
Attachment I- Utility Relocation Schedule 69647.000 100% REVISED - TEC UWS - REV4 7.13.26 TR LS.pdf PDF
Attachment H- Location Map.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
3-Allowance Authorization Release Form.pdf.pdf PDF
29-Attachment I- Utility Relocation Schedule CIP 69647.000 100% URS PGS7-10-2026 REV 1SignedTR.pdf PDF
Attachment D- Permits - SWFWMD ERP 43024488.004 Approved.pdf PDF
17-Attachment F- 69692000 6050BigBend ROE ChildcareBrandon 10-9-25 Signed.pdf PDF
Agreement - Construction - Stand Alone.docx.pdf PDF
54-Attachment K- CSX Insurance Receipt.pdf PDF
Attachment I- Utility Relocation Schedule 69647.000 BIG BEND US 41 TO COVINGTON FTR URS 071426 TR LS.pdf PDF
39-Attachment J- CSX1036508- Agreement.pdf PDF
Attachment B- Geo Report - 69692000 Kings Lake Dr Misc Struc 100% Geo Report SS.pdf PDF
8-Change Order Form.pdf.pdf PDF
42-Agreement - Construction - Stand Alone.docx.pdf PDF
Attachment E- 69692000 BigBendWest Drainage Design Documentation Vol. I Final SS (1).pdf PDF
14-Attachment D- Permits - SWFWMD ERP 43024488.004 Approved.pdf PDF
23-Attachment E- 69692000 Waterset-Kings Lake Drainage Memo.pdf PDF
Attachment F- 669692000 6089BigBend ROE HomeDepot 10-9-25 signed.pdf PDF
20-Attachment B- Geo Report - 69692000 PhIV Rdwy Soil Survey Report 2025-11-20.pdf PDF
Attachment B- Geo Report - 69692000 Waterset Trail 100% RSS SS.pdf PDF
47-Attachment H- Clear Letters 2.pdf PDF
18-Attachment F- 669692000 BayIndustrial ROE 10-9-25. signed.pdf PDF
30-Attachment I- Utility Relocation Schedule CIP 69647.000 URS Uniti Fiber REV 3 7.10.26 TR LS.pdf PDF
Attachment F- 669692000 BayIndustrial ROE 10-9-25. signed.pdf PDF
Attachment I- Utility Relocation Schedule CIP 69647.000 100% URS PGS7-10-2026 REV 1SignedTR.pdf PDF
36-Bid Bond.doc.doc DOC document
9-Insurance Certificate.doc.doc DOC document
31-Attachment I- Utility Relocation Schedule MCI 69647.000 100% URS WSP-8-26 LS.pdf PDF
Attachment A- Construction Sign 2026.pdf PDF
32-Attachment I- Utility Relocation SchedCIP 69647 000 US 41 to Covington Garden Drive Zayo UWS 71326 TR LS.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
Attachment E- 69692000 Waterset-Kings Lake Drainage Memo.pdf PDF
Show 40 more

Latest 50 of 89 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hillsborough County County Road: 672 (Big Bend Rd) Plans Dated: 6/12/2026

CIP Number: 69647.000 Project Name: Big Bend Road from US 41 to Covington Garden Drive

Utility Agency/Owner (UAO): Spectrum Sunshine State, LLC

NON-CONSTRUCTION ITEMS

ESTIMATED

*CALENDAR DAYS

CONSTRUCTION ITEMS

ESTIMATED

*CALENDAR DAYS

Engineering Design 47 Prior to County Project Construction 105

Permitting 14 During County Project Construction 2

Material Procurement 20 As-Built Information _____________

Total Other 30 * Calendar Days = UAO Work Days x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule

This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Hillsborough County, the roadway contractor, and other right-of-way users, the location, relocation, adjustment, installation, and/or protection of facilities, on this Hillsborough County project. The following data is based on the plans dated as listed in the Title Block.

Any deviation by Hillsborough County or its Contractor from plans, as provided may render this work schedule null and void.

Upon notification by, Hillsborough County of such change, this utility may require additional days for assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond the control of the UAO that could not reasonably be anticipated by the UAO and which could not be avoided by the UAO with the exercise of due diligence at the time of the occurrence. The UAO agrees to notify Hillsborough County in writing prior to starting, stopping, resuming, or completing work. The UAO is to provide As-Built information.

The UAO shall obtain a utility permit and comply with the requirements of the Hillsborough County UAM.

During the project, the UAO shall locate their facilities within 48 hours of notice to their Representative: Paul Bustamante Telephone Number: 813-538-2927 -

UAO Project Representative: Paul Bustamante Telephone Number: 813-538-2924

UAO Field Representative: Paul Bustamante Telephone Number: 813-538-2924

This document is a printout of a Hillsborough County form maintained in an electronic format and all revisions thereto by the UAO in the form of additions, deletions or substitutions are reflected only in an Appendix entitled “Changes to Form Document” and no change is made in the text of the document itself. Hand notations on affected portions of this document may refer to changes reflected in the above-named Appendix but are for reference purposes only and do not change the terms of the document. By signing this document, the UAO hereby represents that no change has been made to the text of this document except through the terms of the Appendix entitled “Changes to Form Document”.

You MUST signify by selecting or checking which of the following applies:

No changes to forms document.

Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.

Authorized Utility Agent:

**Engineer of Record (EOR): Acceptance by Hillsborough County:

(Signature) (Signature) (Signature)

Paul Bustamante

Tamishe J. Rodriguez, P.E.

Manuel E. Santos, E.I

(Printed Name) (Printed Name) (Printed Name)

Construction Coordinator

Engineer of Record

County Project Manager

(Title) (Title) (Title)

7.13.26

(Date) (Date) (Date)

Final Approval by Hillsborough County:

(Signature) (Date)

Lisa Strout, P.E. Capital Utility Manager (Printed Name) (Title)

Rodriguez, Tamishe (ChinTa) Text Box 7/13/2026

(**When requested by the County, the EOR will attest to compatibility of plans, specifications and Utility Work Schedule)

Special Conditions and Constraints

C. Disposition of Facilities (List All Existing & Proposed) on Project

TYPE / SIZE /

MATERIAL / OFFSET

TO BASELINE FROM

STA TO STA

DESCRIPTION

OF

UTILITY WORK

DEPENDENT

ACTIVITIES

M.O.T.

PHASE

NUMBER

CONSECUTIVE

CALENDAR

DAYS

Prior During

Sta 1076+72, 112’L to Sta 1087+97,59’L

Proposed new BFOC in 2’’ conduit At 6’ depth and place new HH

Permitting n/a 10 0

Sta 1086+97,59’L to Sta 1087+97,R crossing

Proposed new BFOC in 2’’ conduit At 6’ depth. Placing of handhole north & south side of BB

Permitting n/a 14 0

Sta 1086+97,59’L to Sta 1087+97,R crossing

Proposed new BFOC in 2’’ conduit At 6’ depth. Placing of handhole north & south side of BB

Permitting n/a 14 0

Sta 1086+97,59’L to Sta 1090+58,62’L

Proposed new UG CATV in 2’’ conduit at 9’ depth. Placing Hand hole

Permitting n/a 5 0

Sta 1086+97R Proposed new BFOC in 2’’ conduit.

Hand hole install

Permitting n/a 14 0

Sta 1107+41,97’Lto Sta 1109+57’L

Proposed new BFOC 2’’ conduit At depth 4’. Placement of H/H

Permitting n/a 4 0

Sta 1114,106’L to Sta 1117+20,105’L

Proposed new BFOC in 2’’ conduit at 4’ depth.

Permitting n/a 3 0

Sta 1115+63,121L to Sta 1115+63, 107’R

Proposed new BFOC in 2’’ conduit at crossing. 5’-11’ depth S-67,68,69

Permitting n/a 3 0

Sta 1114+97L Proposed new hand hole Permitting n/a .5 0

Sta 1117+20,105’L Proposed new hand hole Permitting n/a .5 0

Sta 1115+63,107R Proposed new hand hole Permitting n/a 1 0

Sta 1098+76,98’L Hold & monitor n/a 1 1 0

Sta 1076+72,112’L to Sta1087+97,59L&97’R

FOC to remove Permitting/proposed splicing cutover n/a 2 0

Sta 1087+60’L to Sta 1090+58,60’L

FOC/CATV to remove Permitting/proposed splicing cutover n/a 2 0

Sta 1087+97,43’L -to Sta 1087+97,57’R

FOC/CATV to remove and adjust existing HH

Permitting/proposed splicing cutover n/a 2 0

Sta 1107+41,100’L to Sta 1109+57,100’L

FOC to remove Permitting/proposed splicing cutover n/a 2 0

Sta 1114+105’L to 1117+35,104’L

FOC/CATV to remove Permitting/proposed splicing cutover n/a 2 0

Sta 1115+20,104’L to1115+64,55’R

FOC/CATV to remove Permitting/proposed splicing cutover n/a 2 0

Splicing Time

Required 23 day impacting splicing ticket n/a 23 0

2026-07-13T15:37:45-0400
Tamishe J Rodriguez
2026-07-14T06:33:01-0400
Lisa Strout
2026-07-14T08:08:35-0400
Manuel E. Santos

File details come from the government source that posted it. Updated .