This is a Report of Geotechnical Exploration prepared by AREHNA Engineering, Inc. for Hillsborough County, Florida, through WSP USA, documenting subsurface soil conditions for the Waterset Boulevard Trail and Kings Lake Drive/Old Big Bend Road intersection improvements project (CIP 69647000). The report presents the results of geotechnical investigation services conducted under a Continuing Services Agreement dated November 17, 2021, with the exploration performed in December 2023. The scope of work included nine hand auger borings extending to depths up to six feet, four pavement cores with shallow borings, thirteen Dynamic Cone Penetrometer (DCP) tests, and two Limerock Bearing Ratio (LBR) laboratory tests. The project involves a new trail alignment along Waterset Boulevard from Scenic Drive to Big Bend Road, plus intersection improvements at Kings Lake Drive and Old Big Bend Road, including milling and resurfacing, roadway widening, and miscellaneous structure improvements such as HAWK signal poles and mast arm poles. The report was finalized on November 19, 2025, and includes recommendations for site preparation, embankment construction, pavement subgrade preparation, and construction monitoring protocols.
The subsurface exploration revealed primarily fine sandy soils (AASHTO classification A-3) suitable for supporting the proposed improvements after proper subgrade preparation. Laboratory testing determined a recommended design LBR value of 25 percent for existing soils, or 40 percent if improved with Type B Stabilization per FDOT specifications. Groundwater was encountered at depths of 2.2 to 5.7 feet below grade, with estimated seasonal high water tables at 1.5 to 2.0 feet below grade at the Kings Lake/Old Big Bend intersection and 4.0 to 4.5 feet below grade along the Waterset Boulevard Trail alignment. Existing pavement conditions at the intersection showed poor condition with transverse and block cracking, with asphalt thicknesses ranging from 2.0 to 2.6 inches and base material consisting primarily of shell. The report recommends minimum base course clearances of one foot above base clearance water elevation for the trail and two feet for the roadway improvements, compliance with FDOT Standard Plan Indices 120-001 and 120-002, vibration monitoring for three nearby commercial structures, and engagement of qualified personnel for construction observation and in-place density testing throughout fill and backfill placement operations.
View the file
Other files
Show 40 more
Latest 50 of 89 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPORT OF GEOTECHNICAL EXPLORATION
100% ROADWAY SOIL SURVEY REPORT
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG
BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD
INTERSECTION IMPROVEMENTS
HILLSBOROUGH COUNTY, FLORIDA
CIP 69647000
AREHNA PROJECT NO. B-21-112.02
November 19th, 2025
Prepared For:
WSP USA
5411 Skycenter Drive Suite 650 Tampa, FL 33607
Prepared By:
AREHNA Engineering, Inc.
5012 West Lemon Street Tampa, Florida 33609 www.arehna.com
5012 West Lemon Street Tampa, Florida 33609 Ph 813.944.3464 │ www.arehna.com
November 19th, 2025
Ms. Tamishe Rodriguez, P.E.
WSP USA
5411 Skycenter Drive Suite 650 Tampa, FL 33607
Tamishe.Rodriguez@wsp.com
Subject: Report of Geotechnical Exploration – 100% Roadway Soil Survey Waterset Blvd. Trail from Scenic Dr. to Big Bend Rd.
& Kings Lake Dr. at Old Big Bend Road Intersection Improvements Hillsborough County, FL
CIP 69647000
AREHNA Project B-21-112.02
AREHNA Engineering, Inc. (AREHNA) is pleased to submit this report of our geotechnical exploration for the proposed project. Services were conducted in general accordance with a Continuing Services Agreement dated November 17, 2021 and AREHNA Proposal B-21-112.02 dated July 10, 2023.
This 100% report presents our analyses and recommendations for the proposed project including our understanding of the project, an outline of our exploratory procedures, summary of field and laboratory data obtained as well as our recommendations for site preparation, design and construction.
AREHNA appreciates the opportunity to have assisted you on this project. Should you have any questions with regards to this report, or if we can be of any further assistance, please contact this office.
Best Regards, AREHNA ENGINEERING, INC.
FLORIDA BOARD OF PROFESSIONAL ENGINEERS CERTIFICATE OF AUTHORIZATION NO. 28410
This item has been digitally signed and sealed by:
Andrew Sway, PhD, P.G., E.I. Kirk M. Eastman, P.E.
Project Manager Senior Geotechnical Engineer Florida Registration PG-2508 Florida Registration 50733 On the date adjacent to the seal.
Printed copies of this document are not considered signed and and sealed and the signature must be verified on any electronic copies.
Report of Geotechnical Exploration November 19, 2025 Waterset Blvd. Trail from Scenic Dr. to Big Bend Rd. AREHNA Project B-21-112.02 100% Roadway Soil Survey ii
TABLE OF CONTENTS
Page
1.0 PROJECT INFORMATION AND SCOPE OF WORK
1.1 Site Description and Project Characteristics
1.2 Scope of Work
2.0 FIELD EXPLORATION & LABORATORY TESTING
2.1 Field Exploration
2.2 Laboratory Testing
3.0 SUBSURFACE CONDITIONS
3.1 USGS Topographic Data
3.2 USDA Natural Resources Conservation Service Data
3.3 Soil Boring Results
3.4 Groundwater Conditions
3.5 Estimated Seasonal High Water Level
3.6 Existing Pavement Conditions
3.7 Existing Subgrade Conditions ……………………………………………………………………………………..8
4.0 ENGINEERING EVALUATIONS AND RECOMMENDATIONS
4.1 General Information
4.2 Pavement Design Considerations
4.3 Soil Suitability
5.0 CONSTRUCTION CONSIDERATIONS
5.1 Site Preparation
5.2 Embankment Construction and Pavement Subgrade Preparation
5.3 General Construction Monitoring and Testing Guidelines
5.4 Construction Plans and Specifications Review
5.5 Protection Of Existing Structures
6.0 BASIS FOR RECOMMENDATIONS
iii | P a g e
LIST OF APPENDICES
APPENDIX A USDA & USGS Vicinity Maps
Boring Location Plan Roadway Soil Survey (Soil Profiles) Roadway Soil Survey (Pavement Evaluation and Coring Condition Data) Roadway Soil Survey (Cross Section Soil Survey for the Design of Roads)
APPENDIX B Summary of USDA Soil Survey – Table 1 Summary of Laboratory Test Results – Table 2 Summary of Seasonal High Water Table – Table 3 Summary of Dynamic Cone Penetrometer Test Results – Table 4 Dynamic Cone Penetrometer Data Curves Summary of LBR Test Results – Table 5 Laboratory Test Results LBR Test Results
APPENDIX C Pavement Core Photographs
1 | P a g e
1.0 PROJECT INFORMATION AND SCOPE OF WORK
1.1 SITE DESCRIPTION AND PROJECT CHARACTERISTICS
The project is located along Waterset Blvd. just to the south of Big Bend Rd. in Hillsborough County, Florida.
The project improvements include a new trail alignment along Waterset Blvd. from Scenic Dr. to Big Bend Rd.
It is currently undecided if the trail will be on the west or east side of Waterset Blvd. In addition, intersection improvements are proposed further to the north at the Kings Lake Dr. intersection with Old Big Bend Rd. The improvements will consist of milling and resurfacing as well as roadway widening. Miscellaneous structures improvements are also proposed for the project. HAWK (High Intensity Activated Crosswalk) signal poles are proposed along the proposed Waterset Blvd. Trail and mast arm poles are proposed at the Old Big Bend
Rd. intersection with Kings Lake Dr.
This report presents our analyses and recommendations for the proposed trail and intersection improvements; including our understanding of the project, a review of existing subsurface information, an outline of our exploratory procedures, summary of field and laboratory data obtained, as well as our recommendations for site preparation, design and construction. A report addressing the proposed miscellaneous structures improvements will be addressed under separate cover.
1.2 SCOPE OF WORK
The purpose of our geotechnical study was to obtain information on the general subsurface conditions at the project site. The subsurface materials encountered were evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated:
General location and description of potentially deleterious materials encountered in the borings which may have an impact on the proposed project.
Identification of the existing groundwater levels and estimated normal seasonal high groundwater fluctuations.
Assessment of the soil suitability along the project alignment.
The following services were performed to achieve the above-outlined objectives:
2 | P a g e
Reviewed published topographic and soils information from the United States
Geological Survey (USGS) and the ‘Soil Survey of Hillsborough County, Florida’ published by the United States Department of Agriculture (USDA) Soil Conservation
Service (SCS).
Completed a general visual reconnaissance of the site.
Coordinated underground utility location services with Sunshine 811.
Obtained a Hillsborough County ROW permit to perform pavement cores within the existing roadway.
Provided Maintenance of Traffic (MOT) in accordance with Florida Department of
Transportation (FDOT) Standard Indices.
Performed a subsurface exploration consisting of nine (9) hand auger borings extending to depths of up to 6 feet below existing grades.
Measured groundwater levels in the soil borings, if present, and estimated seasonal high groundwater levels along the project alignment.
Performed four pavement cores through the existing pavement with shallow auger borings extending to a depth of approximately 5 feet beneath the existing pavement surface at each location.
Performed 13 Dynamic Cone Penetrometer (DCP) tests in conjunction with the hand auger borings performed at the locations of nine hand auger borings and four pavement cores.
Collected two (2) bulk samples along the subject Waterset Blvd. Trail alignment and the intersection improvements at Old Big Bend Rd. for Limerock Bearing Ratio (LBR) tests.
Visually classified and stratified soil samples in the laboratory using the American
Association of State Highway and Transportation Officials (AASHTO) Classification
System.
Performed a laboratory testing program consisting of natural moisture content tests
(AASHTO T-265), full sieve gradation (AASHTO T-088), -200 wash gradations (AASHTO
T-011) and percent organics (AASHTO T-267).
3 | P a g e
Prepared a Roadway Soil Survey sheet summarizing the laboratory test results, the general soil stratification, and construction recommendations relative to FDOT
Standard Plans Indices 120-001 and 120-002.
Prepared Roadway Soil Profiles to illustrate the subsurface conditions encountered.
Reported the results of the field exploration, laboratory testing program and engineering analysis in this report, signed and sealed by a professional engineer specializing in geotechnical engineering.
4 | P a g e
2.0 FIELD EXPLORATION & LABORATORY TESTING
2.1 FIELD EXPLORATION
AREHNA performed Nine (9) hand auger borings along the roadway widening improvements (hand auger borings B-01 through B-03) and proposed trail alignment (hand auger borings B-04 through B-09). The auger borings were extended to depths of up to 6 feet below existing grades. In addition, four pavement cores with shallow hand auger borings extending to a depth of 5 feet were performed. The borings and pavement cores were located in the field using hand-held Global Positioning System (GPS) equipment with an accuracy of + 10 feet. Each boring location was staked in the field. The pavement core locations were painted on the existing roadway. Alignment data for Waterset Blvd., Old Big Bend Rd. and Kings
Lake Dr. was provided by WSP USA. Elevations for the borings performed were estimated using topography data provided by WSP USA. Boring and LBR locations were selected by WSP USA.
The hand auger borings were performed by manually advancing a 3-inch diameter, 6-inch long sampler into the soil until the sampler was full. The sampler was then retrieved and the soils in the sampler removed and visually classified. Representative samples from the borings were sealed in glass jars, labeled and transferred to our Tampa Office for classification by a Geotechnical Engineer. Upon completion of drilling, the boreholes were backfilled with native soils, as required.
The pavement cores were performed with the use of a 6-inch inside diameter core bit to determine the existing asphalt pavement and base thickness, base material and subgrade material. At the completion of each pavement core, the core was removed, and the core hole was advanced to a depth of 5 feet with the use of a hand auger to identify the underlying subgrade material. At the completion of the borings, the boreholes were backfilled with native soils and each pavement core hole was repaired with cold patch asphalt. The asphalt pavement cores were then transported to our laboratory where they were further examined, measured, and photographed by an engineer. The pavement core locations were selected by
AREHNA Engineering. The Boring Location Plan and Roadway Soil Survey (Soil Profiles) are presented in
Appendix A.
Dynamic Cone Penetrometer (DCP) tests were performed at the nine (9) hand auger borings and four (4) pavement core locations directly below the base material to determine the relative soil density of the
5 | P a g e subgrade soils. DCP results are provided on Table 4 in Appendix B including a graph showing all DCP results (equivalent LBR versus depth) on a single plot for comparison purposes.
2.2 LABORATORY TESTING
Our laboratory testing program included natural moisture content tests (AASHTO T-265), full sieve gradation tests (AASHTO T-088), -200 wash gradations (AASHTO T-011), and percent organics (AASHTO T-
267). In addition, two (2) LBR tests were also performed on representative subgrade samples at locations selected by WSP. The laboratory tests results are summarized on Tables 2 and 5 in Appendix B and on the Roadway Soil Survey Sheet in Appendix A.
6 | P a g e
3.0 SUBSURFACE CONDITIONS
3.1 USGS TOPOGRAPHIC DATA
The USGS “Riverview, Florida” Quadrangle map was reviewed for topographic information in the vicinity of the project site. The approximate location of this site has been superimposed on a reproduction of the USGS topographic map presented in Appendix A. Based on this review, the pre-development ground surface elevation at the project alignment is approximately +20 to +25 feet, National Geodetic Vertical Datum of
1929 (NGVD 29).
3.2 USDA NATURAL RESOURCES CONSERVATION SERVICE DATA
The United States Department of Agriculture (USDA) Natural Resources ConservaƟon Service (NRCS) soil survey (current Web Soil Survey) for the area is attached in Appendix A. This survey indicates that the soil at the boring locaƟons consists of Myakka fine sand, 0 to 2 percent slopes (Map Unit 29). The depth of the seasonal high water table is given as 0.5 feet below the natural ground surface. The USDA Soil Survey map for the project site is attached in Appendix A. The summary of the USDA soil types is provided on Table
1 in Appendix B.
3.3 SOIL BORING RESULTS
The soils were visually classified by a Geotechnical Engineer with index property tests performed on select samples to verify visual classification. In this regard, the surficial soils were categorized into one stratum as described in the following table. The stratum was determined based on it engineering properties regarding suitability for roadway construction per FDOT Standard Index 120-001.
STRATUM SOIL DESCRIPTION
AASHTO SOIL
CLASSIFICATION
Gray, Light Gray, Dark Gray to Brown, Pale Brown, Light Brown, Reddish Brown, Very pale Brown Slightly Silty Fine SAND to Fine SAND
A-3
A pictorial representation of the subsurface conditions encountered in the borings is shown on the Roadway
Soil Survey sheets in Appendix A. The soil profiles presented on these sheets and the above soil conditions highlight the general subsurface stratification. The soil profiles in Appendix A should be consulted for a
7 | P a g e detailed description of the subsurface conditions encountered at each boring location. Subsurface soil conditions may vary between, and away from, boring locations.
3.4 GROUNDWATER CONDITIONS
The groundwater level was encountered at depths of 2.2 to 5.7 feet below existing grades in the majority of the borings performed. The groundwater level was not encountered within the depth of one (1) boring performed.
Fluctuation in groundwater levels should be expected due to seasonal climatic changes, construction activity, rainfall variations, surface water runoff, and other site-specific factors. Since groundwater level variations are anticipated, design drawings and specifications should accommodate such possibilities and construction planning should assume that variations will occur.
3.5 ESTIMATED SEASONAL HIGH WATER LEVEL
The Seasonal High Water Table (SHWT) is the highest average depth of soil saturation during the wet season in a normal year. The procedures for estimating the SHWT depths include an examination of County soil surveys and field verification by observation and identification within the soil profile.
A review of the Hillsborough County Soil Survey data indicated that the project site is generally located within an area classified as Myakka fine sand, 0 to 2 percent slopes (Map Unit 29). The depth to the water table is noted as 0.5 feet below natural grade. The depth to the water table reported by the Soil Survey does not include fill that may have been added to the site for previous development purposes.
Based on a review of the USDA soil survey data, soil information obtained from the site and our experience in the area, we estimate that the seasonal high groundwater table will be encountered at approximate depths of between 1.5 and 2.0 feet below existing grades at the Kings Lake Dr. and Old Big Bend Rd. intersection.
For the proposed Waterset Blvd. Trail alignment, the seasonal high groundwater table is estimated at approximate depths of between 4 and 4.5 feet below existing grades. A summary of the groundwater table data and estimated seasonal high groundwater table data is presented in Table 3 in Appendix B.
8 | P a g e
3.6 EXISTING PAVEMENT CONDITIONS
A total of four (4) asphalt pavement cores were performed within existing pavement at the intersection of
Kings Lake Dr. and Old Big Bend Rd. Thickness measurements of the base material and asphalt were measured in the field. Asphalt thicknesses varied from 2.0 to 2.6 inches and the base thickness varied from 1.9 to 8.5 inches. The base material consisted of shell along Old Big Bend Rd. and Kings Lake Dr. A summary table presenting the pavement section data at each core location is included in Appendix A. Photographs of the pavement cores are presented in Appendix C.
The asphalt pavement appears to be in poor condition with transverse and block cracking observed in the surrounding pavement.
3.7 EXISTING SUBGRADE CONDITIONS
Nine (9) hand auger borings were performed along the Waterset Blvd. Trail alignment and along the proposed widening areas and at the subject Old Big Bend Rd./Kings Lake Dr. intersection. In addition, four pavement cores with hand auger borings were performed in the existing pavement at the Old Big Bend
Rd./Kings Lake Dr. intersection. The subgrade soils at the boring locations consisted primarily of fine sand (A-
3) to the boring termination depth of 5 feet below the existing ground/pavement surfaces. A summary table presenting the DCP test results and corresponding Limerock Bearing Ratio (LBR) values at each boring/core location is presented on Table 4 in Appendix B. For Kings Lake Dr., corresponding LBR values varied from 2 to 46 (PC-01) and 2 to 66 (PC-02). For Old Big Bend Rd., corresponding LBR values varied from 4 to 40 (PC-03) and 4 to 49 (PC-04). Corresponding LBR values for subgrade soils along the roadway widening improvements varied from 2 to 53 (B-01), 2 to 62 (B-02) and 2 to 27 (B-03). Corresponding LBR values for subgrade soils along the proposed trail alignment varied from 7 to 40 (B-04), 7 to 15 (B-05), 2 to 27 (B-06), 7 to 18 (B-07), 2 to 15 (B-08), and 7 to 33 (B-09).
Two (2) Laboratory LBR tests were also performed on existing subgrade soils along the Waterset Blvd.
Trail alignment and the Old Big Bend Rd./Kings Lake Dr. intersection widening area. LBR values varied from 32 to 49 percent.
9 | P a g e
4.0 ENGINEERING EVALUATIONS AND RECOMMENDATIONS
4.1 GENERAL INFORMATION
In general, the existing shallow subsurface soils are suitable to support the proposed trail and intersection improvements after proper subgrade preparation. If the final roadway improvements are significantly different from those described, or if the subsurface conditions during construction are different from those revealed by our borings, we should be notified immediately so we may review and update our recommendations presented in this report, if necessary.
4.2 PAVEMENT DESIGN CONSIDERATIONS
In accordance with the FDOT’s Florida Design Manual (FDM) section 210.10.3 a minimum separation of 3 feet should be maintained between the bottom of the roadway base course and the Base Clearance Water
Elevation except for the following facilities:
2-lane roadways in context classification C1 (Natural), C2 (Rural), C2T (Rural Town) and C3
(Suburban), and all ramps may be reduced to a 2-foot clearance.
Low point on ramps at crossroads may be reduced to a 1-foot clearance.
All other facilities in context classifications C4 through C6 (Urban General, Urban Center, and Urban
Core, respectively) may be reduced to a 1-foot clearance.
For the proposed Waterset Blvd. Trail improvements, a minimum separation of 1 foot should be maintained between the bottom of the trail and the base clearance water elevation for all other facilities as per the
Florida Design Manual. The base should also remain at this minimum separation above water levels within roadside ditches to allow for positive drainage.
Kings Lake Blvd. and Old Big Bend Rd. have no official Context Classifications on the FDOT database. We assumed that the project alignment has a Context Classification of C3, Suburban, or similar, and therefore the base clearance can be reduced to a minimum separation of 2 feet for the proposed roadway improvements. The base clearance water elevation is typically considered the normal seasonal high. The base should also remain at this minimum separation above water levels within roadside ditches to allow for positive drainage. The Roadway Designer will make the final determination of required roadway clearance.
10 | P a g e
Two (2) laboratory LBR tests were performed on representative samples of existing subgrade soils along the proposed Waterset Blvd. Trail alignment and at the proposed widening areas of the Kings Lake Dr. and Old
Big Bend Rd. intersection. LBR values varied from 32 to 49 percent. Based on the FDOT + 2 Percent of
Optimum Method in the Flexible Pavement Design Manual and Soils and Foundations Handbook, a Design
LBR of 24 percent was calculated. We recommend a maximum design LBR value of 25 percent for the existing soils. If the existing soils are planned to be improved by Type B Stabilization, as specified by the
Florida Department of Transportation (FDOT) “Standard Specifications for Road and Bridge Construction”, Section 160; then a maximum design LBR value of 40 can be used.
LBR test results are summarized in Table 5 and presented in Appendix B.
DCP tests were performed at each of the four (4) pavement core locations at the Kings Lake Dr. and Old
Big Bend Rd intersection. The DCP results and corresponding Limerock Bearing Ratio (LBR) values at each core location are presented on Table 4 in Appendix B. Corresponding LBR values for subgrade soils along
Old Big Bend Rd. varied from 4 to 49. For Kings Lake Dr., corresponding LBR values varied from 2 to 66.
Based on the 90 percent LBR value from the DCP corresponding LBR values using the FDOT Flexible
Pavement Design Manual and Soils and Foundations Handbook, a Design LBR of 19 percent was calculated.
We recommend a maximum design LBR value of 25 percent for the existing soils. If the existing soils are planned to be improved by Type B Stabilization, as specified by the Florida Department of Transportation
(FDOT) “Standard Specifications for Road and Bridge Construction”, Section 160; then a maximum design
LBR value of 40 can be used.
4.3 SOIL SUITABILITY
FDOT Standard Plan Indices 120-001 and 120-002 should be followed for soil suitability along the vertical and horizontal extent of the alignment. In this regard, the soil strata encountered during our geotechnical exploration and their suitability have been summarized and are presented on the Roadway Soil Survey sheet in Appendix A.
11 | P a g e
5.0 CONSTRUCTION CONSIDERATIONS
The following recommendations are based upon our understanding of the project information, as outlined in Section 1.0 of this report, and the data gathered during this subsurface exploration. If revised project information is developed, we should be notified so that our recommendations can be reviewed. The stratification and consistency of the subsurface materials encountered may vary within even short lateral distances; therefore, any subsurface conditions encountered during construction or any additional exploration that deviates from that documented in this exploration should be reported to us so that our recommendations can be reviewed.
5.1 SITE PREPARATION
5.1.1 Clearing and Grubbing - The initial step in new pavement, embankment and subgrade preparation within the subject construction area should generally consist of the removal of existing asphalt and vegetation, in accordance with Section 110 of the FDOT Standard Specifications for Road and Bridge.
5.1.2 Surface Water and Shallow Groundwater Control – Dewatering is unlikely at this site. However, depending on groundwater levels at the time of construction, dewatering may be required to achieve compaction requirements or trench excavations for utilities or drainage structures. It should be performed in accordance with Section 455-28 of the Standard Specifications. Excavations should be made in accordance with Section 125 and 455-29 of the Standard Specifications.
5.1.3 Exposed Soil Treatment - Following stripping operations and documentation of the acceptability of the exposed surface by qualified personnel, the exposed sandy soils should be compacted in accordance with Section 120-9 of the Standard Specifications.
Structural Fill Placement and Compaction – Structural fill or backfill, as required in accordance with Index
120-001, should be placed and compacted in accordance with Sections 120-7, 120-8 and 120-9 of the
Standard Specifications. Certain types of A-2-4 materials may be more difficult to compact than the cleaner sands due to their fines content and associated moisture sensitivity.
12 | P a g e
5.1.4 Erosion Control – Erosion control should be established in accordance with Section 104 of the
Standard Specifications.
5.2 EMBANKMENT CONSTRUCTION AND PAVEMENT SUBGRADE PREPARATION
Based on the soils encountered, the requirements of Section 120 of the Standard Specifications, with regard to pavement subgrade and embankment construction, should be achievable in most cases. The acceptable existing, near-surface sandy (A-3) soils, or similar fill soils, can generally be improved or stabilized by blending them with shell, clay fines, or crushed rock to increase the in-place LBR values after compaction. Florida limerock can also be used to stabilize the fine sandy subgrade soils. The subgrade should be stabilized in accordance with Section 160 of the Standard Specifications.
5.3 GENERAL CONSTRUCTION MONITORING AND TESTING GUIDELINES
All cleared and grubbed areas in the proposed roadway widening, roundabout and sidewalk construction areas should be observed by qualified personnel (as determined by a Specialty Engineer or testing lab) prior to any fill or backfill placement to confirm that all undesirable materials have been removed. Before any filling operations begin, representative samples of exposed existing soils and off-site borrow materials should be collected. These samples should be tested in the laboratory to determine their maximum dry density, optimum moisture content, natural moisture content, gradation, plasticity, and in the case of potential pavement subgrade soils, compacted LBR values. Additional testing may be necessary if different soil types are encountered during actual construction operations. These tests are needed for quality control during compaction and to help determine if the fill material is acceptable.
All fill and backfill placement and compaction operations should be observed and documented by a qualified engineering technician working under the direction of the CEI or FDOT engineer. Significant deviations, either from FDOT specifications or good practice, should be brought to the attention of the
FDOT's project engineer along with appropriate recommendations. In-place field density tests should be performed at representative locations in the existing compacted soils and within the fill/backfill material at appropriate intervals to confirm the degree of compaction being achieved. In-place density testing
13 | P a g e frequencies should be based upon the requirements outlined in the current FDOT Materials, Sampling, Testing and Reporting Guide.
5.4 CONSTRUCTION PLANS AND SPECIFICATIONS REVIEW
It is recommended that this office be provided with the opportunity to make a general review of the plans, and special provisions, or specifications prepared from the recommendations presented in this report.
We would then suggest any modifications so that our recommendations are properly interpreted and implemented. Our report has been written in a guideline recommendation format and is not appropriate for use as a specification without in-part being reworded into a specification-type format. It is recommended that this report not be made a part of the contract documents; however, it should be made available to prospective contractors for information purposes.
5.5 PROTECTION OF EXISTING STRUCTURES
Existing commercial building structures are located within 75 feet of the proposed pavement and roadway improvements. Protection of existing structures and nearby utilities during construction activities, including survey and monitoring for settlement should be in accordance with FDOT Section 108 of the specifications. Monitor for all structures located at each property inclusive of residential building structures, associated in-ground swimming pools, and associated deck areas and all other improvements on listed property.
The County will make the final determination of the existing structures to be monitored in accordance with FDOT Section 307.5 of the FDM. We recommend the contractor inspect and survey the condition of the existing structures, pre and post construction, in accordance with Section 108 of the Specifications for excavation, construction of the proposed roadway improvements.
We recommend the contractor continuously monitor, and record, vibration levels during the operation of any equipment causing vibrations; inclusive of pile driving, casing installation, and embankment and asphalt compaction for the adjacent existing structures in accordance with Section 108 of the
Specifications at the locations shown in Table 5.5.1 below. To further reduce any potential vibrations to the subject structures, static compaction can be used during roadway improvements construction.
14 | P a g e
Table 5.5.1 Summary of Vibration Monitoring Recommendations
Site
No. Location (Address) Structures Usage Remarks
7103 Merlot Sienna Ave, Gibsonton, FL 33534 Commercial
Embankment and asphalt vibratory compaction.
7130 Big Bend Rd., Gibsonton, FL 33534 Commercial
Embankment and asphalt vibratory compaction.
6902 Waterset Blvd, Apollo Beach, FL 33572 Commercial
Embankment and asphalt vibratory compaction.
15 | P a g e
6.0 BASIS FOR RECOMMENDATIONS
The analysis and recommendations submitted in this report are based upon the data obtained from the soil borings performed at the locations indicated. Regardless of the thoroughness of a geotechnical exploration, there is always a possibility that conditions may be different from those at specific boring locations and that conditions will not be as anticipated by the designers or contractors. In addition, the construction process itself may alter soil conditions. AREHNA is not responsible for the conclusions, opinions or recommendations made by others based on the data presented in this report.
The assessment of site environmental conditions or the presence of contaminants in the soil, rock, surface water or groundwater of the site was beyond the scope of this exploration. Any statements in this report regarding odors, staining of soils, or other unusual conditions observed are privilege information of WSP
USA and Hillsborough County.
This report was prepared exclusively for WSP USA and Hillsborough County by AREHNA. This report is intended to be used by WSP USA and Hillsborough County only. Any other use of, or reliance on, this report by any third party is at that party’s sole risk.
APPENDIX A
USDUSDA & USGS Vicinity Maps
Boring Location Plan
Roadway Soil Survey (Soil Profiles)
Roadway Soil Survey (Pavement Evaluation and Coring Condition Data)
Roadway Soil Survey (Cross Section Soil Survey for the Design of Roads)
USDA SOIL SURVEY MAP USGS TOPOGRAPHIC MAP
N
Feet
0 250
N
Feet
0 250
SECTION:
RANGE:
TOWNSHIP:
SECTION:
RANGE:
TOWNSHIP:
REFERENCE: USDA SOIL SURVEY OF HILLSBOROUGH COUNTY, FLORIDA
1/8/2024613767 D:\1-Arehna\Projects\2021\B-21-112.02 - Waterset Trail\RDSSGEO.DGN4:05:31 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
PUBLIC WORKS ADMINISTRATION
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
CIP NO. SHT. NO.
USDA & USGS VICINITY MAPS
TAMPA, FL 33609
5012 W. LEMON STREET
AREHNA ENGINEERING, INC.
P.E. LICENSE NUMBER 50733
KIRK M. EASTMAN, P.E.
APPROXIMATE PROJECT LOCATION
11, 14
19 E
31 S
APPROXIMATE PROJECT LOCATION
REFERENCE: "RIVERVIEW, FLORIDA" USGS QUADRANGLE MAP
11, 14
19 E
31 S
WATERSET TRAIL
69647000
209 210
N
Feet
0 10
B-08
B-09
LBR-02
WATERSET BLVD
S C
E N I C
D
R
T H
E
O F
F I
C I
A L
R
C O
D
T
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
A L
U
D
L E
G
A
C
10/29/2025613767 D:\1-Arehna\Projects\2021\B-21-112.02 - Waterset Trail\ABORRD01.DGN2:46:13 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
BORING LOCATION PLAN
PUBLIC WORKS ADMINISTRATION
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
WATERSET TRAIL
69647000
LEGEND
APPROXIMATE HAND AUGER BORING LOCATION
APPROXIMATE PAVEMENT CORE TEST LOCATION
APPROXIMATE LBR TEST LOCATION
TAMPA, FL 33609
5012 W. LEMON STREET
AREHNA ENGINEERING, INC.
P.E. LICENSE NUMBER 50733
KIRK M. EASTMAN, P.E.
211 212 213 214 215 216 217
N
Feet
0 10
B-07
B-06
B-04
B-05
WATERSET BLVD
B I G
B
E N
D
R
D
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
10/29/2025613767 D:\1-Arehna\Projects\2021\B-21-112.02 - Waterset Trail\ABORRD02.DGN2:46:24 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
WATERSET TRAIL
69647000
LEGEND
APPROXIMATE HAND AUGER BORING LOCATION
APPROXIMATE PAVEMENT CORE TEST LOCATION
APPROXIMATE LBR TEST LOCATION
TAMPA, FL 33609
5012 W. LEMON STREET
AREHNA ENGINEERING, INC.
304 305 306 307
N
Feet
0 10
B-03
B-02
B-01
PC-01
PC-03
PC-02
PC-04
LBR-01
B I G
B
E N
D
R
D
O L
D
B I G
B
E N
D
R
D
KINGS LAKE DR
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
10/29/2025613767 D:\1-Arehna\Projects\2021\B-21-112.02 - Waterset Trail\ABORRD03.DGN2:46:32 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
WATERSET TRAIL
69647000
LEGEND
APPROXIMATE HAND AUGER BORING LOCATION
APPROXIMATE PAVEMENT CORE TEST LOCATION
APPROXIMATE LBR TEST LOCATION
TAMPA, FL 33609
5012 W. LEMON STREET
AREHNA ENGINEERING, INC.
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
10/29/2025613767 D:\1-Arehna\Projects\2021\B-21-112.02 - Waterset Trail\ABORRD04.DGN2:46:40 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
ROADWAY SOIL SURVEY
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
WATERSET TRAIL
69647000
A-3
A
AASHTO SOIL CLASSIFICATION GROUP
REVIEW AND/OR LABORATORY TESTING
SYMBOL AS DETERMINED BY VISUAL
LEGEND
1.
B
GROUNDWATER TABLE NOT ENCOUNTEREDGNE
C
WITH ORGANIC STAINING
GRAY, LIGHT GRAY, DARK GRAY TO BROWN,
WITH SILT INTERCALATIONS
WITH REDDISH YELLOW MOTTLING
DURING INVESTIGATION
GROUNDWATER LEVEL ENCOUNTERED
PALE BROWN, LIGHT BROWN, REDDISH
FINE SAND TO FINE SAND (A-3)
BROWN, VERY PALE BROWN SLIGHTLY SILTY
D WITH TRACE SHELL FRAGMENTS
B-01B-02B-03B-04
12/27/202312/27/202312/27/202312/27/2023
B-05
12/27/2023
B-06
12/27/2023
B-07
12/27/2023
B-08
12/27/2023
B-09
12/27/2023
27.793451
-82.3715154
27.7933452
-82.371567
27.7930735
-82.3717283
27.7918017
-82.3720504
27.7917993
-82.3717165
27.7904358
-82.3720985
27.7903916
-82.371741
27.7893352
-82.372141
27.7893175
-82.371844
GNE
1A 1A
1A
1A
1A
1A
1A
1A 1B
1B1 1A
1AC
1C
1AC
1AC
1AC
20 LT
STA. 401+16
19 RT
STA. 401+01
50 RT
STA. 303+56
50 LT
STA. 216+52
58 RT
STA. 216+54
55 LT
STA. 211+55
60 RT
STA. 211+42
52 LT
STA. 207+49
44 RT
STA. 207+55
¡ OLD BBR¡ OLD BBR¡ CONST.
KINGS LAKE DR
¡ CONST.
WATERSET BLVD
¡ CONST.
WATERSET BLVD
¡ CONST.
WATERSET BLVD
¡ CONST.
WATERSET BLVD
¡ CONST.
WATERSET BLVD
¡ CONST.
WATERSET BLVD
ELEV. 20.6ELEV. 20.4ELEV. 20.6ELEV. 24.4 ELEV. 24.2ELEV. 25.5ELEV. 25.5ELEV. 27.2 ELEV. 28.2
E L E
V A
T I O
N
(F
E E
T
N A
V D
E L E
V A
T I O
N
(F
E E
T
N A
V D
10 10
TAMPA, FL 33609
5012 W. LEMON STREET
AREHNA ENGINEERING, INC.
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
10/29/2025613767 D:\1-Arehna\Projects\2021\B-21-112.02 - Waterset Trail\ABORRD05.DGN2:46:41 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
ROADWAY SOIL SURVEY
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
WATERSET TRAIL
69647000
A-3
A
AASHTO SOIL CLASSIFICATION GROUP
REVIEW AND/OR LABORATORY TESTING
SYMBOL AS DETERMINED BY VISUAL
LEGEND
1.
B
GROUNDWATER TABLE NOT ENCOUNTEREDGNE
C
WITH ORGANIC STAINING
GRAY, LIGHT GRAY, DARK GRAY TO BROWN,
WITH SILT INTERCALATIONS
WITH REDDISH YELLOW MOTTLING
DURING INVESTIGATION
GROUNDWATER LEVEL ENCOUNTERED
PALE BROWN, LIGHT BROWN, REDDISH
FINE SAND TO FINE SAND (A-3)
BROWN, VERY PALE BROWN SLIGHTLY SILTY
D WITH TRACE SHELL FRAGMENTS
PC-01 PC-02 PC-03
27.7932039 27.7936309
-82.3719451
27.7934189
-82.3716682
-82.371813
12/28/2023 12/28/2023 12/28/2023
1C
PAVEMENT
PAVEMENT
PAVEMENT
7 LT
STA. 400+67
22 RT
STA. 304+02
24 LT
STA. 305+57
¡ OLD BBR¡ CONST.
KINGS LAKE DR
¡ CONST.
KINGS LAKE DR
ELEV. 20.3 ELEV. 19.7ELEV. 18.7
PC-04
27.7933946
-82.3721391
D E
P T
H
(F
E E
T
D E
P T
H
(F
E E
T
12/28/2023
1A
PAVEMENT
85 LT
STA. 304+69
¡ CONST.
KINGS LAKE DR
ELEV. N/A
E L E
V A
T I O
N
(F
E E
T
N A
V D
E L E
V A
T I O
N
(F
E E
T
N A
V D
1D
1D
TAMPA, FL 33609
5012 W. LEMON STREET
AREHNA ENGINEERING, INC.
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
10/29/2025613767 D:\1-Arehna\Projects\2021\B-21-112.02 - Waterset Trail\SSUVRD01.DGN2:46:41 PM
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTION
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
CIP NO. SHT. NO.
WATERSET BLVD. TRAIL
ROADWAY SOIL SURVEY 69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
TAMPA, FL 33609
5012 W. LEMON STREET
AREHNA ENGINEERING, INC.
P.E. LICENSE NUMBER 50733
KIRK M. EASTMAN, P.E.
SURVEY ENDS STA. : SURVEY BEGINS STA. :
CROSS SECTION SOIL SURVEY FOR THE DESIGN OF ROADS
CONTENT
ORGANIC
CONTENT
MOISTURE
PERCENT PASS (%)
SIEVE ANALYSIS RESULTS
NO.
STRATUM
ORGANIC
MESH
MESH
MESH
MESH
MESH
TESTS
NO. OF
LIMIT
LIQUID
ohm-cm
RESISTIVITY
ppm
CHLORIDE
ppm
SULFATES
DATE OF SURVEY:
SURVEY MADE BY:
SUBMITTED BY: COUNTY:
ROAD NO.:
LIMITS (%)
ATTERBERG
TESTS
NO. OF
TESTS
NO. OF
INDEX
PLASTIC
GROUP
AASHTO
CONTENT
MOISTURE
TESTS
NO. OF
DESCRIPTION
TESTS
NO. OF
CORROSION TEST RESULTS
pH
A-3
EMBANKMENT AND SUBGRADE MATERIAL
STRATA BOUNDARIES ARE APPROXIMATE. MAKE FINAL CHECK AFTER GRADING.
AREHNA ENGINEERING, INC.
NOTES:
1.
KIRK M. EASTMAN, P.E.
REFERENCE:
HILLSBOROUGH COUNTY
HILLSBOROUGH
1-3 2
GNE - GROUNDWATER TABLE NOT ENCOUNTERED
A -
B -
C -
2-6 100 9-21 4 93-95 60-76 31-38 9 --
WITH ORGANIC STAINING
- WATER TABLE ENCOUNTERED
WITH SILT INTERCALATIONS
WITH REDDISH YELLOW MOTTLING
GRAY, LIGHT GRAY, DARK GRAY TO BROWN, PALE BROWN, LIGHT BROWN,
REDDISH BROWN, VERY PALE BROWN SLIGHTLY SILTY FINE SAND TO
FINE SAND
PROJECT NAME: WATERSET TRAIL
N/A N/A
N/A
DECEMBER 2023
N/A
D - WITH TRACE SHELL FRAGMENTS
CIP NO: 69647000
5 (-200)
THE MATERIAL FROM STRATUM 1 (A-3) IS SELECT (S) AND APPEARS SATISFACTORY FOR USE IN THE EMBANKMENT WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-001.
APPENDIX B
Summary of USDA Soil Survey – Table 1 Summary of Laboratory Test Results – Table 2
Summary of Seasonal High Water Table – Table 3 Summary of Dynamic Cone Penetrometer Test Results – Table 4
Dynamic Cone Penetrometer Data Curves Summary of LBR Test Results – Table 5
Laboratory Test Results LBR Test Results
Depth
(feet)
Duration
(months) Kind Steel Concrete
0 ‐ 6 Fine Sand A‐2‐4,A‐3 SP‐SM, SM 12 ‐ 40
6 ‐ 20 Sand, Fine Sand A‐2‐4,A‐3 SP‐SM, SM 12 ‐ 40
20 ‐ 36 Fine sand, sand A‐2‐4,A‐3 SP, SP‐SM 1 ‐ 12
36 ‐ 80 Fine sand, sand A‐2‐4,A‐3 SP‐SM, SM 12 ‐ 40
TABLE 1
SUMMARY OF USDA SOIL SURVEY
HILLSBOROUGH COUNTY, FLORIDA
CIP NO. 69647000
AREHNA Project No. B‐21‐112.02
Myakka fine sand, 0 to 2 percent slopes
(29)
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD INTERSECTION IMPROVEMENTS
USDA Soil Type Depth
(inches) USDA Soil Description AASHTO USCS
Permeability
(ft/day)
Seasonal High Groundwater Risk of Corrosion
0.5 Jun ‐ Nov Apparent High High
B‐01 2‐2.5 A‐3 18 ‐ ‐ ‐ ‐ 2 ‐
B‐02 1.5‐2 A‐3 19 ‐ ‐ ‐ ‐ 6 3
B‐03 1.5‐2 A‐3 14 ‐ ‐ ‐ ‐ 3 ‐
B‐05 3.5‐4 A‐3 21 100 95 68 36 5 ‐
B‐07 2.5‐3 A‐3 11 ‐ ‐ ‐ ‐ 4 1
B‐08 4‐4.5 A‐3 12 ‐ ‐ ‐ ‐ 3 ‐
B‐09 5‐5.5 A‐3 9 100 93 60 31 2 ‐
LBR‐01 1‐2 A‐3 14 100 95 72 38 3 ‐
LBR‐02 1‐2 A‐3 11 100 94 76 37 4 ‐
AREHNA Project No. B‐21‐112.02
TABLE 2
SUMMARY OF LABORATORY TEST RESULTS
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD
INTERSECTION IMPROVEMENTS
HILLSBOROUGH COUNTY, FLORIDA
CIP NO. 69647000
Boring
No.
Sample
Depth
(feet)
AASHTO
Classification
Natural
Moisture
Content
Sieve Analysis (% Passing)
#200
Organic
Content
#10 #40 #60 #100
Baseline Station Offset (feet)
Elevation(3)
(feet, NAVD 88) Date
Recorded Depth(1)
(feet) Elevation
(feet, NAVD 88) Map
Symbol
Estimated SHGWT Depth(2)
(feet)
Depth (Feet)
Elevation (feet, NAVD 88)
B-01 CL OLD BBR 401+16 20 LT 6 20.6 12/27/2023 2.8 17.9 29 0.5 1.5 19.0 ± 0.5
B-02 CL OLD BBR 401+01 19 RT 6 20.4 12/27/2023 2.8 17.6 29 0.5 1.5 19.0 ± 0.5
B-03 CL KINGS LAKE DR 303+56 50 RT 6 20.6 12/27/2023 2.2 18.4 29 0.5 1.5 19.0 ± 0.5
PC-01 CL KINGS LAKE DR 304+02 22 RT 5 20.3 12/28/2023 3.0 17.3 29 0.5 2 18.0 ± 0.5 PC-02 CL KINGS LAKE DR 305+57 24 LT 6 18.7 12/28/2023 4.8 13.9 29 0.5 2 16.5 ± 0.5 PC-03 CL KINGS LAKE DR 400+67 7 LT 5 19.7 12/28/2023 2.7 17.0 29 0.5 1.5 18.0 ± 0.5
PC-04 CL KINGS LAKE DR 304+69 85 LT 5 - 12/28/2023 3.3 - 29 0.5 2 -
B-04 CL WATERSET BLVD 216+52 50 LT 6 24.4 12/27/2023 5.5 18.9 29 0.5 4.5 19.0 ± 0.5 B-05 CL WATERSET BLVD 216+54 58 RT 6 24.2 12/27/2023 4.8 19.5 29 0.5 4 20.0 ± 0.5 B-06 CL WATERSET BLVD 211+55 55 LT 6 25.5 12/27/2023 5.6 19.9 29 0.5 4.5 21.0 ± 0.5 B-07 CL WATERSET BLVD 211+42 60 RT 6 25.5 12/27/2023 5.4 20.1 29 0.5 4.5 21.0 ± 0.5 B-08 CL WATERSET BLVD 207+49 52 LT 6 28.2 12/27/2023 5.7 22.5 29 0.5 4.5 23.5 ± 0.5
B-09 CL WATERSET BLVD 207+55 60 RT 6 27.2 12/27/2023 GNE - 29 0.5 4 23.0 ± 0.5
(1) Depth below existing grade at time of field work.
(2) Seasonal high water table depth below natural grade per Hillsborough County, Florida USDA Soil Survey information.
(3) Elevation dataestimated from topography information provided by WSP USA GNE: Groundwater table not encountered within the boring termination depth.
TABLE 3
SUMMARY OF SEASONAL HIGH GROUNDWATER TABLE ESTIMATE
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD INTERSECTION IMPROVEMENTS
CIP NO. 69647000
AREHNA Project No. B-21-112.02
HILLSBOROUGH COUNTY, FLORIDA
Boring No.
Boring Depth Measured Groundwater Table USDA Soil SurveyBoring Location Estimated Seasonal High Water
(inches)
Number of
Blows
Cumulative
Penetration
(inches)
Penetration
Between
Readings
(inches)
Penetration per Blow
(inches)
Hammer
Factor
DCP Index
(inch/blow)
LBR (%)
4 3 2 2.0 0.667 2 1.333 7
6 4 4 2.0 0.500 2 1.000 10
8 6 6 2.0 0.333 2 0.667 15
10 5 8 2.0 0.400 2 0.800 13
12 8 10 2.0 0.250 2 0.500 21
14 2 12 2.0 1.000 2 2.000 4
16 8 14 2.0 0.250 2 0.500 21
18 8 16 2.0 0.250 2 0.500 21
20 12 18 2.0 0.167 2 0.333 33
22 18 20 2.0 0.111 2 0.222 53
24 14 22 2.0 0.143 2 0.286 40
26 5 24 2.0 0.400 2 0.800 13
28 6 26 2.0 0.333 2 0.667 15
30 7 28 2.0 0.286 2 0.571 18
32 6 30 2.0 0.333 2 0.667 15
34 5 32 2.0 0.400 2 0.800 13
36 6 34 2.0 0.333 2 0.667 15
38 2 36 2.0 1.000 2 2.000 4
40 3 38 2.0 0.667 2 1.333 7
42 3 40 2.0 0.667 2 1.333 7
44 3 42 2.0 0.667 2 1.333 7
46 3 44 2.0 0.667 2 1.333 7
48 2 46 2.0 1.000 2 2.000 4
50 1 48 2.0 2.000 2 4.000 2
52 1 50 2.0 2.000 2 4.000 2
54 1 52 2.0 2.000 2 4.000 2
56 1 54 2.0 2.000 2 4.000 2
58 1 56 2.0 2.000 2 4.000 2
60 1 58 2.0 2.000 2 4.000 2
4 2 2 2.0 1.000 2 2.000 4
6 3 4 2.0 0.667 2 1.333 7
8 3 6 2.0 0.667 2 1.333 7
10 5 8 2.0 0.400 2 0.800 13
12 7 10 2.0 0.286 2 0.571 18
14 5 12 2.0 0.400 2 0.800 13
16 5 14 2.0 0.400 2 0.800 13
18 5 16 2.0 0.400 2 0.800 13
20 6 18 2.0 0.333 2 0.667 15
22 20 20 2.0 0.100 2 0.200 59
24 21 22 2.0 0.095 2 0.190 62
26 4 24 2.0 0.500 2 1.000 10
28 5 26 2.0 0.400 2 0.800 13
30 5 28 2.0 0.400 2 0.800 13
32 5 30 2.0 0.400 2 0.800 13
34 4 32 2.0 0.500 2 1.000 10
36 3 34 2.0 0.667 2 1.333 7
AREHNA Project No. B‐21‐112.02
TABLE 4
SUMMARY OF DCP TEST RESULTS
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD
INTERSECTION IMPROVEMENTS
CIP NO. 69647000
HILLSBOROUGH COUNTY, FLORIDA
B‐01
B‐02
Number of
Blows
Cumulative
Penetration
(inches)
Penetration
Between
Readings
(inches)
Penetration per Blow
(inches)
Hammer
Factor
DCP Index
(inch/blow)
LBR (%)
AREHNA Project No. B‐21‐112.02
TABLE 4
SUMMARY OF DCP TEST RESULTS
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD
INTERSECTION IMPROVEMENTS
CIP NO. 69647000
HILLSBOROUGH COUNTY, FLORIDA
38 1 36 2.0 2.000 2 4.000 2
40 1 38 2.0 2.000 2 4.000 2
42 1 40 2.0 2.000 2 4.000 2
44 2 42 2.0 1.000 2 2.000 4
46 2 44 2.0 1.000 2 2.000 4
48 2 46 2.0 1.000 2 2.000 4
50 2 48 2.0 1.000 2 2.000 4
52 3 50 2.0 0.667 2 1.333 7
54 3 52 2.0 0.667 2 1.333 7
56 2 54 2.0 1.000 2 2.000 4
58 2 56 2.0 1.000 2 2.000 4
60 2 58 2.0 1.000 2 2.000 4
4 2 2 2.0 1.000 2 2.000 4
6 4 4 2.0 0.500 2 1.000 10
8 3 6 2.0 0.667 2 1.333 7
10 5 8 2.0 0.400 2 0.800 13
12 5 10 2.0 0.400 2 0.800 13
14 5 12 2.0 0.400 2 0.800 13
16 3 14 2.0 0.667 2 1.333 7
18 8 16 2.0 0.250 2 0.500 21
20 8 18 2.0 0.250 2 0.500 21
22 7 20 2.0 0.286 2 0.571 18
24 8 22 2.0 0.250 2 0.500 21
26 2 24 2.0 1.000 2 2.000 4
28 6 26 2.0 0.333 2 0.667 15
30 5 28 2.0 0.400 2 0.800 13
32 6 30 2.0 0.333 2 0.667 15
34 10 32 2.0 0.200 2 0.400 27
36 8 34 2.0 0.250 2 0.500 21
38 2 36 2.0 1.000 2 2.000 4
40 2 38 2.0 1.000 2 2.000 4
42 3 40 2.0 0.667 2 1.333 7
44 3 42 2.0 0.667 2 1.333 7
46 6 44 2.0 0.333 2 0.667 15
48 6 46 2.0 0.333 2 0.667 15
50 2 48 2.0 1.000 2 2.000 4
52 1 50 2.0 2.000 2 4.000 2
54 2 52 2.0 1.000 2 2.000 4
56 5 54 2.0 0.400 2 0.800 13
58 5 56 2.0 0.400 2 0.800 13
60 5 58 2.0 0.400 2 0.800 13
4 3 2 2.0 0.667 2 1.333 7
6 4 4 2.0 0.500 2 1.000 10
8 4 6 2.0 0.500 2 1.000 10
10 5 8 2.0 0.400 2 0.800 13
12 8 10 2.0 0.250 2 0.500 21
14 3 12 2.0 0.667 2 1.333 7
B‐03
B‐04
Number of
Blows
Cumulative
Penetration
(inches)
Penetration
Between
Readings
(inches)
Penetration per Blow
(inches)
Hammer
Factor
DCP Index
(inch/blow)
LBR (%)
AREHNA Project No. B‐21‐112.02
TABLE 4
SUMMARY OF DCP TEST RESULTS
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD
INTERSECTION IMPROVEMENTS
CIP NO. 69647000
HILLSBOROUGH COUNTY, FLORIDA
16 9 14 2.0 0.222 2 0.444 24
18 9 16 2.0 0.222 2 0.444 24
20 11 18 2.0 0.182 2 0.364 30
22 14 20 2.0 0.143 2 0.286 40
24 13 22 2.0 0.154 2 0.308 36
26 12 24 2.0 0.167 2 0.333 33
28 13 26 2.0 0.154 2 0.308 36
30 12 28 2.0 0.167 2 0.333 33
32 9 30 2.0 0.222 2 0.444 24
34 10 32 2.0 0.200 2 0.400 27
36 9 34 2.0 0.222 2 0.444 24
38 3 36 2.0 0.667 2 1.333 7
40 5 38 2.0 0.400 2 0.800 13
42 8 40 2.0 0.250 2 0.500 21
44 8 42 2.0 0.250 2 0.500 21
46 9 44 2.0 0.222 2 0.444 24
48 11 46 2.0 0.182 2 0.364 30
50 4 48 2.0 0.500 2 1.000 10
52 6 50 2.0 0.333 2 0.667 15
54 5 52 2.0 0.400 2 0.800 13
56 5 54 2.0 0.400 2 0.800 13
58 6 56 2.0 0.333 2 0.667 15
60 6 58 2.0 0.333 2 0.667 15
4 4 2 2.0 0.500 2 1.000 10
6 5 4 2.0 0.400 2 0.800 13
8 3 6 2.0 0.667 2 1.333 7
10 4 8 2.0 0.500 2 1.000 10
12 5 10 2.0 0.400 2 0.800 13
14 5 12 2.0 0.400 2 0.800 13
16 6 14 2.0 0.333 2 0.667 15
18 6 16 2.0 0.333 2 0.667 15
20 6 18 2.0 0.333 2 0.667 15
22 4 20 2.0 0.500 2 1.000 10
24 3 22 2.0 0.667 2 1.333 7
26 2 24 2.0 1.000 2 2.000 4
28 3 26 2.0 0.667 2 1.333 7
30 3 28 2.0 0.667 2 1.333 7
32 3 30 2.0 0.667 2 1.333 7
34 3 32 2.0 0.667 2 1.333 7
36 4 34 2.0 0.500 2 1.000 10
38 3 36 2.0 0.667 2 1.333 7
40 4 38 2.0 0.500 2 1.000 10
42 4 40 2.0 0.500 2 1.000 10
44 3 42 2.0 0.667 2 1.333 7
46 3 44 2.0 0.667 2 1.333 7
48 4 46 2.0 0.500 2 1.000 10
50 2 48 2.0 1.000 2 2.000 4
52 2 50 2.0 1.000 2 2.000 4
54 4 52 2.0 0.500 2 1.000 10
B‐05
Number of
Blows
Cumulative
Penetration
(inches)
Penetration
Between
Readings
(inches)
Penetration per Blow
(inches)
Hammer
Factor
DCP Index
(inch/blow)
LBR (%)
AREHNA Project No. B‐21‐112.02
TABLE 4
SUMMARY OF DCP TEST RESULTS
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD
INTERSECTION IMPROVEMENTS
CIP NO. 69647000
HILLSBOROUGH COUNTY, FLORIDA
56 5 54 2.0 0.400 2 0.800 13
58 4 56 2.0 0.500 2 1.000 10
60 5 58 2.0 0.400 2 0.800 13
4 1 2 2.0 2.000 2 4.000 2
6 3 4 2.0 0.667 2 1.333 7
8 6 6 2.0 0.333 2 0.667 15
10 9 8 2.0 0.222 2 0.444 24
12 10 10 2.0 0.200 2 0.400 27
14 6 12 2.0 0.333 2 0.667 15
16 8 14 2.0 0.250 2 0.500 21
18 7 16 2.0 0.286 2 0.571 18
20 7 18 2.0 0.286 2 0.571 18
22 6 20 2.0 0.333 2 0.667 15
24 6 22 2.0 0.333 2 0.667 15
26 5 24 2.0 0.400 2 0.800 13
28 6 26 2.0 0.333 2 0.667 15
30 7 28 2.0 0.286 2 0.571 18
32 7 30 2.0 0.286 2 0.571 18
34 8 32 2.0 0.250 2 0.500 21
36 8 34 2.0 0.250 2 0.500 21
38 3 36 2.0 0.667 2 1.333 7
40 6 38 2.0 0.333 2 0.667 15
42 6 40 2.0 0.333 2 0.667 15
44 6 42 2.0 0.333 2 0.667 15
46 5 44 2.0 0.400 2 0.800 13
48 2 46 2.0 1.000 2 2.000 4
50 1 48 2.0 2.000 2 4.000 2
52 2 50 2.0 1.000 2 2.000 4
54 2 52 2.0 1.000 2 2.000 4
56 3 54 2.0 0.667 2 1.333 7
58 3 56 2.0 0.667 2 1.333 7
60 3 58 2.0 0.667 2 1.333 7
4 2 2 2.0 1.000 2 2.000 4
6 3 4 2.0 0.667 2 1.333 7
8 3 6 2.0 0.667 2 1.333 7
10 4 8 2.0 0.500 2 1.000 10
12 6 10 2.0 0.333 2 0.667 15
14 3 12 2.0 0.667 2 1.333 7
16 4 14 2.0 0.500 2 1.000 10
18 7 16 2.0 0.286 2 0.571 18
20 7 18 2.0 0.286 2 0.571 18
22 5 20 2.0 0.400 2 0.800 13
24 6 22 2.0 0.333 2 0.667 15
26 3 24 2.0 0.667 2 1.333 7
28 3 26 2.0 0.667 2 1.333 7
30 3 28 2.0 0.667 2 1.333 7
B‐07
B‐06
Number of
Blows
Cumulative
Penetration
(inches)
Penetration
Between
Readings
(inches)
Penetration per Blow
(inches)
Hammer
Factor
DCP Index
(inch/blow)
LBR (%)
AREHNA Project No. B‐21‐112.02
TABLE 4
SUMMARY OF DCP TEST RESULTS
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD
INTERSECTION IMPROVEMENTS
CIP NO. 69647000
HILLSBOROUGH COUNTY, FLORIDA
32 3 30 2.0 0.667 2 1.333 7
34 3 32 2.0 0.667 2 1.333 7
36 4 34 2.0 0.500 2 1.000 10
38 2 36 2.0 1.000 2 2.000 4
40 3 38 2.0 0.667 2 1.333 7
42 5 40 2.0 0.400 2 0.800 13
44 4 42 2.0 0.500 2 1.000 10
46 4 44 2.0 0.500 2 1.000 10
48 4 46 2.0 0.500 2 1.000 10
50 3 48 2.0 0.667 2 1.333 7
52 3 50 2.0 0.667 2 1.333 7
54 3 52 2.0 0.667 2 1.333 7
56 5 54 2.0 0.400 2 0.800 13
58 3 56 2.0 0.667 2 1.333 7
60 4 58 2.0 0.500 2 1.000 10
4 2 2 2.0 1.000 2 2.000 4
6 3 4 2.0 0.667 2 1.333 7
8 3 6 2.0 0.667 2 1.333 7
10 4 8 2.0 0.500 2 1.000 10
12 5 10 2.0 0.400 2 0.800 13
14 4 12 2.0 0.500 2 1.000 10
16 6 14 2.0 0.333 2 0.667 15
18 6 16 2.0 0.333 2 0.667 15
20 6 18 2.0 0.333 2 0.667 15
22 5 20 2.0 0.400 2 0.800 13
24 4 22 2.0 0.500 2 1.000 10
26 2 24 2.0 1.000 2 2.000 4
28 2 26 2.0 1.000 2 2.000 4
30 3 28 2.0 0.667 2 1.333 7
32 3 30 2.0 0.667 2 1.333 7
34 2 32 2.0 1.000 2 2.000 4
36 3 34 2.0 0.667 2 1.333 7
38 3 36 2.0 0.667 2 1.333 7
40 2 38 2.0 1.000 2 2.000 4
42 2 40 2.0 1.000 2 2.000 4
44 4 42 2.0 0.500 2 1.000 10
46 3 44 2.0 0.667 2 1.333 7
48 2 46 2.0 1.000 2 2.000 4
50 1 48 2.0 2.000 2 4.000 2
52 1 50 2.0 2.000 2 4.000 2
54 1 52 2.0 2.000 2 4.000 2
56 1 54 2.0 2.000 2 4.000 2
58 1 56 2.0 2.000 2 4.000 2
60 1 58 2.0 2.000 2 4.000 2
4 3 2 2.0 0.667 2 1.333 7
6 3 4 2.0 0.667 2 1.333 7
B‐08
B‐09
Number of
Blows
Cumulative
Penetration
(inches)
Penetration
Between
Readings
(inches)
Penetration per Blow
(inches)
Hammer
Factor
DCP Index
(inch/blow)
LBR (%)
AREHNA Project No. B‐21‐112.02
TABLE 4
SUMMARY OF DCP TEST RESULTS
WATERSET BOULEVARD TRAIL FROM SCENIC DRIVE TO BIG BEND ROAD & KINGS LAKE DRIVE AT OLD BIG BEND ROAD
INTERSECTION IMPROVEMENTS
CIP NO. 69647000
HILLSBOROUGH COUNTY, FLORIDA
8 4 6 2.0 0.500 2 1.000 10
10 5 8 2.0 0.400 2 0.800 13
12 5 10 2.0 0.400 2 0.800 13
14 3 12 2.0 0.667 2 1.333 7
16 3 14 2.0 0.667 2 1.333 7
18 4 16 2.0 0.500 2 1.000 10
20 4 18 2.0 0.500 2 1.000 10
22 4 20 2.0 0.500 2 1.000 10
24 4 22 2.0 0.500 2 1.000 10
26 5 24 2.0 0.400 2 0.800 13
28 3 26 2.0 0.667 2 1.333 7
30 4 28 2.0 0.500 2 1.000 10
32 5 30 2.0…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .