30-Attachment I- Utility Relocation Schedule CIP 69647.000 URS Uniti Fiber REV 3 7.10.26 TR LS.pdf
PDF 249 KB Posted
- Attached to
- Big Bend Road from US 41 to Covington Garden Dr.
- Solicitation number
- IFB-26-00378
- Issued by
- Hillsborough County, Florida
About this file
This is a Utility Relocation Schedule prepared by Uniti Fiber LLC, a utility agency/owner, for Hillsborough County, Florida in connection with the Big Bend Road Improvement Project (CIP 69647.000). The project involves resurfacing and widening approximately 0.75 miles of Big Bend Road from US 41 to Covington Garden Drive, with an estimated project cost of $21,624,946.34. The utility relocation work is based on plans dated June 12, 2026, with a revised 100% project phase designation. Uniti Fiber has submitted a detailed work schedule identifying eleven separate utility disposition activities, including conduit installation, hand hole adjustments and removals, splicing operations, and protection measures for existing fiber optic and other utility infrastructure. The utility requires a 72-hour advance notice prior to commencing work and has designated Zach Oliver as its primary point of contact for facility location and project coordination within 48 hours of notice.
The utility relocation schedule specifies estimated calendar days for completion of various non-construction and construction-related tasks, with engineering design estimated at 10 calendar days prior to county project construction, permitting at 14 days, and material procurement at 30 days. Construction-phase work is estimated at 49 calendar days prior to and 8 days during county project construction. The document was authorized by Zach Oliver (Asset Protection Supervisor) on July 10, 2026, and approved by Engineer of Record Tamishe Rodriguez, P.E. and County Project Manager Manuel E. Santos, E.I. on July 13, 2026. Final approval by Hillsborough County's Capital Utility Coordinator, Lisa Strout, was also dated July 13, 2026. Uniti Fiber's project contacts include construction managers, asset protection personnel, and operations specialists across multiple regional locations, ensuring comprehensive coordination throughout the utility relocation process.
View the file
Other files
Show 40 more
Latest 50 of 89 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Updated 01/2026
Hillsborough County County Road: 672 6/12/2026 Plans Dated: 6/12/2026 Project Phase: Revised 100% CIP Number: 69647.000 Project Name: Big Bend Road from US 41 to Covington Garden Drive Utility Agency/Owner (UAO): Uniti Fiber LLC
Sensitivity: Internal
NON-CONSTRUCTION ITEMS ESTIMATED
*CALENDAR DAYS
CONSTRUCTION ITEMS ESTIMATED
*CALENDAR DAYS
Engineering Design 10 Prior to County Project Construction 49 Permitting 14 During County Project Construction 8 Material Procurement 30 As-Built Information 10 Other 0 * Calendar Days = UAO Workdays x 7/5 and takes into consideration simultaneous activities listed on Part “C” of this Schedule
This document has been developed as the method for a Utility Agency/Owner (UAO) to transmit to Hillsborough County, the roadway contractor, and other right-of-way users, the location, relocation, adjustment, installation, and/or protection of facilities, on this Hillsborough County project. The following data is based on the plans dated as listed in the Title Block.
Any deviation by Hillsborough County or its Contractor from plans, as provided may render this work schedule null and void.
Upon notification by Hillsborough County of such change, this utility may require additional days for assessment and negotiation of a new work schedule. This UAO is not responsible for events beyond the control of the UAO that could not reasonably be anticipated by the UAO and which could not be avoided by the UAO with the exercise of due diligence at the time of the occurrence. The UAO agrees to notify Hillsborough County in writing prior to starting, stopping, resuming, or completing work. The UAO is to provide As-Built information.
The UAO shall obtain a utility permit and comply with the requirements of the Hillsborough County UAM.
During the project, the UAO shall locate their facilities within 48 hours of notice to their Representative: Zach Oliver Telephone Number: 727-337-1381
UAO Project Representative: Zach Oliver Telephone Number: 727-337-1381 UAO Field Representative: Zach Oliver Telephone Number: 727-337-1381 This document is a printout of a Hillsborough County form maintained in an electronic format and all revisions thereto by the UAO in the form of additions, deletions or substitutions are reflected only in an Appendix entitled “Changes to Form Document” and no change is made in the text of the document itself. Hand notations on affected portions of this document may refer to changes reflected in the above-named Appendix but are for reference purposes only and do not change the terms of the document. By signing this document, the UAO hereby represents that no change has been made to the text of this document except through the terms of the Appendix entitled “Changes to Form Document”.
You MUST signify by selecting or checking which of the following applies:
No changes to forms document.
Appendix “Changes to Forms Document” is attached. Number of Attachment Pages.
Authorized Utility Agent: **Engineer of Record (EOR): Acceptance by Hillsborough County PM:
(Signature) (Signature) (Signature)
Zach Oliver Tamishe Rodriguez, P.E. Manuel E. Santos, E.I.
(Printed Name) (Printed Name) (Printed Name)
Asset Protection Supervisor Engineer of Record County Project Manager (Title) (Title) (Title)
7/10/2026 (Date) (Date) (Date)
Final Approval by Hillsborough County Utility Coordination: (Signature) (Date)
Lisa Strout Capital Utility Coordinator (Printed Name) (Title)
(**When requested by the County, the EOR will attest to compatibility of plans, specifications and Utility Work Schedule)
Rodriguez, Tamishe (ChinTa) Text Box 7/13/2026
Plans Dated: 6/12/2026 Project Phase: Revised 100% CIP Number: 69647.000 Project Name: Big Bend Road from US 41 to Covington Garden Drive Utility Agency/Owner (UAO): Uniti Fiber LLC
Sensitivity: Internal
Special Conditions and Constraints UNITI FIBER LLC REQUEST A 72Hour NOTICE before work being performed for ACT:
Uniti Fiber Contacts South FL:
Construction Manager: Terry Young 251-422-3872 terry.young@uniti.com Orlando Construction Manager: James Mosley 251-654-8216 James.Mosley@uniti.com Asset Protection Manager: Zach Oliver 727-337-1381 zach.oliver@uniti.com OSP Engineer: John Middleton 727-281-0198 john.middleton@uniti.com OSP Engineer: Tim Pryor 727-293-0697 tim.pryor@uniti.com Field Operations Manager: Michael Hall 251-401-3879 michael.hall@uniti.com Asset Protection Specialist: Juan Hernandez 305-801-1983 Juan.Hernandez@uniti.com
Plans Dated: 6/12/2026 Project Phase: Revised 100% CIP Number: 69647.000 Project Name: Big Bend Road from US 41 to Covington Garden Drive Utility Agency/Owner (UAO): Uniti Fiber LLC
Sensitivity: Internal
Section C. Disposition of Facilities (List All Existing & Proposed) on Project
Act No. Type / Size /
Material
From Station/Offset
To Station/Offset
Description of Utility Work
Dependent Activities
M.O.T.
Phase
No.
Consecutive Calendar Days Prior During
1. Splicing N/A 20 0
2. Uniti Fiber 1-1.88”
FP Conduit
BFOC
STA:1077-45 LT
67.95’
Min. 15’ Depth
1089-20 LT
68.48’
Min. 15’ Depth
Joint Bore ROW and
STRUCTURE
STAKING
N/A 15 0
3. Remove Uniti Fiber
1-1.88” FP Conduit
BFOC
STA:1077-45
LT
1089-20 LT Remove Conduit NEW FOC SPLICIG
COMPELTE
N/A 10 0
4. Uniti Fiber Hand Hole
STA:1076+60
LT
63.23’
STA:1077+45
LT
63.23’
Add Hand Hole 24X36X34
Connect existing FOC to West side of new HH
For Joint Bore N/A 2 0
5. Uniti Fiber 1-1.88”
FP Conduit
BFOC
STA: 1077+00
LT
STA: 1077+00
LT
Hold and Protect S-1 and S-2 PH I 0 2
6. Uniti Fiber Hand Hole
1089+21 LT
67.95’
1089+22 LT
82.21’
Adjust Hand Hole Sidewalk Construction
PH I 0 2
7. ATT Conduit 1089+42 1089+42 Hold and Protect Water install PH I 0 2
8. T-Mobile Conduit
1089+42 1089+42 Hold and Protect Water Install PH I 0 2
9. Uniti Fiber Hand Hole
STA:1077+45
LT 59’
STA:1077+45
LT 59’
Remove Hand Hole NEW FOC SPLICIG
COMPELTE
N/A 1 0
10. Uniti Fiber Hand Hole
1084+18 LT 1084+18 LT Remove Hand Hole NEW FOC SPLICIG
COMPELTE
N/A 1 0
11.
12.
13.
14.
15.
| 2026-07-13T13:06:59-0400 | |
| Tamishe J Rodriguez |
| 2026-07-13T14:53:37-0400 | |
| Lisa Strout |
| 2026-07-13T14:57:11-0400 | |
| Manuel E. Santos |