100690 - SW 205th Avenue - Baseline to Quatama Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 2026.028-LUT CPS
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91313 Construction, Bridge And Drawbridge (Includes Reconstruction/Rehabilitation)
- 91327 Construction, Highway And Road
- 91340 Construction, Pipeline
- 91345 Construction, Sewer And Storm Drain
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 91361 Construction, Vertical, Concrete, Pour-In-Place, Form/Place/Finish
- UNSPSC codes
- 72141205 Drainage system construction service
- 72141206 Dredging service
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 95121601 Steel bridge
- 95121602 Dry dock
Show all 42
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141001 Highway and road new construction service
- 72141106 Gravel or dirt road construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 72141124 Pipe laying service
- 95121640 Pipeline
- 72141123 Manhole construction service
- 72140000 Heavy construction services
- 72141107 Bridge construction and repair service
- 95121626 Railway bridge
- 95121638 Pedestrian overpass
- 95121639 Pipeline carrying bridge
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 72141127 Seal coating of roads, highways and parking lots
- 95121627 Footbridge
- 95121625 Road bridge
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- Point of contact
-
- Kiersten Vanderhoof kiersten_vanderhoof@washingtoncountyor.gov (503) 846-3585
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Washington County, Oregon, through its Department of Land Use and Transportation, is soliciting sealed bids for a comprehensive roadway and infrastructure improvement project designated as Project 100690, Bid 2026.028-LUT CPS, for SW 205th Avenue improvements extending from Baseline to Quatama. The scope of work encompasses temporary traffic and erosion control measures, extensive earthwork, installation of watermain, sanitary and storm sewer infrastructure, construction of retaining walls, removal of existing bridge #671327 and installation of a new multispan bridge structure, cold plane pavement removal, traffic signal installation and modifications, illumination and interconnect systems, construction of aggregate base and asphalt concrete pavement, concrete curbs, gutters, sidewalks and ramps, permanent signing and striping, permanent seeding and landscaping, and water quality facility construction. Bidders must be prequalified by the Oregon Department of Transportation, licensed by the Oregon Construction Contractor's Board, and classified as resident bidders as defined under Oregon law. The project requires submission of questions by March 13, 2026, with bid responses due electronically through the County's OpenGov Procurement Portal by March 18, 2026, at 1:00 p.m., followed by public bid opening via Microsoft Teams video conference. Bids must be accompanied by a bid guaranty equal to ten percent of the total bid amount, valid for at least thirty calendar days from the date of award, and successful bidders must submit the First-Tier Subcontractors Disclosure Form within two work hours of bid closing. All work specifications comply with the 2024 Oregon Standard Specifications for Construction as modified by special provisions and addenda, and contractors must complete initial road opening to traffic by September 20, 2028 (459 consecutive calendar days from Notice to Proceed), with all work except seeding establishment completed by October 20, 2028, with liquidated damages of $4,000 per calendar day for the initial completion date and $2,700 per calendar day for final completion.
Resident bidders as defined under Oregon law are required, and prevailing wage requirements apply under ORS 279C.840 with rates referenced to the Bureau of Labor and Industries website. Washington County's Clean Air Construction standards mandate registration of diesel nonroad equipment in The Yard portal system and certification of emissions compliance or valid exemptions prior to bid submission. Contractors must participate in the County's online Certified Business utilization tracking system for monitoring subcontractor payments and provide comprehensive insurance coverage with specific limits and additional insured endorsements naming Washington County, the City of Hillsboro, Clean Water Services, and Tualatin Valley Water District. Performance and payment bonds in the amount of the total contract are required within ten calendar days of award notification. The project cost range is estimated between $15,000,000 and $30,000,000, reflecting a major capital investment in transportation and infrastructure improvements. Contractors must coordinate extensively with utility providers including Clean Water Services and Tualatin Valley Water District, implement mandatory preconstruction conferences, submit detailed construction schedules and traffic control plans, comply with comprehensive erosion and sediment control measures, and fulfill a two-year landscape establishment period for all plantings, with no pre-bid meeting scheduled for this opportunity.
Opportunity text
The project name is: 100690 - SW 205th Avenue - Baseline to Quatama Improvements.
The Work to be done under this Contract consists of the following in Washington County:
- Implement temporary traffic control and temporary erosion control measures,
- Perform earthwork,
- Perform watermain, sanitary, and storm sewer work
- Install retaining walls
- Remove bridge #671327
- Install new multispan bridge
- Perform cold plane pavement removal
- Perform traffic signal installation and modifications
- Install illumination and interconnect systems
- Construct aggregate base and asphalt concrete pavement,
- Construct concrete curbs, gutters, sidewalks and ramps
- Install permanent signing and striping
- Install permanent seeding and landscaping
- Construct water quality facilities
- Perform additional and Incidental Work as called for by the Specifications and Plans.
The Project cost range is $15,000,000 - $30,000,000.
Files
Show all 11
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity