100690_13_First_Tier_Subs_Disclosure_Fillable.pdf
PDF 182 KB Posted
- Solicitation number
- 2026.028-LUT CPS
- Issued by
- Washington County, Oregon
About this file
This is a First-Tier Subcontractors Disclosure Form for Washington County, Oregon, related to the SW 205th Avenue - Baseline to Quatama Improvements project (Project No. 100690, Bid No. 2026.028-LUT CPS). The form serves as a mandatory disclosure document that prime contractors must complete and submit electronically through OpenGov Procurement either with their initial bid or through a second linked solicitation activated after bid opening. The disclosure must be submitted no later than two work hours after the bid due time. The project encompasses comprehensive transportation and infrastructure improvements including temporary traffic and erosion control, earthwork, watermain and sewer installation, bridge removal and replacement, pavement work, traffic signal installation, illumination systems, concrete construction, signing and striping, landscaping, and water quality facilities. Failure to submit the completed disclosure form by the specified deadline renders the bid non-responsive and ineligible for award consideration.
The form requires prime contractors to disclose all first-tier subcontractors meeting the requirements of subsection 00120.40(f), including subcontractor names, addresses, dollar values, and categories of work to be performed. If no subcontractors meeting these requirements are utilized, contractors must indicate "NONE" on the form. The project cost range is estimated between $15,000,000 and $30,000,000. Electronic submissions via OpenGov Procurement are mandatory; email submissions are not accepted. Additional copies of the disclosure form may be made as necessary to accommodate multiple subcontractor listings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SW 205th Avenue 1-5 Project # 100690 Baseline to Quatama Improvements Bid # 2026.028-LUT CPS
Page of
1.30 FIRST-TIER SUBCONTRACTORS DISCLOSURE FORM
Project Name: SW 205th Avenue - Baseline to Quatama Improvements Project No. 100690 Bid No. 2026.028-LUT CPS
Bid Closing Date: ___________________________________________________ Bid Closing Time: ___________________________________
Prime Contractor:______________________________________ Contact Name:______________________ Phone No.:______________________
Subcontractor Name and Address
Dollar Value Category of Work to be
Performed by Subcontractor
• Submit this form electronically (on OpenGov Procurement) with the Bid, or on a second, linked solicitation that will be activated after the bid opening. Make additional copies if necessary. Email submissions will not be accepted.
• This list is to be completed and submitted no later than two work hours after the time bids are due.
• If subcontractors subject to the requirement of subsection 00120.40(f) are not used in this project, indicate “NONE” on this form and submit.
Failure to submit this form by the disclosure deadline will result in a non-responsive bid. A non-responsive bid will not be considered for award.
(11/2021)
☐ NONE
Check this box if no subcontractors meeting the requirements of 00120.40(f) will be used on this project.
| Page: |
| Bid Closing Date: |
| Bid Closing Time: |
| Prime Contractor: |
| Contact Name: |
| Phone No: |
| Subcontractor Name and AddressRow1: |
| Dollar ValueRow1: |
| Category of Work to be Performed by SubcontractorRow1: |
| Subcontractor Name and AddressRow2: |
| Dollar ValueRow2: |
| Category of Work to be Performed by SubcontractorRow2: |
| Subcontractor Name and AddressRow3: |
| Dollar ValueRow3: |
| Category of Work to be Performed by SubcontractorRow3: |
| Subcontractor Name and AddressRow4: |
| Dollar ValueRow4: |
| Category of Work to be Performed by SubcontractorRow4: |
| Subcontractor Name and AddressRow5: |
| Dollar ValueRow5: |
| Category of Work to be Performed by SubcontractorRow5: |
| #Pages: |
| Check Box1: Off |
File details come from the government source that posted it. Updated .