[Supplemental]_Geotechnical_Report.pdf
PDF 732 KB Posted
- Solicitation number
- 2026.028-LUT CPS
- Issued by
- Washington County, Oregon
About this file
This is a supplemental geotechnical report prepared by Foundation Engineering, Inc. for Washington County, Oregon, concerning the SW 205th Avenue Bridge Replacement project in Hillsboro, Oregon. The report provides final design geotechnical recommendations that supersede the August 29, 2024 geotechnical report prepared by NV5. The project involves replacing an existing bridge over Beaverton Creek with a three-span bridge supported on deep foundations. Key design changes from the 60 percent plans include modifying Bents 2 and 3 from drilled shaft support to driven pipe pile support (PP24X0.5), with revised bent loads. The report includes analysis for four bridge bents supported on driven closed-ended pipe piles: Bents 1 and 4 on twelve PP16X0.5 piles spaced at 6 feet 9 inches on center, and Bents 2 and 3 on eight PP24X0.5 piles spaced at 10 feet on center. Estimated pile lengths range from 89 to 124 feet with tip elevations ranging from elevation 30 to 61 feet. The project also includes two mechanically stabilized earth (MSE) walls for bridge approaches, a temporary construction bridge, a detention pond southwest of the main bridge, and a pond access road.
The foundation analysis incorporates AASHTO 2020 LRFD design methodology with a resistance factor of 0.65 for driven piles based on dynamic testing. Maximum settlement of the north approach is estimated at 4 to 5 inches and the south approach at 8 to 9 inches, with consolidation expected to be 50 to 70 percent of estimated values and requiring 3 to 4 months for 90 percent primary consolidation. The report recommends constructing approach MSE walls early in the construction sequence to allow settlement completion before paving and bridge construction, with settlement monitoring required to confirm completion. MSE wall reinforcement lengths range from 0.7H to 1.4H depending on wall height and location. The detention pond berm should be constructed with specific material gradations and compaction requirements, with minimum static and seismic factors of safety of 1.3 and 1.1 respectively. Temporary construction bridge footings are recommended to be founded on at least 2 feet of granular fill with geogrid reinforcement at a factored bearing resistance of 2,000 psf, with anticipated settlements of 2 to 3 inches. The pond access road requires a modified pavement section with 3 inches of asphaltic concrete over 6 inches of aggregate base with subgrade geotextile to support 30-ton maintenance vehicles in all weather conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Foundation Engineering, Inc.
Professional Geotechnical Services
820 NW Cornell Avenue • Corvallis, Oregon 97330 • 541-757-7645
7857 SW Cirrus Drive, Bldg 24 • Beaverton, Oregon 97008 • 503-643-1541
Date: November 6, 2025
To: Amanda Blankenship, P.E.
David Evans and Associates, Inc.
From: Jeffery D. Tucker, P.E., G.E.
Subject: Supplemental Geotechnical Consultation for Final Design
Project: SW 205th Avenue Bridge
Project No.: 2241123
We have completed geotechnical consultation for the above-referenced project. This memorandum provides a summary of the work completed to date and final design information and recommendations. The information provided in this memorandum supersedes information provided in the final geotechnical report prepared by NV5 dated August 29, 2024 (NV5, 2024).
There are numerous values in geotechnical investigations that are approximate, including calculated values, measured lengths and heights, soil and rock layer depths and elevations, and strength measurements. For brevity, the symbol “±” is used throughout this memorandum to represent the words “approximate” or
“approximately” when discussing approximate values.
BACKGROUND
Washington County is planning to replace the existing SW 205th Avenue bridge over
Beaverton Creek in Hillsboro, Oregon. A geotechnical report for the project dated
August 9, 2024, was prepared by NV5 based on the 60 precent design drawings.
Revisions to the 60 precent design require additional geotechnical recommendations to the geotechnical report. Therefore, Foundation Engineering, Inc. (FE) was retained by DEA to perform supplemental geotechnical engineering for final design.
The proposed bridge will be a three-span bridge supported on deep foundations.
Interior Bents 2 and 3 were designed to be supported on drilled shafts in the
60 percent drawings. Since then, the design team has elected to support Bents 2 and 3 on driven, PP24X0.5 pipe piles. Bent loads have also been revised from the
60 percent plans. Recommendations are also required for a temporary work bridge.
We understand the stormwater detention pond proposed southeast of the bridge was eliminated during final design. Therefore, a stormwater detention pond will be constructed on the southwest side of the bridge.
Ju l y 13 , 2004
74942PE
6/30/26EXPIRES:
OREGON
ENG I NEER
RE
GI
STERED PROFESSI ONAL
E F
T U C K EF E R D .
RJ
Y
SW 205th Avenue Bridge Replacement November 6, 2025 Supplemental Geotechnical Investigation 2 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
FOUNDATION ANALYSIS AND DESIGN RECOMMENDATIONS
Based on the soft subsurface conditions, deep foundations will be required to support the replacement bridge. Bents 1 and 4 will be supported on PP16X0.5 pipe piles, and Bents 2 and 3 will be supported on PP24X0.5 pipe piles.
Design Loads
Bents 1 and 4 will be supported on a single row of twelve, PP16X0.5 pipe piles spaced at 6 feet 9 inches on center, and Bents 2 and 3 will be supported on a single row of eight, PP24X0.5 pipe piles spaced at 10 feet on center. DEA provided estimated abutment loads and axial loads per pile for this layout summarized in Table 1.
Table 1. Factored and Unfactored Loads
Bent
Number of Piles per Bent
Strength I Load per Pile (kips)
Strength II Load per Pile (kips)
Service Load per Pile (kips)
Extreme Event I Load per Pile (kips)
Extreme Event II
Load per Pile (kips)
1 12 396 353 274 185 259
2 8 734 760 519 595 483
3 8 734 760 519 613 483
4 12 419 373 290 193 272
Driven Pile Analysis and Design
Pile Type and Material Specifications. PP16x0.5 piles consisting of ASTM A252 Grade 3 steel were selected for Bents 1 and 4 based on the design loads, and PP24x0.5 consisting of ASTM A252 Grade 3 steel were selected for Bents 2 and 3 based on the design loads and because these sections are typically readily available.
The pipe piles should be driven closed-ended.
Driving will extend through predominantly soft to medium stiff soil and the pile tips will be seated in very stiff silt and clay. The recommended pile properties are summarized in Tables 2 and 3.
Supplemental Geotechnical Investigation 3 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
Table 2. Recommended Pile Properties for Bents 1 and 4
Property Recommended Value
Pile Type PP16x0.5
Steel Grade ASTM A252 Grade 3
Minimum Yield Stress (Fy) 45 ksi
Area Steel (As) 24.3 in2
Min. Nom. Structural Resistance (Fy x As) 1,094 kips
End Condition Closed-ended
Table 3. Recommended Pile Properties for Bents 2 and 3
Property Recommended Value
Pile Type PP24x0.5
Steel Grade ASTM A252 Grade 3
Minimum Yield Stress (Fy) 45 ksi
Area Steel (As) 36.9 in2
Min. Nom. Structural Resistance (Fy x As) 1,661 kips
End Condition Closed-ended
Downdrag. We understand the schedule and sequencing will provide enough time to allow for the completion of settlement of the approach fills prior to installing the piles. We also understand the piles at Bents 1 and 4 will be driven after the settlement is complete. Therefore, a settlement-induced downdrag load is not anticipated.
Downdrag due to seismically-induced strain softening is anticipated for the design crustal and CSZ earthquakes for the piles driven at Bents 1, 2 and 3. Seismic downdrag loads were calculated using residual undrained shear strengths estimated for the very soft to soft alluvial soils and the static skin resistance in the approach fill above these layers. The residual undrained shear strengths were assumed to be ±80% of the undrained shear strengths used for static loading. Our analyses indicate a seismic downdrag load of ±49 kips/pile for Bent 1, ±48 kips for Bent 2, and ±9 kips for Bent 3. We believe this approach provides a conservatively high estimate of the seismic downdrag load. The seismic downdrag load should also be applied to the Extreme Event I load to estimate the driving resistance.
Supplemental Geotechnical Investigation 4 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
Nominal and Factored Axial Resistances. The nominal and factored axial resistances for the driven piles were calculated based on the subsurface profiles encountered in the borings. Axial pile analyses were completed using the AASHTO (2020) Load Resistance Factor Design (LRFD) approach. Strength parameters for the foundation soils were selected based on correlations to SPT N-values and our experience with similar materials. The nominal axial resistances were calculated based on skin friction along the lengths of the driven piles and end-bearing at the pile tips. The end-bearing calculations assume the piles will be driven closed-ended. The calculated nominal and factored axial resistances versus embedment are shown in Figure 1A for Bent 1, Figure 2A for Bent 2, Figure 3A for Bent 3, and Figure 4A for Bent 4. For static loading, the nominal axial pile resistance needed to resist the factored loads is:
Rn = ∑γiQi/φdyn where: ∑γiQi is the Strength I factored load per pile and φdyn is the resistance factor based on the driving criterion. A φdyn of 0.65 was selected because dynamic pile testing will be used to establish the final driving criteria.
For seismic loading, the nominal axial pile resistance needed to resist the foundation loads and downdrag due to cyclic softening is:
Rndr = ∑γiQi/φdyn + γpDD/φseis
Where: ∑γiQi is the Service factored load per pile, DD is the downdrag load due to settlement associated with cyclic softening after a seismic event; φseis is the seismic resistance factor; and γp is the load factor for downdrag. φdyn is equal to 0.65 and γp is equal to 1.0.
Where: ∑γiQi is the Extreme Event I factored load per pile, DD is the downdrag load due to settlement associated with cyclic softening; φseis is the seismic resistance factor; and γp is the load factor for downdrag. φseis and γp are both equal to 1.0 for Extreme Event I limit state design.
The required Rndr for the Extreme Event case must account for the skin friction that has to be overcome during pile driving above and within the downdrag zone, Rsdd.
The required nominal driving resistance is:
Rndr = Rn + Rsdd = ∑γiQi/φseis + γpDD/φseis + Rsdd where: Rsdd is calculated using static design methods.
If the piles are driven prior to the completion of approach settlement, downdrag loads should be used to determine the nominal driving resistance. The seismic downdrag loads were applied to Bents 1, 2 and 3 for the Extreme Event I load case. The calculated required nominal driving resistance including the seismic downdrag load per pile for the maximum Strength and Extreme Event load cases are summarized in Table 4. The nominal driving resistances were rounded up to the nearest 5-kip increment.
Supplemental Geotechnical Investigation 5 Project No.: 2241123
Hillsboro, Oregon David Evans and Associates, Inc.
Table 4. Required Nominal and Factored Axial Resistances Per Pile
Bent
No.
Maximum Loading Condition Qp
(kips)
Seismic DD
(kips)
Rsdd
(kips)
Rndr
(kips)
1 Extreme Event I 185 83 104 375
1 Strength I 409.5 0 0 630
2 Extreme Event I 595 63 78 740
2 Strength II 806 0 0 1240
3 Extreme Event I 613 9 11 635
3 Strength II 806 0 0 1240
4 Strength I 433 0 0 665
The required nominal driving resistance for maximum Strength I/II loading condition exceeds the required nominal driving resistance for Extreme Event I load case for
Bents 1, 2, and 3. Therefore, the required nominal driving resistance and estimated pile lengths are based on Strength I/II loading.
Minimum/Estimated Pile Tip Elevations and Estimated Pile Lengths. Estimated tip elevations were established based on the design loads, axial resistance calculations, and our previous experience driving piles into silts and clays in the area of the project site.
The required nominal driving resistance for Strength I/II loading exceeds the required nominal driving resistance for Extreme Event I loading with the addition of seismicly-induced downdrag. Therefore, the required nominal driving resistance and estimated pile lengths are based on Strength I/II loading.
Table 5 summarizes the bottom of cap, pile cut-off, and minimum and estimated tip elevations, and estimated pile lengths for each bent.
Table 5. Minimum and Estimated Tip Elevations and Estimated Pile Lengths
Bent
Ave. Bottom of
Cap Elevation
(ft)
Ave. Pile Cut-
Off Elevation
(ft)
Minimum
Tip
Elevation
(ft)
Estimated
Tip
Elevation
(ft)
Estimated
Pile Length
(ft)
1 El. 147.00 El. 149.17 El. 78.75 El. 58 92
2 El. 150.66 El. 153.33 El. 61.00 El. 33 121
3 El. 151.16 El. 153.83 El. 64.15 El. 30 124
4 El. 147.25 El. 149.42 El. 93.57 El. 61 89
Supplemental Geotechnical Investigation 7 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
Per AASHTO Section 10.5.2.2, the tolerable movements for a prestressed multi-girder bridge structure may be estimated by the following expression:
∆ = 0.13 L/S-0.17
Where, ∆ = tolerable differential settlement in inches
L = the minimum adjacent span length in feet
S = the girder spacing in feet.
Based on a minimum adjacent span length of 100 feet and a girder spacing of
6.75 feet, the tolerable differential settlement between bridge bents is 2.1 inches.
Based on our analysis, the maximum differential settlement of adjacent bridge bents is 0.2 inches.
Lateral Pile Analysis. We developed recommended static and cyclic soil parameters for LPILE analyses. The parameters are summarized in Tables 1A through 4A (Appendix A). The plans indicate the piles at Bents 1 and 4 will be installed in a single row with a center-to-center spacing of 6.75 feet. This spacing corresponds to ±5B for PP16x0.5 piles, where B is the pile diameter. The plans indicate the piles at Bents 2 and 3 will be installed in a single row with a center-to-center spacing of 10 feet. This spacing corresponds to ±5B for PP24x0.5 piles. P-Y reduction factors are required for analyzing the transverse load case with these pile spacings. The reduction factors are provided in Table 8.
Table 8. P-Y Reduction Factors for Transverse Loading
Pile Center to Center Spacing Row 1 Row 2 Row 3 and higher
5B 1.0 0.85 0.7
MSE Wall Approach Settlement
The bridge approaches will be supported by MSE walls. Wall 1 will support the south approach with wall heights ranging from ±5 to 19 feet, and Wall 2 will support the north approach with wall heights ranging from ±2 to 16 feet.
We completed analysis using Settle3 software to calculate the settlement associated with the existing embankments and proposed embankment widening. A moist unit weight (γm) of 125 pcf was assumed for the new embankment fill and MSE wall backfill, presuming imported granular materials will be used. The consolidation test results were used to select unit weight and compressibility parameters for the very soft to stiff alluvial soil. Unit weights and compressibility parameters for the other soil layers were assigned based on our previous experience with similar materials.
Supplemental Geotechnical Investigation 8 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
Based on our analysis, the maximum settlement of the south approach is estimated to be ±8 to 9 inches, and the maximum settlement of the north approach is estimated to be ±4 to 5 inches. It is difficult to predict the magnitude and timing of settlement in deep, soft soil deposits due to variability in the material properties (including the compressibility, organics content, and permeability) and because the drainage path required to dissipate pore water pressure during consolidation is very long.
The actual settlement typically varies from our estimates. We anticipate the actual settlement will be on order of 50 to 70 percent of the estimated settlement. We have provided DEA with a point cloud data file of the estimated settlement for the north and south MSE walls. Consolidation models typically over predict settlement adjacent to the fill loads. We anticipate settlement due to the north and south approach walls will be negligible at distances of 30 feet from the proposed MSE walls.
We conducted an analysis to estimate the time required to complete the primary consolidation of the soft soils under the weight of the new approach MSE walls. The analysis, using the consolidation test results, suggests a period of 3 to 4 month for ±90% of the consolidation to occur. Given the site conditions, we recommend constructing the approach MSE walls as early as possible in the construction sequence to allow as much of the settlement to occur as possible prior to paving and bridge construction. Settlement monitoring should be performed after the approach walls have been constructed to confirm that settlement is complete.
Minimum MSE Wall Reinforcement Length
We conducted global stability analyses for proposed MSE Walls 1 and 2 using the computer program SLIDE2. For the abutment walls, we included a vertical deal load to account for the weight of the abutment backfill above the MSE reinforced zone, assuming a moist unit weight of 125 pcf. We also included a vertical live load surcharge to account for traffic loading after the bridge is constructed. The traffic surcharge was calculated using a unit weight of 125 pcf and a surcharge height of 2 feet, as recommended in AASHTO 2020 Table 3.11.6.4-1. An inextensible reinforcement per ODOT QPL was assumed for the geogrid reinforcement. Tables 9 and 10 summarize the recommended minimum reinforced lengths for each wall section and the corresponding reinforcement to wall height ratios, where H is the total wall height.
Supplemental Geotechnical Investigation 9 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
Table 9. Wall 1 Summary of Recommended Minimum Reinforcement Lengths
Wall Section Wall Height (feet)
Wall Embedment
(feet)
Minimum Reinforcement
Length (feet)
Reinforcement to Wall Height Ratio
(L = )
Sta. 10+00.00 to Sta.
10+19.37 4.7 to 11.4 2.0 to 4.0 8.0 0.7H
Sta. 10+19.37 to Sta.
10+70.09 8.8 to 11.4 2.0 to 3.5 8.0 0.7H
Sta. 10+70.09 to Sta.
10+82.10 11.0 to 16.4 2.0 to 4.1 8.0 to 11.5 0.7H
Sta. 10+82.10 to Sta.
12+90.97 16.5 to 20.3 2.0 to 4.0 14.9 to 18.3 0.9H
Sta. 12+90.97 to Sta.
13+72.11 16.0 to 17.3 3.3 to 4.9 16.4 to 20.1 1.1H
Sta. 13+72.11 to Sta.
13+93.67 10.8 to 13.0 2.0 to 4.1 8.0 to 9.1 0.7H
Sta. 13+93.67 to Sta.
15+12.11 6.1 to 11.8 2.0 to 3.8 8.0 to 8.3 0.7H
Note: H is the wall height.
Table 10. Wall 2 Summary of Recommended Minimum Reinforcement Lengths
Wall Section Wall Height (feet)
Wall Embedment
(feet)
Minimum Reinforcement
Length (feet)
Reinforcement to Wall Height Ratio
(L = )
Sta. 10+00.00 to Sta.
11+20.52 5.1 to 12.8 2.0 to 6.1 8.0 to 9.0 0.7H
Sta. 11+20.52 to Sta.
11+36.65 15.8 to 18.8 2.0 to 4.9 20.5 to 24.4 1.3H
Sta. 11+36.65 to Sta.
12+04.12 16.9 to 21.0 4.2 to 8.0 23.7 to 29.4 1.4H
Sta. 12+04.12 to Sta.
12+87.99 16.9 to 19.5 4.2 15.2 to 17.6 0.9H
Sta. 12+87.99 to Sta.
13+49.14 15.6 to 17.6 2.2 to 4.3 10.9 to 12.3 0.7H
Sta. 13+49.14 to Sta.
13+76.64 7.5 to 13.6 2.0 to 7.6 8.0 to 9.5 0.7H
Note: H is the wall height.
Supplemental Geotechnical Investigation 10 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
Wall 3 will be located from “205” Sta. 46+93.93, 39.50 feet right to Sta. 47+37.70, 39.50 feet right. The planned wall height ranges from 1.5 to
3.5 feet which is considered a non-structural or landscape wall. The minimum reinforcement length for a non-structural wall is 6 feet.
Pond Berm Slope Stability
We understand a detention pond is being proposed southwest of the bridge. Based on the plan sheets provided by DEA, a berm will be constructed above the existing grade with maximum 3H:1V interior slopes and maximum 2H:1V exterior slopes.
The performance of the pond berm in terms of slope stability and seepage will depend on the type of material selected for berm construction. We recommend the berm be constructed with material that consists of 20 percent silt and clay with a maximum of 60 percent sand and a maximum of 60 precent silt. The berm embankment material should be compacted to a minimum of 95 percent of maximum density per AASHTO T-99 with a placement moisture content within 1 percent dry and 3 percent wet of optimum moisture content.
We have completed slope stability analysis for the detention pond berm using the computer software SLIDE 2.0. Our analysis has assumed typical strength parameters for the berm material selected above. Based on our analysis, the berm will have a minimum factor of safety of 1.3 for the static condition and 1.1 for the seismic condition.
Temporary Construction Bridge
We understand a temporary construction bridge may be required. The temporary structure will consist of a contractor designed work bridge supported on spread footings. Based on the weak and compressible soils encountered in the near surface soils adjacent to the creek, spread footings for a temporary structure should be founded on at least 2 feet of granular fill overlying a geogrid reinforcement.
The granular backfill should comply with Section 00330.14 in ODOT (2024). The geogrid reinforcement should comply with Section 2320.10 in ODOT (2024) for subgrade reinforcement. For subgrade prepared as stated above, we recommend a factored bearing resistance of 2,000 psf for the footings. Based on the compressibility of the near surface soils, temporary footings could experience settlements of ±2 to 3 inches at the factored bearing resistance.
Pond Access Road
We understand an access road will be constructed west of the north end of SW 206th Avenue, southwest of the proposed bridge. The access road was designed to meet the Clean Water Services standard section for maintenance access roads.
The standard section consists of 3 inches of Asphaltic Concrete Pavement (ACP) wearing course over 2 inches of ¾-inch aggregate base followed by 6 inches of
Supplemental Geotechnical Investigation 11 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
1-1/2-inch aggregate base. The section is intended to support a 30-ton maintenance vehicle in all weather conditions.
The recommended pavement section should consist of 3-inch of ACP over 6 inches of ¾-inch aggregate base. A woven subgrade geotextile should also be placed over the subgrade prior to placing the aggregate base. The recommended section is suitable to support a 30-ton maintenance vehicle in all weather conditions.
LIMITATIONS
Variation of Subsurface Conditions, Use of Report, and Warranty
The conclusions contained herein assume the subsurface profile encountered in the boring is representative of the site conditions. No changes to the enclosed recommendations should be made without our approval. We will assume no responsibility or liability for any engineering judgement, inspection, or testing performed by others.
This memorandum was prepared for the exclusive use of Washington County, David Evans and Associates, and their design consultants for the SW 205th Avenue Bridge project in Hillsboro, Oregon. The information contained herein should not be used for other sites or for unanticipated construction without our written consent. This memorandum is intended for planning and design purposes only. Contractors using this information to estimate construction quantities or costs do so at their own risk.
Our services do not include any survey or assessment of potential surface contamination or contamination of the soil or groundwater by hazardous or toxic materials. We assume those services, if needed, have been completed by others.
Our work was done in accordance with generally accepted soil and foundation engineering practices. No other warranty, expressed or implied, is made.
Supplemental Geotechnical Investigation 12 Project No.: 2241123 Hillsboro, Oregon David Evans and Associates, Inc.
REFERENCES
AASHTO, 2020, AASHTO LRFD Bridge Design Specifications, American Association of State Highway and Transportation Officials (AASHTO), 9th Edition.
ODOT, 2024, Oregon Standard Specifications for Construction, Oregon Department of Transportation (ODOT) Highway Division.
NV5, 2024, Report of Geotechnical Engineering Services, NV5, dated August 9, 2024.
Appendix A Figures and Tables
Professional Geotechnical Services
0 200 400 600 800 1000 1200
E le v a ti o n ft
Axial Resistance (kips)
FIGURE 1A
AXIAL RESISTANCE vs. ELEVATION - BENT 1
PP16x0.5 Closed-ended Driven Pile SW 205th Avenue Bridge
Washington County, Oregon Project No.: 2241123
1,2Factored Axial Resistance
3Factored Uplift Resistance
Ground Surface (±El. 151)
Very Stiff to Hard
SILT
Pile Cutoff (El. 149.17)
Medium stiff
CLAY
Soft SILT
Very Stiff SILT
Very Soft SILT
Stiff SILT
Very stiff SILT
Very stiff SILT
1 Nominal Axial Resistance
Notes:
(1) Nominal and factored axial resistances based on skin friction and end-bearing, and the subsurface profile of BH-4. Analysis assumes the piles are driven closed-ended.
(2) Factored axial resistance based on an AASHTO resistance factor (φ) of 0.65 assuming dynamic pile testing will be used to establish the required final driving resistance.
(3) Factored uplift resistance based on an AASHTO resistance factor (f) of 0.8.
Very Stiff
CLAY
0 200 400 600 800 1000 1200
E le v a ti o n ft
Axial Resistance (kips)
FIGURE 2A
AXIAL RESISTANCE vs. ELEVATION - BENT 2
PP24x0.75 Closed-ended Driven Pile SW 205th Avenue Bridge
Washington County, Oregon Project No.: 2241123
1,2Factored Axial Resistance
2Factored Uplift Resistance
Ground Surface (±El. 145)
Very soft Silt
Pile Cutoff (±El. 153.28)
Medium stiff
CLAY
Very soft
SILT
Medium stiff
SILT
Stiff
SILT
Stiff
SILT
Very stiff
SILT
Stiff to very stiff CLAY
Very stiff to hard
CLAY
1,4Nominal Axial Resistance
Notes:
(1) Nominal and factored axial resistances based on skin friction and end-bearing, and the subsurface profile of BH-3. Analysis assumes the piles are driven closed-ended.
(2) Factored axial resistance based on an AASHTO resistance factor (φ) of 0.65 assuming dynamic pile testing will be used to establish the required final driving resistance.
(3) Factored uplift resistance based on an AASHTO resistance factor (f) of 0.8.
(4) Reduce the nominal resistance by 7 kips to account for scour for Extreme II Loading.
Medium dense
SAND
0 200 400 600 800 1000 1200
E le v a ti o n ft
Axial Resistance (kips)
FIGURE 3A
AXIAL RESISTANCE vs. ELEVATION - BENT 3
PP24x0.75 Closed-ended Driven Pile SW 205th Avenue Bridge
Washington County, Oregon Project No.: 2241123
1,2Factored Axial Resistance
3Factored Uplift Resistance
Ground Surface (±El. 145)
Very soft to Soft Silt
Pile Cutoff (±El. 153.78)
Stiff to Very Stiff
SILT
Stiff to Very Stiff
SILT
Very Stiff
CLAY
Very stiff CLAY
Notes:
(1) Nominal and factored axial resistances based on skin friction and end-bearing, and the subsurface profile of BH-2. Analysis assumes the piles are driven closed-ended.
(2) Factored axial resistance based on an AASHTO resistance factor (φ) of 0.65 assuming dynamic pile testing will be used to establish the required final driving resistance.
(3) Factored uplift resistance based on an AASHTO resistance factor (f) of 0.8.
(4) Reduce the nominal resistance by 7 kips to account for scour for Extreme II Loading.
1,4Nominal Axial Resistance
Medium dense
SAND
0 200 400 600 800 1000 1200
E le v a ti o n ft
Axial Resistance (kips)
FIGURE 4A
AXIAL RESISTANCE vs. ELEVATION - BENT 4
PP16x0.5 Closed-ended Driven Pile SW 205th Avenue Bridge
Washington County, Oregon Project No.: 2241123
1,2Factored Axial Resistance
2Factored Uplift Resistance
Ground Surface (±El. 153)
Soft SILT
Pile Cutoff (±El. 149.42)
Medium stiff
CLAY
Stiff CLAY
Medium Stiff
CLAY
Very Stiff
CLAY
Stiff CLAY
Very stiff
CLAY
Notes:
(1) Nominal and factored axial resistances based on skin friction and end-bearing, and the subsurface profile of BH-1. Analysis assumes the piles are driven closed-ended.
(2) Factored axial resistance based on an AASHTO resistance factor (φ) of 0.65 assuming dynamic pile testing will be used to establish the required final driving resistance.
(3) Factored uplift resistance based on an AASHTO resistance factor (f) of 0.8.
1Nominal Axial Resistance
Very Stiff
SILT
SW 205th Avenue Bridge
Project No.: 2241123
Table 1A. Recommended LPILE Soil Parameters for Bent 1
Depth
(ft)
Elev.
(ft)
Material Description LPile p-y Criteria γ' (pcf)
(o)
K (Static)
(pci)
K (Cyclic)
(pci)
Soil c
(psf) e50
0.0 147.0 Medium Stiff Clay STIFF CLAY w/ free water
110 - 100 100 500 0.01
9.0 138.0 47.6 - 100 100 500 0.01
9.0 138.0 Very Soft to Soft SILT Soft Clay
47.6 - - - 250 0.02
14.0 133.0 47.6 - - - 250 0.02
14.0 133.0 Soft to Medium Stiff
CLAY
STIFF CLAY w/ free water
47.6 - 30 30 500 0.010
28.0 119.0 47.6 - 30 30 500 0.010
28.0 119.0 Soft SILT Soft CLAY
47.6 - - - 250 0.02
47.0 100.0 47.6 - - - 250 0.02
47.0 100.0 Stiff SILT STIFF CLAY w/ free water
47.6 - 500 200 1,000 0.005
58.3 89.0 47.6 - 500 200 1,000 0.005
58.3 89.0 Medium Dense SAND Sand (Reese)
52.6 34 60 - - -
63.0 84.0 52.6 34 60 - - -
63.0 84.0 Very Stiff CLAY STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
80.0 67.0 47.6 - 1,000 400 2,000 0.004
80.0 67.0
Very Stiff SILT STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
117.0 30.0 47.6 - 1,000 400 2,000 0.004
Notes:
1. Subsurface profile interpreted based on conditions encountered in BH-4.
2. Top elevation of the soil profile corresponds ± to the bottom of pile cap.
4. Assumes groundwater table (gwt) is at El. 141.5.
Project No.: 2241123
Table 2A. Recommended LPILE Soil Parameters for Bent 2
Depth
(ft)
Elev.
(ft)
Material Description LPile p-y Criteria γ' (pcf)
(o)
K
(Static)
(pci)
K
(Cyclic)
(pci)
Soil c
(psf) e50
0.0 145.0 Soft SILT Soft CLAY
110 - 30 30 250 0.020
5.0 140.0 110 - 30 30 250 0.020
5.0 140.0 Medium Stiff CLAY
STIFF CLAY w/ free water
47.6 - 100 100 500 0.010
15.0 130.0 47.6 - 100 100 500 0.010
15.0 130.0 Stiff SILT
STIFF CLAY w/ free water
47.6 - 500 200 1,000 0.005
25.0 120.0 47.6 - 500 200 1,000 0.005
25.0 120.0 Very Soft to Soft SILT Soft CLAY
47.6 - 30 30 250 0.020
35.0 110.0 47.6 - 30 30 250 0.020
35.0 110.0 Medium Stiff SILT
STIFF CLAY w/ free water
47.6 - 100 100 500 0.010
40.0 105.0 47.6 - 100 100 500 0.010
40.0 105.0 Stiff SILT
STIFF CLAY w/ free water
47.6 - 500 200 1,000 0.005
50.0 95.0 47.6 - 500 200 1,000 0.005
50.0 95.0 Very Stiff SILT
STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
75.0 70.0 47.6 - 1,000 400 2,000 0.004
75.0 70.0 Medium Dense SAND SAND (Reese)
52.6 34 60 60 - -
85.0 60.0 52.6 34 60 60 - -
85.0 60.0
Very Stiff CLAY STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
120.0 25.0 47.6 - 1,000 400 2,000 0.004
Notes:
1. Subsurface profile interpreted based on conditions encountered in BH-3.
2. Top elevation of the soil profile corresponds ± to the finished ground surface.
Project No.: 2241123
Table 3A. Recommended LPILE Soil Parameters for Bent 3
Depth
(ft)
Elev.
(ft)
Material Description LPile p-y Criteria γ' (pcf) f'
(o)
K
(Static)
(pci)
K
(Cyclic)
(pci)
Soil c
(psf) e50
0.0 145.0 Soft to Medium Stiff
SILT
STIFF CLAY w/ free water
48 - 100 100 500 0.010
4.0 141.0 48 - 100 100 500 0.010
4.0 141.0 Very Soft SILT Soft CLAY
47.6 - 30 30 250 0.020
13.0 132.0 47.6 - 30 30 250 0.020
13.0 132.0 Stiff SILT STIFF CLAY w/ free water
47.6 - 500 200 1,000 0.005
39.0 106.0 47.6 - 500 200 1,000 0.005
39.0 106.0 Very Stiff CLAY STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
65.0 80.0 47.6 - 1,000 400 2,000 0.004
65.0 80.0 Medium Dense SAND SAND (Reese)
47.6 34 60 60 - -
75.0 70.0 47.6 34 60 60 - -
75.0 70.0 Stiff to Very Stiff CLAY STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
85.0 60.0 47.6 - 1,000 400 2,000 0.004
85.0 60.0 Stiff SILT STIFF CLAY w/ free water
47.6 - 500 200 1,000 0.005
95.0 50.0 47.6 - 500 200 1,000 0.005
95.0 50.0
Very Stiff CLAY STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
115.0 30.0 47.6 - 1,000 400 2,000 0.004
Notes:
1. Subsurface profile interpreted based on conditions encountered in BH-2.
2. Top elevation of the soil profile corresponds ± to the finished ground surface.
Project No.: 2241123
Table 4A. Recommended LPILE Soil Parameters for Bent 4
Depth
(ft)
Elev.
(ft)
Material Description LPile p-y Criteria γ' (pcf) f'
(o)
K
(Static)
(pci)
K
(Cyclic)
(pci)
Soil c
(psf) e50
0.0 147.0 Medium Stiff SILT STIFF CLAY w/o free water
110 - 100 100 500 0.010
7.0 140.0 110 - 100 100 500 0.010
7.0 140.0 Stiff CLAY STIFF CLAY w/o free water
110 - 500 200 1,000 0.005
14.0 133.0 110 - 500 200 1,000 0.005
14.0 133.0 Medium Stiff CLAY STIFF CLAY w/ free water
47.6 - 100 100 500 0.010
27.0 120.0 47.6 - 100 100 500 0.010
27.0 120.0 Very Stiff CLAY STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
64.0 83.0 47.6 - 1,000 400 2,000 0.004
64.0 83.0 Very Stiff SILT STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
94.0 53.0 47.6 - 1,000 400 2,000 0.004
94.0 53.0
Very Stiff CLAY STIFF CLAY w/ free water
47.6 - 1,000 400 2,000 0.004
117.0 30.0 47.6 - 1,000 400 2,000 0.004
Notes:
1. Subsurface profile interpreted based on conditions encountered in BH-1.
2. Top elevation of the soil profile corresponds ± to the bottom of pile cap.
| SW 205th Avenue Bridge Memo - Foundation Engr - FINAL (11-6-25).pdf |
| BACKGROUND |
| FOUNDATION ANALYSIS AND DESIGN RECOMMENDATIONS |
| LIMITATIONS |
| Variation of Subsurface Conditions, Use of Report, and Warranty |
| Appendix A (11-6-25).pdf |
| APPEND_A (Figures and Tables).pdf |
| 2241123 Figure 1A - Bent 1 (BH-4) - PP16X0.5.pdf |
| 2241123 Figure 2A - Bent 2 (BH-3) - PP24X0.75.pdf |
| 2241123 Figure 3A - Bent 3 (BH-2) - PP24X0.75.pdf |
| 2241123 Figure 4A - Bent 4 (BH-1) - PP16X0.5.pdf |
| 2241123 Tables 1A through 4A - LPILE Parameters.pdf |
| 2025-11-11T17:19:15-0800 | |
| Jeffery D Tucker |
File details come from the government source that posted it. Updated .