100315 - NW Walker Road - NW 185th Ave to NW 173rd Ave
Closed State & local contract opportunity Posted
- Solicitation number
- 2026.011-LUT CPS
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 72140000 Heavy construction services
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
Show all 29
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72141127 Seal coating of roads, highways and parking lots
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
- 72141001 Highway and road new construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 72141124 Pipe laying service
- 95121640 Pipeline
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- Point of contact
-
- Kiersten Vanderhoof kiersten_vanderhoof@washingtoncountyor.gov (503) 846-3585
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Washington County, Oregon Department of Land Use & Transportation is seeking construction bids through a competitive procurement process for Project 100315, a comprehensive roadway improvement initiative on NW Walker Road between NW 185th Avenue and NW 173rd Avenue. The scope of work includes constructing a 5-lane roadway section with curbs, sidewalks, and illumination; widening and improving intersections; constructing retaining walls and sound walls; installing a piped stormwater conveyance system with water quality treatment and detention facilities; implementing signing and striping; installing illumination and traffic signals; constructing waterlines for both the City of Beaverton and Tualatin Valley Water District; and performing additional incidental work as specified. The bid documents comprise 224 line items organized across three schedules: Schedule A (primary roadwork with 168 items), Schedule B (City of Beaverton waterline with 44 items), and Schedule C (Tualatin Valley Water District waterline with 8 items). Bidders must be prequalified by the Oregon Department of Transportation, licensed by the Oregon Construction Contractor's Board, and Oregon residents as defined in ORS 279C.365. The question submission deadline is March 20, 2026, at 5:00 p.m., with electronic bid submissions due March 25, 2026, at 1:00 p.m. A bid guaranty equal to ten percent of the total bid amount is required, and bids remain firm for thirty calendar days following bid opening. Project completion deadlines include in-water work completion by September 30, 2026, and all remaining work except plant establishment by June 30, 2028, with liquidated damages of $800 per calendar day for the first deadline and $2,700 per calendar day for the second deadline, plus additional penalties for lane closure violations.
The procurement is subject to prevailing wage requirements under ORS 279C.840, Clean Air Construction compliance, and federal WIFIA (Water Infrastructure Finance and Innovation Act) compliance requirements including Buy America provisions. Bidders must submit a First-Tier Subcontractors Disclosure Form within two work hours after the bid deadline through the OpenGov Procurement system, identifying all qualifying subcontractors or indicating no subcontractors will be used. The project is partially funded through federal WIFIA funds and is subject to both Oregon Bureau of Labor and Industries and Davis-Bacon wage determinations as of January 5, 2026. Contractors must maintain workers' compensation and employer's liability insurance with minimum combined single limits of $2,000,000 per occurrence and $5,000,000 annual aggregate, with additional insured requirements extending to the City of Beaverton, Clean Water Services, Tualatin Valley Water District, and Tualatin Hills Parks and Recreation District. Utility coordination is required with Northwest Natural Gas, Portland General Electric, Comcast, Lumen, Verizon, Ziply, and Tualatin Valley Water District, with anticipated relocation durations ranging from two weeks to six months. The estimated project cost range is $10,000,000 to $30,000,000, with the contract awarded to the lowest acceptable bidder and a one-year warranty period required for all work performed. Monthly subcontractor payment reporting is mandated through the B2G Now system for certified business utilization tracking.
Opportunity text
The project name is: 100315 - NW Walker Road - NW 185th Ave to NW 173rd Ave.
The work to be done under this contract consists of the following in Washington County:
- Construct roadway widening and construction of a 5-lane section on NW Walker Road including curbs, sidewalks, and illumination.
- Construct intersection widening and improvements.
- Construct retaining walls and sound walls.
- Construct piped storm water conveyance system with water quality treatment and detention.
- Install signing and striping.
- Construct illumination and traffic signals.
- Construct waterline.
- Perform additional and Incidental Work as called for by the Specifications and Plans.
The Project cost range is $10,000,000 - $30,000,000.
Files
Show all 21
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity