This is a Bid Guaranty Form prepared by Washington County, Oregon for Project 100315, a comprehensive roadway improvement initiative on NW Walker Road between NW 185th Avenue and NW 173rd Avenue. The form establishes the bonding requirements for contractors submitting competitive bids for this project, which involves constructing a 5-lane roadway section with curbs, sidewalks, illumination, intersection improvements, retaining walls, sound walls, stormwater conveyance systems with water quality treatment and detention facilities, signing and striping, traffic signals, and waterline construction. The project comprises 224 line items organized across three schedules: Schedule A covering primary roadwork with 168 items, Schedule B addressing City of Beaverton waterline with 44 items, and Schedule C covering Tualatin Valley Water District waterline with 8 items. Electronic bid submissions were due March 25, 2026, at 1:00 p.m., with a question submission deadline of March 20, 2026, at 5:00 p.m. The bid guaranty requirement equals ten percent of the total bid amount, and all bids remain firm for thirty calendar days following bid opening.
The project is estimated to cost between $10,000,000 and $30,000,000 and will be awarded to the lowest acceptable bidder. Bidders must be prequalified by the Oregon Department of Transportation, licensed by the Oregon Construction Contractor's Board, and classified as Oregon residents under ORS 279C.365. Project completion deadlines include in-water work completion by September 30, 2026, and all remaining work except plant establishment by June 30, 2028, with liquidated damages of $800 per calendar day for the first deadline and $2,700 per calendar day for the second deadline. The project is partially funded through federal WIFIA funds and is subject to prevailing wage requirements, Clean Air Construction compliance, and Davis-Bacon wage determinations. Contractors must maintain workers' compensation and employer's liability insurance with minimum combined single limits of $2,000,000 per occurrence and $5,000,000 annual aggregate. The contract includes a one-year warranty period for all work performed, and contractors must submit First-Tier Subcontractors Disclosure Forms within two work hours after the bid deadline through the OpenGov Procurement system.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NW Walker Road 1-3 Project # 100315 NW 185th Ave to NW 173rd Ave Bid # 2026.011-LUT CPS
1.20 BID GUARANTY FORM
KNOW ALL PERSONS by these presents, that we
(Contractor), as principal and
(Surety), a corporation duly organized under the laws of the State of , having its principal place of business at , and authorized to do business in the State of Oregon, as surety, are held and firmly bound unto Washington County, Oregon, as obligee, in the full sum of ten (10) percent of the total amount of the bid for the payment of which will and truly be made, we bind ourselves, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
NOW, THEREFORE, as the principal named below is submitting an irrevocable bid for the construction of “NW Walker Road - 185th Ave. to 173rd Ave.”
as described in the Washington County Invitation to bid, and accompanying contract documents incorporated by reference herein, and if said bid submitted by principal is accepted by Washington County and said principal fails to execute the contract and required performance and payment bonds in accordance with 00130.50, then the Bid Guaranty shall immediately be paid to Washington County in accordance with 00130.60.
AND FURTHER, if the submitted Bid is accepted by Washington County and said principal shall enter into and execute the contract and shall furnish bonds as required by Washington County, Oregon, within the time fixed by said County, then this obligation shall be void; otherwise, to remain in full force and effect for not less than thirty (30) calendar days from the date of award, unless otherwise specified in the Special Provisions.
Signed and sealed this day of , 2026.
By: Principal
Surety
By: Attorney-In-Fact
APPROVED AS TO FORM:
/s/ Cortney D. Duke-Driessen Assistant County Counsel (06/2020)
| Surety: |
| State: |
| Surety's Place of Business: |
| Date: |
| Month: |
| Contractor: |
| Contractor1: |
| Surety1: |
File details come from the government source that posted it. Updated .