Travis AFB MACC BOA

Closed Solicitation Posted

Solicitation number
FA442725R0016
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Travis AFB, California, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Mobility Command seeks to establish a Multiple Award Construction Contract Basic Ordering Agreement (BOA) for construction requirements at Travis Air Force Base, California, with applications open until May 15, 2030. The procurement is a total small business set-aside under NAICS 236210 (Industrial Building Construction).

Place of performance is Travis Air Force Base, 690 Airmen Dr, Travis AFB, CA 94535. The solicitation establishes two contractor pools: Pool 1 for minor non-complex construction without design, with order limits between $2,000 and $300,000; Pool 2 for design-build and major construction, with order limits between $300,000 and $3,000,000. The contract period runs from May 12, 2025 through May 11, 2030, with task orders issued by the 60th Contracting Squadron using firm fixed pricing.

Contractors must pass a four-step evaluation process of equal weight: compliance review with active SAM.gov registration; past performance on three multi-disciplinary construction projects completed within the past three years for Department of Defense or federal agencies; bonding capacity documentation from surety; and architect/engineer qualifications. Pool 2 applicants must demonstrate licensed professionals in mandatory disciplines of Architectural, Electrical, Mechanical, and Civil Engineering; Environmental, Fire Protection, and Force Protection disciplines are desired but non-mandatory.

Application requirements include a cover letter using the government template, past performance questionnaire, and bonding capability letter. Pool 2 applicants must additionally submit SF-330 Architect-Engineer Qualifications forms with separate Section E documentation for each discipline. All submissions must be a single PDF; incomplete applications or failure to use prescribed templates results in automatic rejection. Contractors passing Steps 1 and 2 receive a BOA; placement in Pool 1 or Pool 2 is determined by Steps 3 and 4 results. There is no guaranteed minimum work volume or order frequency. Task orders exceeding $150,000 require bid, performance, and payment bonds. There is no pre-established limit on the number of BOA awards.

Notice text

24 versions

Update #24 · Latest ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.

21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.

22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing.

4 May 2026: 13th, additional synopsis for Anticipated Pool 1 Orders has been added to include Dog Park Installation and P1 Power Pro Office Renovation.

14 July 2026: 14th, additional synopsis for Anticipated Pool 1 Orders has been added.

15 July 2026: 15th, additional synopsis for Anticipated Pool 1 Orders has been added.

Update #23 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.

21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.

22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing.

4 May 2026: 13th, additional synopsis for Anticipated Pool 1 Orders has been added to include Dog Park Installation and P1 Power Pro Office Renovation.

14 July 2026: 14th, additional synopsis for Anticipated Pool 1 Orders has been added.

Update #22 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.

21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.

22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing.

4 May 2026: 13th, additional synopsis for Anticipated Pool 1 Orders has been added to include Dog Park Installation and P1 Power Pro Office Renovation.

Update #21 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.

21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.

22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing.

Update #20 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.

21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.

Update #19 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.

21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2. 

Update #18 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7

Update #17 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachment 7

Update #16 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement

10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.

Update #15 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.

Update #14 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.

Update #13 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

Update #12 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

Update #11 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

22 Jan 2026: 4th, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

Update #10 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

7 Jan 2026: 3rd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

Update #9 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.

31 Dec 2025: 2nd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.  

Update #8 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included. 

Update #7 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 

Update #6 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

11 August 2025: Updated list of synopsis for potential pool 1 awards added.

Update #5 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

5 June 2025: Updated list of synopsis for potential pool 1 awards added. 

Update #4 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 

Update #3 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.

Update #2 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 

Update #1 ·

The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.

Files

File Type Posted
SYNOPSIS FOR ANTICIPATED ORDERS_July 2026 (2).pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_July 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_4 May 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_22 Apr 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 21 April 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_21 Apr 2026.pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 3.pdf PDF
Consolidated RFI Responses_3.17.26.xlsx XLSX spreadsheet
Attachment 7 - Application Evaluation Procedures_Amend 3.pdf PDF
SYNOPSIS FOR ANTICIPATED POOL 1 ORDER -Building 859 Flooring Paint Windows.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS (B380A 383) (002).pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 2.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 7 - Application Evaluation Procedures_Amend 2.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS (B381 - B4) 18 FEB 2026.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_5 Feb 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 28 January 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 22 JAN 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 7 Jan 26.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 15 Dec 2025.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 6 - Instructions for BOA Application.docx DOCX document
Attachment 7 - Application Evaluation Procedures.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS.pdf PDF
Synopsis for Anticipated Orders - 22 May.pdf PDF
Synopsis for Anticipated Orders.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 1 - Travis Specification.zip ZIP file
Attachment 3 - Request for Information.xlsx XLSX spreadsheet
Attachment 5 - SF330.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 2 - Model Agreement.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Show all 43

Similar open opportunities

Opportunity Agency Set-aside Responses due
Tri-Base Area Construction Basic Ordering Agreement RAF Lakenheath Suffolk United Kingdom · NAICS 236220 Air Forces Europe and Africa No set-aside
Tinker AFB 2026 Multiple Award Construction Contract (MACC) Tinker AFB, Oklahoma 73145, United States · NAICS 236210 Air Force Sustainment Center Partial Small Business
JB Charleston Multiple Award Construction Contract South Carolina 29404, United States · NAICS 236220 Air Mobility Command No set-aside
Mechanized Material Handling System at Travis AFB, California 60 APS/TRO Building 968Travis AFB, CA 94535 · NAICS 333922 AFLCMC Wright Patterson AFB No set-aside
SABER V Hill AFB NAICS 236220 Air Force Sustainment Center Competitive 8(a)

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity