Travis AFB MACC BOA
Closed Solicitation Posted
- Solicitation number
- FA442725R0016
- Agency
-
Air Mobility Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236210 Industrial Building Construction
- Place of performance
- Travis AFB, California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Mobility Command seeks to establish a Multiple Award Construction Contract Basic Ordering Agreement (BOA) for construction requirements at Travis Air Force Base, California, with applications open until May 15, 2030. The procurement is a total small business set-aside under NAICS 236210 (Industrial Building Construction).
Place of performance is Travis Air Force Base, 690 Airmen Dr, Travis AFB, CA 94535. The solicitation establishes two contractor pools: Pool 1 for minor non-complex construction without design, with order limits between $2,000 and $300,000; Pool 2 for design-build and major construction, with order limits between $300,000 and $3,000,000. The contract period runs from May 12, 2025 through May 11, 2030, with task orders issued by the 60th Contracting Squadron using firm fixed pricing.
Contractors must pass a four-step evaluation process of equal weight: compliance review with active SAM.gov registration; past performance on three multi-disciplinary construction projects completed within the past three years for Department of Defense or federal agencies; bonding capacity documentation from surety; and architect/engineer qualifications. Pool 2 applicants must demonstrate licensed professionals in mandatory disciplines of Architectural, Electrical, Mechanical, and Civil Engineering; Environmental, Fire Protection, and Force Protection disciplines are desired but non-mandatory.
Application requirements include a cover letter using the government template, past performance questionnaire, and bonding capability letter. Pool 2 applicants must additionally submit SF-330 Architect-Engineer Qualifications forms with separate Section E documentation for each discipline. All submissions must be a single PDF; incomplete applications or failure to use prescribed templates results in automatic rejection. Contractors passing Steps 1 and 2 receive a BOA; placement in Pool 1 or Pool 2 is determined by Steps 3 and 4 results. There is no guaranteed minimum work volume or order frequency. Task orders exceeding $150,000 require bid, performance, and payment bonds. There is no pre-established limit on the number of BOA awards.
Notice text
24 versions
Update #24 · Latest ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.
21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.
22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing.
4 May 2026: 13th, additional synopsis for Anticipated Pool 1 Orders has been added to include Dog Park Installation and P1 Power Pro Office Renovation.
14 July 2026: 14th, additional synopsis for Anticipated Pool 1 Orders has been added.
15 July 2026: 15th, additional synopsis for Anticipated Pool 1 Orders has been added.
Update #23 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.
21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.
22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing.
4 May 2026: 13th, additional synopsis for Anticipated Pool 1 Orders has been added to include Dog Park Installation and P1 Power Pro Office Renovation.
14 July 2026: 14th, additional synopsis for Anticipated Pool 1 Orders has been added.
Update #22 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.
21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.
22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing.
4 May 2026: 13th, additional synopsis for Anticipated Pool 1 Orders has been added to include Dog Park Installation and P1 Power Pro Office Renovation.
Update #21 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.
21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.
22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing.
Update #20 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.
21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added.
Update #19 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7.
21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2.
Update #18 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7
Update #17 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachment 7
Update #16 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement
10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement.
Update #15 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7.
Update #14 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2.
Update #13 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
Update #12 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
Update #11 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
22 Jan 2026: 4th, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
Update #10 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
7 Jan 2026: 3rd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
Update #9 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
31 Dec 2025: 2nd, additional synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
Update #8 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
15 Dec 2025: Synopsis for Anticipated Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included.
Update #7 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030.
Update #6 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
11 August 2025: Updated list of synopsis for potential pool 1 awards added.
Update #5 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
5 June 2025: Updated list of synopsis for potential pool 1 awards added.
Update #4 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included.
Update #3 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs.
Update #2 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Update #1 ·
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design.
Files
Show all 43
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Tri-Base Area Construction Basic Ordering Agreement | Air Forces Europe and Africa | No set-aside | |
| Tinker AFB 2026 Multiple Award Construction Contract (MACC) | Air Force Sustainment Center | Partial Small Business | |
| JB Charleston Multiple Award Construction Contract | Air Mobility Command | No set-aside | |
| Mechanized Material Handling System at Travis AFB, California | AFLCMC Wright Patterson AFB | No set-aside | |
| SABER V Hill AFB | Air Force Sustainment Center | Competitive 8(a) |