Synopsis for Anticipated Orders.pdf

PDF 93 KB Posted

Attached to
Travis AFB MACC BOA
Solicitation number
FA442725R0016
Issued by

About this file

This document is a Synopsis for Anticipated Orders dated 19 May 2025, issued by the 60 CONS Contracting Office at Travis AFB, detailing three separate construction and installation projects. The first project involves HVAC unit replacement for B934 SCIF with a budget range of $25,000-$100,000, requiring Carrier Corp equipment and compliance with multiple industry codes and environmental regulations. The second project focuses on safety film installation for windows in buildings 664, 665, 668, 7690, and 7763, with a budget range of $100,000-$250,000, utilizing government-furnished safety film and adhering to current governing codes and environmental standards.

The third project entails installing a commercial sink, disposal, and grease interceptor at Travis Bowl (B214), with a budget range of $25,000-$100,000. This project requires verifying field conditions, dimensions, and material quantities prior to contract award, and compliance with specific industry standards including ASHRAE, NEC, UFC, IBC, ABA codes, ASME A112.14.3, CSA B481, and ANSI Z1001. All three projects share common requirements of comprehensive labor, materials, and supervision, strict adherence to industry codes, and compliance with environmental laws and hazardous material abatement. The point of contact for all projects is SSgt Stephen Platt, and the Contracting Officer is currently to be determined (TBD).

View the file

Other files

File Type Posted
SYNOPSIS FOR ANTICIPATED ORDERS_July 2026 (2).pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_July 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_4 May 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_22 Apr 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 21 April 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_21 Apr 2026.pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 3.pdf PDF
Consolidated RFI Responses_3.17.26.xlsx XLSX spreadsheet
Attachment 7 - Application Evaluation Procedures_Amend 3.pdf PDF
SYNOPSIS FOR ANTICIPATED POOL 1 ORDER -Building 859 Flooring Paint Windows.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS (B380A 383) (002).pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 2.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 7 - Application Evaluation Procedures_Amend 2.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS (B381 - B4) 18 FEB 2026.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_5 Feb 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 28 January 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 22 JAN 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 7 Jan 26.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 15 Dec 2025.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 6 - Instructions for BOA Application.docx DOCX document
Attachment 7 - Application Evaluation Procedures.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS.pdf PDF
Synopsis for Anticipated Orders - 22 May.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 2 - Model Agreement.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 1 - Travis Specification.zip ZIP file
Attachment 3 - Request for Information.xlsx XLSX spreadsheet
Attachment 5 - SF330.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYNOPSIS FOR ANTICIPATED ORDERS

19 MAY 2025

Contracting Office: 60 CONS

350 Hangar Ave B549 Travis AFB, CA 94535

Subject: B934 SCIF HVAC Replacement

Location: B934, Travis AFB

Magnitude Range: Between $25,000 and $100,000.

Subject: The contractor shall provide all labor, materials, and supervision to meet HVAC unit replacement requirements for B934. Any work not specifically covered by the specifications shall comply with current governing ASHRAE, NEC, UFC, IBC, NFPA codes, and industry standards while abiding by the more stringent code; including a brand name necessity satisfied through the manufacturer, Carrier Corp (see Attachments). All work must comply with environmental laws and regulations, including the abatement of any hazardous materials.

Contracting Officer: TBD

Point of Contact: SSgt Stephen Platt (Email: Stephen.Platt.2@us.af.mil, DSN:424-7754)

Subject: Window Safety Film Installation

Location: Various Buildings on Travis AFB

Magnitude Range: Between $100,000 and $250,000.

Subject: The contractor shall provide all labor, materials, and supervision to apply safety film to the identified windows at buildings 664, 665, 668, 7690, and 7763. Government furnished equipment (safety film) will be purchased by the government and installed by a separate contractor. Any work not specifically covered by the specifications shall comply with current governing ASHRAE, NEC, UFC, IBC codes, and industry standards while abiding by the more stringent code. All work must comply with environmental laws and regulations, including the abatement of any hazardous materials.

Subject: Travis Bowl Grease Trap and Degreaser Pump

Location: B214, Travis AFB

Magnitude Range: Between $25,000 and $100,000.

Subject: The contractor shall provide all labor, materials, and supervision to install the commercial sink, disposal and grease interceptor. Any work not specifically covered by the specifications shall comply with current governing ASHRAE, NEC, UFC, IBC, ABA codes, ASME A112.14.3, CSA B481, ANSI Z1001 and industrial standards while abiding by the more stringent code. The contractor shall verify field conditions, dimensions, and material quantities prior to finding with planner and award of the contract. All work must comply with environmental laws and regulations, including the abatement of any hazardous materials.