This document is an application instruction for a Basic Ordering Agreement (BOA) for construction services at Travis Air Force Base, California. The solicitation offers two construction pools: Pool 1 for Minor Construction and Pool 2 for Major Construction, with applications accepted between the current date and 15 May 2030. Applicants must have an active System for Award Management (SAM) registration and submit a comprehensive application package including a cover letter, past performance questionnaire highlighting three multi-disciplinary construction projects completed within the past three years, and a bonding capability letter from their surety. Pool 2 applicants for the Design Build Construction Pool must additionally complete the SF-330 Architect-Engineer Qualifications form, with a separate Section E required for each discipline (Architect, Civil, Mechanical, and Electrical). All submissions must be a single PDF, and applications will be automatically rejected for incomplete documentation or failure to use the prescribed templates. The application process closes on 15 May 2030 at 14:30 PST, with submissions after this time deemed ineligible for agreement award.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. General
1.1. These instructions cover the preparation of an application for the basic ordering agreement (BOA) at Travis AFB, CA. Questions and applications shall be submitted to the SSgt Stephen Platt at stephen.platt.2@us.af.mil and Mr. Rory Gardner rory.gardner@us.af.mil. Applications for Pool 1:
Minor Construction and Pool 2: Major Construction are opened. Applications may be submitted anytime between now and 15 May 2030
2. Application Preparation
2.1. The applicant will utilize Attachment 4 - Application for the submission of all required documents. A completed application will cover the requirements for submission in para. 2.3. Pool 1:
Minor Construction Application Preparation. Failure to use the application form or submitting incomplete applications may result in rejection. The first step to applying is to have a System for Award Management (SAM) registration at SAM.gov. A company must have an active registration at the time of the submission in SAM.gov to be considered for a Construction BOA. All requirements will be submitted as a singular PDF in line with Attachment 4 - Application. A completed application will cover the requirements for submission in para. 2.4. Pool 2: Major Construction Application Preparation, as well as the submission of SF 330 in accordance with para. 2.4.4.
2.2. The application process for Pool 1: Minor Construction and Pool 2: Major Construction will close on 15 May 2030 14:30 PST. Submissions past this time and date will be ineligible for the award of an agreement.
2.3. Pool 1: Minor Construction Application Preparation
2.3.1. Cover Letter. The cover letter will be filled out to the best of the contractor’s ability. Cover letter template in Attachment 4 - Application shall be used. Failure to use the appropriate cover letter will result in automatic rejection.
2.3.2. Past Performance. The contractor will be required to submit a past performance questionnaire (PPQ) highlighting three (3) multi-disciplinary construction requirements the offeror has completed in the past three (3) years with the DoD or other federal agencies. PPQs shall be completed by the applicable agency and included in the application as required. If applicants do not have the minimum past performance required annotate “No relevant past experience”.
2.3.3. Bonding Capability. Applicants must provide bonding capabilities in the form of a letter from the applicant’s surety. The letter should demonstrate the contractors maximum bonding capability, per order.
2.4. Pool 2: Major Construction Application Preparation
2.4.1. Cover Letter. The cover letter will be filled out to the best of the contractor’s ability. Cover letter template in Attachment 4 - Application shall be used. Failure to use the appropriate cover letter will result in automatic rejection.
2.4.2. Past Performance. The contractor will be required to submit a past performance questionnaire (PPQ) highlighting three (3) multi-disciplinary construction requirements the offeror has completed in the past three (3) years with the DoD or other federal agencies. PPQs shall be completed by the applicable agency and included in the application as required.
2.4.3. Bonding Capability. Applicants must provide bonding capabilities in the form of a letter from the applicant’s surety. The letter should demonstrate the contractors maximum bonding capability, per order.
2.4.4. SF 330 Architect/Engineering Capabilities. If you are applying for the Design Build Construction Pool, Complete the SF-330, Architect-Engineer Qualifications form (Attachment 7) and include it with your application. Section E is the key for this form in that there must be a separate Section E for each of the disciplines, (Architect, Civil, Mechanical, & Electrical).