SYNOPSIS FOR ANTICIPATED ORDERS (B380A 383) (002).pdf

PDF 96 KB Posted

Attached to
Travis AFB MACC BOA
Solicitation number
FA442725R0016
Issued by

About this file

This is a Synopsis for Anticipated Orders issued on 10 March 2026 by the Air Force 60th Contracting Squadron (60 CONS) located at Travis Air Force Base, California. The synopsis announces two separate anticipated contract orders for mechanical system replacements at Travis AFB.

The first anticipated order concerns the B380A Chiller Replacement project, located in Building 380A at Travis AFB. The contractor shall remove and replace an old Carrier 40-ton chiller with a new Carrier 40-ton chiller or equivalent unit. The contractor must provide all labor, equipment, tools, materials, and supervision necessary to complete the work. The second anticipated order covers the B383 Boiler Replacement project in Building 383 at Travis AFB, which requires removal and replacement of an old boiler with a new Peerless brand 1530 MBH or better unit, installation of a new Carrier brand 72-ton chiller (already purchased by the government), installation of a new 52-gallon electric water heater for domestic hot water, and balancing of the hydronic system for optimal performance. Both projects require full compliance with Federal, State, and Local Code requirements, including the National Standard Plumbing Code (NSPC), National Electrical Code (NEC), ASHRAE standards, OSHA requirements, National Fire Protection Agency (NFPA) standards, and Unified Facilities Criteria (UFC) codes. The Contracting Officer is to be determined (TBD). The Point of Contact for both projects is 2nd Lt Phillip Manwaring (phillip.manwaring@us.af.mil, DSN: 424-7769).

View the file

Other files

File Type Posted
SYNOPSIS FOR ANTICIPATED ORDERS_July 2026 (2).pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_July 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_4 May 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_22 Apr 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 21 April 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_21 Apr 2026.pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 3.pdf PDF
Attachment 7 - Application Evaluation Procedures_Amend 3.pdf PDF
Consolidated RFI Responses_3.17.26.xlsx XLSX spreadsheet
SYNOPSIS FOR ANTICIPATED POOL 1 ORDER -Building 859 Flooring Paint Windows.pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 2.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 7 - Application Evaluation Procedures_Amend 2.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS (B381 - B4) 18 FEB 2026.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_5 Feb 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 28 January 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 22 JAN 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 7 Jan 26.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 15 Dec 2025.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.docx DOCX document
Attachment 6 - Instructions for BOA Application.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS.pdf PDF
Synopsis for Anticipated Orders - 22 May.pdf PDF
Synopsis for Anticipated Orders.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 3 - Request for Information.xlsx XLSX spreadsheet
Attachment 5 - SF330.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 2 - Model Agreement.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 1 - Travis Specification.zip ZIP file
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYNOPSIS FOR ANTICIPATED ORDERS

10 Mar 2026

Contracting Office: 60 CONS 350 Hangar Ave B549 Travis AFB, CA 94535

Subject: B380A Chiller Replacement

Location: B380A, Travis AFB

Subject: The contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly remove and replace old Carrier 40-ton chiller with a new Carrier 40-ton chiller or better. The contractor shall comply with Federal, State, and Local Code requirements, as well as the NSPC (National Standard Plumbing Code), NEC (National Electrical Code), ASHRE, Heating Ventilation Air Conditioning standards, and Occupational Safety and Health Administration (OSHA), National Fire Protection Agency (NFPA), and Unified Facilities Criteria (UFC) codes and standards

Contracting Officer: TBD

Point of Contact: 2nd Lt Phillip Manwaring (Email: phillip.manwaring@us.af.mil, DSN:424- 7769)

PLATT, STEPHEN T SSgt USAF AMC 60 CONS/PKA Fix the overall formatting.

BURNETT, RYAN M CIV USAF AMC 60 CES/CEOE

What is the recommended formatting fix?

PLATT, STEPHEN T SSgt USAF AMC 60 CONS/PKA In some paragraphs it uses double spacing in others it uses single spacing. The SOW should be in-line with the tongue and quill in regards to formatting.

BURNETT, RYAN M CIV USAF AMC 60 CES/CEOE

Updated

Contracting Office: 60 CONS 350 Hangar Ave B549 Travis AFB, CA 94535

Subject: B383 Boiler Replacement

Location: B383, Travis AFB

Subject: The contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly remove and replace old boiler with new Peerless brand 1530 MBH or better. Also, install new Carrier brand 72-ton chiller which has already been purchased.

Then, install a new 52-gallon electric water heater for domestic hot water usage. Finally, balance the hydronic system to ensure optimal flow and asset performance. The contractor shall comply with Federal, State, and Local Code requirements, as well as the NSPC (National Standard Plumbing Code), NEC (National Electrical Code), ASHRE, Heating Ventilation Air Conditioning standards, and Occupational Safety and Health Administration (OSHA), National Fire Protection Agency (NFPA), and Unified Facilities Criteria (UFC) codes and standards.

Contracting Officer: TBD

Point of Contact: 2nd Lt Phillip Manwaring (Email: phillip.manwaring@us.af.mil, DSN:424- 7769)

PLATT, STEPHEN T SSgt USAF AMC 60 CONS/PKA Fix the overall formatting.

BURNETT, RYAN M CIV USAF AMC 60 CES/CEOE

What is the recommended formatting fix?

PLATT, STEPHEN T SSgt USAF AMC 60 CONS/PKA In some paragraphs it uses double spacing in others it uses single spacing. The SOW should be in-line with the tongue and quill in regards to formatting.

BURNETT, RYAN M CIV USAF AMC 60 CES/CEOE

Updated

File details come from the government source that posted it. Updated .