This is a Synopsis for Anticipated Orders issued on 10 March 2026 by the Air Force 60th Contracting Squadron (60 CONS) located at Travis Air Force Base, California. The synopsis announces two separate anticipated contract orders for mechanical system replacements at Travis AFB.
The first anticipated order concerns the B380A Chiller Replacement project, located in Building 380A at Travis AFB. The contractor shall remove and replace an old Carrier 40-ton chiller with a new Carrier 40-ton chiller or equivalent unit. The contractor must provide all labor, equipment, tools, materials, and supervision necessary to complete the work. The second anticipated order covers the B383 Boiler Replacement project in Building 383 at Travis AFB, which requires removal and replacement of an old boiler with a new Peerless brand 1530 MBH or better unit, installation of a new Carrier brand 72-ton chiller (already purchased by the government), installation of a new 52-gallon electric water heater for domestic hot water, and balancing of the hydronic system for optimal performance. Both projects require full compliance with Federal, State, and Local Code requirements, including the National Standard Plumbing Code (NSPC), National Electrical Code (NEC), ASHRAE standards, OSHA requirements, National Fire Protection Agency (NFPA) standards, and Unified Facilities Criteria (UFC) codes. The Contracting Officer is to be determined (TBD). The Point of Contact for both projects is 2nd Lt Phillip Manwaring (phillip.manwaring@us.af.mil, DSN: 424-7769).
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYNOPSIS FOR ANTICIPATED ORDERS
10 Mar 2026
Contracting Office: 60 CONS 350 Hangar Ave B549 Travis AFB, CA 94535
Subject: B380A Chiller Replacement
Location: B380A, Travis AFB
Subject: The contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly remove and replace old Carrier 40-ton chiller with a new Carrier 40-ton chiller or better. The contractor shall comply with Federal, State, and Local Code requirements, as well as the NSPC (National Standard Plumbing Code), NEC (National Electrical Code), ASHRE, Heating Ventilation Air Conditioning standards, and Occupational Safety and Health Administration (OSHA), National Fire Protection Agency (NFPA), and Unified Facilities Criteria (UFC) codes and standards
Contracting Officer: TBD
Point of Contact: 2nd Lt Phillip Manwaring (Email: phillip.manwaring@us.af.mil, DSN:424- 7769)
PLATT, STEPHEN T SSgt USAF AMC 60 CONS/PKA Fix the overall formatting.
BURNETT, RYAN M CIV USAF AMC 60 CES/CEOE
What is the recommended formatting fix?
PLATT, STEPHEN T SSgt USAF AMC 60 CONS/PKA In some paragraphs it uses double spacing in others it uses single spacing. The SOW should be in-line with the tongue and quill in regards to formatting.
BURNETT, RYAN M CIV USAF AMC 60 CES/CEOE
Updated
Contracting Office: 60 CONS 350 Hangar Ave B549 Travis AFB, CA 94535
Subject: B383 Boiler Replacement
Location: B383, Travis AFB
Subject: The contractor shall provide all labor, equipment, tools, material, supervision, and any other items necessary to properly remove and replace old boiler with new Peerless brand 1530 MBH or better. Also, install new Carrier brand 72-ton chiller which has already been purchased.
Then, install a new 52-gallon electric water heater for domestic hot water usage. Finally, balance the hydronic system to ensure optimal flow and asset performance. The contractor shall comply with Federal, State, and Local Code requirements, as well as the NSPC (National Standard Plumbing Code), NEC (National Electrical Code), ASHRE, Heating Ventilation Air Conditioning standards, and Occupational Safety and Health Administration (OSHA), National Fire Protection Agency (NFPA), and Unified Facilities Criteria (UFC) codes and standards.
Contracting Officer: TBD
Point of Contact: 2nd Lt Phillip Manwaring (Email: phillip.manwaring@us.af.mil, DSN:424- 7769)
PLATT, STEPHEN T SSgt USAF AMC 60 CONS/PKA Fix the overall formatting.
BURNETT, RYAN M CIV USAF AMC 60 CES/CEOE
What is the recommended formatting fix?
PLATT, STEPHEN T SSgt USAF AMC 60 CONS/PKA In some paragraphs it uses double spacing in others it uses single spacing. The SOW should be in-line with the tongue and quill in regards to formatting.
BURNETT, RYAN M CIV USAF AMC 60 CES/CEOE