This is a consolidated Request for Information (RFI) responses document for the Travis Air Force Base MACC (Multiple Award Construction Contract) Blanket Ordering Agreement (BOA) solicitation. The file contains approximately 70 questions submitted by prospective contractors and the government's responses, addressing critical clarifications regarding the application process, submission requirements, and contract structure.

The solicitation establishes a two-pool construction contracting vehicle for Travis Air Force Base, California, with Pool 1 designated for minor non-complex construction and Pool 2 for design-build or major complex construction projects. The corrected application deadline for Pool 1 is May 16, 2025, at 1430 hours (Pacific Time), with Pool 2 applications opening at a later date following Pool 1 contractor selection. The contract is a complete small business set-aside with no further set-asides, and contractors may participate in both pools simultaneously. Key application requirements include a Past Performance Questionnaire (preferred over CPARS submissions), bonding capability documentation (coordinated between financial institutions and surety companies), and demonstration of relevant three-year project experience. The SF 1442 form is informational only and does not require submission. SF 330 forms are required only for Pool 2 applications. The government clarified that this is an agreement establishment with non-binding participation—contractors are not required to bid on every task order, though performance bonds, payment bonds, and bid bonds are required for task orders exceeding $150,000. No pricing information is required at the application stage; pricing occurs at the task order level. Contractors preferably should have a place of business within San Francisco/Sacramento SBA districts, though other California SBA districts will be considered.

View the file

Other files

File Type Posted
SYNOPSIS FOR ANTICIPATED ORDERS_July 2026 (2).pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_July 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_4 May 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_22 Apr 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 21 April 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_21 Apr 2026.pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 3.pdf PDF
Consolidated RFI Responses_3.17.26.xlsx XLSX spreadsheet
Attachment 7 - Application Evaluation Procedures_Amend 3.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS (B380A 383) (002).pdf PDF
SYNOPSIS FOR ANTICIPATED POOL 1 ORDER -Building 859 Flooring Paint Windows.pdf PDF
Attachment 7 - Application Evaluation Procedures_Amend 2.pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 2.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS (B381 - B4) 18 FEB 2026.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_5 Feb 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 28 January 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 22 JAN 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 7 Jan 26.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 15 Dec 2025.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.docx DOCX document
Attachment 7 - Application Evaluation Procedures.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS.pdf PDF
Synopsis for Anticipated Orders - 22 May.pdf PDF
Synopsis for Anticipated Orders.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 4 - Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 1 - Travis Specification.zip ZIP file
Attachment 2 - Model Agreement.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 3 - Request for Information.xlsx XLSX spreadsheet
Attachment 5 - SF330.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Project Title: MACC BOA Travis Air Force Base, CA INSTRUCTIONS: Please complete this form if your firm has questions concerning any aspect of the application process. All questions must be submitted to the Contracting Officer by RFI due date. Specify the page, section, and paragraph number(s) pertaining to your question.

Late inquiries/questions may not be entertained.

DocumentPageSectionParagraphQuestionsResponses
VariousThere is a discrepancy in the application due date and time across the attachments:

• Attachment 2 (SF1442) states the application is due May 7, 2025, no later than 1400 PDT.

• Attachment 6, section 1.2, states the application is due May 9, 2025, no later than 14:30 PST.

• Attachment 7, section 2.4, simply states applications must be submitted by May 9, 2025.

Could you please confirm the correct submission date and time?The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the proposed terms and conditions. The extended date is 16 May 25 at 1430.
Attachment 4Can previously completed PPQs and/or CPARS be submitted in lieu of the provided form in Attachment 4?No, The application and compliance with the application is required to be considered.
Attachment 46Attachment 4, page 6, includes a form to be completed by the Financial Institution. However, item number 3 requests bonding information—specifically single and aggregate limits—which are typically provided by a Surety, not a Financial Institution. Can we instead submit a letter from our Financial Institution addressing the applicable items on the form, and a separate letter from our Surety providing the required bonding information, in lieu of completing the form as-is?The contractor can complete the form based on input from the two institutions. The signature block was changed to remove the financial institutions signature. The letters can be attached as supporting documents.
N/AIs there a Contract Dollar Amount for each of the Pools 1 and 2, independently?Pool 1 is and pool 2 proposed amounts are annotated on the SF1442.
N/AIs this a Full and Open application request or just open to 8(a) firms?This requirement is a complete small business set aside with no further set-asides
Attachment 61General1.1Could you please clarify the due date for Pool 1? The SF 1442 (Attachment 2) indicates May 7, 2025, while Attachment 6, Page 1 of the RFP states May 9, 2025.The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the proposed terms and conditions. The extended date is 16 May 25 at 1430.
Attachment 61General1.1Can you please clarify the intent for the May 9th application submission is for Pool 1 only?The 16th of May 2025 is the due date for the initial stand-up of pool 1 only.
Attachment 61Application2.2Can you please confirm that Pool 2 application submissions will be identified after establishment of Pool 1 awardees?Pool 2 will be opened after the initial stand-up of pool 1. Pool 1 will be reopened at that time as well.
Attachment 61Application2.2May Offerors submit for Pool 1 (again) after Pool 1 and 2 are reopened via amendment?The agreements are going to be established for 5 years. If a vendor is already in pool 1 their agreement will be valid.
Attachment 45PPQNAMay Offerors complete the first page (Attachment 4, page 4) of the Past Performance Questionnaire, but in lieu of submitting the respondent page (Attachment 4, page 5) provide a CPARS and/or previously completed past performance questionnaire? Given the many changes for government personnel, identifying points of contact that have current project knowledge can be prohibitive as many federal employees can no longer be reached.The application is preferred but additional performance reports can be attached as supporting documentation.
Attachment 21SF 1442, 13.aNAPlease confirm Standard Form 1442 does not need to be submitted with the application as there is no pricing component associated with this submission.The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the proposed terms and conditions.
Attachment 62Pool 22.4.4Are Offerors able to provide more than one SF 330 (Attachment 7) for each discipline (i.e., architects and engineers)?SF330s are only required for pool 2. This initial application is only for pool 1
Attachment 74Pool 24.2.2Are Offerors eligible to in both Pool 1 and Pool 2 assignments? Does entry to Pool 1 prohibit Offerors from application of Pool 2?There are no restrictions for Pool 1 or Pool 2. Contractors have the ability to participate in both pools.
Attachment 74Pool4If an Offeror intends to pursue a single pool, for instance, Pool 2, should that Offeror forgo submission of the Pool 1 application due May 9th and await a forthcoming amendment to submit a single application for Pool 2? - OR - Should that entity submit all the information (Steps 1-4) for that application on the May 9th due date with the assumption that it will be evaluated for both Pools 1 and 2?Pool 2 applications will not be evaluated at this time. It is best to submit the application for pool 2 when it is open.
Attachment 72General2, Step 2Can consideration be given to extend the relevant period of projects evaluated for past performance from three (3) years to five (5) years?The government prefers relevant project with in the past three years. Unless it is deemed in the best interest of the government to not do so.
NANANANAWould the government kindly consider extending the application due date, at least one week, following responses to all RFIs?The will extend the solicitation until 16 May at 1430
Attach 612.3.3Attachment 6-Instructions for BOA Application, 2.3.3. Bonding Capability ends with a partial
sentence, "Applicants bonding shall". Please clarifyCorrected
Attach 6 &
Attach 7A6: p1 ;
A7: pp 1 & 2A6: 2.3.2 & A7: Step 2 & 3.4.1Attachment 6 Instructions, 2.3.2. Past Performance, ask for projects completed in the past three

years, but Attachment 7 Application Evaluation Procedure, Step 2, and Para. 3.4.1 say two years.

Please confirm that three years is correct.Corrected
Attach 7p1Step 4 and Section 3.1Please confirm that Attachment 7 Application Evaluation Procedure, Step 4 regarding SF330 and
3.1 Evaluation Factor Architect/Engineer Qualifications apply only if we are applying for Pool 2 Major Construction.Step 4 is only for Pool 2 applications.
Attach 6 &
Attach 7A6: p1; A7: p4A6:1.1 & A7:4.2Attachment 7 Application Evaluation Procedure, 4.2. Pools, lists a date of 05/07/2025 for Pool 1

Minor Construction, but Attachment 6 Instructions say 05/09/2025. Please confirm that the actual

deadline is 05/09/2025, and 05/07/2025 is just aspirational.The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the proposed terms and conditions. The extended date is 16 May 25 at 1430.
Attach 2Attachment 2 Model Agreement contains a Standard Form 1442 with a due date of 05/07/2025, 2 pm PDT, along with Sections A–M. Is this Model Agreement merely illustrative, or are we supposed to sign and submit the SF 1442 alone or the entire document? If we are to submit the SF1442, is the due date 05/07/2025, 2 pm Pacific Daylight Time, or
05/09/2025, 230 pm Pacific Daylight Time?The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the proposed terms and conditions. The extended date is 16 May 25 at 1430.
Is there a listing of Primes Subs can access for networking purposes?There are no prime contractors at this moment.
For QA/QC materials testing and 3rd party special inspections, will that be covered by the General Contractor or the CM?Quality Control responsibilities always fall with the contractor. QA is the responsibility of the government
Attachment 4 - Application3Part 21Should we list all NAICS we cover or just the NAICS for this application (236210 - Industrial Building Construction)?You can list as many NAICS that apply to your company.
Attachment 4 - Application6Bonding1Page 6 of the application is requesting information that will come from two different institutions. Our bank (questions 1 and 2) and our bonding surety (question 3). How should that section be completed?The contractor can complete the form based on input from the two institutions. The signature block was changed to remove the financial institutions signature. The letters can be attached as supporting documents.
Instructions for BOA Application111.1It appears that all pool 1 and pool 2 applications must be received by 09 MAY25 please confirm this interpretation.No, Pool 2 is not open at this time.
Instructions for BOA Application111.1Please confirm an application period for the Pool 2 contractors will be established after the Pool 1 contractors have been selected as indicated.Pool 2 will be opened along with the reopening of pool 1 at a later date.
Instructions for BOA Application122.2If we do not submit an application by 09MAY25 for pool 1, will we be able to submit our application for pool 2 via the amendment mentioned.Yes, participation in pool 1 does not determine pool 2 eligibility.
Instructions for BOA Application111.2Please confirm all RFI responses issued under this solicitation will be will be posted to SAM.gov.Yes.
Instructions for BOA Application111.2Will Pool 2 Contractors be allowed to ask questions (RFI's) once the Pool 2 "Amendment" is opened after the initial application period of 09MAY25.Yes, when pool 2 opens contractors will have the ability to submit RFIs.
Attachment 6 Instructions122.3.2The instructions require the use of PPQ's to be completed by the applicable agency. Please clarify if the Contractor can utilize government issued CPARS in lieu of the PPQs for relevant projects.The application is preferred but additional performance reports can be attached as supporting documentation.
Attachment 2 Model Agreement SF14421The Contract Data listed in SAM.gov states the SF1442 is for information only. Please confirm the SF1442 provided is not required to be completed and/or submitted as part of this solicitation.The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the proposed terms and conditions. It does not need to be completed.
Attachment 2 Model Agreement SF1443113aPlease confirm the bid date noted in the SF1442 is erroneous/fictitious and has no bearing on the SAM.gov proposal period "Bid Date" of 09MAY25 prior to 2:30 PM or as stated in "Attachment 6 Instructions for BOA Application"The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 16 May 25 at 1430 is the new date.
NANANANADoes this BOA have a set aside on it? Ex: 8(a), SB, HUB ?It is a small business set aside with no further set-aside restrictions. All small-businesses are welcome to apply.
NANANANAWill Bid bonds, Performance Bonds and Payment Bonds be required for each task order?Yes, bonds will be required for any TO over the 150,000 threshold.
NANANANAWill prime contractors be required to have a place of business within the San Francisco / Sacramento
SBA districts?Preferable, will also consider other SBA districts in California
SF 1442SF 1442 states that the bid due date is May 7th 2025 however, page 1 of Instruction to bidders states
May 9th 2025 and sam.gov says May 9th 2025. Please advise which date is correct.The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 16 May 25 at 1430 is the new date.
NANANANAWill each participant be required to provide a bid for each task order? If a participant can not provide a bid for a particular task order, will they be required to submit a "No Bid" letter?No, agreements are non-binding. If a contractor does not intend to participate the contractor is within their right. The government doe reserve the right to end agreements early if considered to be in the governments best interest as well.
Attachment 6111.1Att 6 - Instruction to bidders mentions that Pool 1 is due on May 9th, however, it mentions that Pool 2 will be reopened/opened at a later date through amendments. Can we submit for Pool 2 with the due date for Pool 1?Pool 2 applications will not be evaluated at this time. It is best to submit the application for pool 2 when it is open.
Instructions of BOA11.11Please confirm the Due date for pool 1 proposals? The 1442 states May 7th the documents states May 9th.The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 16 May 25 at 1430 is the new date.
Attachment 612.3.2Can we submit a CPARS to satisfy this requirement?The application is preferred but additional performance reports can be attached as supporting documentation.
Attachment 612.3.2Will a Past Performance Questionnaire be provided?A PPQ form is in attachment 4 - Application.
Attachment 61Past performancePPQCan we submit CPARS instead of the PPQ forms?The application is preferred but additional performance reports can be attached as supporting documentation.
Attachment 6 & Attachment 21General1Please clarify bid due date. Attachment 6 calls for May 9 and SF1442 on Attachment 2 calls for May 7.The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. 16 May 25 at 1430 is the new date.
Attachment 21 & 2SF1442Does form SF1442 need to be submitted with offer on bid date?The SF 1442 used in the attachments is for informational use only. It is there to demonstrate the clauses that are being proposed in the future agreements.
Attachment 62 & 2Pool 1 and 2Does the GC have to perform contracts on pool 1 to be considered for pool 2No, pool 1 and pool 2 are for different types of construction.
Att4.1Confirm there are no page limitations of contractors application package.There is no page limit requirement in the instructions
Att. 611.11Please clarify if Contractors who are only interested in Pool 2:Major Construction are to submit proposals by the 9 May 2025 deadline and that these applications will be evaluated at a later date.Pool 2 applications will not be evaluated at this time. It is best to submit the application for pool 2 when it is open.
Att. 72Step 22Will submission of CPARS Evaluations be accepted in lieu of the Past Performance Questionnaire?The application is preferred but additional performance reports can be attached as supporting documentation.
Attachment+5+-+SF330.pdf9ALLALLI am not sure it this is for a complete project or the architect that we think e will use when we get awarded the MACC contract? We want to show the correct people but it is hard to say who that would be from our roster until we know more about the details of the job... Please advise the best practices for filling this page out. Thank you.This is for the establishment of an agreement. Pricing will happen at the task order level.
Attachment+5+-+SF330.pdf9C. Proposed TeamALLHow do we represent subcontractors when we do not yet know the scope of work? We have sub-contractors and capabilities to accomplish any range of tasks required. Please advise how we correctly represent our capabilities on this form.The SF330 does not need to be completed for pool 1 applications. Currently the government is only interested in prime capabilities and past performance at this time.
Attachment+5+-+SF330.pdf25ALLALLHow do we know what the scope is here for us to pair the correct team members with the project? Is this intended to be in relation to the sample projects we provided in our capability statement?There is no project, this is for the establishment of an agreement with prime contractors for pool 1 that have capability and experience to perform potential projects.
Attachment+2+-+Model+Agreement.pdf218ALLACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

Is there anything for us to note here?No, when the application closes, this would require the offeror to acknowledge any amendments (if any).
Attachment+2+-+Model+Agreement.pdf4ALLALLHow do we do unit pricing without any scop of work or plans? How do we list it on the form for submission?This is for the establishment of an agreement. Pricing will happen at the task order level.
Attachment 61Past performancePPQCan we submit CPARS instead of the PPQ forms?The application is preferred but additional performance reports can be attached as supporting documentation.
Attachment 6 & Attachment 21General1Please clarify bid due date. Attachment 6 calls for May 9 and SF1442 on Attachment 2 calls for May 7.The 1442 is for informational use only. The purpose is to show the proposed terms and conditions of the agreements. 16 May 25 at 1430 is the new date.
Attachment 21 & 2SF1442Does form SF1442 need to be submitted with offer on bid date?No, the 1442 is for informational use only
Attachment 62 & 2Pool 1 and 2Does the GC have to perform contracts on pool 1 to be considered for pool 2No, Pool 1 and pool 2 are independent of each other.
Attachment 7PPQPPQWe already have in our possession PPQ's that we want to use for this project. Is it ok if our company sends them directly to you instead of coming straight from the owner?The PPQ in the application is required
Attachment 733. Proposal Evaluation3.5.1 and 3.5.2Regarding the minimum mandatory disciplines to demonstrate professional capabilities, the environmental engineering discipline is required in paragraph 3.5.1 and not mandatory in paragraph 3.5.2. Would the government please clarify if including an environmental engineer on the design team is mandatory?See revised section 3.5.2 in Amended Attachment 7.
Attachment 514Architect-Engineering QualificationsAllWould the government please clarify if the Architect-Engineering Qualifications of the SF 330 are required for submission?Yes; all pages are required for Pool 2 applications.
Attachment 514Architect-Engineering QualificationsAllAttachment 5, Page 14, Architect-Engineering Qualifications appears to be geared towards A&E firms specifically. Would the government please clarify if the primary contractor is required to complete this document?The primary contractor is required to complete this form if representing itself as an Architect-Engineer firm.
Attachment 514Architect-Engineering QualificationsAllIf Attachment 5 is required, would the government please clarify if the Architect-Engineer Qualifications page is required for each of the consulting/engineering firms on the proposed design team?The primary contractor is required to complete this form if representing itself as an Architect-Engineer firm. Additionaly, if there are Architect-Engineering firms or branch offices on the design team, please submit a form for each firm/branch office.
Attachment 722. Evaluation Process.Step 1Since the SF 1442 is not required for submission, would the government please clarify if there is another location we should acknowledge the terms and conditions of the solicitation? Or should we provide a signed document that denotes our acknowledgement to the terms of the contract?Terms and conditions are Task Order specific therefore the contractor will be required to complete acknowledgment according to the instructions of each Task Order Proposal Request (TOPR).
Attachment 513Example ProjectsAllWould the government please confirm that 10 example projects should be listed under Example Projects Which Best Illustrate Proposed Team's Qualifications for the Project?Contractors may submit up to 10 projects but are not required to submit 10 total.