This document contains application instructions for a Basic Ordering Agreement (BOA) for construction services at Travis Air Force Base, California. The Air Force is accepting applications for two separate pools: Pool 1 (Minor Construction) and Pool 2 (Major Construction). Applications must be submitted by 15 May 2030 at 14:30 PST to Lt Phillip Manwaring (phillip.manwaring@us.af.mil) or Ms. Christina Johnson (christina.johnson.32@us.af.mil). All applicants must have an active System for Award Management (SAM) registration at SAM.gov at the time of submission and must submit all required documents as a single PDF using the specified application form (Attachment 4).
For Pool 1 (Minor Construction), applicants must submit: (1) a cover letter using the provided template, (2) a past performance questionnaire (PPQ) completed by the applicable agency highlighting three multi-disciplinary construction projects completed within the past three years with the Department of Defense or other federal agencies (or notation of "No relevant past experience" if unavailable), and (3) a bonding capability letter from the applicant's surety demonstrating maximum bonding capability per order. Pool 2 (Major Construction) requires the same three items plus completion of the SF-330, Architect-Engineer Qualifications form (Attachment 7) for applicants pursuing the Design Build Construction Pool. The SF-330 must include a separate Section E for each discipline: Architect, Civil, Mechanical, and Electrical. Failure to use the appropriate cover letter template or submit incomplete applications will result in automatic rejection.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. General
1.1. These instructions cover the preparation of an application for the basic ordering agreement (BOA) at Travis AFB, CA. Questions and applications shall be submitted to Lt Phillip Manwaring at phillip.manwaring@us.af.mil and Ms. Christina Johnson at christina.johnson.32@us.af.mil.
Applications for Pool 1: Minor Construction and Pool 2: Major Construction are opened.
Applications may be submitted anytime between now and 15 May 2030.
2. Application Preparation
2.1. The applicant will utilize Attachment 4 - Application for the submission of all required documents. A completed application will cover the requirements for submission in para. 2.3. Pool 1:
Minor Construction Application Preparation. Failure to use the application form or submitting incomplete applications may result in rejection. The first step to applying is to have a System for Award Management (SAM) registration at SAM.gov. A company must have an active registration at the time of the submission in SAM.gov to be considered for a Construction BOA. All requirements will be submitted as a singular PDF in line with Attachment 4 - Application. A completed application will cover the requirements for submission in para. 2.4. Pool 2: Major Construction Application Preparation, as well as the submission of SF 330 in accordance with para. 2.4.4.
2.2. The application process for Pool 1: Minor Construction and Pool 2: Major Construction will close on 15 May 2030 14:30 PST. Submissions past this time and date will be ineligible for the award of an agreement.
2.3. Pool 1: Minor Construction Application Preparation
2.3.1. Cover Letter. The cover letter will be filled out to the best of the contractor’s ability. Cover letter template in Attachment 4 - Application shall be used. Failure to use the appropriate cover letter will result in automatic rejection.
2.3.2. Past Performance. The contractor will be required to submit a past performance questionnaire (PPQ) highlighting three (3) multi-disciplinary construction requirements the offeror has completed in the past three (3) years with the DoD or other federal agencies. PPQs shall be completed by the applicable agency and included in the application as required. If applicants do not have the minimum past performance required annotate “No relevant past experience”.
2.3.3. Bonding Capability. Applicants must provide bonding capabilities in the form of a letter from the applicant’s surety. The letter should demonstrate the contractors maximum bonding capability, per order.
2.4. Pool 2: Major Construction Application Preparation
2.4.1. Cover Letter. The cover letter will be filled out to the best of the contractor’s ability. Cover letter template in Attachment 4 - Application shall be used. Failure to use the appropriate cover letter will result in automatic rejection.
2.4.2. Past Performance. The contractor will be required to submit a past performance questionnaire (PPQ) highlighting three (3) multi-disciplinary construction requirements the offeror has completed in the past three (3) years with the DoD or other federal agencies. PPQs shall be completed by the applicable agency and included in the application as required.
2.4.3. Bonding Capability. Applicants must provide bonding capabilities in the form of a letter from the applicant’s surety. The letter should demonstrate the contractors maximum bonding capability, per order.
2.4.4. SF 330 Architect/Engineering Capabilities. If you are applying for the Design Build Construction Pool, Complete the SF-330, Architect-Engineer Qualifications form (Attachment 7) and include it with your application. Section E is the key for this form in that there must be a separate Section E for each of the disciplines, (Architect, Civil, Mechanical, & Electrical).