This document is a Synopsis for Anticipated Orders dated 19 May 2025, detailing multiple construction and maintenance projects at Travis Air Force Base (AFB). The synopsis includes seven separate contract opportunities ranging in magnitude from $25,000 to $250,000, covering various facility improvement projects such as HVAC replacement, window safety film installation, septic tank replacement, water fountain installation, roll-up door replacement, and window replacements across different buildings on the base.
Each project requires contractors to provide labor, materials, and supervision while complying with specific building codes, safety standards, and environmental regulations. The contracts specify precise locations within Travis AFB, such as B934, B214, B576, B560, and B977, and mandate adherence to codes like ASHRAE, NEC, UFC, IBC, and ADA standards. All projects require obtaining necessary permits, verifying field conditions, and submitting work schedules and material specifications for government review. The point of contact for these opportunities is SSgt Stephen Platt, and the contracting office is 60 CONS, located at 350 Hangar Ave, B549 Travis AFB, CA 94535.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYNOPSIS FOR ANTICIPATED ORDERS
19 MAY 2025
Contracting Office: 60 CONS
350 Hangar Ave B549 Travis AFB, CA 94535
Subject: B934 SCIF HVAC Replacement
Location: B934, Travis AFB
Magnitude Range: Between $25,000 and $100,000.
Subject: The contractor shall provide all labor, materials, and supervision to meet HVAC unit replacement requirements for B934. Any work not specifically covered by the specifications shall comply with current governing ASHRAE, NEC, UFC, IBC, NFPA codes, and industry standards while abiding by the more stringent code; including a brand name necessity satisfied through the manufacturer, Carrier Corp (see Attachments). All work must comply with environmental laws and regulations, including the abatement of any hazardous materials.
Contracting Officer: TBD
Point of Contact: SSgt Stephen Platt (Email: Stephen.Platt.2@us.af.mil, DSN:424-7754)
Subject: Window Safety Film Installation
Location: Various Buildings on Travis AFB
Magnitude Range: Between $100,000 and $250,000.
Subject: The contractor shall provide all labor, materials, and supervision to apply safety film to the identified windows at buildings 664, 665, 668, 7690, and 7763. Government furnished equipment (safety film) will be purchased by the government and installed by a separate contractor. Any work not specifically covered by the specifications shall comply with current governing ASHRAE, NEC, UFC, IBC codes, and industry standards while abiding by the more stringent code. All work must comply with environmental laws and regulations, including the abatement of any hazardous materials.
Subject: Travis Bowl Grease Trap and Degreaser Pump
Location: B214, Travis AFB
Magnitude Range: Between $25,000 and $100,000.
Subject: The contractor shall provide all labor, materials, and supervision to install the commercial sink, disposal and grease interceptor. Any work not specifically covered by the specifications shall comply with current governing ASHRAE, NEC, UFC, IBC, ABA codes, ASME A112.14.3, CSA B481, ANSI Z1001 and industrial standards while abiding by the more stringent code. The contractor shall verify field conditions, dimensions, and material quantities prior to finding with planner and award of the contract. All work must comply with environmental laws and regulations, including the abatement of any hazardous materials.
Subject: Replace Septic Tank
Location: B2012, Cypress Lake Golf Course, Travis AFB
Subject: The contractor shall provide all design labor, materials, and supervision to replace the facility’s existing septic tank. The contractor will obtain all necessary permits prior to starting work. Any work not specifically covered by the specifications shall comply with latest governing NEC, UPC, UFC, IBC, ABA codes, California Septic System Regulations and industry standards while abiding by the more stringent code. All work must comply with environmental laws and regulations, including abatement of any hazardous materials.
Subject: Replace Windows
Location: B576, Travis AFB
Subject: The contractor shall provide all planning, materials, installation and supervision to replace all exterior windows at bldg. 576, Housing Office. Any work not specifically covered by the specifications shall comply with current governing NEC, UFC, IBC codes, and industry standards while abiding by the more stringent code. All work must comply with environmental laws and regulations, including abatement of any hazardous materials.
Subject: Replace Roll-up Doors
Location: B560 and B977, Travis AFB
Magnitude Range: Between $100,000 and $250,000.
Subject: The contractor shall provide all design labor, materials, and supervision to remove and install roll-up doors at bldgs. 560 and 977. Any work not specifically covered by the specifications shall comply with all relevant codes and standards, including NEC Article 610, IBC Section 3006, and UFC 3-410-01, to ensure that the roll-up doors meet the required safety and performance standards while abiding by the more stringent code. All work must comply with environmental laws and regulations, including abatement of any hazardous materials.
Subject: Install Water Fountains
Location: Main Gate, North Gate, South Gate, Hospital Gate and Visitor Center, Travis AFB
Subject: The contractor shall provide all labor, materials, and supervision to remove existing water fountains and install new water fountains and bottle fillers with accompanying GFCI outlets within the Main Gate, North Gate, South Gate, Hospital Gate and Visitors Center. The contractor will obtain all necessary permits prior to starting work. Any work not specifically covered by these specifications shall comply with current governing building codes, including the California Building Standards Code (Title 24), the Americans with Disabilities Act (ADA) Standards for Accessible Design (if applicable), and all relevant electrical and plumbing codes, while abiding by the most stringent applicable code. The contractor shall verify field conditions, dimensions, and material quantities prior to the fact-finding meeting with the planner and the award of the contract. The government prefers that contractors submit a Request for Information (RFI) if any additional information is needed from the government after the initial site survey.
All work must comply with applicable environmental laws and regulations. Prior to purchasing materials and beginning work, the contractor shall submit proposed work schedule and material specifications/datasheets for government review and approval.