SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 28 January 2026.pdf

PDF 142 KB Posted

Attached to
Travis AFB MACC BOA
Solicitation number
FA442725R0016
Issued by

About this file

This is a Synopsis for Anticipated Orders issued by the 60th Civil Engineering Squadron and 60th Contracting Squadron at Travis Air Force Base, dated January 21, 2026, covering Pool 2 anticipated contract opportunities.

The document outlines six upcoming construction and maintenance projects at Travis AFB, all managed through the 60th Contracting Squadron (60 CONS) located at 350 Hangar Ave, Building B549, Travis AFB, CA 94535. The projects include: (1) Repair Skymaster Drive—full depth pavement replacement of approximately 39,000 square feet along Hickam Avenue to Travis Avenue, magnitude $1,000,000–$5,000,000; (2) Construct Egress Road—a new two-lane emergency egress road from Perimeter Road to Creed Road with security gate (K-4 crash rated), concrete pad, and utility infrastructure, magnitude $5,000,000–$10,000,000; (3) Restripe 900 Ramp—airfield pavement marking work including reflective and non-reflective paint applied with 20-minute dry time, magnitude $1,000,000–$5,000,000; (4) Pavement Maintenance Plan—restoration work across roads and parking lots in Zone 1 including patching, crack sealing, and HMA overlay with mandatory pre-construction site walk, magnitude $250,000–$500,000; (5) Repair AAFES Gas Stations—underground fuel system repairs including excavation, pipe replacement, and EPA compliance, magnitude $250,000–$500,000; and (6) Construct Egress Road includes cultural survey requirements within 500 feet of construction areas. All work must comply with applicable Unified Facilities Criteria, Unified Facilities Guide Specifications, Caltrans Standard Specifications, and Air Force installation requirements. Contracting Officers are to be determined (TBD), and Brandon Spratt (brandon.spratt.2@us.af.mil, DSN 424-7743) serves as the point of contact for all projects with an anticipated order date of January 28, 2026.

View the file

Other files

File Type Posted
SYNOPSIS FOR ANTICIPATED ORDERS_July 2026 (2).pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_July 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_4 May 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_22 Apr 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS Pool 2 21 April 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDER_Pool 1_21 Apr 2026.pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 3.pdf PDF
Attachment 7 - Application Evaluation Procedures_Amend 3.pdf PDF
Consolidated RFI Responses_3.17.26.xlsx XLSX spreadsheet
SYNOPSIS FOR ANTICIPATED ORDERS (B380A 383) (002).pdf PDF
SYNOPSIS FOR ANTICIPATED POOL 1 ORDER -Building 859 Flooring Paint Windows.pdf PDF
Attachment 7 - Application Evaluation Procedures_Amend 2.pdf PDF
Attachment 6 - Instructions for BOA Application_Amend 2.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
SYNOPSIS FOR ANTICIPATED ORDERS (B381 - B4) 18 FEB 2026.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS_Pool 1_5 Feb 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 22 JAN 2026.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 7 Jan 26.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 31 Dec 2025.pdf PDF
SYNOPSIS FOR ANTICIPATED ORDERS 15 Dec 2025.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 7 - Application Evaluation Procedures.docx DOCX document
Attachment 6 - Instructions for BOA Application.docx DOCX document
SYNOPSIS FOR ANTICIPATED ORDERS.pdf PDF
Synopsis for Anticipated Orders - 22 May.pdf PDF
Synopsis for Anticipated Orders.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Consolidated RFI Responses.xlsx XLSX spreadsheet
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Attachment 7 - Application Evaluation Procedures.pdf PDF
Attachment 1 - Travis Specification.zip ZIP file
Attachment 2 - Model Agreement.pdf PDF
Attachment 4 - Application.pdf PDF
Attachment 3 - Request for Information.xlsx XLSX spreadsheet
Attachment 5 - SF330.pdf PDF
Attachment 6 - Instructions for BOA Application.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYNOPSIS FOR ANTICIPATED ORDERS

Pool 2

60th Civil Engineering Squadron & 60th Contracting Squadron Travis AFB

21 January 2026

Repair Skymaster Drive 28 Jan 2026

Contracting Office: 60 CONS 350 Hangar Ave B549 Travis AFB, CA 94535

Subject: Repair Skymaster Drive

Location: Hickam Avenue to Travis Avenue

Magnitude Range: Between $1,000,000 and $5,000,000.

Subject: This project consists of a full depth pavement replacement of an existing roadway. The existing pavement is in poor condition and has reached the end of its service life. This project includes site surveying, striping, adjustments of existing features (manholes, drains, etc.), traffic control, quality control and testing. The total estimated project area is approximately 39,000 square feet. All work shall be performed in accordance with applicable Unified Facilities Criteria (UFC), Unified Facilities Guide Specifications (UFGS), Caltrans Standard Specifications, and Air Force installation requirements.

Contracting Officer: TBD

Point of Contact: Brandon Spratt (brandon.spratt.2@us.af.mil, DSN 424-7743) mailto:brandon.spratt.2@us.af.mil

Construct Egress Road

B549 Travis AFB, CA 94535

Subject: Construct Egress Road

Location: Perimeter Road to Creed Road

Magnitude Range: Between $5,000,000 and $10,000,000.

Subject: A new egress road that can accommodate oversize vehicles enabling Travis AFB to provide proper services, material, and supplies during emergencies to the local community. The project scope includes a security gate (crash rated K-4 and/or above) for roadway entry, a concrete pad (minimum 20 ft by 20 ft) for mobile security checkpoint, a concrete roadway between concrete pad to the exit point on Creed Road (2 lane road; 1 lane entrance and 1 lane exit), an asphalt roadway between Perimeter Road to concrete pad (2 lane road; 1 lane entrance and 1 lane exit), traffic sign plan, utility plan to support all equipment and activities, and a cultural survey of the roadway and the surrounding area within the base (±500 ft from the road center, concrete pad, and utility trenches center) from the 100% design.

Restripe 900 Ramp

B549 Travis AFB, CA 94535

Subject: Restripe 900 Ramp

Location: Airfield

Magnitude Range: Between $1,000,000 and $5,000,000.

Subject: Re-stripe all pavement markings to existing conditions/specifications with changes and updated specifications for various areas on the airfield. The types of restriping to be performed include reflective, non-reflective, lettering, and warnings. Design, dimensions, areas, colors, and specifications will be provided. The paint must be quick to dry; preferably in operational condition in 20 minutes or less after application. Work also includes preparing/cleaning surface to increase the bond between newly applied material and existing surface.

Pavement Maintenance Plan

B549 Travis AFB, CA 94535

Subject: Pavement Maintenance Plan

Location: Travis AFB

Magnitude Range: Between $250,000 and $500,000.

Subject: The primary objective is to restore pavement integrity, extend service life, and prevent further deterioration across all roads and parking lots within Zone 1. Work may include but not limited to patching, crack sealing, joint sealing, grinding, full-depth repairs, and cold milling and HMA overlay at locations shown on provided plans/pavement repair map and/or directed by the Government. The contractor shall perform a mandatory pre-construction site walk with the Government to preview access, staging, and existing parking lot conditions within the project limits. As part of the site walk, the Ktr shall field-verify pavement distress conditions and identify the areas requiring crack sealing that are necessary to deliver a complete scope.

Repair AAFES Gas Stations

B549 Travis AFB, CA 94535

Subject: Repair AAFES Gas Stations

Location: Travis AFB

Magnitude Range: Between $250,000 and $500,000.

Subject: The AAFES gas stations' underground system failed several tests, are no longer compliant with regulations, and have been shut down. Repairs are required to bring systems back into compliance and restore service. The contractor shall sawcut and excavate around four fuel dispensers and three sumps to expose pipes and conduit. Replace boots, test for leaks, backfill and pour new concrete. Must be compliant with EPA regulations.

Contracting Officer: TBD