P-5001 DBB, joint air defense operations phase II, joint base anacostia-bolling, washington, DC
Closed Solicitation Posted
- Solicitation number
- N4008021R3502
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for the construction of a two-story Joint Air Defense Operations Center at Joint Base Anacostia-Bolling in Washington, D.C. The Naval Facilities Engineering Command will evaluate proposals and award a firm-fixed-price contract to complete the project scope, which includes site work, utilities, security features, communications infrastructure, and a concrete foundation and structural steel frame constructed in accordance with Intelligence Community standards. Evaluation criteria will assess offerors' experience, small business utilization, safety record, and past performance on similar defense facility projects. The proposal deadline is April 13, 2022.
There is no set-aside designation for this opportunity. The primary NAICS code is 236220 for commercial and institutional building construction, and the predominant PSC code is W912BU for military construction projects. The place of performance is Joint Base Anacostia-Bolling. Key requirements include a 455-day period of performance from notice to proceed and construction of a permanent facility compliant with Department of Defense antiterrorism standards. The total budget for phase one is estimated at $25,000,000.
Notice text
2 versions
Update #2 · Latest ·
P-5001 DBB, JOINT AIR DEFENSE OPERATIONS PHASE II, JOINT BASE ANACOSTIA-BOLLING, WASHINGTON, DCThis acquisition will result in the completion of the Joint Air Defense Operations Center permanent facility by providing the second phase of the Military Construction: Construct a two-story Joint Air Defense Operations Center. Construction includes concrete slab-on-grade foundation with Concrete spread footings under steel columns, structural steel frame, concrete masonry unit shear walls, and roofing system with sloping roof deck. Includes pavements, all utilities, site improvements, passive force protection measures, security fencing, and diverse communication routing to eliminate single points of failure and ensure constant connectivity. Special Construction Requirements include Controlled Space in accordance with Intelligence Community Directive/Intelligence Community Standard 705 and use of special exterior finishes to meet Joint Base Anacostia Bollings architectural design requirements. The facility shall be compatible with applicable Department of Defense, Air Force, and Joint Base design standards. In addition, local materials and construction techniques shall be used where cost effective. Facilities will be designed as permanent construction in accordancewith the Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N4008021R3502' to obtain more details.*
Update #1 ·
P-5001 DBB, JOINT AIR DEFENSE OPERATIONS PHASE II, JOINT BASE ANACOSTIA-BOLLING, WASHINGTON, DCThis acquisition will result in the completion of the Joint Air Defense Operations Center permanent facility by providing the second phase of the Military Construction: Construct a two-story Joint Air Defense Operations Center. Construction includes concrete slab-on-grade foundation with Concrete spread footings under steel columns, structural steel frame, concrete masonry unit shear walls, and roofing system with sloping roof deck. Includes pavements, all utilities, site improvements, passive force protection measures, security fencing, and diverse communication routing to eliminate single points of failure and ensure constant connectivity. Special Construction Requirements include Controlled Space in accordance with Intelligence Community Directive/Intelligence Community Standard 705 and use of special exterior finishes to meet Joint Base Anacostia Bollings architectural design requirements. The facility shall be compatible with applicable Department of Defense, Air Force, and Joint Base design standards. In addition, local materials and construction techniques shall be used where cost effective. Facilities will be designed as permanent construction in accordancewith the Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N4008021R3502' to obtain more details.*
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| P-5001 joint air defense operations phase II joint base anacostia-bolling, washington, DC | Pre-Solicitation | |
| P5001 - Notice of Intent to Sole Source - Advantor (ESS) Electronic Security System | Special Notice | |
| P5001 - Notice of Intent to Sole Source - Siemens (DDC) Direct Digital Control | Special Notice | |
| P5001 JADOC Phase II | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity