This document summarizes an amendment to a solicitation for construction services. The amendment extends the proposal due date to March 25, 2022, the RFI cutoff date to March 11, 2022, and provides responses to contractor questions. The construction project involves building a two-story Joint Air Defense Operations Center at Joint Base Anacostia-Bolling in Washington, D.C. The scope of work includes site work, utilities, security fencing, communications routing, and construction of a structural steel frame facility with concrete masonry walls and roof to meet Department of Defense and Air Force standards. The facility design must also comply with antiterrorism and force protection requirements.
The amendment provides clarification on items such as access floor and wall heights, foundation and reinforcement details, signage requirements, and clearance needs. It addresses questions on fencing, fireproofing, expansion joints, and secure area partitions. The wage determination is also included.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION: N4008021R3502 P5001 JOINT AIR DEFENSE OPERATIONS PHASE II
The purpose of this amendment is to provide the follow ing:
1. The proposal due date is hereby extended to Friday, 25 March 2022 no later than 2:00 pm (EST).
2. RFI cut off date is hereby extended to Friday, 11 March 2022 no later than 2:00 pm (EST)
3. RFi Responses
4. Wage Rate Determination
CONTINUED ON PAGE 2
1. CONTRACT ID CODE PAGE OF PAGES
1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Feb-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008021R3502
X 9B. DATED (SEE ITEM 11)
06-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Feb-2022
CODE
NAVAL FACILITIES ENG COMMAND WASHINGTON
1314 HARWOOD ST
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008021R3502
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
1. See DWG 0 of 2, Sheets A-102 & S-102. In the General Notes on Sheet S-102, Note C states that the “Raised Access Floor is to be 10” above the slab at ELEV 13’-4”. In the Keyed Notes on Sheet A-102, Note #9 states, “6” high raised access floor assembly.” When you scale the Access Floor details on Sheet A-565, the top of panel is 10” from the concrete deck below.
Please confirm that the Keyed Notes for the Architectural Floor Plans should state “10” high raised access floor assembly.”
GOVERNMENT RESPONSE: Confirmed; keynote 9 on A-102 should state "10" HIGH RAISED ACCESS
FLOOR ASSEMBLY."
2. RFP S-510. Please provide the dimension of the Concrete T/Beam on details A1,A2 & A4 on S-510. We have assumed the dimension to be 1’4”x2’, please confirm.
GOVERNMENT RESPONSE: Concrete grade beams shown in A1, A2, A4 on S-510 are 16"x24" (reflective of aligning T/CONC BEAM elevation with adjacent three CMU coursings).
3. Section S-101 & S-501. Drawing S-501 shows 2 pedestal types, P1 and P2. The only P2 pedestals appear to be called out on CL J. Pedestal (P1) are not called out on S-101. Are P1 type Pedestals used at all interior HSS columns?
GOVERNMENT RESPONSE: Yes, provide pedestal type P1 at all interior HSS columns; keynote #4 of S-101 was intended to correspond to pedestal type P1.
4. S-102 & A1/S-507. Please provide slab on deck reinforcing requirements. S-102 and S-507 do not detail reinforcing needed for D2+4.5 and D1.5+2.5 slabs.
GOVERNMENT RESPONSE: For D2+4.5, provide bid considering [6x6 W2.1xW2.1] reinforcement. For D1.5+2.5, provide bid considering [6x6 W1.4xW1.4] reinforcement.
5. Drawings-CS101. If a new dumpster enclosure is required per Keyed Note 13 “Dumpster Enclosure Addition” on CS101, please provide.
GOVERNMENT RESPONSE: Designer to provide dumpster enclosure information.
6. S-101. Can you please provide locations of stepped footings on S-101? Typical wall footings are noted as –2'8”, but there is a note reflecting –4 along CL I east of CL 2.05, but extents of –4' footing is not shown S-101.
GOVERNMENT RESPONSE: The wall footing with T/FTG EL = [-4'-0"] is dimensioned on S-101 as occuring from 4'-2" off gridline I to 13'-6 1/4" off gridline 2.05. Keynote #10 on S-101, which highlights an anticipated step in the existing footing, with exact location unknown.
7. S-101 & A-101. Drawing A-101 shows a CMU wall at the Shipping and Receiving room 176, wall types OV and 1V. Drawing S-101 does not show this CMU wall and thickened slab required for these walls. Can you please revise S-101 to show this wall and the thickened slab or footing needed?
GOVERNMENT RESPONSE: Per Masonry Note 1 on S-001, refer to Architecture drawings for locations of non-load bearing walls; not all non-load bearing walls are shown on the structural drawings. Coordinate as noted and provide thickened slab at non-load bearing CMU walls in accordance with C1/S-503.
8. S-001, S-510 & A2/A-510. S-001 “Foundation and Earthwork”, note 5 states to provide an interior perimeter and underslab drainage system designed by the Contractors Geotechnical Engineer. This is also shown in details on S-510. Details shown on A-510 do not reflect a drain/pipe system along with plumbing plan P-101.
Please verify this is to be provided by the Contractor.
GOVERNMENT RESPONSE: Yes, the interior perimeter and underslab drainage system are to be designed and provided by the contractor.
9. On A-130, Keyed Note 15, Fall protection anchors and lifelines are to be provided on the roof. Please provide a specification for this system.
GOVERNMENT RESPONSE: Refer to Specification Section 07 54 19 Paragraph 2.5 for fall protection anchors and life line.
10. Details A3 and B3 on A-501 show 8” CMU wall added at the existing building. Keyed Note 2, says “Refer to Structure”. This additional CMU is not shown on the structural plans S-101 and S-102. Please detail these walls on the structural plans S-101 and S-102. Will #4 vertical rebar need to be provided in the grouted cell shown on details A3 and B3?
GOVERNMENT RESPONSE: CMU wall shown is a non-load bearing wall not represented on the structural drawings. Provide bid considering #4 vertical rebar and horizontal dowels every 8 feet to tie into the existing structure.
11. S-103, S-202 and A-545. Steel posts are shown on drawing S-103, S-104 and S-202 for the Louvered Screen wall, but the post size is not detailed. Is this to be Galv HSS? If so, please provide size.
GOVERNMENT RESPONSE: Post size (HSS 5x5x1/4) is indicated by keynote #6 on S-103. Per Structural Steel Note 6 on S-001, all structural steel members exposed to weather must be hot dipped galvanized.
12. Detail B3/S-507 and S-103. L5x3x5/16 is detailed on S-102 at edge of deck and masonry wall. Where L5x3x5/16 is not shown on S-102, should detail B3 on S-507 be used? Typical edge of slabs at the 2nd floor on A1,C1,C2 and C4 on S-301 do not show angles.
GOVERNMENT RESPONSE: Provide bid considering angle L5x3 1/2x5/16 continuous around perimeter of decks.
13. S-507. Typical masonry deck support is given in detail C1 on S-507. Please provide the angle size, is this to be L5x3 1/2x3/8?
GOVERNMENT RESPONSE: Provide bid considering angle L5x3 1/2x5/16 continuous around perimeter of decks.
14. DWG 3 of 4, I-401. Keyed Note 8 on I-401 says “All windows to receive window shade (WS-1)”.
Drawing I-601, under WS-1 it notes to only provide at the Private office, Breakroom and VTC. Please verify window shades are only to be provided at the Private Office, Breakroom and VTC.
GOVERNMENT RESPONSE: ALL ROOMS NOTED WITH KEYNOTE 7 ON I-104 AND KEYNOTE 8
ON I-401 ARE TO RECEIVE WINDOW SHADE WS-1.
15. Detail A4/A-550 and A-102. Folding panel partition is shown on A-102 splitting room 299 and 241. Detail A4/A-550 shows the top and bottom of the partition attaching to the metal stud partitions. Structural plan S-103 does not show any additional steel or bracing for the folding panel partition. Please verify no additional steel is needed for the folding panel partition.
GOVERNMENT RESPONSE: As described in Section 10 22 39 paragraph 2.1, the electrically operated acoustical folding panels must be supported from an overhead track system. The overhead support system must be independently supported for use with operable partitions consisting of a premanufactured horizontal structural frame (see keynote 14 on A4/A-550) and two structural frame vertical supports (columns) see keynote 1 on C4/A-550), the system attaches to the building for lateral support only as shown graphically on A4/A-550.
The supporting horizontal structural frame must be factory fabricated of steel or aluminum attached to the building structure for lateral support only. The load of the horizontal structural frame and partition is supported by two structural frame vertical supports. The vertical end supports are nominally 2 ½-inch x 5-inch attached to the horizontal frame support with metal brackets and secured to the structural floor slab.
Provide lateral support at intervals as needed across the span of the horizontal structural frame.
Space between the vertical support and the adjacent partition must be fitted with gasket to prohibit sound transmission. The sound attenuated metal stud partition shown on top of the frame support system and bottom of the folding partitions are not structural, but to maintain the STC-45 requirement between Room 299 and Room 241 when the operable partitions are in closed position.
The self-support frame system for use with operable partitions must conform to the criteria set forth per ASTM E557 Standard Practice for Architectural Application and Installation of Operable Partitions and must be validated by calculations performed by a licensed Professional Engineer.
Exposed trim and track color must match adjacent colors (vertical supports match adjacent wall finish, and horizontal support match ceiling finish) or of clear anodized architectural grade extruded aluminum alloy 6063-T6. Provide cover sides of horizontal structural frame support if it is below the ceiling to match folding panels’ finish or from manufacturer’s standard color and finish options with color to closely match adjacent finish per COR approval. Paint or otherwise finishing all trim and other materials adjoining the operable partitions’ support frame system.
The complete installation of the self-support frame system must be by an authorized factory-trained installer and be in strict accordance with the approved shop drawings and manufacturer’s standard printed specifications, instructions, and recommendations.
16. A-601. The door/frame types on page A-601 show frame type F2. None of the door openings on the door schedule have a frame type F2. Please confirm that this frame type is not required.
GOVERNMENT RESPONSE: Door number 292 located on the second floor leading to Break Room (Room #292) is a glazed and aluminum door and door frame with door frame type F2 which includes a sidelite.
17. A-101 & A-601. There is a discrepancy between the floor plans(A-101) and the door schedule (A-601) for doors #176AX & #176B. I believe the door types should be reversed where door 176AX should be a type G door and door 176B should be an OHD. Please confirm that this change should be applied.
GOVERNMENT RESPONSE: Correct, Door 176AX is door door type "G" (four fold blast bay door). Door 176B is an overhead door.
18. A-601. Please provide a specification section with more description/details on the bi-folding blast resistant door type G (176AX).
GOVERNMENT RESPONSE: Door 176AX is four fold blast bay door described under spec Section 08 11 13 paragraph 2.4. Please note that door must comply with blast resistance requirements as described in paragraph 1.1.
19. S-002, S-103. Drawing S-103 is calling for several beams in the stairwell to receive fireproofing. No specification section was provided for applied fireproofing. Please provide a specification section along with the material, details, and application method for the fireproofing if it is required.
GOVERNMENT RESPONSE: Keynote 11 on A-405 indicates 1-hour rated cementitious spray-on fireproofing. Specification Section 07 81 00 will be provided. Provide fireproofing to underside of structure for floor support per UL design D982.
20. A-102, A-613. Wall Types 0AF and 1AF call for RF Shielding on the controlled area side of the wall.
Please confirm that interior partitions within the controlled area require RF shielding on both sides of the partition (partition dividing Room 251 and 251A, and partition dividing 251A and 251B.
GOVERNMENT RESPONSE: Confirmed, the VTC Room (251A) is considered a Secure Working Area per Government direction, and requires RF Shielding as described in the construction documents.
21. A-102, A613. Vest 251C is constructed of Wall Types 0Z and 1Z which do not require RF Shielding according to Sheet A-613. Note 13 on Sheet A-102 calls for continuous RF shielding membrane at the floor slab below the raised access flooring in Rooms, 251, 251A, 251B, and 251C. Please clarify whether RF shielding is required below the raised access flooring in Room 251C.
GOVERNMENT RESPONSE: RF Shielding is not required below access floor Room 251C.
22. A-102, A-601. Rooms 251, 251A and 251B are calling for RF shielding. Please confirm if the three corresponding doors require RF shielding, or if only the STC-50 is acceptable. Currently the door schedule on A- 601 only mentions STC-50 for these doors.
GOVERNMENT RESPONSE: Doors 251, 251A and 251B do not require specific RF shielding, the hollow metal construction of both door and frame act as the shielding. The door frame must be tied into the shielding within the wall per shielding manufacturer’s instructions. The STC ratings of the doors remain as scheduled/noted. Government, please validate that you are in agreement with this response.
23. A-101, A-510. Detail A2 on A-510 shows where the new wall meets the existing building. There are three door openings (140A, 171D, 171E) passing through this detail. Please provide details on the floor expansion joint and ceiling expansion joint at the first-floor door openings.
GOVERNMENT RESPONSE: Provide an architectural heavy duty floor aluminum expansion joint at floor openings and an aluminum architectural expansion joint wall and ceiling cover between the existing structure and new construction as indicated in the construction documents. Refer to wall section A1/A-310 and expansion joint details called out on the wall sections.
Please note: Nominal Joint Width: 4 inches Movement Capability: +/- 0.834 inches Minimum Joint Width: 3.166 inches Maximum Joint Width 4.834 inches.
Expansion joints must comply with ASTM E1399 Architectural floor joint system must be heavy duty Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
24. The RFI period closes before the Site Visit and no questions will be answered at the site visit. Further, the site visit is less than a week before the bid due date.
Please consider extending the RFI period and bid due date 2 weeks.
GOVERNMENT RESPONSE: RFI Cut off date is extended to 11 March.
25. Please confirm that the Federal Awardee Performance and Integrity Information System (FAPIIS) Certification shall be submitted under Volume II, Section 6 – within the same tab as VETS-4212 registration.
GOVERNMENT RESPONSE: Confirmed. Please submit the FAPIS certification under Volume II, Section 6 same tab as VETS-4212 registration.
26. Request that the proposal submission deadline be extended four weeks to allow for the submission and answering of the RFIs that may arise from the upcoming site walk.
GOVERNMENT RESPONSE: Proposal due date is extended to 25 March 2022.
27. Spec section 099000 calls for SSPC QP1 surface preparation requirements on steel which is typically and exterior industrial preparation method seen on bridges and other industrial structures and not a lot of commercial painters have this certification. Please confirm that this surface preparation method is not required on this project.
GOVERNMENT RESPONSE: Bid per spec.
28. Referencing sheet L-001/102, it is indicated that the construction type of the building shall be Type II-B which allows for a non-fire resistance rated structure. Sheet L-102 indicates a variety of 1-hour fire resistance rated fire barrier walls on the 2nd floor (enclosing the exit stairs, radio/antenna room, comm rooms, etc.). IBC Section
707.5.1 (as adopted by UFC 1 200 01) requires the supporting construction (i.e., floors and columns) for the fire barrier walls to have a rating equivalent to that of the fire barrier. Additionally, UFC 3 600 01 Section 1-7.2.3.e for Life Safety Plans indicates that “barriers requiring fire resistance rated supporting construction must be specifically identified for coordination with the structural design.” The Life Safety Plans on Sheet L-102 do not identify protection of the supporting construction for the various fire barrier walls identified on the 2nd floor.
Please confirm if the government has accepted an exception to the aforementioned requirements.
GOVERNMENT RESPONSE: The requirement for the fire and smoke protection features is provided by UFC 3-600-01 in lieu of IBC chapter 7 per UFC 1-200-01. UFC 3-600-01 refers the fire and smoke protection features to NFPA 101 per Section 7-1. NFPA 101 Section 7.1.3.1 states that stairways under 3 stories require a minimum of 1 hour fire barrier, from the rest of the building. The 10' of 1-hour fire barrier protection provided on the outskirts of the stairway shaft is provided per NFPA 101 Section 7.2.2.5.2. Areas such as the comm room, radio/antenna room, storage room, and walls adjecnt to the existing telecom room have a 1-hour fire barrier per NFPA section 38.3.2.1. The supporting structrual elements of the fire resistance rated walls will not require the same rating as the fire rated walls per NFPA section 8.2.3.3. Refer to architectural and structural documents for fire-rating of supporting construction. Design to comply with UFC 3-600-01 Chapter 7.
29. Per specification section 271000 paragraph 2.3.2.1, please clarify if F/UTP is acceptable for the STP requirement?
GOVERNMENT RESPONSE: STP is required. F/UTP is not acceptable as a substitution for STP.
30. Per specification section 271000 paragraph 2.3.1.2, Please clarify if OM5 backbone fiber is to be factory or field terminated?
GOVERNMENT RESPONSE: Factory terminated is required
31. Per specification section 271000 paragraph 2.3.2.2, Please clarify if OM5 horizontal fiber is to be factory or field terminated?
GOVERNMENT RESPONSE: Factory terminated is required
32. Per specification section 271000 paragraph 2.4.5.2, Please clarify if 24 MM LC adapters are to be MPO-LC modules or pigtail splice cassettes as specified in 2.4.6?
GOVERNMENT RESPONSE: pigtail splice cassettes are required
33. Per specifications section 271000 paragraph 2.4.6, Please clarify if these splice cassettes are only for terminating the horizontal fiber or to be used for the backbone fiber as well?
GOVERNMENT RESPONSE: splice cassettes are for the horizontal fiber and backbone fiber.
34. Per specification section 271000, Is the intention to have OM5 cable jacket and LC couplers to be color coded per each network classification?
GOVERNMENT RESPONSE: Yes
35. Per specification section 271000, Is color coding mandatory for both cable and LC couplers? OM5 cable and couplers may not be widely available in the required colors as is typically available for OM3 & OM4.
GOVERNMENT RESPONSE: Yes. Each type of cable must be color coded for its classification.
36. Per specifications section 271000, Please provide quantity of patch cables required for each fiber back bone cable?
GOVERNMENT RESPONSE: One patch cable per strand or termination port
37. Per specification section 271000, Please provide quantity of fiber and CAT6A F/UTP patch cables required for each Work Area Outlet (WAO)?
GOVERNMENT RESPONSE: One patch cable per strand or port. No F/UTP patch cables required. Patch cables must match link (STP).
38. Referencing drawing sheet T-100 Keynote #6: please confirm if this is informational only and the exisitng 144SMis not part of this project?
GOVERNMENT RESPONSE: Key Note #6 is informational only. The existing 144SM is not part of the project.
39. Referencing drawing sheet T-100 Keynote #8: please clarify if the termination panels are the only requirements for this project or is the 144SM between #110 and #119 also required?
GOVERNMENT RESPONSE: The termination panels are the only requriements for this project. The alternate 144-strand OS2 SMF optical cable in Room 119 will be pulled by others and is not part of this project.
40. Referencing drawing sheet T-100 Keynote #11: please confirm the 12OM3 and CAT6 cables are being installed between rm# 119 and the new fusion pad location?
GOVERNMENT RESPONSE: Correct. New 12-strand OM3 cables and CAT6 cables must be installed between Room 119 and the new fusion pad.
41. Referencing drawing sheet T-100 Keynote #11 please clarify if CAT6 cables should be terminated on protector blocks in the enclosure or directly to patch panels?
GOVERNMENT RESPONSE: To protector blocks in the enclosure.
42. Referencing drawing sheet T-111 Keynote #4: please clarify if 144SM is part of this project? If so, please confirm 144SM is between #110 and #119 and is not a continuous run into JADOC II.
GOVERNMENT RESPONSE: No. The 144-strand OS2 cable is not part of this project. It will be pulled and provided by others. We will provide a termination panel and modules for this cable only as part of this project scope. Identify this panel to be dedicated as the alternate 144-strand OS2 cable.
43. Referencing keynote 21 of drawing sheet A-201, several manufacturers have expressed concern about the retractable awning meeting the wind load performance requirements per the S-001 standards. Please provide a basis of design or specification section for the retractable awning, or consider providing a permanently installed steel awning to meet load requirements.
GOVERNMENT RESPONSE: Please bid awning according to structural requirements shown on drawings.
Note that the wind speed shown on S-001 is the Ultimate Wind Speed.
44. Please clarify if the contractor requires a Secret Facility Clearance to perform this project since certain personnel require Secret clearances.
GOVERNMENT RESPONSE: Construction on the project site must be performed by U.S. Firms using U.S.
Citizens. In addition, Bidders must be aware that some works within the project must be accomplished by U.S. SECRET-cleared personnel as stated in contract section 01 14 00. The response related to the procedures, Government sponsoring contractor’s employees and clearance granted to personnel most be responded by the DoD security office.
45. Section 011400 states that all work within the secure space requires personnel to be US Citizens. Is it correct that this requirement is limited to the secure space or is all work on the project required to be performed by US Citizens?
GOVERNMENT RESPONSE: Construction on the project site must be performed by U.S. Firms using U.S.
Citizens. In addition, Bidders must be aware that some works within the project must be accomplished by U.S. SECRET-cleared personnel as stated in contract section 01 14 00. The response related to the procedures, Government sponsoring contractor’s employees and clearance granted to personnel most be responded by the DoD security office.
46. Section 011400 states that the Electronic Security Systems work must be performed by personnel with Secret Clearances. Is this applicable to Security work in the entire project or only the secure space?
GOVERNMENT RESPONSE: Construction on the project site must be performed by U.S. Firms using U.S.
Citizens. In addition, Bidders must be aware that some works within the project must be accomplished by U.S. SECRET-cleared personnel as stated in contract section 01 14 00. The response related to the procedures, Government sponsoring contractor’s employees and clearance granted to personnel most be responded by the DoD security office.
47. Section 011400 states that work performed in the secure area and all demolition work must be performed by personnel with a Secret clearance. Please confirm this is correct or is work within the entire building required to be performed by personnel with Secret clearances?
GOVERNMENT RESPONSE: See response to #51.
48. On Sheet I-200, two different tile heights are indicated at the tile wainscoting in Accessible Shower/Toilets 195 and 196. Please confirm the intent is for all tile wainscoting is to be typically composed of 4'-0" of the CT-3, 4, and 5 pattern.
GOVERNMENT RESPONSE: WAINSCOTING OF TILE SHOULD BE AT A TOTAL HEIGHT OF 5'-3".
THIS INCLUDES (1) ROW OF CT-8 COVE TILE, (9) ROWS OF THE FIELD TILES CT-3. CT-4. AND
CT-5, AND TOPPED WITH (1) ROW OF CT-6 BULLNOSE.
49. Sheet I-200, Detail A4. Please confirm wall tiling intent at toilet areas of restrooms 195 and 196. Per detail A4/I-200, this appears to describe full height tile directly behind the toilet, but the orientation of the elevation does not match either restroom and appears to be inconsistent with the wainscot height tile shown in the other restrooms.
GOVERNMENT RESPONSE: WALL BEHIND TOILET IN 195 AND 196 WILL EXTEND TO CEILING.
DUE TO IT BEING ON A WALL THAT IS EXTENDING INTO THE SHOWER, THESE TWO ROOMS
WILL HAVE FULL HEIGHT TILE BEHIND THE TOILET.
50. A/I series drawings. Please provide a layout detail showing the preferred combination of CT-1 and CT-9 where indicated for use in the 1st floor Shower/Toilets.
GOVERNMENT RESPONSE: REFER TO B1/I-401. THIS SHOWS THE TRANSITION FROM CT-1 TO
CT-9. CT-9 IS ONLY TO BE LOCATED WITHIN THE SHOWER BAY.
51. Section 014600, para 1.11.b. Due to the significant range of product pricing inherent in blast doors, manufacturers are currently unable to provide accurate pricing without knowing the static load. Specification 014600 1.11b 1&2 only lists dynamic loads. Please provide the static equivalent load which will be experienced at this door.
GOVERNMENT RESPONSE: The equivalent static pressure is equal to the peak pressures listed in specification 014600 multiplied by 1.9. The 1.9 factor is the maximum dynamic load factor obtained from Fig. A1.4 of ASTM F2247.
52. Drawing sheet A-101/Door schedule. Per the door schedule, 176AX is indicated as a coiling door and 176B is a Four-Fold, but A-101 shows the opposite. Please confirm that A-101 is correct.
GOVERNMENT RESPONSE: Door 176AX is door type "G" (four fold blast bay door). Door 176B is an overhead door. Refer to RFI 44 and 45 for additional information.
53. Section 083323 2.2.1.1, para 2.2.1.1 calls for galvanized steel, stainless steel, and aluminum slats. Clarify slat material.
GOVERNMENT RESPONSE: Door 176B is a galvanized steel overhead coiling door as described in Section 08 33 23 paragraph 2.2.1.1. Doors 251, 251A and 251B do not require specific RF shielding, the hollow metal construction of both door and frame act as the shielding. The door frame must be tied into the shielding within the wall per shielding manufacturer’s instructions. The STC ratings of the doors remain as scheduled/noted.
54. Section 083323 paragraphs 2.2.1.1 and 2.2.1.2 provide conflicting details for insulated and uninsulated slats. Please confirm the overhead coiling door is to be provided insulated per Door Schedule sheet A-601.
GOVERNMENT RESPONSE: The overhead coiling door is a non-insulated interior door identified as 176B on sheet A-601 and described under specification 08 33 23. Refer to RFI responses 44, 45, 83 & 84 for additional information.
55. Specification Section 32 31 13.53 and Sheet C-505. High-Security Fences 2.1.2 calls for maximum picket spacing not to exceed 2.25” and this does not match elevation fence detail C-505 which is standard 4" spacing. What spacing should be used?
GOVERNMENT RESPONSE: Fence maximum picket spacing must follow Specification Section 32 31 13.53.
56. Section 32 31 13.53 and shee C-505, para 2.1.2 High-Security Fences 2.1.2 calls for 80"post spacing and this does not match elevation fence detail C-505 which shows 96" spacing. What spacing should be used?
GOVERNMENT RESPONSE: Fence post spacing must follow Specification Section 32 31 13.5
57. Please provide the following fence details, post sizes and channel sizes for fence and gates?
GOVERNMENT RESPONSE: Refer to 4” Square post, 2” Square upright, u-channel, top and bottom rail size in detail C1/C-509.
58. Sheet 1-600. Please confirm if Equipment items E01 thru E09, E13, E14 Residential Appliances shown on I-600 Equipment Schedule are part of FF&E or to be provided by GC?
GOVERNMENT RESPONSE: EQUIPMENT IS INCLUDED IN FF&E BUDGET
59. Given that the Site Visit has been postponed to February 2, 2022 and all RFIs are currently due on Monday, January 31, 2022, we request that the RFI period be extended to Friday, February 4, 2022 so that questions generated during the site visit can be asked.
GOVERNMENT RESPONSE: See response to #24 & #26.
60. Section 280000. Please provide specification section for electronic security systems.
GOVERNMENT RESPONSE: The ESS installation by the GC is limited to "rough in". Meaning conduit with pull strings and back boxes as described in the General Notes. Therefore systems specifications are not required
61. General Note 5 on sheets I-500 and I-501 calls to match existing signage finishes within JADOC 1. Please provide the basis of design for signage. Framed interior signage details do not indicate the framing materials. Please clarify if the signage frames are made of aluminum or plastic.
GOVERNMENT RESPONSE: REFERRING TO THE DRAWINGS ON I-500, THEY NOTE "ABS
COLORED PLAQUE", ABS IS PLASTIC.
62. General Note 13 on sheets I-500 and I-501 calls for exterior signage at building to be exterior grade 1 5/8" thick. No exterior signage is shown. Please confirm if exterior signage is required.
GOVERNMENT RESPONSE: ON I-106 THERE ARE SIGNS NOTED ON THE EXTERIOR. B1-33, B1-32, E2A-01, AND B1-31.
63. Solicitation form SF1442 section 13.D states the proposal is to be held for 90 days while attachment H 'Pricing Schedule' states for proposal to be held for 120 days. Please confirm the duration the bid proposals should be held.
GOVERNMENT RESPONSE: See RFI response#6 in amendment 0003.
64. Please confirm if the project holds any sales tax exemptions on permanently installed materials.
GOVERNMENT RESPONSE: Refer to specification Section 01 30 01.00 23 paragraph 2.1.6 Taxes and
2.1.6.1 Exemptions. The contractor needs to get a Certificate of Exemption from DC for no sales tax on installed materials. Refer to the DC tax code.
65. Referencing specification section 015000 part 3.2.2, please confirm the utility usage rates for construction shall be carried by the general contractor.
GOVERNMENT RESPONSE: The Government will make all reasonably required utilities available from existing outlets and supplies, as specified in the Contract. Unless otherwise provided in the Contract, the amount of each utility service consumed by the Contractor will be charged at prevailing rates charged by the utility companies to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. Carefully conserve utilities furnished without charge.
66. We have been told by fencing subcontractor that there is no place to put deadman to accomodate an 8’ high cable reinforced dumpster fence and gate shown on C-509, due to the short runs. Please advise what fence should be provided for the dumpster enclosure.
GOVERNMENT RESPONSE: Please advise the minimum fence layout size to accommodate a 8-ft tall reinforced ornamental fence.
67. Reference specification 32 31 13.53 part 2.3 Reinforced Cable, calls for galvanized cable that conflicts with Note 1 on drawing C-506 that calls for black vinyl coated galvanized cable. Please advise what cable type to be provided. Note: Vinyl coated galvanized cable has been unavailable or in limited supply.
GOVERNMENT RESPONSE: Black vinyl coated galvanized cable must be provided for all reinforced cable.
68. Please confirm that all AV equipment is Not in Contract.
GOVERNMENT RESPONSE: AV is not a part of the contract
69. Specification 01 30 01.00 23 - 3.2 mentions electrical & AV equiptment that may be a part of FF&E.
Please confirm that the design and procurement of AV is not required.
GOVERNMENT RESPONSE: AV is not a part of the contract
70. Sheet C-509 Details does not clearly show the cable hardening on the slide gate to terminate, nor a layout for the deadmen anchoring. Please provide a full layout and detail for each slide gate location of deadmen, and anchoring, and how the hardening is to be mounted in relation to the gate operator mechanism, and the adjoining swing gate at the one side.
GOVERNMENT RESPONSE: Fencing requirements are provided from sheet C-505 thru C-509 and Specification 32 31 13.53. Contractor to provide complete fence installation shop drawings prior to fabrication as per Section 3.2.1 in Specification 32 31 13.53.
WAGE RATE DETERMINATION
"General Decision Number: DC20220002 02/18/2022
Superseded General Decision Number: DC20210002
State: District of Columbia
Construction Type: Building
County: District of Columbia Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that aresubject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/07/2022 1 01/14/2022 2 02/11/2022 3 02/18/2022
ASBE0024-007 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 39.27 18.67+a
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
ASBE0024-008 04/01/2021
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER.................$ 24.46 8.69+a
Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
ASBE0024-014 04/01/2021
Rates Fringes
FIRESTOPPER......................$ 29.41 8.73+a
Includes the application of materials or devices within or around penetrations and openings in all rated wall or floor assemblies, in order to prevent the pasage of fire, smoke of other gases. The application includes all components involved in creating the rated barrier at perimeter slab edges and exterior cavities, the head of gypsum board or concrete walls, joints between rated wall or floor components, sealing of penetrating items and blank openings.
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BRDC0001-002 05/02/2021
Rates Fringes
BRICKLAYER.......................$ 34.00 12.59
CARP0197-011 05/01/2021
Rates Fringes
CARPENTER, Includes Drywall
Hanging, Form Work, and Soft Floor Laying-Carpet..............$ 30.34 13.80
CARP0219-001 05/01/2021
Rates Fringes
MILLWRIGHT.......................$ 35.34 13.53
CARP0441-001 05/01/2021
Rates Fringes
PILEDRIVERMAN....................$ 33.62 12.73
ELEC0026-016 06/07/2021
Rates Fringes
ELECTRICIAN, Includes Installation of HVAC/Temperature Controls........$ 49.00 20.26
ELEC0026-017 09/07/2020
Rates Fringes
ELECTRICAL INSTALLER (Sound & Communication Systems).........$ 29.05 11.39
SCOPE OF WORK: Includes low voltage construction, installation, maintenance and removal of teledata facilities (voice, data and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, railroad communications, micro waves, VSAT, bypass, CATV, WAN (Wide area networks), LAN (Local area networks) and ISDN (Integrated systems digital network).
WORK EXCLUDED: The installation of computer systems in industrial applications such as assembly lines, robotics and computer controller manufacturing systems. The installation of conduit and/or raceways shall be installed by Inside Wiremen. On sites where there is no Inside Wireman employed, the Teledata Technician may install raceway or conduit not greater than 10 feet. Fire alarm work is excluded on all new construction sites or wherever the fire alarm system is installed in conduit. All HVAC control work.
ELEV0010-001 01/01/2022
ELEVATOR MECHANIC................$ 50.27 36.885+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
IRON0005-005 06/01/2021
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 33.90 24.19
IRON0005-012 05/01/2021
Rates Fringes
IRONWORKER, REINFORCING..........$ 29.20 22.83
LABO0011-009 06/01/2021
Rates Fringes
LABORER: Skilled................$ 26.60 8.87
FOOTNOTE: Potmen, power tool operator, small machine operator, signalmen, laser beam operator, waterproofer (excluding roofing), open caisson, test pit, underpinning, pier hole and ditches, laggers and all work associated with lagging that is not expressly stated, strippers, operator of hand derricks, vibrator operators, pipe layers, or tile layers, operators of jackhammers, paving breakers, spaders or any machine that does the same general type of work, carpenter tenders, scaffold builders, operators of towmasters, scootcretes, buggymobiles and other machines of similar character, operators of tampers and rammers and other machines that do the same general type of work, whether powered by air, electric or gasoline, builders of trestle scaffolds over one tier high and sand blasters, power and chain saw operators used in clearing, installers of well points, wagon drill operators, acetylene burners and licensed powdermen, stake jumper,demolition.
MARB0002-004 05/02/2021
MARBLE/STONE MASON...............$ 40.81 19.43
INCLUDING pointing, caulking and cleaning of All types of masonry, brick, stone and cement EXCEPT pointing, caulking, cleaning of existing masonry, brick, stone and cement (restoration work)
MARB0003-006 05/02/2021
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 31.18 12.60
MARB0003-007 05/02/2021
Rates Fringes
TERRAZZO FINISHER................$ 25.81 11.55
MARB0003-008 05/02/2021
Rates Fringes
TILE SETTER......................$ 31.18 12.60
MARB0003-009 05/02/2021
Rates Fringes
TILE FINISHER....................$ 25.81 11.55
* PAIN0051-014 06/01/2021
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 29.02 12.80 Glazing Contracts over $2 million.....................$ 33.26 12.80
PAIN0051-015 06/01/2021
Rates Fringes
PAINTER
Brush, Roller, Spray and Drywall Finisher............$ 25.50 11.27
PLAS0891-005 07/01/2021
Rates Fringes
PLASTERER........................$ 30.53 7.93
PLAS0891-006 02/01/2020
CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68
PLAS0891-007 08/01/2016
Rates Fringes
FIREPROOFER
Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89
Spraying of all Fireproofing materials. Hand application of Fireproofing materials. This includes wet or dry, hard or soft. Intumescent fireproofing and refraction work, including, but not limited to, all steel beams, columns, metal decks, vessels, floors, roofs, where ever fireproofing is required. Plus any installation of thermal and acoustical insulation. All that encompasses setting up for Fireproofing, and taken down. Removal of fireproofing materials and protection. Mixing of all materials either by hand or machine following manufactures standards.
PLUM0005-010 08/01/2021
Rates Fringes
PLUMBER..........................$ 45.92 20.35+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-008 08/01/2021
Rates Fringes
PIPEFITTER, Includes HVAC Pipe Installation................$ 45.39 23.12+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.
* ROOF0030-016 07/01/2021
ROOFER...........................$ 31.26 14.56
SFDC0669-002 01/01/2022
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 36.95 24.66
SHEE0100-015 11/01/2021
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 44.37 21.33+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
SUDC2009-003 05/19/2009
Rates Fringes
LABORER: Common or General......$ 13.04 2.80
LABORER: Mason Tender - Cement/Concrete..................$ 15.40 2.85
LABORER: Mason Tender for pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking and cleaning of new or replacement masonry, brick, stone and cement.................$ 11.67
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 18.88
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union, which prevailed in the survey for this classification, which in this example would be Plumbers 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .