This solicitation is for the construction of a two-story Joint Air Defense Operations Center at Joint Base Anacostia-Bolling in Washington, DC. The project involves constructing a permanent facility with a concrete slab-on-grade foundation, structural steel frame, concrete masonry unit shear walls, and roofing system. Additional requirements include pavements, utilities, site improvements, passive force protection measures, security fencing, and diverse communication routing. The facility must meet Intelligence Community, Department of Defense, Air Force, and Joint Base design standards. Local materials and construction techniques should be used where cost effective. The facility will be designed as permanent construction according to Department of Defense criteria and comply with antiterrorism and force protection requirements. Offerors should visit the provided link for additional solicitation details. The soliciting agency is the Naval Facilities Engineering Command within the Department of the Navy.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
& AND
@ AT
AB ANCHOR BOLT
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
AD AREA DRAIN
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJACENT
AE AIR ENTRAINED
AFF ABOVE FINISH FLOOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALNMT ALIGNMENT
ALT ALTERNATE
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
AR ANCHOR ROD
ARCH ARCHITECT or ARCHITECTURAL
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS
AWS AMERICAN W ELDING SOCIETY
B/ BOTTOM OF
B/B BACK TO BACK
BF BOTH FACES
BLDG BUILDING
BM BEAM
BOS BOTTOM OF STEEL
BOT BOTTOM
BPL BASE PLATE
BRDG BRIDGING
BRG BEARING
BS BOTH SIDES
BTWN BETWEEN
C TO C CENTER TO CENTER
C/C CENTER TO CENTER
CANT CANTILEVER
CF CUBIC FEET
CFRP CARBON-FIBER-REINFORCED POLYMER
CHFR CHAMFER
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLR CLEAR
CLSM CONTROLLED LOW STRENGTH MATERIALS
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMPR COMPRESSION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CY CUBIC YARD
D DEPTH
db REINFORCING BAR DIAMETER
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DEMO DEMOLITION
DEP DEPRESSED or DEPRESSION
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DL DEAD LOAD
DN DOW N
DTL DETAIL
DWG(S) DRAWING(S)
DWLS DOW ELS
(E) EXISTING
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELECT ELECTRIC or ELECTRICAL
ELEV ELEVATOR
EMBED EMBEDMENT
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EST ESTIMATE
ETC ETCETERA
EW EACH WAY
EXIST EXISTING
EXP JT EXPANSION JOINT
EXT EXTERIOR
FA FALL ARREST ANCHOR
FD FLOOR DRAIN
FDN FOUNDATION
FIN FINISH or FINISHED
FLG FLANGE
FLR FLOOR
FOB FACE OF BUILDING
FOW FACE OF WALL
FP FIRE PROTECTION
FRP FIBER REINFORCING POLYMER
FT FOOT or FEET
FTG FOOTING
GA GAGE or GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GR GRADE
H HIGH
HCA HEADED CONCRETE ANCHOR
HGR HANGER
HK HOOK
HORZ HORIZONTAL
HP HIGH POINT
HPC HIGH PERFORMANCE COATING
HS HIGH STRENGTH
HSA HEADED SHEAR ANCHOR
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INCL INCLUDED
INFO INFORMATION
INT INTERIOR
INV INVERT
IP INFLECTION POINT
JF JOINT FILLER
JST JOIST
JT JOINT
K KIPS (1000 POUNDS)
KB KNEE BRACE
KN KILONEWTON
KOP KNOCK OUT PANEL
KPa KILOPASCAL
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
l LITER
L LENGTH
LB(S) POUND(S)
Ld REINF BAR DEVELOPMENT LENGTH
LE LEFT END
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LOW POINT
LTWT LIGHT WEIGHT
MANUF MANUFACTURE(R)
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MC MOMENT CONNECTION
MECH MECHANICAL
MEP MECH, ELECT AND PLUMB
MEZZ MEZZANINE
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MPa MEGAPASCAL
MTL METAL
N NORTH
N NEWTON
(N) NEW
NIC NOT IN CONTRACT
NLWT NORMAL WEIGHT
NOM NOMINAL
No. or # NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE or OPPOSITE HAND
PC PILE CAP
P/C PRECAST CONCRETE
PEN PENETRATION
PJF PREFABRICATED JOINT FILLER
PJP PARTIAL JOINT PENETRATION
PL PROPERTY LINE
PLUMB PLUMBING
PROJ PROJECTION
PS PRESTRESSED
PSF POUND PER SQUARE FOOT
PSI POUND PER SQUARE INCH
PT POST-TEN
R RISER or RADIUS
RAD RADIUS
RE RIGHT END
REBAR REINFORCING STEEL BARS
REF REFERENCE
REINF REINFORCEMENT or REINFORCING
REQD REQUIRED
REV REVISION
RFI REQUEST FOR INFORMATION
RTU ROOF TOP UNIT
SC SLIP CRITICAL
SCHED SCHEDULE
SDI STEEL DECK INSTITUTE
SDL SUPERIMPOSED DEAD LOAD
SEC SECTION
SHT SHEET
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SK SKETCH
SLV SLEEVE
SOG SLAB-ON-GRADE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STAG STAGGERED
STD STANDARD
STIF STIFFENER
STIR STIRRUPS
STL STEEL
STRUC STRUCTURAL
SUPP SUPPORT
SW SHEAR WALL
SYMM SYMMETRICAL or SYMMETRY
T TREAD
T/ TOP OF
TB THROUGH BOLT
T&B TOP AND BOTTOM
TEMP TEMPORARY
THK THICK or THICKNESS
THRU THROUGH
TMS THE MASONRY SOCIETY
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOL TOLERANCE
TOS TOP OF SLAB
TYP TYPICAL
UON UNLESS OTHERW ISE NOTED
V VERTICAL
VERT VERTICAL
VR VAPOR RETARDER
VIF VERIFY IN FIELD
W WIDTH
W/ WITH
W/C WATER-CEMENTITIOUS MATL RATIO
W/O WITHOUT
WD WOOD
WP WATERPROOFING
WP WORK POINT
WS WATERSTOP
WT WEIGHT
WW R WELDED W IRE REINF
ABBREVIATIONS
V=XX k V=XX k
BEAM SIZE
NUMBER OF SHEAR STUDS
CAMBER
MOMENT CONNECTION
FACTORED VERTICAL
SHEAR REACTION
BRACE ABOVE
BRACE BELOW
T/STL 0'-0"
TOP OF STEEL RELATIVE
TO DATUM ELEVATION
FACTORED MOMENT
REACTION
M=XX k-ft
ASTERISK INDICATES
BEAM IS TO RECEIVE
FIREPROOFING
W X* (X) C=X"
HSS8X8X3/8
BP1
[X' - XX"]
P24
STEEL COLUMN SIZE
CONC PEDESTAL MARK
W X (A,B,C,D) C=X"
SHEAR STUD CALLOUT
FOR BEAMS WITH
MULTIPLE SEGMENTS
X'-X"
T/CONC UNLESS NOTED OTHERWISE. TARGET
ELEVATIONS WITHOUT LEADERS INDICATE
LEVEL PLANES. TARGET ELEVATIONS W ITH
LEADERS INDICATE ELEVATIONS OF WORK
POINTS.
BASE PLATE MARK
DX+X
ONE-W AY DECK OR SLAB
SPAN
DIRECTION
LEGEND
ANNOTATIONS
STEEL BEAMS, COLUMNS, BRACES
FOUNDATIONS
A B C D
DISCONTINUOUS COLUMN.
BEAM RUNS UNDER OR OVER
B/BASE PLATE EL
SOG REINFORCEMENT AT
DISCONTINUOUS JOINTS
x
"x" INDICATES FULL DEPTH
SHEAR TAB CONNECTION
SEE A5/S-505 AND B5/S-505
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:0
PM
S -0
-G
E N
ER
AL
N O
TE
S
S-002 30277
W
AS
H
IN
GT
O N D
.C
13134546
1673850
TJH VEC AMP
GE
N
ER
AL
N
O
TE
S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
N40080-21-R-3502
BUILDING COMPONENTS & CLADDING WIND PRESSURE (PSF)
AREA ZONE
EFFECTIVE WIND AREA (SF)
PARAPET
ROOF
WALL
1'
+ 150 / - 91 + 121 / - 81
+ 16 / - 37 + 16 / - 63 + 16 / - 84
+ 16 / - 114 + 39 / - 43 + 39 / - 53
+110 / - 74 + 97 / - 69
+ 16 / - 37 + 16 / - 50 + 16 / - 66 + 16 / - 78 + 33 / - 37 + 33 / - 42
+ 138 / - 86 + 114 / - 78
+ 16 / - 37 + 16 / - 59 + 16 / - 78
+ 16 / - 103 + 37 / - 42 + 37 / - 50
+ 122 / - 79 + 104 / - 73
+ 16 / - 37 + 16 / - 54 + 16 / - 71 + 16 / - 89 + 35 / - 39 + 35 / - 45
10 20 50 100
BUILDING SNOW DRIFT SURCHARGE LOADS (PSF)
LOAD TYPE HATCH SNOW DRIFT SURCHARGE
MAX MIN A
PARAPET
A
MIN DRIFT
SURCHARGE
MAX DRIFT
SURCHARGE
16 0 7'-3"
STAIRWELL/
SCREENWALL 54 0 12'-6"
FIRST FLOOR LOAD PLAN SECOND FLOOR LOAD PLAN SNOW DRIFT MAP
ROOF LOAD PLAN
FIRST FLOOR LOAD PLAN LEGEND
HATCH AREA SDL (PSF) LIVE LOAD (PSF)
50 250SHIPPING & RECEIVING
20 100WORKSHOP & ASSEMBLY
20 100CORRIDORS
50 150ARMS VAULT & MAINTENANCE
50 250STORAGE AREA
50 100MECHANICAL ROOM
10 100STAIRWELL
45 75TOILET ROOMS
SECOND FLOOR LOAD PLAN LEGEND
HATCH AREA SDL (PSF) LIVE LOAD (PSF)
20 100BREAK ROOM
30 100TRAINING & ASSEMBLY
30 80CORRIDORS
50 100CONTROLLED SPACE
30 65*
50 150MECHANICAL ROOM
10 100STAIRWELL
45 75TOILET ROOMS
OFFICE & ADMINISTRATION
COMMUNICATIONS ROOMS 50 150
ROOF LOAD PLAN LEGEND
HATCH AREA SDL (PSF) LIVE LOAD (PSF)
15 20ROOF
20 40ROOFTOP EQUIPMENT PLATFORM
5 100STAIRWELL
WIND LOAD MAP SECOND FLOOR T/STEEL
ROOF T/STEEL
FIRST FLOOR
5 5
NOTE:
1. DRIFT ZONES OVERLAP AT SHADED AREAS. THE MOST
CONSERVATIVE LOAD APPLIES WHERE DRIFT ZONES OVERLAP.
NOTE:
1. THE CORNER ZONE DIMENSION THAT DEFINES THE WIDTH OF ZONES 1, 2,
3, AND 5 IS 17'
2. POSITIVE VALUES INDICATE PRESSURE TOWARDS THE SURFACE AND
NEGATIVE VALUES INDICATE PRESSURE AWAY FROM THE SURFACE.
3. SEE W IND DESIGN CRITERIA IN GENERAL NOTES FOR AWNINGS AND
CANOPIES.
MAJOR EQUIP LOADS
MARK EQUIP. DESIGNATION LOAD
5.9 KIPDOAS-11
.7 KIPAHU-12
.8 KIPAHU-23
NOTE: * INCLUDES A 15 PSF PARTITION LOAD
50 125SCREENW ALL
2 KIPTROLLEY HOIST4
2 KIPJIB CRANE5
.5 KIPBOILER6
.7 KIPEXPANSION TANK7
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
J
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
J
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
J
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
J
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
1'12
3 2
J
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:0
PM
S -0
-G
E N
ER
AL
N O
TE
S
S-003 30278
W
AS
H
IN
GT
O N D
.C
13134547
1673850
TJH VEC AMP
GE
N
ER
AL
N
O
TE
S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
G
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
F
A1
SD301
A2
SD301
T/EXISTING WALL FOUNDATION -2' - 8"
T/EXISTING SLAB 0' - 0"
5 5
20' - 9 1/4" 23' - 11" 20' - 10" 13' - 7" 7' - 8" 21' - 8" 21' - 6 7/8"
A3
SD301
N
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:5
PM
S D
1-
FO
U
N D
A
TI
O N
D E
M O
LI
TI
O N
P
LA
N
SD101
30279
W
AS
H
IN
GT
O N D
.C
13134548
1673850
TJH VEC AMP
FO
U N
DA
TI
O N D
EM
O
LI
TI
O N P
LA
N
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/8" = 1'-0"A1 FIRST FLOOR DEMOLITION PLAN
GENERAL NOTES
GRAPHIC SCALE(S)
KEY PLAN
DEMOLITION KEYED NOTES
GRAPHIC SCALE 1/8" = 1'-0"
24'4' 8' 16'
1 NO SCOPE WITHIN EXISTING STRUCTURE
BEYOND BREAK LINE
2 EXISTING 8" THK MASONRY WALL TO REMAIN
3 EXISTING 12" THK MASONRY WALL TO REMAIN
4 EXISTING WALL FOUNDATION TO REMAIN
5 REMOVE EXISTING KNOCKOUT PANEL. REFER TO
ARCHITECTURAL DRAWINGS FOR EXACT
LOCATION AND TEMPORARY ENCLOSURES TO
PROHIBIT CONSTRUCTION DEBRIS.
6 REMOVE CMU STEM WALL SUPPORTING
MASONRY VENEER TO EXISTING FOOTING,
REFER TO ARCH FOR EXTENT OF MASONRY
VENEER REMOVAL
A. DO NOT DAMAGE ADJACENT FINSHES OR STRUCTURE WHEN REMOVING
EXISTING BUILDING COMPONENTS.
B. THE WORK IS AT A CRITICAL FACILITY W HICH MUST REMAIN
OPERATIONAL 24-HOURS, 7-DAYS A W EEK. DO NOT INTERFERE WITH OR
DISRUPT FACILITY OPERATIONS. PROTECT SPACES IN EXISTING
FACILITY AND OPERATIONAL SENSITIVE EQUIPMENT FROM DAMAGE,
INCLUDING BUT NOT LIMITED TO: DUST, DEBRIS, VIBRATIONS, ODORS
AND WATER. EXISTING FACILITY MUST REMAIN AIR AND WATER TIGHT;
SEAL EXTERIOR PENETRATIONS IMPACTED BY THE SCOPE OF WORK.
C. NO POWER OUTAGE DISRUPTION ARE PERMITTED DURING THE W ORK
EXCEPT FOR ONE (1) POW ER OUTTAGE. THE POWER OUTTAGE MUST
BE NO MORE THAN FOUR (4) HOURS, SCHEDULED SIX (6) MONTHS IN
ADVANCE W ITH CONTRACTING OFFICER TO CONNECT THE PHASE II
POWER SYSTEM TO THE PHASE I SWITCHBOARD. A MAXIMUM OF SIX (6)
HOURS MAY BE PERMITTED IF PROVEN NECESSARY AND APPROVED
BY THE CONTRACTING OFFICER. THE PERMITTED POWER OUTTAGE
MUST BE SCHEDULED BETW EEN 0000 HOURS LOCAL TO 0400 HOURS
LOCAL OR 0600 HOURS LOCAL IF ALLOWED BY THE CONTRACTING
OFFICER.
D. POWER MAY NOT BE INTERRUPTED, WITH THE EXCEPTION OF ONE,
REFER TO GENERAL NOTE C.
E. THE EXISTING FACILITY IS A RESTRICTED ACCESS AREA W ITH SEVERAL
SPACES ROUTINELY OPERATE WITH SENSITIVE INFORMATION. ACCESS
TO PERFORM WORK IN RESTRICTED ACCESS AREA WILL BE LIMITED TO
SUCCESSFULLY CLEARED PERSONNEL AND TO SPECIFIC TIMES
ESTABLISHED BY THE GOVERNMENT. COORDINATE WITH COR AND
PROVIDE NOTIFICATION NOT LESS THAN [[## HOURS] [##DAYS]] PRIOR TO
PERFORMING W ORK. NOTIFICATION MUST INCLUDE BUT NOT LIMITED TO
THE EXACT TIME, DATE, HOURS OF W ORK, SPECIFIC AREAS OF THE
BUILDING IN WHICH WORK IS TO BE PERFORMED AND IDENTIFICATION
OF THE CLEARED CONTRACTING STAFF THAT WILL PERFORM THE
WORK. LIMIT THE PRESENCE OF PERSONNEL IN AND ADJACENT TO
RESTRICTED ACCESS AREA AND MUST REGULATE AND COORDINATE
THE WORK.
F. CONSTRUCTION AREAS AND AREAS AFFECTED BY THE SCOPE OF
WORK, MUST BE CLEANED DAILY AND IN GOOD WORKING ORDER TO
SATISFACTION OF COR PRIOR TO [##:## [AM] [PM]].
G. PROVIDE TEMPORARY UTILITIES FOR
CONSTRUCTION EQUIPMENT REQUIREMENTS. NO UTILITY
INTERRUPTIONS OF THE PHASE I FACILITY ARE PERMITTED, REFER TO
GENERAL NOTE C. REFER TO SPECIFICATIONS IN DIVISION 1 FOR
ADDITIONAL REQUIREMENTS.
H. JADOC I BUILDING WAS COMPLETED IN 2014 PER "RECORD DOCUMENTS"
ISSUED ON MARCH 14TH, 2014. NO HAZMAT MATERIAL IS ANTICIPATED
TO BE ENCOUNTERED DURING DEMOLITION W ORK.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
G
F
A1
SD301
A2
SD301
20' - 9 1/4" 23' - 11" 20' - 10" 13' - 7" 7' - 8" 21' - 8" 21' - 6 7/8"
A3
SD301
N
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:5
PM
S D
2-
S E
C O
N D
F
LO
O R
D E
M O
LI
TI
O N
P
LA
N
SD102
30280
W
AS
H
IN
GT
O N D
.C
13134549
1673850
TJH VEC AMP
SE
C O N D
FL
O O R
D
EM
O
LI
TI
O N P
LA
N
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/8" = 1'-0"A1 SECOND FLOOR DEMOLITION PLAN
GENERAL NOTES
GRAPHIC SCALE(S)
KEY PLAN
DEMOLITION KEYED NOTES
GRAPHIC SCALE 1/8" = 1'-0"
24'4' 8' 16'
1 REMOVE EXISTING KNOCKOUT PANEL. REFER TO
ARCHITECTURAL DRAWINGS FOR EXACT
LOCATION AND TEMPORARY ENCLOSURES TO
PROHIBIT CONSTRUCTION DEBRIS.
2 NO SCOPE WITHIN EXISTING STRUCTURE
BEYOND BREAK LINE
3 EXISTING 12" THK MASONRY WALL TO REMAIN
4 EXISTING 8" THK MASONRY WALL TO REMAIN
A. DO NOT DAMAGE ADJACENT FINSHES OR STRUCTURE WHEN REMOVING
EXISTING BUILDING COMPONENTS.
B. THE WORK IS AT A CRITICAL FACILITY W HICH MUST REMAIN
OPERATIONAL 24-HOURS, 7-DAYS A W EEK. DO NOT INTERFERE WITH OR
DISRUPT FACILITY OPERATIONS. PROTECT SPACES IN EXISTING
FACILITY AND OPERATIONAL SENSITIVE EQUIPMENT FROM DAMAGE,
INCLUDING BUT NOT LIMITED TO: DUST, DEBRIS, VIBRATIONS, ODORS
AND WATER. EXISTING FACILITY MUST REMAIN AIR AND WATER TIGHT;
SEAL EXTERIOR PENETRATIONS IMPACTED BY THE SCOPE OF WORK.
C. NO POWER OUTAGE DISRUPTION ARE PERMITTED DURING THE W ORK
EXCEPT FOR ONE (1) POW ER OUTTAGE. THE POWER OUTTAGE MUST
BE NO MORE THAN FOUR (4) HOURS, SCHEDULED SIX (6) MONTHS IN
ADVANCE W ITH CONTRACTING OFFICER TO CONNECT THE PHASE II
POWER SYSTEM TO THE PHASE I SWITCHBOARD. A MAXIMUM OF SIX (6)
HOURS MAY BE PERMITTED IF PROVEN NECESSARY AND APPROVED
BY THE CONTRACTING OFFICER. THE PERMITTED POWER OUTTAGE
MUST BE SCHEDULED BETW EEN 0000 HOURS LOCAL TO 0400 HOURS
LOCAL OR 0600 HOURS LOCAL IF ALLOWED BY THE CONTRACTING
OFFICER.
D. POWER MAY NOT BE INTERRUPTED, WITH THE EXCEPTION OF ONE,
REFER TO GENERAL NOTE C.
E. THE EXISTING FACILITY IS A RESTRICTED ACCESS AREA W ITH SEVERAL
SPACES ROUTINELY OPERATE WITH SENSITIVE INFORMATION. ACCESS
TO PERFORM WORK IN RESTRICTED ACCESS AREA WILL BE LIMITED TO
SUCCESSFULLY CLEARED PERSONNEL AND TO SPECIFIC TIMES
ESTABLISHED BY THE GOVERNMENT. COORDINATE WITH COR AND
PROVIDE NOTIFICATION NOT LESS THAN [[## HOURS] [##DAYS]] PRIOR TO
PERFORMING W ORK. NOTIFICATION MUST INCLUDE BUT NOT LIMITED TO
THE EXACT TIME, DATE, HOURS OF W ORK, SPECIFIC AREAS OF THE
BUILDING IN WHICH WORK IS TO BE PERFORMED AND IDENTIFICATION
OF THE CLEARED CONTRACTING STAFF THAT WILL PERFORM THE
WORK. LIMIT THE PRESENCE OF PERSONNEL IN AND ADJACENT TO
RESTRICTED ACCESS AREA AND MUST REGULATE AND COORDINATE
THE WORK.
F. CONSTRUCTION AREAS AND AREAS AFFECTED BY THE SCOPE OF
WORK, MUST BE CLEANED DAILY AND IN GOOD WORKING ORDER TO
SATISFACTION OF COR PRIOR TO [##:## [AM] [PM]].
G. PROVIDE TEMPORARY UTILITIES FOR
CONSTRUCTION EQUIPMENT REQUIREMENTS. NO UTILITY
INTERRUPTIONS OF THE PHASE I FACILITY ARE PERMITTED, REFER TO
GENERAL NOTE C. REFER TO SPECIFICATIONS IN DIVISION 1 FOR
ADDITIONAL REQUIREMENTS.
H. JADOC I BUILDING WAS COMPLETED IN 2014 PER "RECORD DOCUMENTS"
ISSUED ON MARCH 14TH, 2014. NO HAZMAT MATERIAL IS ANTICIPATED
TO BE ENCOUNTERED DURING DEMOLITION W ORK.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
FIRST FLOOR
0' - 0"
F
REMOVE EXISTING
KNOCK-OUT PANEL
BELOW EXISTING
STEEL LINTEL BEAM
REMOVE EXISTING
KNOCK-OUT PANEL
BELOW EXISTING
STEEL LINTEL BEAM
EXISTING SLAB ON
GRADE
EXISTING SLAB ON
METAL DECK
EXISTING METAL
ROOF DECK
SECOND FLOOR
T/STEEL LINTEL BEAM
24' - 10"
0"
VI
F)
T/EXISTING CONC SLAB
ON METAL DECK
12' - 10"
FIRST FLOOR T/STEEL
LINTEL BEAM
10' - 8"
8"
VI
F)
FIRST FLOOR
0' - 0"
F
REMOVE EXISTING
KNOCK-OUT PANEL
BELOW EXISTING
STEEL LINTEL BEAM
REMOVE EXISTING
KNOCK-OUT PANEL
BELOW EXISTING
STEEL LINTEL BEAM
EXISTING METAL
ROOF DECK
EXISTING SLAB ON
METAL DECK
EXISTING SLAB ON
GRADE
SECOND FLOOR
T/STEEL LINTEL BEAM
24' - 10"
8"
VI
F)
0"
VI
F)
RAISED ACCESS FLOOR
T/EXISTING CONC SLAB
ON METAL DECK
12' - 10"
FIRST FLOOR T/STEEL
LINTEL BEAM
10' - 8"
[-2' - 0"]
FIRST FLOOR
0' - 0"
F
REMOVE EXISTING
KNOCK-OUT PANEL
BELOW EXISTING
STEEL LINTEL BEAM
EXISTING METAL
ROOF DECK
EXISTING SLAB ON
METAL DECK
EXISTING SLAB ON
GRADE
8"
VI
F)
RAISED ACCESS FLOOR
T/EXISTING CONC SLAB
ON METAL DECK
12' - 10"
FIRST FLOOR T/STEEL
LINTEL BEAM
10' - 8"
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:0
PM
S D
1-
D
EM
O
LI
TI
O
N S
E C
TI
O
N S
SD301
30281
W
AS
H
IN
GT
O N D
.C
13134550
1673850
TJH BB AMP
DE
M O
LI
TI
O N S
EC
TI
O N S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/4" = 1'-0"A1 EAST KNOCK OUT W ALL SECTION
1/4" = 1'-0"A2 W EST KNOCK OUT W ALL SECTION 0
GRAPHIC SCALE 1/4" = 1'-0"
2' 4' 8' 12'
1/4" = 1'-0"A3 W EST KNOCK OUT W ALL SECTION
A. REFER TO AS-BUILTS (VIF) AND ARCH FOR KNOCK-OUT PANEL
LOCATIONS AND DIMENSIONS.
B. SEE GENERAL NOTES ON DRAWING SHEET SD101 AND SD102.
GRAPHIC SCALE(S)
GENERAL NOTES
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
F8x8 F8x8 F8x8 F8x8
F5x5F5x5
F8x8
F5x5 F5x5
F8x8
F8x8 F8x8
F5x5
4 3
/8" 20
8 3 /8"
C1 S-301
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
23' - 11" 20' - 10" 13' - 7" 7' - 8" 21' - 8" 21' - 6 7/8"
6"
3"
6"
F8x8 F8x8 F8x8 F8x8 F8x8
F8x8F8x8
TYP3TYP4
C4 S-301
CIP8
CIP8
MW 8-2
MW 8-3
MW 8-3
MW12
S-201 C1
20' - 9 1/4"
B1 S-502
S-202 A1
A1 S-510
B2 S-502
A2 S-301
WF1x3
WF1x4
WF1x3
WF1x4
WF1x4
WF1x4
WF1x4
C2 S-301
C3 S-301
MW6
6' - 0"
3' - 0"
WF1x3
WF1x4
A1 S-301
CJ TYP
WF1x4
CIP8
CIP8
J
6"
TYP7
TYP7
WF1x4
WF1x4
A3 S-301
WF1x4 [ -4' - 0" ]
TYP8 TYP8
2' - 11 3/4"7' - 5 1/4"10' - 7 1/4"
9 9
9 ABOVE EDGE OF OPNG
2'
- 8
0 3
/8"
1'
- 1
0"
2"
8"
11' - 4"
2'
- 8
0 3
/8"
2' - 0" 5' - 3 1/4"
6'
- 3
5'
- 5
5' - 4 1/4"
5' - 4 1/4"
S-201 C3
S-201 A1
BP1 UON
BP4
MW 8-2 MW 8-2
MW 8-2
MW 8-3
CIP8
3 3
BP5 BP5
[-0' - 6 1/2"] [-0' - 6 1/2"] P2 P2
11 TYP
4'
- 2
13' - 6 1/4" 11' - 1 7/8"
3' - 4" 5' - 7 1/4"
4'
- 0
7'
- 6 1/
2"16' - 5 1/4"
A1 S-511
1' - 6 1/4"
B16
B1
B16
B1
B16
SO
UT
H
OF
G
RI
D G1
6'
- 0
" M
AX
PI
LE
S
PA
CI
NG
NO
RT
H
OF
G
RI
D G1
8'
- 0
" M
AX
PI
LE
S
PA
CI
NG
AL
ON
G
TH
IS
W
AL
L O
NL
Y
9'
- 0
" M
AX
P
ILE
S
PA
CI
NG
UO
N
16 TYP
BAR GRATING SCHEDULE
CONCRETE PEDESTAL SCHEDULE
WALL FOOTING SCHEDULE
MASONRY WALL SCHEDULE
STEEL BASEPLATE SCHEDULE
STEEL DECKING SCHEDULE
COLUMN FOOTING SCHEDULE
CONCRETE BEAM SCHEDULE
CAST-IN-PLACE CONCRETE WALL SCHEDULE..
FOR SEE
/B1 S-507 /A3 S-501 /A1 S-502
/B1 S-501
/C1 S-501 /A1 S-507
/B1 S-504
/B4 S-508
/C4 S-504
N
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:1
PM
S -1
-F
IR
ST
F
LO
O R
A N
D F
O U
N D
A
TI
O N
P
LA
N
S-101 30282
W
AS
H
IN
GT
O N D
.C
13134551
1673850
TJH VEC AMP
FI
RS
T
FL
O O R
AN
D
FO
U N
DA
TI
O N P
LA
N
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/8" = 1'-0"A1 STRUCTURAL PLAN - FIRST FLOOR
1 EXISTING 8" THK MASONRY WALL.
2 EXISTING STRIP FOOTING UNDER EXISTING 8" MASONRY WALL.
3 HSS 8X8X3/8 COLUMN
4 24" SQUARE CONCRETE FOOTING PEDESTAL
5 9 1/2" EXPANSION JOINT, SEE ARCH
6 4" EXPANSION JOINT, SEE ARCH
7 PROVIDE (2) 3'-0" LONG #4 TOP BARS AT RE-ENTRANT CORNERS OF SLAB
8 6" THK CONCRETE SLAB #4 BARS AT 18" OC EW
9 MASONRY CONTROL JOINT @ NORTH WALL, SEE ELEVATIONS ON S-201 FOR
OTHER CONTROL JOINT LOCATIONS
10 FIELD VERIFY STEP FOOTING TO EXISTING JADOC I FOUNDATION
11 3" DEPRESSED SLAB SEE ARCH FOR LOCATION AND EXTENTS
12 INTERIOR EQUIPMENT PAD. COORD SIZE AND DETAIL WITH MEP AND
A4/S-503
13 EXTERIOR EQUIPMENT PAD. COORD SIZE AND DETAIL WITH MEP AND
A3/S-503
14 COORD DOOR ROUGH OPENING WITH ARCH AND DOOR MANUFACTURER
15 PROVIDE THICKENED SLAB UNDER NON-LOAD BEARING CMU WALL
16 PILE FOUNDATION. SEE S-510.
17 ANCHOR STORAGE RACKS TO CIP WALL FROM OVERTURNING WITH MIN (6)
1/2" DIA EXPANSION ANCHORS PER RACK. MIN 2 3/8" NOMINAL EMBEDMENT.
BASIS OF DESIGN IS THE HILTI KWIK BOLT TZ. SEE INTERIORS
18 COORD RECESSED FLOOR BOXES WITH ELECTRICAL. PROVIDE MIN 3"
COVER BELOW RECESSED FLOOR BOX IN SOG.
19 6" THK CONCRETE SLAB #4 BARS AT 9" OC EW
A. TOP OF SLAB ELEVATION IS 0'-0" UNLESS OTHERW ISE NOTED.
B. TOP OF COLUMN FOOTING ELEVATION IS [-3'-0"] UNLESS OTHERWISE NOTED.
C. TOP OF FOOTING PEDESTAL EL IS [-0'-6"] UNLESS OTHERWISE NOTED.
D. TOP OF WALL FOOTING EL IS [-2'-8"] UNLESS OTHERWISE NOTED.
E. INTERIOR CAST IN PLACE CONCRETE WALL FOOTINGS ARE CENTERED
UNDER THE KNEE WALL UNLESS OTHERWISE NOTED.
F. EXTERIOR MASONRY AND CAST IN PLACE CONCRETE WALL FOOTINGS ARE
CENTERED UNDER THE KNEE WALL UNLESS OTHERWISE NOTED.
G. SPREAD FOOTINGS AND FOOTING PEDESTALS ARE CENTERED ON COLUMN
LINES UNLESS OTHERWISE NOTED.
H. CMU WALLS TYPE MW8-1 UNLESS OTHERWISE NOTED.
I. PILE SPACING SHOW N IS CONCEPTUAL ONLY. DETERMINE ACTUAL SPACING
AS PART OF DELEGATED PILE DESIGN. SPACING MAY NOT EXCEED
MAXIMUM SHOW N.
GRAPHIC SCALE 1/8" = 1'-0"
24'4' 8' 16'
GENERAL NOTES
GRAPHIC SCALE(S)
KEY PLAN
KEYED NOTES
LEGEND
# M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
A5 S-301
OPEN
STAIR
OPEN
STAIR
2" 1'
- 1 0"
C1 S-301
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
D2 + 4.5
C4 S-301
TYP1
W16X26 (24) W16X26 (21) W16X26 (22) W16X26 (28)
W18X35 (24) W18X35 (21) W18X35 (14) W21X50 (60)
W18X46 (24) W18X35 (21) W18X35 (22) W18X35 (22)
W18X35 (24) W18X35 (22) W18X35 (21) W18X35 (21)
W
X2
(1 5)
W
X1
(1 4)
W
X1
(1 4)
W
X1
(1 4)
W
X3
(2 3)
W
X2
(2 2)
W
X2
(2 3)
W
X2
(2 2)
W
X3
(2 3)
W
X2
(2 2)
W
X2
(2 6)
W
X2
(2 7)
W
X2
(2 7)
W
X2
(2 7)
W
X2
(2 7)
W
X3
(2 7)
W
X1
(1 4)
W
X1
(1 4)
W
X2
(2 2)
W
X2
(2 2)
W
X2
(2 6)
W
X2
(2 6)
W
X1
(6
W
X1
(6
W
X2
(2 7)
W
X3
(3 1)
W18X35 (22)
W18X35 (22)
W12X19 (21)
W16X26 (22)
W
X3
(1 5)
W12X19 (20)
W12X19 (20)
W12X19 (14)
W12X19 (6)
W
X2
(2 7)
W
X2
(2 7)
W
X1
(1 4)
W
X1
(1 4)
W
X1
(1 4)
W
X2
(2 2)
W
X2
(2 2)
W
X2
(2 2)
W
X2
(2 6)
W
X2
(2 6)
W
X2
(2 6)
W
X1
(6
W
X1
(6
W
X1
(6
W
X1
(1 4)
W
X1
(1 4)
W
X1
(1 4)
W
X2
(2 2)
W
X2
(2 2)
W
X2
(2 2)
W
X2
(2 6)
W
X2
(2 6)
W
X2
(2 6)
W
X2
(2 7)
W
X2
(2 7)
W
X2
(2 7)
W
X1
(1 4)
W
X1
(1 4)
W
X2
(2 2)
W
X2
(2 2)
W
X2
(2 6)
W
X2
(2 6)
W12X19 (20)
W12X19 (20)
W12X19 (20)
W12X19 (20)
W12X19 (20)
W12X19 (14)
W12X19 (14)
W12X19 (11)
W12X19 (11)
W12X19 (21)
W12X19 (21)
W12X19 (21)
W12X19 (21)
W12X19 (21) W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(7
W
X1
(6
W
X1
(7
CIP8
CIP8
CIP8
CIP8
CIP8
CIP8
S-201 C1
6"
3"
6"
20' - 9 1/4" 23' - 11" 20' - 10" 13' - 7" 7' - 8" 21' - 8" 21' - 6 7/8"
S-202 A1
W12X19 (21)
W12X19 (21)
W12X19 (21)
W18X46 (28) W12X19 (20)
W12X19 (10)
W12X19 (10)
S-504 A3
S-508 A2
A2 S-301
C2 S-301
W
X2
(2 6)
W
X2
(2 6)
W
X2
(2 6)
D2
.5
D2
.5
D2
.5
L5 X3
-1 /2X
5/1
L5X3-1/2X5/16
L5X3-1/2X5/16
L5 X3
-1 /2X
5/1
L5X3-1/2X5/16L5X3-1/2X5/16
3' - 7 5/8"
4' - 8 5/8"
W
X3
(2 5)
B8 X1
B8 X1
B8 X1
B8 X1
B8 X1
2 B8 X1
B8 X1
B8 X1
TYP3
2' - 0"
L5X3-1/2X5/16
L5X3-1/2X5/16
7 1 /2"
5/
8" 2'
- 8 "2'
- 8
A1 S-301
B4 S-507
B3 S-503
5'
- 7
5'
- 7
3'
- 1
0" 3'
- 1 0"
J
6"
6" THK CONC SLAB.
REFER TO BEAM
SCHEDULE ON
S-504 FOR SLAB
REINF
A3 S-301
4 5
W
X1
(1 4)
L5X3-1/2X5/16
W12X19 (14)
W12X30
W
X3
W
X3
W12X30
W
X3
L5X3-1/2X5/16
L5 X3
-1 /2X
5/1
L5X3-1/2X5/16
B4 S-301
L5X3-1/2X5/16
D2 + 4.5
D2 + 4.5
W
X1
(6
W
X1
(6
C2 S-505L5X3-1/2X5/16
5' - 3 1/4"
6'
- 3
0"
5'
- 5
8'
- 0
7'
- 7
24' - 8"
5' - 0 3/8"
EQ EQ EQ
S-201 C3
S-201 A1 k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k k
32k 32k 24k 24k 30k 30k30k 30k 17k 17k
17k 17k
17k 17k
17k 17k
17k 17k
17k 17k
17k 17k
36k 36k k k k k k k k k k k k k k k k k k k k k k k k k k k
10 1/4"
11' - 4"
18k18k
25k25k
18k18k
18k18k
25k25k
25k25k
25k25k
25k25k
18k18k
18k18k
18k18k
10k10k
10k10k
53k 53k 44k 44k 115k44k 44k 115k
62k 62k 48k 60k 60k48k 60k 60k
38k 38k38k 38k 48k 56k 38k48k 56k 38k
20k 20k
20k 20k
20k 20k
20k 20k
10k 10k
10k 10k k k k k k k k k k k k k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
8k 8k
L5 X3
-1 /2X
5/1
3' - 8"2' - 4"
HSS16X8X3/8
S-401 C1
7 7
W
X1
(7
W
X1
(7
8k 8k
8k 8k
8k 8k
W12X19
L5 X3
-1 /2X
5/1
L5X3-1/2X5/16
9 7 /8"
SIM
5'
- 1
0 1 /4"
C2 S-508
C4 S-508 k k k k k k k k k k k k k k k k k k k k k k k k
BAR GRATING SCHEDULE
CONCRETE PEDESTAL SCHEDULE
WALL FOOTING SCHEDULE
MASONRY WALL SCHEDULE
STEEL BASEPLATE SCHEDULE
STEEL DECKING SCHEDULE
COLUMN FOOTING SCHEDULE
CONCRETE BEAM SCHEDULE
CAST-IN-PLACE CONCRETE WALL SCHEDULE..
FOR SEE
/B1 S-507 /A3 S-501 /A1 S-502
/B1 S-501
/C1 S-501 /A1 S-507
/B1 S-504
/B4 S-508
/C4 S-504
N
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:2
PM
S -1
-S
EC
O
N D
F
LO
O R
F R
A M
IN
G
P
LA
N
S-102 30283
W
AS
H
IN
GT
O N D
.C
13134552
1673850
TJH VEC AMP
SE
C O N D
FL
O O R
FR
AM
IN
G
PL
AN
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/8" = 1'-0"A1 STRUCTURAL PLAN - SECOND FLOOR
1 HSS 8X8X3/8 COLUMN TYP
2 STAIR, SEE ARCH
3 CONCRETE BEAMS ABOVE ARMS MAINTENANCE AREA AND VAULT
4 SECONDARY CONCRETE SLAB ON METAL DECK BEARING ON STEEL
SHIM BEAMS (SHADED REGION). COORD EXTENTS WITH ARCH
LAYOUT. SECONDARY SLAB IS D1.5+2.5, MAXIMUM SPACING
BETWEEN SHIM BEAMS IS 4'-6". SEE DETAIL D1/S-506. ORIENT SHIM
BEAMS PERPENDICULAR TO MAIN FRAMING BELOW. LOCATE FIRST
AND LAST SHIM BEAMS SO THAT FLANGE ALIGNS WITH EDGE OF
SLAB. T/SECONDARY SLAB ELEV. IS 13'-4".
5 EDGE OF SLAB
6 REFER TO PLUMBING FOR EMBEDDED SLEEVES IN CONC WALL
7 FACTORED DRAG FORCE T = ±47 KIPS
8 FACTORED WEAK AXIS SHEAR FORCE V = 65 KIPS
9 HATCH OPENING, SEE ARCH
10 COORDINATE EXACT LOCATION OF STEEL BEAM WITH ARCH AND
STAIR FABRICATOR
GRAPHIC SCALE 1/8" = 1'-0"
24'4' 8' 16'
A. T/CONC ELEVATION OF PRIMARY SLAB IS 12'-6" UON.
T/CONC ELEVATION OF RAISED SECONDARY SLAB (SHADED AREA) IS 13'-4".
T/RAISED ACCESS FLOOR ELEVATION (UNSHADED AREA) IS 13'-4".
B. T/STEEL ELEV. IS 11'-11 1/2".
C. RAISED ACCESS FLOOR IS 10" ABOVE THE SLAB AT ELEV 13'-4".
COORDINATE LOCATION AND EXTENTS OF SECONDARY CONCRETE SLAB
WITH ARCH.
D. SEE S-101 FOR W ALL TYPES.
GENERAL NOTES
GRAPHIC SCALE(S)
KEY PLAN
KEYED NOTES
LEGEND
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
C1 S-301
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
D1.5
SL
OP
E
UP
SL
OP
E
UP
SL
OP
E
UP
SL
OP
E
UP
SL
OP
E
UP
SL
OP
E
UP
SL
OP
E
UP
SL
OP
E
UP
W12X19*
W12X19*
W12X19*
W12X19*
C4 S-301
W16X26 W16X26 W16X26 W16X26
W18X50 W16X26 W16X26
W18X35W21X44W21X44W18X35
W18X35 W21X83 W18X35
W
X2
W
X2
W
X1
W
X1
W
X1
W
X1
W
X1
W16X26
W12X19
W18X35
W16X26 (22)
W
X3
W
X5
W
X3
W
X2
W12X19
W
X2
W12X19
W12X19
W12X19
W
X3
W
X3
W
X3
W
X3
W
X3
W
X2
W
X2
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X3
W
X3
W
X3
W
X3
W
X3
W
X6
W
X3
W
X3
W
X3
W
X3
W
X3
W
X1
W
X1
W
X1
W
X1
W12X19
W12X19
W12X19
W12X19
W12X19
W12X19
W12X19
W12X19
W12X19
W12X19
W12X19
W12X19 W12X19
W12X19
W12X19
W12X19
W12X19
W18X60 (21)
W16X26 (11)
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X3
W
X3
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X1
W
X3
W
X3
W
X3
W
X3
W
X1
W
X1
S-201 C1
6"
3"
6"
20' - 9 1/4" 23' - 11" 20' - 10" 13' - 7" 7' - 8" 21' - 8" 21' - 6 7/8"
C1 S-507
S-202 A1
A2 S-301
C2 S-301
C3 S-301
5' - 10" 5' - 2" 5' - 2"
W
X2
(2 7)
W
X2
(2 7)
W
X2
(2 7)
W
X2
(2 3)
W
X2
(2 3)
W
X2
(2 3)
W
X2
(2 5)
D1 .5
D1 .5
3 3 /4"
6'
- 4
3/ 8"
A4 S-301
L5X3-1/2X5/16
L5X3-1/2X5/16
L5X3-1/2X5/16*
L5 X3
-1 /2X
5/1
L5 X3
-1 /2X
5/1
L5X3-1/2X5/16
L5X3-1/2X5/16
L5X3-1/2X5/16
OPEN
STAIR
4'
- 1
0" 4'
- 1 0"
3'
- 5
1/ 4"
TYP3
L5X3-1/2X5/16
L5X3-1/2X5/16*
A1 S-301
3"
5'
- 6
3/ 4"
5'
- 6
3/ 4"
J
6"
ROOF LOW POINT
SEE ELEVATIONS
ROOF HIGH POINT
SEE ELEVATIONS
A3 S-301
D2
.5
W12X30
C9X20
C9X20
C9 X2
W
X1
W
X1
W
X3
W
X3
W
X3
W
X3
W
X3
6' - 0"
W
X2
(2 3)
L5 X3
-1 /2X
5/1
L5 X3
-1 /2X
5/1
W12X19 W12X19 W12X19
W12X19
W12X19 W12X19 W12X19D1.5
W
X1
W
X1
W16X26 (25)
L5X3-1/2X5/16
L5 X3
-1 /2X
5/1
TYP6
B5 S-301
L5X3-1/2X5/16
WT4X6.5
S8X18.4
6'
- 7
11' - 4"
2'
- 8
0"
1'
- 1
0"
2"
7'
- 7
2'
- 8
0 3
/8"
2' - 0"
5' - 3 1/4"
24' - 8"6'
- 3
0"
5'
- 5
8'
- 0
S-201 C3
S-201 A1 k 7
28 PLACES
BP2 UON
BP3
D2
4.
D2 + 4.5 xxxxxxxx x x x x x x x x x x x x x x x x x xxxxxx x x x x x x x
W16X26 (11)
ROOF LOW POINT
SEE ELEVATIONS
W12X19
D1.5
S-401 D3
S-401 D4
(ABOVE)
29' - 1"
STAIR LANDING T/STL
BAR GRATING SCHEDULE
CONCRETE PEDESTAL SCHEDULE
WALL FOOTING SCHEDULE
MASONRY WALL SCHEDULE
STEEL BASEPLATE SCHEDULE
STEEL DECKING SCHEDULE
COLUMN FOOTING SCHEDULE
CONCRETE BEAM SCHEDULE
CAST-IN-PLACE CONCRETE WALL SCHEDULE..
FOR SEE
/B1 S-507 /A3 S-501 /A1 S-502
/B1 S-501
/C1 S-501 /A1 S-507
/B1 S-504
/B4 S-508
/C4 S-504
N
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:2
PM
S -1
-R
O O
F
FR
A M
IN
G
P
LA
N
S-103 30284
W
AS
H
IN
GT
O N D
.C
13134553
1673850
TJH VEC AMP
RO
O F
FR
AM
IN
G
PL
AN
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/8" = 1'-0"A1 STRUCTURAL PLAN - ROOF
1 HSS 6X6X3/8 MECHANICAL PLATFORM POST ABOVE (6 PLACES)
2 HSS 2X2X1/4 MECHANICAL PLATFORM STAIR POST ABOVE (2
PLACES)
3 HSS 8X8X3/8 COLUMN TYP
4 EQUIP. PLATFORM STAIR FRAMING
5 AREA OF ROOFTOP EQUIP. COORD LOCATION OF OPENING WITH
MECH. NOTIFY COR IF EQUIP PROCURED IS OF A DIFFERENT SIZE,
WEIGHT, OR ORIENTATION THAN SHOWN.
6 HSS 5X5X1/4 SCREENWALL POST ABOVE
7 HOIST BEAM FOR 1 TON TROLLEY HOIST. REFER TO SPECIFICATION
41 22 23. 19. SEE C4/S-505.
8 CMU WALL BELOW, SEE S-103
9 COORDINATE EXACT LOCATION OF STEEL BEAM WITH ARCH AND
STAIR FABRICATOR
10 CMU WALL CONTROL JOINT AT WALL ABOVE ROOF ELEVATION
11 JIB CRANE. COORDINATE WITH MANUFACTURER'S REQUIREMENTS.
12 APPROXIMATE JIB CRANE OPERATING ENVELOPE. SUBMIT JIB
CRANE TECHNICAL INFORMATION TO COR FOR APPROVAL.
A. ROOF PROFILE IS DEFINED BY TWO VALLEYS W ITH LOW POINT
ELEVATIONS ALONG GRID LINES G1 AND I. B/DECK ELEVATION AT HIGH
POINT IS 28'-0 3/4" AND LOW POINT IS 26'-11".
B. BEAMS ARE EQUALLY SPACED BETWEEN GIRDERS UNLESS
OTHERW ISE NOTED.
C. COORDINATE LOCATIONS OF PENETRATIONS THROUGH ROOF DECK
WITH MEP.
D. REFER TO ARCH FOR HORIZONTAL FALL ARREST SYSTEM. ANCHORAGE
TO TOP OF FLANGE OF ROOF BEAMS ONLY, NOT TO METAL DECK.
E. REFER TO ARCH AND PLUMBING FOR ROOF DRAIN LOCATIONS AND
ASSEMBLIES.
F. SEE S-101 FOR W ALL TYPES.
GRAPHIC SCALE 1/8" = 1'-0"
24'4' 8' 16'
GENERAL NOTES
GRAPHIC SCALE(S)
KEY PLAN
KEYED NOTES
LEGEND
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
S-401 A3
G
H
I
8.9 6.8 4.9 4.4 3.8 3.1 2.5 2.05
G1
20' - 9 1/4" 23' - 11" 20' - 10" 13' - 7" 7' - 8" 21' - 8" 21' - 6 7/8"
6"
6"
3"
6"
3'
- 3
1/ 8"
8 7 /8"
8 7 /8"
T/GRATING 34' - 2 1/2"
48' - 1"
11' - 4"
S-201 C1
S-202 A1
J
26' - 1 3/4" 15' - 11 1/4" 6' - 0"
S-202 B3
S-202 D3
S-202 A3
S-201 B4 S-201
C3
S-201 A1
BG2
28 PLACES
A3
SD301
5' - 3 3/4"
S-401 A1
BAR GRATING SCHEDULE
CONCRETE PEDESTAL SCHEDULE
WALL FOOTING SCHEDULE
MASONRY WALL SCHEDULE
STEEL BASEPLATE SCHEDULE
STEEL DECKING SCHEDULE
COLUMN FOOTING SCHEDULE
CONCRETE BEAM SCHEDULE
CAST-IN-PLACE CONCRETE WALL SCHEDULE..
FOR SEE
/B1 S-507 /A3 S-501 /A1 S-502
/B1 S-501
/C1 S-501 /A1 S-507
/B1 S-504
/B4 S-508
/C4 S-504
N
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:3
PM
S -1
-P
EN
TH
O U
S E
R O
O F
FR
A
M
IN
G P
LA
N
S-104 30285
W
AS
H
IN
GT
O N D
.C
13134554
1673850
TJH VEC AMP
PE
N
TH
O U
SE
R O O F
FR
AM
IN
G
PL
AN
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/8" = 1'-0"A1 STRUCTURAL PLAN - PENTHOUSE ROOF FRAMING PLAN
1 STAIR, SEE ARCH
2 COORDINATE EXACT LOCATION OF STEEL BEAM WITH ARCH
AND STAIR FABRICATOR
3 OPNG FOR DOGHOUSE, SEE ARCH
A. TOP OF MECHANICAL PLATFORM STEEL FRAMING EL IS 34'-1/2"
B. BEAMS ARE EQUALLY SPACED BETWEEN GIRDERS UNLESS OTHERW ISE
NOTED.
C. TOP OF STAIRWELL TOW ER DECK EL VARIES, SEE A1/S-401.
D. TOP OF STAIRWELL TOW ER WALL EL IS 38'-8".
E. REFER TO ARCH AND PLUMBING FOR ROOF DRAIN LOCATIONS AND
ASSEMBLIES.
GRAPHIC SCALE 1/8" = 1'-0"
24'4' 8' 16'
GENERAL NOTES
GRAPHIC SCALE(S)
KEY PLAN
KEYED NOTES
LEGEND
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
C1 S-202
C4 S-301
8" THK EXTERIOR CIP CONCRETE
WALLS ALONG THE PERIMETER OF
THE VAULT ROOM
T/PARAPET 29' - 9 1/2" 8" THK EXTERIOR
MASONRY W ALLS
S-508 A3
A2 S-508
S-508 A4
B1 S-502
A5 S-508
A4 S-301
MASONRY KNEE W ALL BELOW
ARCH EXTERIOR FACADE
A1 S-301
S-508 D1
2' - 0"
CM
U
CJ
20' - 0"1' - 6 1/4"
CM
U
CJ
CM
U
CJ
2' - 0"
CM
U
CJ
3' - 4 1/4"
CM
U
CJ
28' - 4"
T/STEEL
11' - 11 1/2"
T/STEEL
0' - 0"
FIRST FLOOR
SECOND FLOOR
ROOF HIGH POINT
A1 S-511
T/GRATING EL
29' - 3 1/2"
WHERE LINTEL BARS CANNOT EXTEND 24" BEYOND EDGE OF OPENING,
TERMINATE BARS WITH STANDARD HOOKS. PROVIDE (1) #5 VERTICAL JAMB BAR
BETWEEN ADJACENT OPENINGS. SEE S-509 FOR ADDITIONAL INFORMATION.
FIRST FLOOR
0' - 0"
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
G H IG1
S-508 A4
S-508
A3EXISTING WALL
FOUNDATION
EXISTING
MASONRY
WALL
T/ PARAPET 29' - 9 1/2"
8" THK CIP CONCRETE W ALL
ALONG PERIMETER OF THE
VAULT ROOM
MASONRY KNEE
WALL BELOW ARCH
EXTERIOR FACADE
8" THK EXTERIOR
MASONRY WALLS
J
13' - 9" CM
U
CJ
OPP
GHI FG1
T/STAIR TOWER 40' - 4"
T/ PARAPET 29' - 9 1/2"
T/EXISTING WALL (VIF) 10' - 0"
8" THK EXTERIOR
MASONRY W ALLS
BEHIND EXISTING WALL
MASONRY KNEE WALL
BELOW ARCH EXTERIOR
FACADE
EXISTING STEPPED
FOOTING
C2 S-301
J
2' - 1"
CM
U
CJ
28' - 4"
T/STEEL
11' - 11 1/2"
T/STEEL
0' - 0"
FIRST FLOOR
SECOND FLOOR
ROOF HIGH POINT
ROOF HIGH POINT
T/CONC
28' - 4"
STAIR TOWER T/STEEL
36' - 0"
I
STEEL POST
SEE PLAN
TYP
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:3
PM
S -2
-F
R
AM
IN
G
E
LE
VA
TI
O N
S
S-201 30286
W
AS
H
IN
GT
O N D
.C
13134555
1673850
TJH VEC AMP
FR
AM
IN
G
EL
EV
AT
IO
N S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/8" = 1'-0"A1 SOUTH W ALL ELEVATION
1/8" = 1'-0"C1 W EST W ALL ELEVATION
1/8" = 1'-0"C3 EAST W ALL ELEVATION
GRAPHIC SCALE 1/8" = 1'-0"
24'4' 8' 16'
3/16" = 1'-0"B4 SCREENW ALL W EST-EAST ELEVATION
GRAPHIC SCALE 3/16" = 1'-0"
16'4' 8'2'
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
GHI FG1
S-505 B1
ROOF LP 27' - 1" ROOF HP 28' - 2 1/4" ROOF LP 27' - 3 1/4"
S-510 A1
S-504 B1
S-505 A3
EXISTING FACE OF
ARCH
4" EXP JOINT, SEE ARCH
J
OPP
S-202 C1
OPP
ROOF HIGH POINT
T/CONC
28' - 4"
STAIR TOWER T/STEEL
36' - 0"
I C3
S-202
TYP
SEE A4/S-505
23' - 2 7/8" 14' - 2 7/8"
ROOF LP 27' - 1"
T/GRATING = SEE PLAN T/STEEL 34' - 0 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
STAIR TOWER T/STEEL
36' - 0"
4.94.43.83.1
C1 S-202
MECHANICAL
PLATFORM STAIR
STRINGERS BY MFR
T/GRATING = SEE PLAN
TYP
SEE A4/S-505
ROOF HIGH POINT
T/CONC
28' - 4"
STAIR TOWER T/STEEL
36' - 0"
I
ROOF LP 27' - 1"
HSS2X2X1/4
T/GRATING = SEE PLAN
TYP
SEE A4/S-505 T/STEEL 34' - 0 1/2"
S-505 B2
ROOF HIGH POINT
T/CONC
28' - 4"
STAIR TOWER T/STEEL
36' - 0"
2.05
STEEL POST
SEE PLAN TYP
ROOF HIGH POINT
T/CONC
28' - 4"
STAIR TOWER T/STEEL
36' - 0"
2.05
STEEL POST
SEE PLAN TYP
ROOF HIGH POINT
T/CONC
28' - 4"
STAIR TOWER T/STEEL
36' - 0"
I
STEEL POST
SEE PLAN TYP
T/GRATING EL
29' - 3 1/2"
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:4
PM
S -2
-F
R
AM
IN
G
E
LE
VA
TI
O N
S
S-202 30287
W
AS
H
IN
GT
O N D
.C
13134556
1673850
TJH VEC AMP
FR
AM
IN
G
EL
EV
AT
IO
N S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/8" = 1'-0"A1 ARMS VAULT FRAMING ELEVATION
3/16" = 1'-0"C1 MECHANICAL PLATFORM EAST-W EST FRAMING ELEVATION
3/16" = 1'-0"C3 MECHANICAL PLATFORM NORTH-SOUTH ELEVATION
GRAPHIC SCALE 1/8" = 1'-0"
24'4' 8' 16'
GRAPHIC SCALE 3/16" = 1'-0"
16'4' 8'2'
3/16" = 1'-0"D1 MECHANICAL PLATFORM W EST-EAST FRAMING ELEVATION
3/16" = 1'-0"B3 SCREENW ALL SOUTH-NORTH ELEVATION
3/16" = 1'-0"A3 SCREENW ALL NORTH-SOUTH ELEVATION
3/16" = 1'-0"D3 SCREENW ALL EAST-W EST ELEVATION
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
RAISED ACCESS FLOOR
SEE PLAN
PRIMARY SLAB
SEE PLAN
EXISTING MASONRY
WALL
EXISTING FOOTING
SLAB ON GRADE
SEE PLAN
T/PARAPET 29' - 9 1/2"
EXISTING FACE OF
ARCH
SEE ARCH
4" EXP JOINT
S-510 A1
FIRST FLOOR
0' - 0"
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
SECOND FLOOR
CONCRETE ON
METAL DECK
6" THK SLAB ON GRADE
EXISTING FOOTING
EXISTING 8" THK
MASONRY WALL
8" THK MASONRY WALL
FACE OF ARCH
S-510 A2
SIM
FIRST FLOOR
0' - 0"
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
MECHANICAL AREA
BAR GRATING
6" THK SLAB ON GRADE
EXISTING FOOTING
T/PARAPET 29' - 9 1/2"
EXISTING 8" THK
MASONRY WALL
8" THK MASONRY WALL
FACE OF ARCH
EXISTING FACE
OF ARCH
9 1/2" EXP JOINT, SEE ARCH
S-510 A2
FIRST FLOOR
0' - 0"
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
CONCRETE BEAM IN
VAULT ROOM
FACE OF ARCH
8" THK CIP CONCRETE
WALLS EXTEND TO
FOOTING
6" SLAB ON GRADE
8" THK MASONRY WALL
ABOVE CONCRETE WALL.
SEE DETAIL A4/S508
RAISED SECONDARY SLAB
FIRST FLOOR
0' - 0"
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
SEE ARCH
2" EXP JOINT
T/SLAB 0' - 0"
EXISTING 12" THK
MASONRY WALL
EXISTING FOOTING
6" THK MASONRY
WALL
LEDGER ANGLE
S-507 B3
T/CONC 12' - 6"
OPP
S-510 A4
OPP
FIRST FLOOR
0' - 0"
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
FACE OF
ARCH
8" THK MASONRY
WALL
6" SLAB ON
GRADE
T/CONC 12' - 6"
HP DECK 28' - 2 1/4"
FIRST FLOOR
0' - 0"
SECOND FLOOR
T/STEEL
11' - 11 1/2"
ROOF HIGH POINT
T/CONC
28' - 4"
W BEAM
SEE PLAN
W BEAM
SEE PLAN
STAIRWELL
SEE ARCH
T/CONC 12' - 6"
CONC SLAB
SEE PLAN
MASONRY W ALL
SEE PLAN
SECOND FLOOR
T/STEEL
11' - 11 1/2"
2.05
CONC ON METAL DECK
SEE PLAN
BAR GRATING
W BEAM
SEE PLAN
CHANNEL
SEE PLAN
1'
- 2
1/ 2"
PARTITION SEE ARCH
ROOF HIGH POINT
T/CONC
28' - 4"
2.5
5/8
CONC ON METAL DECK
SEE PLAN
METAL DECK SEE PLANL6X6X3/8
W BEAM SEE PLAN5/16 3-12
5/16 3-12
ROOF HIGH POINT
T/CONC
28' - 4"
STAIRWELL ROOF
TOWER WALL
8" THK MASONRY
STAIR WALL
W18X60
HP CONC 27' - 6"
S-507 B3
VERT #5 @ 40" HOOKED
IN ALT DIRECTION
ANGLE
T/WALL 28' - 5 1/2"
1"
3'-0" LONG #3 @ 12" OC FOR
ENTIRE LENGTH OF WALL
2"
SECOND FLOOR
T/STEEL
11' - 11 1/2"
F
CONC ON METAL
DECK SEE PLAN
W BEAM
SEE PLAN
FACE OF ARCH
SEE ARCH
4" EXP JT
EXISTING 8" THK
MASONRY WALL
8" THK MASONRY
WALL
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:5
PM
S -3
-S
E C
TI
O
N S
S-301 30288
W
AS
H
IN
GT
O N D
.C
13134557
1673850
TJH VEC AMP
SE
C
TI
O N S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/4" = 1'-0"C1 TYPICAL BUILDING INTERFACE SECTION
1/4" = 1'-0"C2 INTERFACE SECTION - EAST W ALL MECHANICAL YARD
1/4" = 1'-0"C3 INTERFACE SECTION - SOUTH W ALL MECHANICAL YARD
GRAPHIC SCALE 1/4" = 1'-0"
2' 4' 8' 12'
1/4" = 1'-0"C4 TYPICAL W ALL SECTION AT ARMS VAULT
1/4" = 1'-0"A2 SECTION THROUGH BUILDING EAST OF KNOCK-OUT PANEL
1/4" = 1'-0"A1 TYPICAL EXTERIOR MASONRY W ALL SECTION
1/4" = 1'-0"A3 INTERIOR W ALL AT W EST STAIRW ELL
3/8" = 1'-0"B4 MECH ROOM FLOOR
3/8" = 1'-0"B5 MECH ROOM ROOF
3/8" = 1'-0"A4
STAIR TOW ER W ALL
SUPPORT FRAMING
3/8" = 1'-0"A5
SECOND FLOOR
DOOR OPENING
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
2.05
MW12
MW 8-2
D1 .5
J
S-202 D3
WT4X6.5
W12X30*
W12X30*
W12X30*
5' - 6 7/8"
SEE /B3 S-505
2'
- 8
0"
11' - 4"
NOTE: SEE C1/S-507 FOR TYPICAL DECK SUPPORT DETAIL
C1 2X
C9X20*
C9X20*
C1 2X
3'
- 3
3/ 4"
5'
- 1
1 1 /2"
4'
- 8
7/ 8"
ROOF ACCESS
HATCH, SEE ARCH
L5X3-1/2X5/16*
I
4.9 4.4 3.8 3.1
C1 S-202
2 7 /8"
2 7 /8"
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
C3 S-202
HSS2X2X1/4
W14X34
W
X3
A1 S-301
C9 X2
W
X3
W
X3
W
X3
W
X3
W
X3
W
X3
W
X3
W
X3
W14X34 W14X34 W14X34 W14X34 W14X34
W14X34
W14X34 W14X34 W14X34 W14X34
W
X3
W
X3
W14X34 W14X34
W14X34 W14X34
HSS3X3X3/8
HS
S3
X3 X3
/8
HS
S3 X3
X3 /8
HSS3X3X3/8
HS
S3
X3 X3
/8
W14X34
1'
- 6
4'
- 6
D1 S-202
HSS3X3X3/8
W14X34
HSS3X3X3/8
HS
S3
X3 X3
/8
HS
S3 X3
X3 /8
HSS3X3X3/8HSS3X3X3/8 HSS3X3X3/8
REMOVABLE HATCH,
SEE ARCH
5' - 3 3/4"
6' - 0" 4' - 11"
9'
- 9
1/ 4"
1'
- 6
6'
- 7 1/
4"
HS
S3
X3 X3
/8
C9 X2
I
2.05
C3 S-301
B4 S-301
2" 1'
- 1 0"
MW 8-1
MW 8-3
MW 8-3
W
X2
W
X2
W
X2
W
X2
W16X26
W16X26
9" 4' - 2" 4' - 2" 6' - 3" 4' - 6" 4' - 10"
B3 S-507
C9X20
C9X20
BG2
W
X2
C9X20
C9X20 W
X2
24' - 8"
C9X20
C9X20
C9X20
C9X20
C9 X2
C9X20
C9X20
C9X20
C9X20
C9X20
9'
- 5
EQ
EQ
EQ
4'
- 0
EQ
EQ
EQ
EQ
C9X20
OPP
EQ
EQ
EQ
EQ
EQ
EQ
2'
- 0
1'
- 5
5/ 8"
2'
- 4
7/ 8"
2' - 0" 2' - 0"
C9 X2
C9 X2
C9 X2
3' - 3"
1' - 6" 9"
4 1 /2" L3
-1 /2X
3- 1/2
X3 /8
T/STL 13'-6"
TYP, UON
T/
ST
L 1 1'-
1/
2" W
X3
(2
5)
HATCH,
SEE ARCH
C9 X2
3.8 3.1
J
JIB CRANE
A1 S-512
9 1 /2"
2'
- 3
1' - 4" 1' - 4"
W18X35
W18X35
W18X35
W18X35
W
X4
W
X4
W
X5
* (TYP)
* (TYP)
* PROVIDE STD FULL DEPTH
SHEAR TAB CONNECTION
5'
- 6
5' - 0"
A3 S-511
10 1/4"
BG
HSS3X3X3/8
L3X2X3/8
L3X2X3/8 VENEER,
SEE ARCH
DOOR THRESHOLD,
SEE ARCHBG
B4 S-511
HS
S3
X3 X3
/8
HS
S3
X3 X3
/8
HSS3X3X3/8
HSS3X3X3/8HSS3X2X5/16
1' - 1 1/2"
S-511 B1
(TYP)
(TYP)
L3X2X3/8 (TYP)
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:5
PM
S -4
-E
N
LA
R G
E D
P
LA
N S
S-401 30289
W
AS
H
IN
GT
O N D
.C
13134558
1673850
TJH VEC AMP
EN
LA
RG
ED
P
LA
N S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
1/4" = 1'-0"A1 ENLARGED STRUCTURAL PLAN - STAIR TOW ER
1/4" = 1'-0"A3 ENLARGED STRUCTURAL PLAN - MECHANICAL AREA 0
GRAPHIC SCALE 1/4" = 1'-0"
2' 4' 8' 12'
1/4" = 1'-0"C1 ENLARGED STRUCTURAL PLAN - SECOND FLOOR
N
N
N
1/2" = 1'-0"D3 ENLARGED STRUCTURAL PLAN - ROOF FRAMING - JIB CRANE
GRAPHIC SCALE 1/2" = 1'-0"
1' 2' 4' 6'
N
1/2" = 1'-0"D4 ENLARGED PLAN - ROOF ACCESS PLATFORM
N
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
FOOTING SCHEDULE
SCHEDULED
FOOTING
T/ FTG EL
SEE PLAN
SCHEDULED
BOT FOOTING
REINF
TY
P
3" C
LR
TYP
3" CLR
BOTTOMTOP
COL
NOTES:
1. SEE SCHEDULE FOR DIMENSIONS AND REINFORCING SIZE AND SPACING.
2. FOOTINGS MUST BE CENTERED UNDER COLUMNS, UON.
FOOTING
MARK
-F5x5
TRANSVERSE
REINF(SHORT BARS)
(8) #5
BOTTOM
REMARKS
LONGITUDINAL
REINF (LONG BARS)
TOP
THICK
T
1'-6"
LENGTH
L
WIDTH
W
5'-0"5'-0"
FOOTING SIZE
(8) #5
"T
"W
SEE NOTE 3
"L"
TY
P
2" C
LR
SHORT BARS
LONG BARS
--F8x8 (12) #6 -1'-6"8'-0"8'-0" (12) #6
COL
TIES
SEE SCHEDCOL
W
ID
TH
(W
LENGTH (L)
NOTES:
1. CENTER P1 PEDESTALS ON COLUMN GRID
INTERSECTION UNLESS OTHERWISE NOTED
CO
L
TIES
SEE SCHED
COL
W
ID
TH
(W
LENGTH (L)
P1 P2
SCHEDULED PEDESTAL REINF
STEEL COLUMN
SEE PLAN
SCHEDULED PEDESTAL
NON-SHRINK GROUT
SCHEDULED FOOTING
SEE T/ FTG EL
SEE PLAN
T/ PIER EL
SEE PLAN2"
2"
PE
DE
ST
AL
S
CH
ED
SP
AC
E
PE
R
COL
STD HOOK, TYP
PEDESTAL SCHEDULE
MARK W (in) VERT REINF
P1 24 (8) #8
TIES
#3 @ 16" OC
REMARKSL (in)
24 -
/C1 S-501
(3) TOP TIES SEE SCHED
P2 24 (12) #6 #4 @ 8" OC24 -
T/ FTG OR PIER EL
SEE PLAN
SCHEDULED BASE PLATE.
B/ BASE PLATE EL=T/ FTG OR PIER EL + 2"
PROVIDE 1/4" THICK MASTIC COATING ON
EXPOSED PORTIONS OF BASE PLATE,
ANCHOR RODS AND COLUMN BELOW TOP
OF SLAB TO PREVENT CORROSION
NON-SHRINK
GROUT
BASE PLATE ANCHOR ROD
SEE
LEVELING NUTS WITH
PLATE WASHERS OR SHIM
COL
NUTS WITH PLATE WASHERS. ANCHOR
ROD LESS THAN 1 3/4" PROVIDE 1/2x3x0'-3"
WASHER. HOLE ON WASHER = DIA OF
ANCHOR ROD + 1/16"
TACK WELD NUT TO
ANCHOR ROD
/B1 S-501
BASE PLATE SCHEDULE
TYPE W
(in)
L (in)
THK
(in)
1 18 18 1 1/4
ANCHOR RODBASE
PLATE
MARK
BP1
WELD A
(in)
5/16
ROD DIA
(IN)
3/4
HOLE DIA
(IN)
EMBED
(IN)
15/16 18
NOTES:
1. FOR ADDITIONAL INFORMATION, SEE BASE PLATE TYPES, BASE PLATE TO STEEL COLUMN W ELD DETAIL
2. SEE C3/S-501 FOR BASE PLATE DIMENSIONS
PLATE DIMENSION
2 10 1/4 13 3/4 1/2BP2 5/16 1/2 9/16 2 3/8
3 NOTE 2 NOTE 2 1/2BP3 5/16 1/2 9/16 2 3/8
4 1/2BP4 5/16 1/2 9/16 2 3/815 15
5 3/4BP5 NOTE 2 7/8 15/16 12NOTE 2 NOTE 2
REMARKS
SEE A4/S-501
SEE D3/S-501
SEE D3/S-501
SEE D3/S-501
SEE A4/S-501
A
NOTE:
1. "A" INDICATES W ELD SIZE, SEE SCHEDULE.
BASE PLATE
SEE SCHEDULE
TYPE 2
SE
E
SC
HE
DU
L E
W
SEE SCHEDULE
LSEE SCHEDULE
L
SE
E
SC
HE
DU
L E
W
TYP
2"
COL
COL
TYPE 1
1' - 1 3/4"
1/
4"
1' - 1 3/4"
1/
4"
TYP
9 3/4"
TYPE 3
TYP
7/8"
TYP
7/8"
TYPE 4
SEE SCHEDULE
L
SE
E
SC
HE
DU
L E
W
TYP
1 1/2"6 1
/4"
NOTE: SEE BASE PLATE SCHEDULE FOR HOLE DIAMETER AND PLATE THICKNESS
TYPE 5
1' - 6"
1'
- 6
TYP
2 1/4"
4" 2" 1/4
5/16 3 SIDES
OUTSIDE FACE OF COL, APPLY
ELASTOMERIC FLUID APPLIED WATER
PROOFING ASPHALT MEMBRANE
COATING AT LOWER 10" OF COL
PROVIDE 1-1/2" NON-
SHRINK GROUT BTW
BASEPLATE AND
PEDESTAL
ORIENT BASE
PLATE SUCH THAT
THERE ARE (3)
BOLTS EA SIDE OF
SCREENWALL
STEEL HSS POST
SEE BASE PLATE SCHED
FOR SIZE AND
THICKNESS
NOTES:
1. PROVIDE 1/2" MINIMUM EXTENSION OF EXPANSION ANCHOR ABOVE TOP NUT.
2. PROVIDE LEVELING SHIMS UNDER BASE PLATE TO ACHIEVE SPECIFIED FRAMING
ELEVATION AND TO MAINTAIN PLUMBNESS OF POST.
3. NOMINAL EMBED DEPTH. SEE BASE PLATE SCHEDULE. BASIS OF DESIGN IS THE
HILTI KWIK BOLT TZ.
SEE BASEPLATE SCHEDULE
FOR ANCHOR DETAILS.
EXPANSION ANCHOR INTO SOG
OR SLAB ON METAL DECK
NO
TE
COL
COL
SLAB-ON-GRADE CJ
1/2" ISOLATION JOINT
COLUMN SEE PLAN
3"
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:0
PM
S -5
-T
YP
IC
A L
D E
TA
IL
S
FO
U
N D
A
TI
O N
S
S-501 30290
W
AS
H
IN
GT
O N D
.C
13134559
1673850
TJH VEC AMP
TY
PI
C
AL
DE
TA
IL
S
FO
U N
DA
TI
O N S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
NTSC1 FOOTING DETAIL AND SCHEDULE
NTSA1 CONCRETE PEDESTAL DETAIL
NTSA3 STEEL COLUMN FOOTING W / PEDESTAL
NTSA4 ANCHOR ROD
NTSB1 BASE PLATE DETAILING SCHEDULE
NTSA2 TYP BASEPLATE TO STEEL COLUMN W ELD
NTSC3 BASE PLATE TYPES
NTSD3 POST INSTALLED BASE PLATE SECTION
NTSD4 ISOLATION JOINTS
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
WALL FOOTING SCHEDULE
MARK
WF1x4
THICKNESS
(IN)
WIDTH
(IN) REMARKS
REINF "L"
(5)#5 CONT
BARS
REINF "M"
#5@12"
WF1x3 16 36 (4)#5 CONT
BARS #5@12"
FIRST FLOOR
0' - 0"
CMU WALL REINF
PER
TY
P3"
TYP
3"
FACE OF
ARCH
8" CMU w/ #5 @ 40"
OC/ FULLY
GROUTED BELOW
FLOOR LEVEL
/B4 S-508
FTG SIZE AND
REINF PER A1 / S-502
FOUNDATION DRAIN
(REF)
WALL VERTICAL REINFORCEMENT
WALL FOOTING
REINF "M"
T/W ALL FTG EL
NOTE:
1. UNLESS NOTED OTHERWISE, CENTER WALL FOOTING
ON W ALL ABOVE.
TH
IC
KN
ES
S
WIDTH
CONCRETE OR CMU WALL
UNLESS NOTED OTHERWISE,
PROVIDE A CLASS B TENSION
LAP SPLICE AT THIS LOCATION
REINF "L"
D
2 X D MIN
ST
EP
H
EI
GH
T
DOWELS TO WALL ABOVE
WALL FOOTING
REINFORCEMENT
ELEVATION
(4) 3/8" DIA x 4" LONG
GALVANIZED HEADED STUDS
GALVANIZED STANDARD
WEIGHT PIPE SLEEVE
THICKNESS
CONC WALL
OUTSIDE DIA OF PIPE PLUS 2"
PLACE THE PIPE AT THE
BOTTOM OF THE SLEEVE
SECTION A-A
FILL PIPE TRENCH W/ LEAN CONC
FILL TO BOTTOM OF FOOTING
SONOTUBE OR EQUAL, ID MIN
2" LARGER THAN PIPE
UTILITY PIPE W HERE BENEATH THE
WALL FOUNDATION
1' - 0"
6" 6"
9"
MIN
MI
N
MI
N
FOUNDATION WALL &
FOOTING
SEE PLAN
A
A
A
B
C
D
1 2 3 4 5
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
SATISFACTORY TO DATE 10/27/2021
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
A
B
C
D
D E P A R T M E N T
O F
TH
E
N A V Y
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH 2009
<<PM-DM>> MDR/MLR
BRANCH MANAGER CA
CHIEF ENG/ARCH TC
FIRE PROTECTION JG
1100 NORTH GLEBE ROAD
SUITE 500
ARLINGTON, VIRGINIA 22201
571.218.1000
FAX: 571.218.1600
AS NOTED
1 2 3 4 5
FOUO
FOUO
Approved by AFCEC via email
/2
2/
2:
:0
PM
S -5
-T
YP
IC
A L
D E
TA
IL
S
FO
U
N D
A
TI
O N
S
S-502 30291
W
AS
H
IN
GT
O N D
.C
13134560
1673850
TJH VEC AMP
TY
PI
C
AL
DE
TA
IL
S
FO
U N
DA
TI
O N S
JO
IN
T B
AS
E
AN
AC
O
ST
IA
B O
LL
IN
G
P-
JA
D
O C
P H
AS
E
II
N A
VA
L
FA
C
IL
IT
IE
S
EN
G
IN
E
ER
IN
G C
O M
M
AN
D , W
AS
H
IN
G
TO
N
W
AS
H
IN
GT
O N D
.C
TH
E
N
AV
Y
YA
RD
NTSA1 W ALL FOOTING SCHEDULE
3/4" = 1'-0"B1 TYPICAL EXTERIOR CMU W ALL FOUNDATION
NTSB2 W ALL FOOTING REINFORCEMENT
NTSB3 STEPPED CONCRETE W ALL FOOTING
NTSC1 PIPE SLEEVE THRU W ALL
NTSC2 PIPE UNDER W ALL FOOTING
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
1 1/2" DEEP SAWCUT JOINT.
FILL WITH SEMIRIGID JOINT
FILLER
SEE PLAN FOR SLAB
REINF
3/4" DIA x 0'-10" LONG SMOOTH
DOW EL @ 12" OC. LIGHTLY OIL
FULL LENGTH OF DOW EL.
CONTRACTION JOINT CONSTRUCTION JOINT
10" DRAINAGE COURSE
VAPOR
RETARDER
10" DRAINAGE COURSE BASE
VAPOR
RETARDER
SEE PLAN FOR
REINF 3" 3"
T/SLAB
PROVIDE 1/4" WIDE x 1" DEEP TOOLED
SLOT. FILL WITH SEMIRIGID JOINT
FILLER
T/ SLAB EL
SEE PLAN
T/ SLAB EL
SEE PLAN
3/4"
CHAMFER,
TYP
EQUIPMENT PAD W/ #4 @ 12" OC EACH WAY
TOP AND BOTTOM ON COMPACTED
SUBGRADE.